Maxson WWTF – GMP #3 Addendum #7
ADDENDUM NO. 7
To: All Bidders
Date: February 12, 2020
Reference: Maxson Wastewater Treatment Facility Upgrades – GMP #3 / Package 2A
01/07/2020 Advertisement
Subcontractor Packages: Site Survey, Testing Service
Equipment Packages: Centrifugal Pumps End Suction, Centrifugal Pumps Split
Case, Secondary Clarifier Round System, Biological
Process Aeration System, Odor Control Biofilter.
BIDS DUE: February 18, 2020 @ 2:00 P.M. CST
Subcontractor Packages: Site Work, Electrical, Yard Piping, Concrete, Plant
Construction.
BIDS DUE: March 10, 2020 @ 2:00 P.M. CST
The following changes, additions, and clarifications are hereby made part of the Purchase Order
Documents for the above referenced Project and shall be taken into account in the preparation
of all Bids and the execution of all Work.
ATTACHMENTS
The following attachments are included with this addendum:
1. 11-3040 SECONDARY CLARIFIER ROUND RFP ATTACHMENT 1 – EQUIPMENT/MATERIAL
PRICING
Maxson WWTF – Addendum #7
February 12, 2020
Page 2
Maxson WWTF – GMP #3 Addendum #7
ITEM 1. CONTRACT
Changes to the contract documents are as follows:
SECONDARY CLARIFIER ROUND RFP ATTACHMENT 1: Replace
• REVISED Attachment 1 – Equipment /Material Pricing
Bid Item 10:
Furnish all labor, equipment and incidentals required for a complete system
including, but not limited to, secondary sludge collection, scum removal, local
alarm panel and appurtenant equipment in each of the two (2) 135-foot-
diameter secondary clarifiers (Clarifiers 5N and 5S) as shown on the Drawings
and Specification and as specified herein.
ITEM 2. TERMS AND CONDITIONS
A signed acknowledgement of this addendum must be received by the Construction Manager
prior to the Bid due date and hour as mentioned in this Addendum No. 7. Signature on this
Addendum does not constitute your signature on the original bid document. The original bid
document must be signed also.
Yaribell Hernandez, PE, DBIA
Vice President, Sr. Project Manager
CDM Constructors Inc.
Name of Firm: ___________________________________________________________
Signature and Title: _______________________________________________________
Date: ___________________________________________________________________
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
1.
Bid Item Qty UM Unit Price Total Price
10 1 Lot
1 Lot
Sub-Total:
Freight:
Total Purchase Order Value:
2.
▪
▪
▪
▪
3.
▪
▪
▪
▪
4. PROJECT SCHEDULE REQUIREMENTS
Required on Site Date: REFER TO PROJECT SCHEDULE PROVIDED ON ADDENDUM #4
PAYMENT MILESTONES
The following payment milestones are being requested. All payments shall be Pay-when-paid as defined in the Invoicing Instructions.
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
Furnish all labor, equipment and incidentals
required for a complete system including, but not
limited to, secondary sludge collection, scum
removal, local alarm panel and appurtenant
equipment in each of the two (2) 135-foot-diameter
secondary clarifiers (Clarifiers 5N and 5S) as
shown on the Drawings and Specification and as
specified herein.
0
The project schedule requirements applicable to this package are as follows and/or attached herein. The Equipment / material shall be
delivered on or before the below listed Required on Site Date:
EQUIPMENT AND MATERIAL
The Seller shall provide the following equipment / material inclusive of any and all ancillary components to meet the requirements as
stated in the attached and/or referenced specifications, drawings, and Order documents.
Description
Supplier Bond for 100% of the value of the
Purchase Order
SCOPE OF WORK CLARIFICATION
The following additional information is included to clarify the requirements of this package.
CDM Constructors Inc. Page 1 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Weeks
Weeks
Weeks
Weeks
5.
