1.0 Services Offered
2.0 Company Establishment History
I. Architectural Design and Supervision of building Projects2. Interior Design 3. Project Management4. Master Planning5. Coordination of the activities of professionals involved in building and construction projects where we are the lead consultants6. Obtaining local authority and statutory approvals for building construction projects
Architecture by Cedar is a young Architectural firm that was founded and established in 2012. Since itsinception, Architecture by Cedar has grown significantly in its expertise and service provision.
The company was founded on the principle of FUNCTIONAL SPACE. This principle forms the basis of our designs. The founding directors of Architecture by Cedar at the time agreed that there wasneed for architecture that directly responds to the needs of the people rather than creation of a master piecefor the architect’s glory.
The company was also established on strong philosophies of EFFICIENCY and SUSTAIN ABILITY indesign. We believe in conserving the environment by fostering green buildings.
3.0 Company Identification and Registration
1. Company identification:
Legal Name of Firm: Architecture by Cedar Limited.Post office address: P.O. Box 51207 - 00100, NairobiCity: NairobiCountry: KenyaTelephone No.: +254 721 321721/729 376999Website: www.designcedar.co.keE-mail address: studio@designcedar.co.ke
Person to contact: Mr. Kelvin Bwamu KisienyaTitle: Managing Director / Principal Architect
2. Company Registration:
Company registration number CPR/2012?76633Current PIN certificate number P051392204P
5.0 Principal’s Registration
1. Registration with BORAQS Registration No. A1339
2. Registration with Architectural Association of Kenya Registration No. A3221
4.0 Principal’s Curriculum Vitae
Name of the Professional staff: Kelvin Bwamu KisienyaProfessional discipline: ArchitectRegistration by:Board of Registration of Architects and Quantity Surveyors (BORAQS)Architectural Association of Kenya (AAK)
Proficiency:
• Architectural design in Arc hi CAD, and Artlantis• Design presentations via Photoshop• Preparation of scheme and construction drawings and details Preparation of Site inspection reports and minutes• Supervision of the construction sites according to proposed design• Periodic inspection during defect liability period.
Education:
Jomo Kenyatta University of Agriculture and Technology: Bachelor of ArchitectureUpper Second Class Honours (Graduated 2008)Chebisaas Boys High School Certificate of Secondary Education A- (minus)Uasin Gishu Primary School Certificate of Primary Education B (Plain)
Work Experience Record:
Work experience of 5 years as an Architect, specializing in the following areas:
1. Architectural Design in Arc hi CAD and Artlantis2. Interior Design and detailing3. Preparation of scheme and construction drawings with relevant details4. Supervision of the construction sites according to proposed designs 5. Preparation of Site inspection reports and minutes6. Acquisition of occupation certificates7. Periodic inspection during defect liability period.
Projects undertaken under Previous Employment: (Images courtesy of Edon Consultants Int. Ltd)
1. Toyotsu Auto mart ltd – Used car business complex in South C, Nairobi 2. Hino Trucks Center, Toyota Central Parts Depot and Vehicle logistics Center in South C, Nairobi Kenya3. Cold Springs Hotel Homabay - 70 Room Hotel in Homabay 4. Trent Villas (5 No. Town houses) in Karen Nairobi5. Oasis Park Apartments (30 No. Apartments) in Valley Arcade, Nairobi, Kenya6. Renovations of 7th and 8th Floors executive wings at Stima Plaza, Parklands, Nairobi7. Staff welfare building for The Kenya Sugar Board in Westlands, Nairobi, Kenya8. Kenya Railways Relocation programme (ongoing) in Mukuru slums Nairobi, Kenya9. Interior Renovations of the Central Bank of Kenya building
