1ACAPELLA installation manual
ACAPELLAjoule acapella solar tubes installation manual
2
3ACAPELLA installation manual
Table of Contents:
04 Introduction05 Site survey06 Risk assessment08 Kit components09 Mounting Options10 Important Pre Installation Information11 Roof Mounting Options12 Collector Assembly13 Inserting Tubes14 Sloped Roof Bolt Mounting Kit15 Sloped Roof Tile Mounting Bracket16 Sloped Roof Slate Mounting Bracket17 Flat Roof Mounting Frame18 Collecting Flow and Return Pipework19 Stainless Steel Solar Pipe20 Pump Station21 Safety Vessel Connection22 Electrical Solar Controller23 Standard Solar System24 East/West Solar System25 Dual Store Solar System26 Commissioning28 Servicing and Maintenance
3ACAPELLA installation manual
4
Introduction
Solar hot water systems should be designed and sized correctly before commencing the installation. Proper design will ensure that a system is correctly sized to provide many years of optimised performance and most or all of the required hot water when the most solar radiation is available. However a supplementary heating system such as oil or gas boiler, heat pump or wood boiler is required for months which have less solar radiation. This guide will illustrate and explain how a system should be installed to conform to the Joule manufacturer guidelines for the Acapella product models. Us-ing this guide Stages of a solar installation are described in the following pages, with illustrations where necessary to explain how to install the relevant components, and contains general recommendations and important safety information.
Handling Guidance • Tubeandmanifoldboxesshouldbetransportedhorizontally.• Heavygoodsshouldnotbeloadedontopofthekitboxes.• Careshouldbetakenwhenopeningboxestopreventscratchesorsuddenshocks
to the glass.• Donotusesharpobjectstoopenthetubeboxes.
Installation Guidance• Unpackandinstalltubesonlyafterthemanifoldandpipeworkhasbeeninstalled.• Donotleavethesolarcollectorexposedtosolarradiationwhenthesolarloopand
manifoldhavebeendrained.Collectorsleftexposedinadrystatemustbecov-ered to prevent possible long term damage.
• Tubesmusthaveaminimumelevationof20˚andamaximumof70˚.• Thepipeworkofthesolarcollectorloopistobeearthedandthecollectoristobe
lightening protected in accordance to local regulations.
A solar panel installation must be performed in accordance with all Health & Safety legislationandlocalbuilding/planningregulationsfortherelevantjurisdiction.Further-more,thenecessaryelectricalworkrequiredtoinstallcontrolequipmentshouldbeundertakenbyaqualifiedelectricalcontractor.
4
5ACAPELLA installation manual
DegreeofOverShadingShadingwillreducetheoverallperformanceofasolarsystem.Duringtheplanningstageofasolarsystem.Con-sid-erationshouldbegiventothelocationofthecollectorswiththeaimofminimisingtheeffectsofshadingfromhigh buildings, trees, etc.
none / little / a lot
CollectorFixingSurface
Is there enough room for the solar panels to sit on the required roof? (yes/no)
Is there enough between gulleys (top, bottom and both sides) to prevent leafs and debris from gathering around the panels?
(yes/no)
OrientationofRoof&EstimatedTiltAngleofRoofforMountingSolarCollectors
WhatistheRooforientation(shouldbebetweenEastSE-WestSW)
Collectorshouldbefacingtheequator
Is an inclinded roof frame need to obtain required pitch? (yes/no)
Tocalculateoptimalangleoftiltmultiplelatitudex0.7fordomestichotwaterproductionBirr37.16°,Cork36.3°,Dublin53.43°
EstimatingHotWaterDemand&SizeofSystemRequired
No. of people using hot water in the house
Any other exceptional water loads in the dwelling
No. of People SolarCylinderSize SizeofFlatPanelSystem SizeofEvacuatedTube
2PanelSystem(4m2) 30TubeSystem(2.83m2) 1-2people 200litres
3PanelSystem(6m2) 40TubeSystem(3.77m2) 3-5people 300litres
LocationofSolarPumpStation&SolarController
Ensurethepumpstationislocatedinanareawhereitcanbeeasilyaccessedforservicing&main-tenance (Confirm)
Ensurethatthereisadequatespacebothleftandrightofpumpstationtoalloweasyaccesstoremovepumpin future.
