AIRPORT BREMEN
AIRPORT BREMEN
Technical Details
AIRPORT BREMEN
1987 2003 2004
Movements 56.456 42.789 42.722
Passengers 858.549 1.639.834 1.674.987
Air Cargo 11.902 t 24.509 t 24.992 t
Air Mail 3.902 t 1.075 t < 1.000 t
Employees 239 253
Sales Proceeds24 Mio. DM37,2 Mio. (M)
Share Capital 15 Mio. DM 30,8 Mio. (M)
Balance Sht. Tt.29,7 Mio. DM176,4 Mio. (M)
Economical Details
AIRPORT BREMEN
Connections
AIRPORT BREMEN
Airport Cluster
ATCAirbus
LFTEADS
University
Flyline
Mail Distr.
Stuhr
AIRPORT BREMEN
Historical Background
1912 First Sightseeing Flights from „Neuenlander Feld“
1913 Approval for Airfield Operation
First Passenger Transports
1920 Official Begin of Airport Bremen
First KLM Scedule AMS-BRE-HAM-CPN
1937 Construction of a paved 4-RWY-System
1944/45 Destruction of Airport Infrastructure
1949 Civil Administration takes over Airport.
from US-mil. Begin of „Propeller Era“
AIRPORT BREMEN
Historical Background
1955 Free Airspace for General Aviation
1965 Begin of „Jet Era“ with Lufthansa B727
Late 60th Project for new Airport „North Germany“
1971 Rapid Increase in Touristic Flights
1973 Decision to develop and improve Bremen Airport
Early 80th Establishmt. of Obstacle Clearance in the East
AIRPORT BREMEN
Historical Background
1988/90 Displacement of River and Dike
Instrument Cat. II
Construction of 2 x 300 m add. RWY for Airbus wing transport with Super Guppy
1995/97 Construction of parallel TWY
Instrument Cat. IIIa/b
1991/98 Programm „Airport 2000“
- 3 new terminals- 2 new multi-storey car parks- new cargo hangar
1999 Construction of RWY 23
1993 Change of Operating Hours for Home Carrier
AIRPORT BREMEN
Airport Reputation Problems
People fear Establishment of an Intercontinental Flight capable Airport („Salami Tactics“)
Full scale Airport very close to residential Areas
Decreasing Aircraft Movements in Total (due to decreasing Movements of small aircraft)
Increasing Aircraft Movements at Night (22 to 6 o‘clock)
Investments in Airport-Infrastructure while there is no or less money for schools and other social Institutions
Lots of Discussions in Media with a negative Touch
AIRPORT BREMEN
Airport Promotion Ideas
BMW Drivers Training on the Apron
Travel Fair in all Terminals
Planned:
Job FairCruise Fair
Skate Night
AIRPORT BREMEN
Skate Night Background
Since 2001 each Year a Skate Night has been organized.
It takes approx. ½ –Year-Preparation and Organization
Including Catering, Sponsoring, Media, Programme, Security
The Message is:
“The Airport is not something strange, closed for Public and producing negative Impacts, but something you can experience! It’s your Airport!”
- sports event
- family event
- airport open door
- party
Skate Night Details
Normally ~10.000 People (2004 only 7.000 due to Weather)
Free Parcour approx. 3.000 m along
- Main Apron
- TWYs C and A
- ~ 1.000 m RWY
Lots of positive Media feedback
Many positive personal Fax and e-mail-Messages
First year: 50 complaints on (music) Noise
AIRPORT BREMEN
Skate Night Details AIRPORT BREMEN
Begin of Party at 21 o‘clock
Open Parcour after last Arrival, approx. 23:30 o‘clock
End of Parcour at 4 o‘clock
Airport ready for Flight Operations by 6 o‘clock
AIRPORT BREMENSecurity Issues
Random Security Checks at the Entrance
Use of movable Fences limited to Apron
Along the Runway -> add. Security Staff
Skate Night Budget
Coverage (planned):
1/3 Sponsors (mainly Haake-Beck)
1/3 Tickets
1/3 Consession Fees (Catering), dep. on Turnover
AIRPORT BREMEN
Average Total Expenses ~ 80.000 €
~ 1/3 -1/2 for additional Security Staff and Facilities
Coverage (current):
2001-2003 (>) 100%
2004 (rain) < 100%
Skate Night Future
Next Skate Night will take place July 2nd
AIRPORT BREMEN
Due to new german „Aviation Security Law“ there will be additional Requirements in Security Issues
Due to Success Bremen Airport will continue to offer the Event year by year, if there is no Change in Interest and Participation
top related