Date
Jun-18
Apr-17
Jun-18
May-17
Apr-17
Apr-17
Apr-17
May-17
May-17
Apr-17
Apr-17
Apr-17
Apr-17
May-17
Apr-17
Apr-17
May-17
Apr-17
Apr-17
Apr-17
Number of weeks After Receipt of Order (ARO) drawings will be submitted for
approval
Number of weeks After Receipt of Approved Drawings (ARAD) equipment /
material will Ship
Number of weeks from Shipment to Delivery and the Jobsite (FOB Jobsite)
Total number of weeks ARO to Delivered on the Jobsite
The following documents are incorporated herein and made part of the Purchase Order Documents.
PLANS AND SPECIFICATIONS:
Technical Document Order of Precedence
In case of conflict in the technical documents, the following priority, in descending order shall govern:
Exhibit C - Supplementary Terms and Conditions
Data / Specification Sheets
Project Specific Specifications and Standards
Referenced Industry Standards (such as ANSI, ASME, etc.)
Drawings
Approved SUBCONTRACTOR submitted drawings or documents
Any conflict identified by SUBCONTRACTOR shall be brought to the attention of the CONTRACTOR for clarification and confirmation
prior to commencement of Work.
Definition of Parties
The text of the technical documents contained herein shall be deemed to be modified with respect to the identification of parties as
follows:
The term "DN/CMAR" or “Engineer” or “Construction Manager” or "Owner" shall mean "CONTRACTOR" or "Buyer".
The term “Contractor” shall mean "SUBCONTRACTOR" or "Supplier".
Description
GENERAL REQUIREMENTS
SUMMARY OF WORK
SITE CONDITIONS
PIPELINE TESTING AND CLEANING
EQUIPMENT TESTING AND STARTUP
SUBMITTALS
CONSTRUCTION SCHEDULING
AUDIO VIDEO RECORDING
QUALITY CONTROL
TESTING AND TESTING LABORATORY SERVICES
CONSTRUCTION SEQUENCE
CONTRACTOR'S USE OF PREMISES
CUTTING, CORING AND PATCHING
SPECIAL PROVISIONS
PROJECT MEETINGS
TIGHTNESS TESTING OF LIQUID RETAINING STRUCTURES
CLEANING
PROJECT IDENTIFICATION AND SIGNS
DELIVERY, STORAGE AND HANDLING
SITE SAFETY AND SECURITY MEASURES
TEMPORARY FACILITIES
PROJECT SPECIFICATIONS
Section
DIVISION 1
01010
01011
01014
01015
01045
01170
01200
01300
01310
01381
01400
01410
01445
01465
01480
01500
01560
01580
01600
01710
CDM Constructors Inc. Page 2 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Apr-17
Apr-17
Apr-17
May-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Jun-18
Apr-17
Apr-17
Apr-17
Jun-18
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
May-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
CONCRETE FORMWORK
CONCRETE REINFORCEMENT
CONCRETE JOINTS AND JOINT ACCESSORIES
CAST-IN-PLACE CONCRETE
CONCRETE FINISHES
CONCRETE
TRENCHING, BACKFILLING AND COMPACTION
GRANULAR FILL MATERIALS
JACK AND BORE
EARTHWORK