Ensurethatthesolarcontrollerislocatedinanareathatiseasilyaccessiblefortheuser (Confirm)
Ensurethatthecontrollerismountedattheocrrctheightforeasyviewing. (Confirm)
ExistingPlumbingSystem
What type of plumbing system is in the dwelling (vented or un-vented)?
Is solid fuel incorporated into the plumbing system?
Isthereadequateaccesstoroutepipeworkfromsolarcollectorsdowntocylinderlocation? (yes/no)
Is there space in the hot press to locate solar pump station? (yes/no)
Site Survey
5ACAPELLA installation manual
6
SafeRoofAccessToWork
Isthereadequateaccesstoareaofhousetomountscaffoldingorladders? (yes/no)
Istheresteadyandsecurebaseonwhichtomountscaffoldingorladders? (yes/no)
Arethescaffoldingandorladdersfitforuseintended? (yes/no)
Allinstallerstrainedinworkingatheights? (yes/no)
Areallharnessandothersafetyequipmentworkingcorrectly? (yes/no)
Allworkcarriedoutshouldbeinaccordancewithallrelevantgoodpraticesandorcurrentbuildingstand-ards.Allcurrentregulationsshouldbefollowedinrelationtoworkingatheights.Nothingstatedinthisguidetakespre-sedenceovercurrentstandards.
ConditionofRoof
Whatarethecentresofroofrafterswheresolarcollectoristobemounted(eg400mm)? (mm)
Whatisthesizeofroofrafters(eg6x2”,7x2”,8x2”)? (inch)
Are roof rafters cross braced? (yes/no)
Is any of the timber showing discolouration (indicating rot)? (yes/no)
To determine the total load on the roof you must get the total weight of the collectors and divide this weight bythenumberofrooffixingboltsoranchorsusedtoholdthecollectorontheroof.Thiswillgiveyoutheweight of the solar panels on each point of the roof. You must then carefully review the points where the col-lectorsareconnectedtotherooftoensurethattheseexactpointscantaketheanticipatedload.
Wherethereissignsofdiscolourationacloserexaminationwillberequried.Ifblackspotsarefoundonthetimberthis indicatesaleakwhichneedsattention.Ifthetimberappearsbrownandflakythenthetimbermay need to be replaced. If the situation is unclear a structural engineers report should be obtained prior to completinganyfurtherwork.
EffectsofSnowLoads
What is the estimated annual snow fall for this part of the country? (mm)
TheestimatedsnowloadforallpartsofirelandmaybefoundfromhistoricaldatalocatedonMetEireann’swebsite. www.met.ie
What is the total extra weight to be assumed from a snow fall? (kg)
Irishsnowweighsapprox150kgperm3.Todeterminetheextraweightthesnowwilladdtothesolarpanelsyou may assume the following formula. (snow fall in meters x area of panel on the roof in m2x150kg/m3)
Whenyoufindoutthetotalextraweightofthesnowaddittothetotalweightofthecollectorontheroof.The using this new weight examine the roof structure to ensure its suitability. You do not need to consider the snow load when installing evacuated tubes.
EffectsofWindLoad
The evacuated tube collector is exempt from consideration of wind loading for the same reason as the snow loading.Whenconsideringflatpanelswindtestshavebeenconductedthatensurethattheyandtheirfixingbracketscanwithstandallrecorded wind forces in Ireland when mounted on a four storey house or less.
Risk Assesment
6
7ACAPELLA installation manual
Pipework&Liquids
Isantifreezebeingusedasthesolarsystemfluid? (confirm)
Ensuresolderjointsarenotusedthroughouttherentiresystem (confirm)
Ensurehightemperatureinsulationisusedthroughtallpipeworkinsolarsystem (confirm)
Ensurewhitepasteandhempisusedonallfittingconnectionsthroughout (confirm)
EnsureyouuseJoulecopperoverflowanddischargevesseltorecoverfluidfromsafetyvalve (confirm)
Water Quality
Water sample visually inspected and no signs of contamination visible (yes/no)
Wheninstallingthesolarsystemitisimportanttocheckthequalityoftheexistingincomingwatertothehotwatercylinder.Ifyouareindoubtastoitspurityasampleshouldbesentofftothedepartmentofhealthfor testing.
