addendum 2 - attachment 2pdf
Post on 05-Apr-2022
9 Views
Preview:
TRANSCRIPT
5
A-201
6
A-201
7"
/ 12
"7
" /
12
"
SLO
PE
DN
SLO
PE
DN
7"
/ 12
"7
" /
12
"
SLO
PE
DN
SLO
PE
DN
STANDING SEAM ALUMINUM ROOF PANEL
ROOF RIDGE
FULL PERIMETER INTEGRATED GUTTER SYSTEM BEHIND FASCIA
THE INTEGRAL GUTTER COLLECTS WATER AND ROUTES IT TO THE WEEP HOLES ON THE REAR OF THE SHELTER
5
A-201
6
A-201
CROSS BEAM MEMBER - TYP
ROOF RIDGE - TYP
POWER POST SUPPLY - TBD
FLEX STEEL CONDUIT HOUSE - TBD
ECLIPSE LIGHT 24" - TYP
ECLIPSE LIGHT 24" - TYPECLIPSE LIGHT
24" - TYPECLIPSE LIGHT 24" - TYP
ROOF PLAN GENERAL NOTES
1. ROOF SHALL BE STANDING SEAM ALUMINUM DUTCH HIP ROOF WITH 2 ½” FASCIA AND INTEGRAL GUTTER.
2. 2 1/2" INTEGRAL PERIMETER GUTTER BEHIND FASCIA TO COLLECT WATER AND ROUTE IT TO THE REAR OF THE SHELTER TO DRAIN IT WITH WEEP HOLES.
3. DRAINAGE SHALL BE DIRECTED TO REAR OF SHELTER AND AWAY FROM SHELTER WALLS.
4. ROOF SHALL NOT RELY ON SELF-TAPPING OR SELF-DRILLING SCREWS IN TENSION FOR CONTAINMENT.
5. SELF-DRILLING OR SELF-TAPPING FASTENERS IN TENSION (OR PULL OUT CONDITION SHALL NOT BE AN ACCEPTABLE METHOD OF SECURING ROOF ASSEMBLY TO FRAME.
NOT FOR CONSTRUCTION
PRELIMINARY DOCUMENTS
A
54321
B
C
D
E
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
8401 ARLINGTON BLVE.FAIRFAX, VA 22031703.849.0100 (PHONE)703.849.0518 (FAX)
BU
S S
TA
TIO
N S
HE
LT
ER
DU
LL
ES
NO
RT
H
TR
AN
SIT
C
EN
TE
R
RE
LO
CA
TIO
N
DU
LLE
S E
LE
CT
ION
DIS
TR
ICT
LO
ND
ON
CO
UN
TY
, V
IRG
INIA
50082729
OF 39
11/1
0/2
020 1
:23:3
4 P
M
REFLECTEDCEILING PLAN
AND ROOF PLAN
MD
MS
MD
09-23-2020
A-121
Scale: 1/4" = 1'-0"1
ROOF
Scale: 1/4" = 1'-0"2
FIRST FLOOR REFLECTED CEILING PLAN
NORTH
NORTH
0' 4' 8'2'
SCALE: 1/4" = 1' - 0"
NORTH
NO. DESCRIPTION DATE
PERMIT SUBMISSION 9/23/20
1 ADDENDUM 11/10/202
2
2
ADDENDUM 2
5
A-201
6
A-201
ROOF LEVEL
GROUND LEVEL
2' -
9 5
/8"
2 3
/8"
7' -
2 3
/8"
STANDING SEAM ALUMINUM DUTCH ROOF PANEL
POST - TYP
1/4" THICK CLEAR TEMPERED SAFETY GLASS
5
A-201
6
A-201
5"
3' -
0"
ROOF LEVEL
GROUND LEVEL
OPEN OPEN
STANDING SEAM ALUMINUM DUTCH ROOF PANEL
POST - TYP
1/4" THICK CLEAR TEMPERED SAFETY GLASS
2 1
/2"
CLE
AR
AT
OP
EN
ING
7' -
0"
MIN
.