Previous Employer (References)Edon Consultants International Ltd. | P.O. Box 19684 - 00202 Nairobi, Kenya | Tel: +254-20 3874901/3878345 | Email: info@edoninternational.com
Principal Architect: Jerry Ndong
5.0 Projects undertaken under previous Employment
Oasis Park Apartments(30 No. 3 Bedroom Apartments)
Client: Peers Oasis Park Ltd
Project Cost: KES 150,000,000
Areas Handled: Architectural design Interior Design Detailed/Construction Layouts Construction Supervision Contract Management
Location: Gitanga rd. - Nairobi, Kenya
Trent Villas(4 No. 5 Bedroom Town houses with DSQs)
Client: Peers Oasis Park Ltd
Project Cost: KES 120,000,000
Areas Handled: Architectural design Interior Design Detailed/Construction Layouts Construction Supervision Contract Management
Location: Karen - Nairobi, Kenya
2 No. Townhouses in Syokimau(1 No. 4 bedroom townhouse with DSQ and 2 No.2 Bedroom apartments)
Project Cost: KES 30,000,000
Areas Handled: Architectural design Interior Design Detailed/Construction Layouts Construction Supervision Contract Management
Location: Syokimau, Kenya
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
5.0 Projects undertaken under previous Employment
Toyotsu Automart Kenya Building
Client: Toyotsu Automart Kenya Ltd
Project Cost: KES 120,000,000
Areas Handled: Architectural design
Interior Design Detailed/Construction Layouts
Construction Supervision Contract Management
Location: South C - Nairobi, Kenya
Hino Truck Center,Toyota Central Parts Depot and
Vehicle Logistics Center
Client: Toyota Kenya Ltd
Project Cost: KES 700,000,000
Areas Handled: Architectural design
Interior Design Detailed/Construction Layouts
Construction Supervision Contract Management
Location: South C - Nairobi, Kenya
Cold Springs Hotel(70 Bed Hotel with conferencing facilities)
Client: Cold Springs Hotels Ltd
Areas Handled: Architectural design
Interior Design Detailed/Construction Layouts
Construction Supervision
Location: Homa Bay, Kenya
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
5.0 Projects undertaken under previous Employment
Renovations of 7th and 8th Floors (executive wings)of the Stima Plaza
Project Cost: KES 20,000,000
Areas Handled: Interior Design Detailed/Construction Layouts Construction Supervision Contract Management
Location: Stima Plaza - Parklands, Nairobi, Kenya
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
5.0 Projects undertaken under previous Employment
Interior Renovations at the Central Bankof Kenya Building
Client: Central Bank of Kenya
Project Cost: KES 950,000,000
Areas Handled: Reconassiance study
Design Report formulation Interior Design
Location: CBD - Nairobi, Kenya
Status: Construction Ongoing
Kenya Sugar Board Staff Welfare Building
Client: Kenya Sugar Board
Project Cost: KES 70,000,000
Areas Handled: Architectural Design
Interior DesignDetailed/Construction Layouts
Construction SupervisionContract Management
Location: Westlands - Nairobi, Kenya
Status: Complete
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
(Courtesy of Edon Consultants Int. Ltd)
Architecture by Cedar has to date been involved in various types of projects. These are at different stages ofdesign. We have taken part in the design of residential and commercial facilities of different kinds in variousparts of the country.We have selected a few of them to highlight the works carried out by Architecture by Cedar.
6.0 Project Gallery
6.1 Proposed Nyabantu Villas
Proposed 76No. 4 Bedroommaisonettes with common
grounds/facilities
Estimated Project Cost: KES 500M
Design Stage: Financing
Location: Kitengela, Kenya
!"##
#$"##
#%&
"###
%&"###
%"'#
#!"##
#$"##
#
%#"###
%&"###
%%("##
#
%!%"###)#"#'# )"### *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' *"+$' %#"###
!"#$%&'()$
)$*"!$%#+$"#,$-#
+$.+$"#/'-"0%!"+1$-)
&'()$%#23$%%4,"/)'-##$5
!($)#%3"+6/-!