FireSafety
Ensurethatthereisnoobviousrisktofirepreventionbyinstallingthesolarsystem. (confirm)
Ensurethatallwiresarenotindirectconnectionwithanyun-insulatedpipeworkorplantthatcouldcauseariskofburning
(confirm)
Legionella / Bacterial Growth
Ensurethatthereisnodeadlegsintheexistingplumbingsystemthatcouldinducethegrowthoflegionella. (confirm)
Ensurethatthestatscontrollingtheboilerandthestatcontrollingtheimmersionaresetto60°Corabove. (confirm)
Ensurethattheclientunderstandstheriskoflegionellaandthestandardproceduresforreducingtheriskof it forming. Also ensure that the client understands that you are their to install a solar thermal system and
thatyoudonottakeanyresponsibilityforauditingtheirhotwatersystemforriskoflegionnellaforming.Thatyouwillendeavourtominimisetheriskofitformingbytheworkthatyoucarryoutbutanyexisting
riskshouldbedealtwithacertifiedprofessional.
(confirm)
7ACAPELLA installation manual
8
Kit Components
Solar Pump SolarController SolarExpansionVessel
Standard Kit Components
Mounting Options
SolarTubes&Profiles
BoltMountingOption TileBracketOption SlateBracketOption
Roof Flashing Options
LeadRoofFlashing AluminiumRoofFlashing 4”RubberGasketSet
SolarFluid
8
9ACAPELLA installation manual
Mounting Options
Piping Options
DN16DuoPipe DN20Pipe StainlessTails&Copper
Optional Accessories
InstallationHoseMountingSet OverVoltageLightning 3/4”ThermostaticMixingValve
CoolingVessel
9ACAPELLA installation manual
DischargeVessel
10
Important Pre Installation Information
Sizing of safety equipmentComponentsizesarerelativetothevolumeofliquidinthesystem.
Pipe sizing(minimumof15mmdiameterpipeworkmustbeused)
CollectorArea (m2)
FlowRateltr/hr
PipeDiameterCopperExternal
(mm)
Acapella20Tube(mbar)
Acapella30Tube(mbar)
Acapella40Tube(mbar)
2 120 15 8.54 1.18 4.11
3 180 15 12.57 2.87 10.74
4 240 15 17.08 2.36 8.22
5 300 22 21.11 4.05 14.58
6 360 22 25.14 5.74 20.94
8 240 22 33.68 6.92 25.05
EXPANSIONVESSSELSIZING
Model CollectorArea(m2)
SystemVolume(ltrs)
Static Height VesselSize
Acapella20Tube 24
Acapella30Tube 24
Acapella40Tube 24
10
11ACAPELLA installation manual
Roof Mounting options
TheAcapellaproduct range isavailablewithachoiceof rooffixingoptions tosuitmanyrooftypes,seediagrambelowforthemostcommonfixings.Themostcommonfixingsareillustratedandexplainedinthefollowingsectionandmaybeeasilysecuredtoslate,tileormasonryfinishes.
Metal Roof FixingsJoulealsosuppliesrooffixingkitsformetalandothercommercialroofs.Twooptionsavailable utilise appropriate clamps so the fabric of the metal roof is not penetrated - seepagexx.Notetheminimumandmaximumdistancesoneachfixingkit.
Option Code Describtion1a RF-PA-MT-BO-X Slopedroofboltkitoption
1b RF-PA-MT-SL-X Slopedroofslatemountingbracketoption
1c RF-PA-MT-TI-X Slopedrooftilemountingbracketoption
2 SOL-FRF-X-25 25Degincreaseroofinclinedbracket
3 SOL-FRF-X-45 45Degflatroofinclinedroofbracket
X=2,3,4,5,6
11ACAPELLA installation manual
1a1b 1c
23
12
Collector Assembly
13ACAPELLA installation manual
Inserting Tubes
Aftertheframehasbeencompletelyassembledandthesystemhasbeenfilledandcommissioned the evacuated tubes can be inserted into the manifold.
1. Holdingthetubeinonehanduseyourotherhandtoslidetheheatpipeoutoftheglasstubebyabout6”.
2. Byapplyingforcetothemetalheatpipeguidethebulbintothemanifoldinthenextavailablesocket.
3. To ensure the bulb has been inserted fully, twist the metal heat pipe to remove any friction.
4. Onceyouaresurethatthemetalheatpipeandbulbareinsertedcorrectlyslidethe glass tube up towards the manifold.
5. Toeasetheglasstubesealinginsidethemanifoldsocketrublubricantaroundtherimoftheglass.Waterwillsufficeiflubricantisnotavailable.