SITE PREPARATION
DEWATERING AND DRAINAGE
CIVIL AND SITE WORK
DEMOLITION AND MODIFICATIONS
OPERATING AND MAINTENANCE DATA
WARRANTIES AND BONDS
PROJECT RECORD DOCUMENTS
METALS
MISCELLANEOUS METALS
WOOD AND PLASTICS (NOT USED)
GROUT
MODIFICATIONS TO EXISTING CONCRETE
CONCRETE REPAIRS
CONCRETE ELECTRICAL RACEWAY ENCASEMENT
MASONRY (NOT USED)
SURFACE PREPARATION AND SHOP PRIME PAINTING
PAINTING
ARCHITECTURAL (NOT USED)
EQUIPMENT
THERMAL AND MOISTURE PROTECTION
BITUMINOUS DAMPPROOFING
DOORS AND WINDOWS (NOT USED)
FINISHES
DOUBLE DISC SCUM PUMPS
ALUMINUM COVERS
BIO-TRICKLING FILTER ODOR CONTROL SYSTEMS
SLIDE GATES, WEIR GATES, STOP PLATES AND STOP LOGS
SUBMERSIBLE SOLIDS HANDLING PUMPS
HORIZONTAL SUBMERSIBLE SOLIDS HANDLING RAS PUMPS
EROSION AND SEDIMENTATION CONTROL
EXCAVATION SUPPORT AND PROTECTION
GEOTECHNICAL INSTRUMENTATION
ASPHALT PAVING
CONCRETE WALKWAYS
PRECAST CONCRETE MANHOLES AND CATCH BASINS
PRECAST REINFORCE CONCRETE BOX CULVERT
REINFORCED CONCRETE SEWER PIPE
DUCTILE IRON PIPE AND FITTINGS
POLYVINYL CHLORIDE (PVC) GRAVITY SEWER PIPE
POLYVINYL CHLORIDE (PVC) PRESSURE PIPE
HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS
VALVES, HYDRANTS AND APPURTENANCES
LOAMING AND SEEDING
01720
01730
01740
DIVISION 2
02050
02100
02140
02150
02200
02221
02230
02270
02311
02495
02510
02515
02605
02608
02613
02616
02622
02623
02624
02640
02930
DIVISION 3
03100
03200
03250
03300
03350
03600
03740
03741
03800
DIVISION 4
DIVISION 5
05500
DIVISION 6
DIVISION 7
07115
DIVISION 8
DIVISION 9
09901
09902
DIVISION 10
DIVISION 11
11244
11257
11282
11306
11312
11317
CDM Constructors Inc. Page 3 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Addendum #1
Jun-18
Apr-17
May-17
Apr-17
Apr-17
Apr-17
May-17
Apr-17
May-17
May-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
May-17
May-17
May-17
Apr-17
Jun-18
Jun-18
Jun-18
Jun-18
May-17
May-17
Apr-17
May-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
May-17
Apr-17
Apr-17
Apr-17
Apr-17
Apr-17
Jun-18
Apr-17
Apr-17
Apr-17
SECONDARY SLUDGE COLLECTION AND SCUM REMOVAL EQUIPMENT
FIBERGLASS BAFFLES
DISC-TYPE FINE BUBBLE DIFFUSERS
WASTEWATER SAMPLER
METAL BUILDING SYSTEMS
FIBERGLASS REINFORCED PLASTIC BUILDINGS
INSTRUMENTATION AND CONTROL-GENERAL PROVISIONS
TESTING
CONTROL DESCRIPTIONS
TEMPORARY SYSTEM FOR RAS BYPASS OPERATION
TEMPORARY PUMPING SYSTEMS FOR INFLUENT BYPASS OPERATION
FURNISHINGS (NOT USED)
SPECIAL CONSTRUCTIONS
DAVIT CRANES
JIB CRANES
HOISTS
CONVEYING SYSTEMS (NOT USED)
DCS CONTROLLER HARDWARE AND SOFTWARE
CONTROL AND DATA NETWORK EQUIPMENT
FIBER OPTIC CABLING AND EQUIPMENT
CONTROL PANEL ENCLOSURES AND PANEL EQUIPMENT
INSTRUMENTS
GATE AND VALVE ACTUATORS
PIPING SPECIALTIES