)$+7/.$%!"#$
,"/-%!"#$
!"#$%&'()$
#(+6%)&'3
!"#$%&#'()*#+,-*((.#./01($,22,3024#5#6),12#+,-*((.#($#6*()$-
'7((*#/$-#8#+,-*((.1#($#'0*12#'7((*3024#./12,*#,$1)02,9#(:,$#:7/$#7()$6,
-0$0$6#/$-#;02<4,$9#</*#:/*;9'*($2#/$-#+/<;#=/*-1
80''+%"+$"%9%:;<=>
)$-,*6*()$-#1,3/6,2*,/2.,$2#:7/$2#</:/+7,
('#*,<=<70$6#3/2,*'(*#6/*-,$0$6#:)*:(1,1
>?$(&#:/*;0$6#17(21#'(*6),121
:7/=#6*()$-1#/$-#*,<*,/20($/7:/*;
6.3 Proposed Apartments in Nanyuki
Proposed Residential Apartments (3 Bedroom)
Estimated Project Cost: KES 110,000,000
Design Stage: Submission to Council
Location: Nanyuki, Kenya
Concept Designs for Proposed 200 Bed Hoteland conference center with all relevant hotel and
conferencing facilities
Estimated Project Cost: Not yet estimated
Location: Mombasa, Kenya
6.5 Proposed Hotel in Mombasa, Kenya
A modern center for visual Arts thataccommodates a large art gallery and variousartist studios among other facilities
Estimated Project Cost: KES 100,000,000
Design Stage: Presentation to potential donors for funding
Location: Nairobi, Kenya
6.4 The Proposed Kuona Arts Center
Proposed Tamani Children’s CenterA children’s home and rescue center
to host a primary school, multi purpose hall,children’s hostels, staff residence, health
center, agriculture training and playgrounds.
Estimated Project Cost: Not yet estimated
Design Stage: Preliminary Design
Location: Isinya, Kenya
6.2 Proposed Tamani Children’s Center
!"#$%&'"(')*+&,-##
'(%!-(.&*/,))#
,+-#$,&/+0$+(
*$-11&2"-($+(*
3%(#*4&,)*$+#*
5).*4&,)*$+#*
*+6-3+&$(+-$!+0$
(+/(+-$%)0
-7!%0&5#)/8
3"+*$&,)"*+
3-$+&,)"*+
(-%*+7&6-$+(&$-08
'(%0/%'-#4*&(+*%7+0/+
!""#$%&&'()#*+
,-)..)/0'(""&'-)#+*+%/0)/0'1"".,
#2//),'*"31#
4"&&25'$%&&'*"31#
$%,62#'$%&&'*"31#
7'/31,215'*&%,,1"".,(89(:'*&%,,1"".,
&)$1%15,#%!!'1"".,,#"12'1"".,
,#%!!'%/;'*+)&;12/'#")&2#,"(2/'01"3/;,
<=='(%>',#3;2/#,
?==@7'A=='(%>'*%(%*)#512&%#2;',3(("1#'!%*)&)#)2,(1%*#)*2'1"".,77B@7'*"..21*)%&',)C2'6)#*+2/$12%6'%-%5'1"".,
02/21%&'#12%#.2/#'1"".,*"3/,2&&)/0'1"".,(+%1.%*5#2.("1%15',#%5'-%1;,*"/,3&#%#)"/'1"".,&%$"1%#"15#")&2#,
A'/"D'$&"*6,'"!'7'$2;1"".%(%1#.2/#,'E:'%(%1#.2/#,)/'2%*+'$&"*6F
(%16)/0<8'*%1,
B==@7
.%)/',*+""&'%;.)/),#1%#)"/'"!!)*2,.%)/'*+)&;12/G,'+".2'%;.)/),#1%#)"/
,+%12;'!%*)&)#)2,
8'/"D'$&"*6'"!';"3$&2'1"".,2%*+'$&"*6'#"'+%42'7='1"".,
(21'!&""1'%/;'A'/"D'!&""1,#"#%&'/"'D'"!'1"".,'H'A=''#"
%**".";%#2'?='(%>,+%12;'-2#'%12%,
"(2/'01"3/;,
3/;2101"3/;';)02,#"1,%/#)*)(%#2;'#"'+%42'*%(%*)#5'#"12*5*&2'-%#21
8='$2;1"".'+"3,2'"!B'(%>'(21'1"".I'-)#+
.%#1"/G,'1"".I'*".."/&"3/02I';)/)/0'%/;'6)#*+2/
/()'&1-(!
.%)/0%#2
,214)*20%#2
&"%;)/0$%5
"(2/01"3/;,
$"#%/)*%&0%1;2/
(",)#)"/'"!'2&24%#2;'-%#21'#%/6'-)#+,3/6'$"12+"&2 %**2,,'1"%;
-0%!-#&1-(!