13ACAPELLA installation manual
1
2 2
3 4
14
Sloped Roof Bolt Mounting KitMounting parallel bench srew mountingsystem
12
1 )
2 )
3 )
4 )
General Note: Points 9-12, 17 and 18 of these instructions only apply when mounting more than two collectors!
1: A = 1540 mm ±10 mmMeasure the mounting points (for a suggestion see previous side)
2: Drill tiles - Ø 14mm (Note: On roofs with corrugated tiles do not drill boreholes in the tile trough!)
3: Drill rafters - Ø 8mm
4: Fasten bench screw, minimum screw depth ≥ 100mm
Rooffixingboltsaredrilleddownthroughthe slate or tile covering the roof. The rub-bergasketontheboltkeepsthepenetra-tion point in the roof weather proofed. The bolt is connected to the profile byuse of a stainless steel L plate and nuts, bolts and washers. The bolt head slides throughtheprofiletothedesiredlocationandtheLbracket tofixedusingthenutand washer.
14
15ACAPELLA installation manual
Sloped Roof Tile Mounting Bracket
Adjustable tile roof mounting bracketsare an ideal solution when fixing a so-lar collector to a thick roof tile. The toppiececanadjusttoincreaseordecreasethe height of the collector above the roof tile.Thebracketisconnectedtothepro-file usingnuts,bolts andwashers. Theboltheadslidesthroughtheprofiletothedesired locationand then thebracket isfixedusingthenutandwasher.
15ACAPELLA installation manual 15ACAPELLA installation manual
16
Sloped Roof Slate Mounting Bracket
Slate roofbrackets are an ideal bracketfor fixing the solar collectors to thin flatslates. Thebracket isconnectedtotheprofileusingnuts,boltsandwashers.Theboltheadslidesthroughtheprofiletothedesired locationand then thebracket isfixedusingthenutandwasher.
16
17ACAPELLA installation manual
Flat Roof Mounting Frame
Theflatroofframecreatesapitchof35Degfrom a horizontal base. The frame is manu-factured from30x30mmanglealuminium.The frame consists of triangle nunber A frame pieceswith two back and slopedbars.EachAframeconnectstothecollec-torprofilesusingnuts,boltsandwashers.The frame is fixed to surface by installer.Preferredmethodffixingtoflatsurfaceisdependent on type of surface and available supports.
17ACAPELLA installation manual
18
Connecting Flow & Return Pipework
18
Connecting Flow & Return PipeworkTails – 075m Stainless SteelEachtailhasbeenmanufacturedwithaswivelnutoneachend.Thisswivelnutscrewsdirectlyontoonesideofthepanelsystemwherethe¾”flatfacedmalethreadcon-nectionis.A¾”x¾”flatfacenipplemustbeusedbetweentheswivelnutonthecol-lector and the swivel nut on the tails.
Stainless Steel Solar PipeWhenusingsolarpipeasflowandreturnpipeworkthenit isadvisablethat0.75mlongtailsarenotusedalsoasthisincreasesthenumberofjointsinthesystem.Thesolar pipe should be reated as normal and be prepared for connecting. (see solar pipe pageforfurtherdetails).Theswivelnutfittingonthesolarpipewillscrewdirectlyontoonsideofthecollectorsystemwherethe¾”flatfacedmalethreadconnectionis.A¾”x¾”flatfacenipplemustbeusedbetweentheswivelnutonthecollectorandtheswivel nut on the solar pipe.
Connecting Panels TogetherTheAcapellacollectorhasa¾”flatfacemalethreadononesideandaswivelnut¾”female on the other side. This means that each panel connects directly to the panel besideit.Afibrewashermustbeinsertedbetweentheflatfaceofthemalethreadandthe internal of the female swivel nut. Insulation.
19ACAPELLA installation manual 19ACAPELLA installation manual
Stainless Steel Pipe Specification
Silicone Cable Specification
Insulation Specification
Stainless Steel Solar Pipe
20
TheJouleproductrangeoffersbothasinglestreamandadualstreampumpstation.Theflowraterequiredonasystemistypically1 litreperminute,persquaremetreinstalled.Thereforea2-12litrepumpstationwillbesufficientforsystemsupto12m².
1. Insulatingbox(back)inEPP2. Safetyunitconsistingof:manometer0/10bar,solarsafetyvalvescali-
bratedto6bars,3/4”connectionforexpansionvessel3. Security clips4. Shutoffvalveswithintegratedthermometersandcheck-valves5. Solarpump6. Visualflowbalancingvalvewithfillinganddraingroup7. Hoseconnection8. InsulatingEPPbox(cover)
Connectionsofflowandreturnpipeworktothepumpstationaremadevisthe¾”flatface thread connection on all points apart from the connection directly underneath the pump.Thisconnectionistobemadewith22mmsmoothtube.