PIPE HANGERS, SUPPORTS AND RESTRAINTS
THERMAL INSULATION
ODOR CONTROL FANS
MECHANICAL
PIPING-GENERAL REQUIREMENTS
PLASTIC PIPE AND FITTINGS
DUCTILE IRON PIPE AND FITTINGS
VALVES
RACEWAYS, BOXES, FITTINGS AND SUPPORTS
WIRES AND CABLES (600 VOLT MAXIMUM)
MEDIUM VOLTAGE CABLES
WIRING DEVICES
ELECTRIC MOTORS
FIBERGLASS REINFORCED PLASTIC DUCTWORK AND ACCESSORIES
TESTING, ADJUSTING AND BALANCING
ELECTRICAL
ELECTRICAL-GENERAL PROVISIONS
POWER SYSTEM STUDY
PANELBOARDS
LOW VOLTAGE MOTOR CONTROL CENTERS
MEDIUM VOLTAGE MOTOR CONTROL CENTER MODIFICATIONS
MOTOR CONTROL CENTER MODIFICATIONS
MISCELLANEOUS EQUIPMENT
SURGE PROTECTIVE DEVICES
MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR
VARIABLE FREQUENCY DRIVES
MEDIUM VOLTAGE PAD MOUNTED DISTRIBUTION SWITCHGEAR
MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCH
LIGHTING SYSTEM
UNDERGROUND SYSTEMS
PAD MOUNTED TRANSFORMERS
11341
11354
11375
11392
11500
11501
DIVISION 12
DIVISION 13
13125
13140
13300
13302
13305
13311
13320
13321
13330
13340
14650
14651
14900
DIVISION 14
DIVISION 15
15050
15064
15072
15100
15101
15120
15140
15250
15860
15891
15990
DIVISION 16
16000
16015
16110
16120
16121
16141
16150
16191
16192
16345
16370
16380
16431
16470
16480
16482
16484
16495
16500
16600
CDM Constructors Inc. Page 4 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Apr-17
Apr-17
Apr-17
Date
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Apr-17
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
ELECTRICAL LEGEND I
ELECTRICAL LEGEND II
INSTRUMENTATION LEGEND I
INSTRUMENTATION LEGEND II
SYSTEM ARCHITECTURE PACKAGE 2A
COVER
HEADWORKS AND INFLUENT JUNCTION BOX SITE PLAN
FINAL CLARIFIERS AND RAS PUMP STATION DEMOLITION PLAN
ELECTRICAL SYSTEM TESTING AND SETTINGS
GROUNDING SYSTEM
WALK-IN ELECTRICAL ENCLOSURE
24" RAS DISCHARGE PIPING PROFILE
FINAL CLARIFIERS, RAS AND SCUM YARD PIPING
FINAL CLARIFIER 5-N DRAIN AND UNDERDRAIN PIPING
FINAL CLARIFIER 5-S DRAIN AND UNDERDRAIN PIPING
ODOR CONTROL SYSTEM YARD PIPING I
INTERMEDIATE PUMP STATION AND PRIMARY CLARIFIER DEMO. PLAN
BIOFILTER AND ODOR CONTROL DEMOLITION PLAN
ODOR CONTROL BIOFILTER DEMOLITION PLAN DETAIL
ODOR CONTROL BIOFILTER DEMOLITION SECTION DETAIL
BIOFILTER FAN AND HUMIDIFIER DEMOLITION PLAN DETAIL
OVERALL SITE PLAN
BORING AND SUE LOCATIONS
BORING AND SUE LOCATION TABLES
FINAL CLARIFIERS AND RAS PUMP STATION SITE PLAN
PRIMARY CLARIFIER SITE PLAN
EROSION CONTROL PLAN PKG 2A - PH 1
PRIMARY CLARIFIER PAVING AND GRADING PLAN
HEADWORKS AND INFLUENT J.B. PAVING AND GRADING PLAN
CONCRETE PAVEMENT JOINT DETAIL SHEET
EROSION CONTROL PLAN PKG 2A - PH 1
EROSION CONTROL PLAN PKG 2A - PH 1
ODOR CONTROL SYSTEM YARD PIPING II