8' -
2 1
/2"
+/-
3' -
0"
STANDING SEAMALUMINUM DUTCH ROOF PANEL
ROOF END PANEL
POST - TYP
1/4" THICK CLEAR TEMPERED SAFETY GLASS
7
12
7
12
ROOF LEVEL
GROUND LEVEL
STANDING SEAMALUMINUM DUTCH ROOF PANEL
POST - TYP
1/4" THICK CLEAR TEMPERED SAFETY GLASS
12
7
3' -
0"
7' -
2 1
/2"
2 1
/2"
12
7
1/4" THICK CLEAR TEMPERED SAFETY GLASS
STANDING SEAMALUMINUM DUTCH ROOF PANEL
CONCRETE SIDE WALKWAY - SEECIVIL FOR SLOPE
12
7
12
72 1/2" INTEGRATED PERIMETER GUTTER W/ FASCIA
3' -
0"
7' -
5"
CLE
AR
AT
OP
EN
ING
7' -
0"
MIN
ROOF LEVEL
GROUND LEVEL
3' -
0"
1/4" THICK CLEAR TEMPERED SAFETY GLASS
STANDING SEAMALUMINUM DUTCH ROOF PANEL
CONCRETE SIDE WALK WAY SEE CIVIL FOR SLOPE
12
7
12
7
8 FEET ALUMINUMPEDESTAL BENCH SURFACE MOUNTEDW/ BACKREST - TYP
2 1
/2"
7' -
2 1
/2"
2 1/2" INTEGRATED PERIMETER GUTTER W/ FASCIA
A-201
9
A-201
8
ECLIPSE LIGHTING ATEACH RIGID BEAM8' - 0" MIN. ABOVE F.F
FINISH GENERAL NOTES
1. ALL STRUCTURAL FRAMING MEMBERS AND MULLIONS SHALL BE ONE-PIECE SEAMLESS EXTRUDED ALUMINUM TUBES. SNAP TOGETHER OR TWO-PIECE MEMBERS ARE NOT ACCEPTABLE.
2. ALL ROOF AND GLAZING FRAME, STRUCTURAL CONNECTOR CHANNELS, ROOF CORNERS, ROOF KEY ANGLES, AND BASE ANCHOR BOOTS SHALL BE EXTRUDED ALUMINUM.
3. ALL FINISHED JOINT SHALL BE FLUSH.4. ALL FASTENERS SHALL BE ALUMINUM OR STAINLESS STEEL OR A COMBINATION
THEREOF AND SHALL BE TAMPER PROOF.5. ZINC, CARBON STEEL, PLATED, OR ANY OTHER "NON-CORROSIVE" FASTENERS
WILL NOT BE ACCEPTABLE.6. SELF-TAPPING OR SELF-DRILLING FASTENERS ARE NOT ACCEPTABLE.7. EXPOSED FASTENERS SHALL BE FINISHED TO MATCH SHELTER FINISH. 8. ALL CORNERS SHALL BE MITERED AND REINFORCED WITH INTERNAL SCREW
BOSS AND SCREWS.9. ALL GLAZING MATERIAL SHALL BE 1/4" THICK CLEAR TEMPERED SAFETY GLASS.10. ALL WALL GLAZING SHALL BE GASKETED WITH CONTINUOUS EXTRUDED PVC
DRY-SET SPLINES.11. FINISH COLORS WILL BE SELECTED BY ARCHITECT/ OWNER FROM THE
MANUFACTURER COLOR PALLETS.
2 1/2" ALUMINUM FASCIAW/ INTEGRATED PERIMETER GUTTER; ROUTING WATER TO REAR OF THE SHELTER
2 1/2" ALUMINUM HEADER TUBE PER MANUFACTURER REQUIREMENT
WEEP HOLES AT 24" MAX O.C. APPLICABLE AT REAR SIDE OF SHELTER ONLY
ALUMINUM RIGID CAP
ALUMINUM MOUNTING "Z"
ALUMINUM RIGID BEAM
ALUMINUM ROOF PANEL
ALUMINUM RIGID BEAMPER MANUFACTURER
ECLIPSE LIGHTING AT EACH RIGID BEAM - PROVIDE ATTACHMENT AS REQUIRED W/ SIMILAR MATERIAL AND FINISH
NOT FOR CONSTRUCTION
PRELIMINARY DOCUMENTS
A
54321
B
C
D
E
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
8401 ARLINGTON BLVE.FAIRFAX, VA 22031703.849.0100 (PHONE)703.849.0518 (FAX)
BU
S S
TA
TIO
N S
HE
LT
ER
DU
LL
ES
NO
RT
H
TR
AN
SIT
C
EN
TE
R
RE
LO
CA
TIO
N
DU
LLE
S E
LE
CT
ION
DIS
TR
ICT
LO
ND
ON
CO
UN
TY
, V
IRG
INIA
50082729
OF 39
11/1
0/2
020 1
:23:3
5 P
M
EXTERIORELEVATIONS AND
SECTION
MD
MS
MD
09-23-2020
A-201
Scale: 1/4" = 1'-0"1
NORTH ELEVATION
Scale: 1/4" = 1'-0"2
SOUTH ELEVATION
Scale: 1/4" = 1'-0"3
EAST ELEVATION
Scale: 1/4" = 1'-0"4
WEST ELEVATIONScale: 1/4" = 1'-0"
5SECTION AT OPENING
Scale: 1/4" = 1'-0"6
SECTION AT WALL
0' 4' 8'2'
SCALE: 1/4" = 1' - 0"
Scale:7
3D View CONCEPT SKETCH
Scale: 3" = 1'-0"8
GUTTER DETAIL
Scale: 3" = 1'-0"9
RIDGE DETAILNO. DESCRIPTION DATE
PERMIT SUBMISSION 9/23/20
1 ADDENDUM 11/10/202
22
ADDENDUM 2
top related