When locating the pump station consideration should be given to future access for maintenance. It is best practice to locate the pump as far downstream the system as possibleawayfromthecollectorstohelpreducetheamountofhightemperaturefluidthat comes in contact with the pump station. If the distance between the collector andheatstoreisshort(>5m)thenrunningextrapipeworkoverandbackinsidetheattic space to increase the linear distance between pump station and collectors is recommended.
Pump Station
21ACAPELLA installation manual 21ACAPELLA installation manual
PressureReliefValve(PRV)Ratedat6bar,thePRVmaydischargeheattransferfluidwhich must be channelled into a container capable of withstanding high temperature discharge and containing the total collector volume. The container should be secured so it cannot be removed or spilled.
ThePRVshouldnotbechannelledintoadrainoranypipeworkwhichwillallowittoenter the normal water course.
Fitting the expansion vessel: It is recommended that the expansion vessel is located below the level of the connec-tion from the pump station to prolong its life. TemperatureReducingVessel(TRV)Alsoknownasa‘coolingvessel’or‘stratificationvessel’,theTRVishighlyrecommendedwherethedistancebetweencollectorsandpumpstationislessthanfivemeters.TheTRVensuresthatenoughfluidispresentbetween the collectors and expansion vessel to prevent damage to the expansion vessel membrane.
Safety Vessel Connection
1 PRVdischargepoint
2 Wallbracket(supplied)
3 Dischargecontainer
4 TRVkit
5 Expansionvessel
6 Dualstreampumpstation
1
2
2
3
4
5
6
2222
Allelectricalaspectsoftheinstallationshouldbeundertakenbyaqualifiedelectrician.Note that for safety, the pump and sensor connections should always be wired prior to connecting power to the solar control panel.
IMPORTANT The solar control panel must have a permanent electrical power supply which must not be interrupted either manually or with a time switch. If the permanent electricalsupplytothebuildingistobeswitchedoffforanyperiodoftime,thesolarcollector(s) should either be covered, or the system drained. In order to protect the normaloperationofthecontrolpanel,itshouldbelocatedatleast100mmfromin-sulatedpipeswhichmaybecomehotduringoperation.ControlpanelsusePT1000sensorscontainingtwincorecoppercablewitha0.75mmcrosssection.Thesen-sorssuppliedare1.5metresinlength.Sensorcablescanbeextendedwithtwincorecoppercableof0.75mmdiameterupto50metresand1.50mmdiameterbetween50-100m.ScreenedcableshouldbeusedonthesensorcablestopreventRFIfromelectricalcables.Allconnectionstoextendthecablesshouldbehousedinajunctionbox for protection. The following diagrams show the connection of the solar pump andotherrelaysontheJoulerangeofcontrollers.ThisshouldbereadinconjunctionwiththeInstallationandOperationManualsuppliedwitheachJoulecontrolpanel.
Electrical Solar Controller
23ACAPELLA installation manual 23ACAPELLA installation manual
2424
25ACAPELLA installation manual 25ACAPELLA installation manual
2626
Expansion VesselIMPORTANTPriortofillingthesystem,theexpansionvesselpressuremustbeset0.3Barbelowthesystempressure.Omittingtoperformthischeckwillresultinirregularpressurereadingsduringthecommissioningofthesystem.Thepressureischeckedat the base of the vessel and the bleed valve may be bled or topped up with a pump.
Filling the LoopItisimportantthatamotorisedflushandfillcentreisusedtofillandpressurisethesystemwithsolarfluidasfollows:
• Openthefillanddrainvalvestoallowtheliquidtocirculatearoundthesolarloop• Closetheisolatingvalveabovetotheflowmetertoensureallairandliquidpasses
throughthefillcentretofilteranyairandcontaminants.• Runthefillcentrepumptocirculatesolarfluidforapproximately60minutes.• Openandclosetheisolatingvalveintermittentlytocirculateairbubbleswhichmay
accumulate in the sight glass.• Returnisolatingvalvetoclosedposition.• Whenthesolarloophasbeenpurgedofair,closethedrainconnection–thefill
centre will begin to pressurise the solar loop.• Reopentheisolatingvalveabovetheflowmeterfully.• Filltheloopuntilthepressuregaugejustexceedstherequiredpressureandstop
thepumpandimmediatelyclosethefillconnection.Checkpipejointsonthesolarloopforleaksandcheckthatpressureisnotlostovera30minuteperiod.