24" RAS REAERATION BASIN TIE INS (PACKAGE 2A)
INTERMEDIATE PUMP STATION TRICKLING FILTER BYPASS ROUTING
FINAL CLARIFIERS AND RAS PUMP STATION EXCAVATION PLAN
FINAL CLARIFIERS AND RAS PUMP STATION PAVING AND GRADING PLAN
DRAWING INDEX
GENERAL NOTES
GENERAL LEGEND AND SYMBOLS
GENERAL ABBREVIATIONS
OVERALL SITE PHASING PLAN
CIVIL/SITE LEGEND AND SYMBOLS
CIVIL/SITE NOTES
STRUCTURAL NOTES
MECHANICAL NOTES
PIPING LEGEND, SYMBOLS, NOMENCLATURE AND TESTING
VALVE LEGEND AND SYMBOLS
PROCESS EQUIPMENT LEGEND AND SYMBOLS
PROPOSED HYDRAULIC PROFILE
PROPOSED HYDRAULIC PROFILE FOR EFFLUENT PUMPING STATION
EXISTING PROCESS FLOW DIAGRAM
PROCESS FLOW DIAGRAM
EXISTING SITE PLAN HORIZONTAL CONTROL
16660
16920
16950
PROJECT DRAWINGS
Sheet No Description
-
GP-G-3A
GP-G-5
GP-G-6
GP-G-7
GP-G-8
GP-C-1
CP-C-2
GP-S-1
GP-M-1
GP-M-2
GP-M-3
GP-M-4
GP-M-5
GP-M-6
GP-M-7
GP-M-8
GP-E-1
GP-E-2
GP-I-1
GP-I-2
GP-I-3
GS-C-100
GS-C-101
GS-C-102
GS-C-103
GS-C-107
GS-C-108
GS-C-109
GS-C-206
GS-C-207
GS-C-208
GS-C-209
GS-C-210
GS-C-211
GS-C-322
GS-C-343
GS-C-344
GS-C-345
GS-C-346
GS-C-347
GS-C-348
GS-C-351
GS-C-404
GS-C-405
GS-C-406
GS-C-407
GS-C-408
GS-C-457
GS-C-458
GS-C-459
CDM Constructors Inc. Page 5 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Jun-18
Jun-18
Jun-18
Jun-18
Oct-19
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Oct-19
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
DIVERSION STRUCTURE SECTIONS AND DETAILS
EXISTING AERATION BASIN MODIFICATION PLANS AND SECTION
EXISTING AERATION BASIN MODIFICATION SECTION
DISINFECTION TRUCK LOADING SLAB PLAN, SECTIONS AND DETAIL
FLOW CONTROL STRUCTURE DEMOLITION PLANS AND SECTIONS
FLOW CONTROL STRUCTURE DEMOLITION PLANS AND SECTIONS
TRICKLING FILTER PUMP STATION MODIFICATION PLAN
EXISTING AERATION BASIN DEMOLITION PLANS AND SECTION
EXISTING AERATION BASIN MODIFICATION PLANS AND SECTION
EXISTING AERATION BASIN MODIFICATION SECTION
EXISTING AERATION BASIN DEMOLITION PLANS AND SECTION
FLOW CONTROL STRUCTURE DEMOLITION PLANS AND SECTIONS
FLOW CONTROL STRUCTURE TEMPORARY BYPASS PIPING
DIVERSION STRUCTURE DEMOLITION AND MODIFICATION PLANS AND SECTIONS
DIVERSION STRUCTURE PLAN, SECTION AND DETAIL
EROSION CONTROL PLAN PKG 2A - PH 2
EROSION CONTROL PLAN PKG 2A - PH 2
EROSION CONTROL PLAN PKG 2A - PH 2
EROSION CONTROL NOTES AND DETAILS
HEADWORKS BIOTRICKLING FILTER FOUNDATION DETAILS
INFLUENT JUNCTION BOX BIOTRICKLING FILTER FOUNDATION PLAN
INFLUENT JUNCTION BOX BIOTRICKLING FILTER FOUNDATION DETAILS
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER FOUNDATION PLANS
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER FOUNDATION DETAILS
HEADWORKS BIOTRICKLING FILTER FOUNDATION PLAN
