7 Sep 2011: Progress Meeting
0-6549 Hydraulic Performance of Staggered-Barrel Culverts for Stream
Crossings
Agenda
• Introductions
• By-Task Progress
• Problems
• Miscellaneous
• Lab Visit
Introductions
• Researchers:
• Project Management Committee:
• Visitors:
Project Background
• Develop knowledge to address the issue of solids accommodation in Texas Department of Transportation low-water crossing structures (not bridges).
• To develop design guidelines to assist in building multiple barrel systems that mimic the necessary stream behavior to facilitate solids migration.
Progress by Tasks
• Brief by-task report.– Task 1: Literature Review– Task 2: Screening Tools– Task 3: Quantitative Modeling– Task 4: Data Analysis– Task 5: Reporting
Task 1: Literature Review
• TM1 submitted.– Copies on server
• Database(s) assembled.– QA/QC complete.
Task 2: Screening tool(s).
• Database dependent– QA/QC on-going as just reported– Prototype screening tool exists
– USGS is programming for team deployment.– Prototype runs OK on PC, will not run on Mac
(but should)
– TM2 was due July 2011– PD reminded RS about TM2. TM2 to be
completed before end of CY 2011, probably sooner.
Task 2: Screening tool(s).
• Database dependent– QA/QC on-going as just reported– Prototype screening tool exists
– USGS is programming for team deployment.– http://tx.cr.usgs.gov/jvrabel/WATER_index.html
#guiTaskItem2_demo– TM2 was due July 2011
– PD reminded RS about TM2. TM2 to be completed before end of CY 2011, probably sooner.
Task 3: Quantitative modeling.
• Laboratory system functional.– Have solids in-place and will demonstrate
today.
– Experimental program ended August 31– Large fraction of planned experiments
were conducted.– Data interpretation FY12 (CY11-12)
Task 3: Quantitative modeling.
• Certain experiments were omitted• Sand – entirely omitted, could not keep
sand in model.
• Gravel sizes changed to reflect mobility from first few months of experimental program.
• Slopes different to fit actual model capabilities.
Task 4: Data Analysis.
• 2-D/2-phase computer program (UH researchers) to guide experiments.
• FaSTMECH CFD computer program (TTU) to extrapolate to larger scales.
• CAP-R (Culvert Analysis Program – R) to provide design and performance guidance.
Task 4: Data Analysis.
• 2-D/2-phase computer program (UH researchers) to interpret experiments.
UH Activities
1D coupled morphodynamics profile modelPeople: Ruosen Qian (MS), Kyle Strom
Database refinement for screening toolPeople: Kyle Strom (Task 2)
HEC-RAS modeling of Real County crossingPeople: Miguel Albuja (UG), Guillo Machado
(UG), Kyle Strom
1D Morphodynamic Model
Purpose of modelDynamic modeling of culvert reach that
accounts for deposition/erosion (data analysis)
Upscaling of lab model results (data analysis)
1D Morphodynamic Model
1D Morphodynamic ModelProgress
Validated modelPure open channel with movable bed and variable
width (transcritical flow)
Open/pressured flow in a circular pipe
Ruosen graduated in August
1D Morphodynamic Model
EquationsContinuity:
Saint Venant:
Exner:
Methods
MacCormack Finite Difference
TVD
Modification to sources terms
1D Morphodynamic Model
Transcritical flow
1D Morphodynamic Model
Bed aggradation due to sediment overloading
1D Morphodynamic Model
Bed degrading due to base level drop
1D Morphodynamic Model
Remaining work
•1D morphodynamic model– Use culvert equations as internal boundary
conditions with dynamic bed equation to capture changes in culvert geometry.
•Screening tool
– Aid TTU and USGS in tool development
•HEC-RAS
– Finish analysis of Real County and a hypothetical case to determine extent to which HEC-RAS can be helpful in analysis.
Real County LWC still looks good
looking downstream
upstream
downstream
Task 4: Data Analysis.
• FasTMECH CFD computer program (TTU) to extrapolate to larger scales.
Task 4: Data Analysis.
• CAP-R (Culvert Analysis Program – R) to provide design and performance guidance.
Task 5: Reporting.
• SAR submitted end of August
• Monthly reports on server; Project start to June 2011 should be there.
• TM1 submitted
• TM2 in-progress
• TM3, TM4 pending.
• Final Report FY12 (Draft August 2012)
Problems Encountered
• Took longer to start experiments than anticipated.– Weir calibration
– Leaks, computers failing, etc.
• Boundary conditions in 1D not continuous from free-surface to pressure flow
• Screening Tool• MatLab compiler not producing architecture
independent application)
Miscellaneous
• Present provisional results at ASCE/EWRI in ABQ next May.
Laboratory Tour
• Visit laboratory and see demonstration of how experiments were conducted.• Underwater video, ADV• Solids motion