• Ifalltheplumbingissound,setthesystempressurebyopeningthereturnconnec-tion until the required pressure is met.
• Thefillcentremaynowbedisconnected.• Capthefillanddrainpointswiththebrasscoversprovided.
Commissioning
27ACAPELLA installation manual 27ACAPELLA installation manual
Setting The Flow RateThepumpmayonlyberunwhenthesystemhasbeenfilledasdryoperationwilldam-agethepump.Thedesiredflowrateis1litreperminuteperm²(10tubes=0.93m²/1panel=1.91m²)
Setthepumptothefirstspeedandrunitmanuallyfrom the controller (see following paragraph).Ifthedesiredflowrateisexceeded,settheflowme-tertothedesiredratebyadjustingtheisolatingvalvewithaflatheadedscrewdriver(seediagram)withthepumprunning.Otherwiserepeatthisstepatthenextpumpspeedsandcontinueuntilthedesiredflowrateis achieved. Stop the pump.
Turning The Solar Pump On Manually For Service:Press the left or down button the controller until the screen displays the time. Press and hold the down button for 3 seconds and the controller will enter the service menu.PressdownthroughalloptionsuntiloptionHND1isvisible.
• Pressthecentrebuttononce• SETbeginstoflash• WhenSETisflashingusetheUP & DOWN arrow buttons to change the setting
from AUTO to ON• Pressthecentrebuttontoconfirm• Pumpwillstarttorunandwarninglightswillflashtoalertyoutothefactthatthe
pump is running continuously.• WhenfinishedcarryouttheabovestepsandchangeONbacktoAUTO
2828
Usersshould regularlycheck the temperatureswhich thesolarcontrolpanel is re-cording.With theSCrangeofcontrollers,simplypressing the ‘SET’buttonon thefascia once will display the upper and lower collector temperatures since the control panel was last reset. If the collector temperatures have been excessively high i.e. over 170˚C,itisrecommendedthattheantifreezelevelbecheckedusingarefractometerbyaqualifiedengineer.Asampleofthesolarantifreezefluidcanbeextractedfromthe pump station at the pump itself. The large centre of the pump hub can be opened with a large flathead screwdriver. This should be opened slowly until a fewdropsoftheantifreezefluidarereleased.Asampleofthefluidplacedontheglassoftherefractometer will display the level of antifreeze in the system. If the antifreeze has lostitsantifreezepropertiesthesystemshouldberefilledwithfreshsolarfluid.Itisrecommendedthatthesolarsystemisservicedannuallybyaqualifiedengineerandimmediately if the system shows evidence of having lost pressure or has discharged liquidatthepressurereliefvalve.Thesolarantifreezefluidshouldalwaysbereplacedafter7years.
Maintenance scheduleAqualifiedpersonshouldservicethesystemattherecommendedintervals,us-ingthemaintenanceschedulebelow.Inadditiontheusershouldcheckthesystempressure at regular intervals. A visual inspection of the pressure gauge is required to checkthatthesystempressureismaintainedatthelevelnotedbelow.Theserviceengineer should complete the following; the shaded boxes should be completed if thesystemrequiresrefilling:
Servicing and Maintenance
29ACAPELLA installation manual 29ACAPELLA installation manual
Upon comissioning
Year1 Year2 Year 3 Year4 Year5 Year6 Year7
Dateofinspection
Expansionvesselsettingbeforefilling
System pressure
Expansionvesselsettingbeforefilling
Flowrate
Antifreeze level
pH reading
Inspection of barium get-ter on tubes
Engineerdetails
Print name
Sign
Telephone No.
3030
31ACAPELLA installation manual 31ACAPELLA installation manual
32
JOULE IE
A KylemoreParkWest,Ballyfermot,Dublin10T +35316237080 F +35316269337E info@joule.ie W www.joulesolutions.ie
JOULE UKA NewportBusinessPark,NewbridgeRoad, EllesmerePort,Cheshire,CH654LZT t+44(0)1513551094 F +44(0)1513568336E info@jouleuk.co.uk W www.jouleuk.co.uk
JOULE PL
A 23-200Kraśnik,ul.Towarowa34. E biuro@joule-pl.pl W www.joule-pl.pl
top related