HEADWORKS BIOTRICKLING FILTER FOUNDATION DETAILS
HEADWORKS BIOTRICKLING FILTER PLAN
HEADWORKS BIOTRICKLING FILTER SECTION 1
HEADWORKS BIOTRICKLING FILTER SECTION 2
HEADWORKS GRIT BUILDING DUCT PLAN
INFLUENT JUNCTION BOX BIOTRICKLING FILTER DUCT PLAN
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER FOUNDATION DETAILS
PRIMARY CLARIFIER AND FINE SCREEN BIOTRICKLING FILTER FOUNDATION PLAN
PRIMARY CLARIFIER AND FINE SCREEN BIOTRICKLING FILTER FOUNDATION DETAILS
PRIMARY CLARIFIER AND FINE SCREEN BIOTRICKLING FILTER FOUNDATION DETAILS
HEADWORKS BIOTRICKLING FILTER DUCT PLAN
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER SECTION 1
INTERMEDIATE PUMP STATION AND DIVERSION STRUCTURE DUCT PLAN
INTERMEDIATE PUMP STATION SECTION 1
PRIMARY CLARIFIER & FINE SCREEN BIOTRICKLING FILTER DUCT PLAN I
PRIMARY CLARIFIER & FINE SCREEN BIOTRICKLING FILTER PLAN
INFLUENT JUNCTION BOX BIOTRICKLING FILTER PLAN
INFLUENT JUNCTION BOX BIOTRICKLING FILTER SECTION 1
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER DUCT PLAN I
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER DUCT PLAN II
INTERMEDIATE PUMP STATION BIOTRICKLING FILTER PLAN
ODOR CONTROL RISER DIAGRAMS
PRIMARY CLARIFIER & FINE SCREEN BIOTRICKLING FILTER SECTION I
PRIMARY CLARIFIER & FINE SCREEN DUCT DETAILS
ODOR CONTROL ELECTRICAL SITE PLAN
ODOR CONTROL DEMOLITION ONE-LINE DIAGRAM
ODOR CONTROL MODIFICATION ONE-LINE DIAGRAM
INTERMEDIATE PUMP STATION PLANS
MCC-4 DEMOLITION AND MODIFICATION ONE-LINE DIAGRAMS
EXISTING MCC-4 ELECTRICAL BUILDING PLAN
DEMOLITION DUCT PLANS I
DEMOLITION DUCT PLANS II
GS-C-460
GS-C-461
GS-C-462
GS-C-470
TF-M-13
AB-M-1
AB-M-2
AB-M-3
AB-M-4
AB-M-5
AB-M-6
DIS-S-9
FCS-S-1
FCS-M-1
FCS-M-2
FCS-M-5
IPS-S-1
IPS-S-2
IPS-S-3
IPS-E-1
IPS-E-2
IPS-E-3
OC-DM-1
OC-DM-2
OC-S-1
OC-S-2
OC-S-3
OC-S-4
OC-S-5
OC-S-6
OC-S-7
OC-S-8
OC-S-9
OC-S-10
OC-S-11
OC-M-3
OC-M-4
OC-M-5
OC-M-6
OC-M-7
OC-M-10
OC-M-11
OC-M-12
OC-M-20
OC-M-21
OC-M-22
OC-M-23
OC-M-24
OC-M-25
OC-M-30
OC-M-31
OC-M-32
OC-M-33
OC-E-1
OC-E-2
OC-E-3
OC-E-4
CDM Constructors Inc. Page 6 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
HEADWORKS AND INFLUENT JUNCTION BOX BIOTRICKLING FILTER PLANS
INTERMEDIATE PUMP STATION AND PRIMARY CLARIFIER & FINE SCREENS
BIOTRICKLING FILTER PLANSODOR CONTROL HEADWORKS I (LOCATION 1)
ODOR CONTROL HEADWORKS II (LOCATION 1)
RAS PS PLANS AND SECTIONS
RAS PS PLANS AND SECTIONS
RAS PS ELEVATIONS
CLARIFIER DEMOLITION PLAN AN SECTIONS
CLARIFIER 5-N (5-S) RAS/SCUM PUMPS PLAN
ODOR CONTROL INFLUENT JUNCTION BOX (LOCATION 2)
ODOR CONTROL - PRIMARY CLARIFIERS NO. 3 & 4 AND INTERMEDIATE PS (LOCATION
3)ODOR CONTROL - -PRIMARY CLARIFIERS NO. 1 & 2 AND FINE SCREENS (LOCATION 4)