A'$2;1"".'$3/0%&"-'-)#+.%,#21'2/,3)#2I'7'$2;1"".
,+%1)/0'%'$%#+I'&"3/02I6)#*+2/I';)/)/0'%/;'+".2
"!!)*2I'"3#;""1'$21$2J32'%12%
8'/"D'$&"*6'"!';"3$&2'1"".,2%*+'$&"*6'#"'+%42'7='1"".,
(21'!&""1'%/;'A'/"D'!&""1,#"#%&'/"'D'"!'1"".,'H'A=''#"
%**".";%#2'?='(%>,+%12;'-2#'%12%,
"(2/'01"3/;,
"(2/01"3/;,
"(2/01"3/;,
"(2/01"3/;,
Proposed 3 No. 2 Bedroom and 3 No. 3Bedroom serviced cottages in the secludedserene area of Karamaini complete withrelated hotel facilities for in-stay guests.
Estimated Project Cost: Not yet estimated
Design Stage: Preliminary design
Location: Juja, Kenya
6.6 Proposed Cottages in Karamaini, Juja.
11
Proposed Residential Estate with an 8 bedroom main house, 3 bedroom guesthouse, gazebo, staff housing and parkings
Estimated Project Cost: KES 80,000,000
Design Stage: Preliminary Design
Location: Kajiado, Kenya
6.7 Proposed Presidential Villa in Kajiado, Kenya
Proposed 6 No. 2 Bedroom affordableapartments.
Estimated Project Cost: KES 24,000,000
Design Stage: Preliminary design
Location: Syokimau, Kenya
6.8 Proposed Residential Apartments in Syokimau
Proposed 2 No. 4 Bedroom townhouses with DSQ and indoor 2-car garage.
Estimated Project Cost: KES 48,000,000
Design Stage: Scheme design (Submission to council)
Location: Ridge ways, Nairobi Kenya
6.9 Proposed Town Houses in Ridge ways
Proposed 2 No. 4 Bedroom town houses
Estimated Project Cost: KES 30,000,000
Design Stage: Council Approvals
Location: Syokimau, Mavoko, Kenya
6.10 2 No. Town Houses in Syokimau
6.11 Proposed 2 Bedroom Cottage in Karamaini
Proposed 2 Bedroom Cottagewith en-suite rooms and overflow
front and back porches in Karamaini.
Estimated Project Cost: KES 8,000,000
Design Stage: Scheme design (Submission to council)
Location: Ridge ways, Nairobi Kenya
Proposed 4 Bedroom Town house with master en suite, family room and an open livingarea.
Project Cost: KES 15,000,000
Stage: Under Construction
Location: Machakos, Kenya
6.12 Proposed Residential Dwelling, Machakos, Kenya
17
6.13 Proposed Renovation of a Country Home
Renovations of an old countryhome into a 2 Bedroom Cottage
Project Cost: KES 2,000,000
Stage: Under construction
Location: Kitale, Kenya
Courtyard Monument comemorating 90years sinceKapsabet boys High School was founded
Stage: Complete
Location: Kapsabet, Kenya
6.14 Courtyard Monument in Kapsabet Boys High School
Proposed 3 Bedroom villa with openplan lounge, kitchen and dining and
a prayer room
Estimated Project Cost: KES 18,000,000
Design Stage: Scheme design
Location: Kisumu, Kenya
6.14 Proposed Residential House in Kisumu
Design and constructionsupervision of Nyadhi House of Fashion
Store at Lavington Mall, Nairobi
Project Cost: KES 4,000,000
Project Complete
Location: Nairobi, Kenya.
6.15 Fashion Store Interior Design
6.14 Salon and Beauty shop Interior
Design of Pam Hair and Beauty Salonat Capital Center Mall, Nairobi
Estimated Project Cost: KES 3,000,000
Design Stage: Under construction
Location: Nairobi, Kenya.
6.15 Proposed Renovation of Jamaa Mission Hospital, Buru Buru.
Proposed Renovation of Jamaa Mission HospitalMaternity Wing
Estimated Project Cost: KES 14,000,000
Design Stage: Financing
Location: Buruburu, Nairobi, Kenya.