CLARIFIER 5-S (5-N) PLAN, SECTION AND DETAILS
CLARIFIER 5-S (5-N) SECTIONS
SECONDARY CLARIFIER SITE PLAN
EXISTING MCC-303N ONE-LINE DIAGRAM
EXISTING MCC-304E ONE-LINE DIAGRAM
EXISTING DISINFECTION RISER DIAGRAM AND PANEL SCHEDULES
ELEMENTARY DIAGRAMS
CLARIFIER 5-N (5-S) PLAN
CLARIFIER 5-N (5-S) SECTION I
RAS PS PLAN
RAS PS SECTIONS
SCUM PUMP SECTIONS
CIVIL/SITE STANDARD DETAILS II
CIVIL/SITE STANDARD DETAILS III
CIVIL/SITE STANDARD DETAILS IV
YARD PIPING DETAILS I
PAVING AND GRADING DETAILS I
SECONDARY CLARIFIER PLAN
SCUM PUMP AND RAS PUMP STATION ELECTRICAL PLANS
DISINFECTION ELECTRICAL IPA BUILDING MODIFICATION PLAN
CLARIFIERS AND RAS PUMP STATION
CIVIL/SITE STANDARD DETAILS I
PROCESS MECHANICAL STANDARD DETAILS XII
PROCESS MECHANICAL STANDARD DETAILS XIII
PROCESS MECHANICAL STANDARD DETAILS XIV
PROCESS MECHANICAL STANDARD DETAILS VII
PROCESS MECHANICAL STANDARD DETAILS VIII
PROCESS MECHANICAL STANDARD DETAILS IX
PROCESS MECHANICAL STANDARD DETAILS X
PROCESS MECHANICAL STANDARD DETAILS XI
PROCESS MECHANICAL STANDARD DETAILS II
PROCESS MECHANICAL STANDARD DETAILS III
PROCESS MECHANICAL STANDARD DETAILS IV
PROCESS MECHANICAL STANDARD DETAILS V
PROCESS MECHANICAL STANDARD DETAILS VI
SPECIAL INSPECTIONS I
SPECIAL INSPECTIONS II
SPECIAL INSPECTIONS III
STRUCTURAL DETAILS V
PROCESS MECHANICAL STANDARD DETAILS I
PAVING AND GRADING DETAILS II
STRUCTURAL DETAILS I
STRUCTURAL DETAILS II
STRUCTURAL DETAILS III
STRUCTURAL DETAILS IV
OC-E-5
OC-E-6
OC-I-1
OC-I-2
OC-I-3
OC-I-4
OC-I-5
SC-S-1
SC-S-2
SC-S-3
SC-S-4
SC-S-5
SC-M-1
SC-M-2
SC-M-3
SC-M-4
SC-M-5
SC-M-6
SC-M-7
SC-E-1
SC-E-2
SC-E-3
SC-E-4
SC-E-5
SC-E-6
SC-E-7
SC-E-8
SC-I-1
STD-C-1
STD-C-2
STD-C-3
STD-C-4
STD-C-10
STD-C-30
STD-C-31
STD-S-1
STD-S-2
STD-S-3
STD-S-4
STD-S-5
STD-S-6
STD-S-7
STD-S-8
STD-M-1
STD-M-2
STD-M-3
STD-M-4
STD-M-5
STD-M-6
STD-M-7
STD-M-8
STD-M-9
STD-M-10
STD-M-11
STD-M-12
STD-M-13
STD-M-14
CDM Constructors Inc. Page 7 of 8
Attachment 1 - Equipment / Material Pricing
Project
Owner:
Date:
Package No.:
T.E. Maxson WWTF Upgrades Package 2A - Aeration Basin,
Secondary Clarifiers, RAS/SCUM Pump Station & Headworks Odor
Control Improvements
City of Memphis, Tn.
11-3040 Secondary Clarifiers Round
0
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Jun-18
Date
INSTRUMENTATION STANDARD DETAILS II
Description
INSTRUMENTATION STANDARD DETAILS I
PROCESS MECHANICAL STANDARD DETAILS XV
PROCESS MECHANICAL STANDARD DETAILS XVI
PROCESS MECHANICAL STANDARD DETAILS XVII
ELECTRICAL DETAILS I
ELECTRICAL DETAILS II
ELECTRICAL DETAILS III
STD-M-15
STD-M-16
STD-M-17
STD-E-1
STD-E-2
STD-E-3
STD-I-1
STD-I-2
STD-I-3 INSTRUMENTATION STANDARD DETAILS III
OTHER DOCUMENTS