alabama 19 2015
Post on 23-Jul-2016
225 Views
Preview:
DESCRIPTION
TRANSCRIPT
By Cindy RileyCEG CORRESPONDENT
Located across the street from the existing campus, thenew $22 million Citronelle High School in south Alabama isa highlight of the Mobile County Public School System’songoing construction efforts. The 96,000 sq. ft. (8,918 sq m)building won’t be completed until mid-2016, but is alreadygetting plenty of attention.
“The city, staff and students are very excited to get a newhigh school of this nature in a small town like Citronelle,”said Huey Belaire, the director of construction/planning ofthe Mobile County Public School System. “|It will be a hugeboost to the city, as it will attract new business.”
A groundbreaking ceremony was held in January 2015 tomark the start of construction, which some may considerlong overdue.
“Citronelle High has been in a very old building for manyyears,” Belaire said. “One of the existing three-story build-ings was built in the early 1920’s.”
So far, work appears to be on schedule for the two-storystructure, which has been described as a high school for the21st-century.
“All plumbing and electrical has been roughed into slab.About 40 percent of the first floor slab is poured. Blockwalls are going up. Structural steel is being erected and out-side utilities are being installed,” Belaire said.
Various contractors are needed to complete electrical,plumbing, masonry, steel, utilities, asphalt paving, technolo-gy, roofing, mechanical and installation of furniture. As forthe biggest challenges on the project, Belaire pointed out,“Completion during the time frame is very important. Wehave to complete the new school and move in so we can thenrenovate the existing buildings. We had soil issues to beginwith, but all is going well now.”
As part of the survey process, the testing company per-formed borings and analyzed soils. The unsuitable soils dis-covered would have required structural pilings to be installedat a very high cost. That prompted a search for a differentlocation for the high school. The property where the newconstruction is taking place had been the site of a mini mall,practice football field and athletic building.
“We purchased the mini mall property along Hwy 45, anddemolished that, as well as the existing athletic building,”said Belaire.
Heavy machinery being used on the project includes bull-dozers, track hoes, bobcat, excavators, cranes, dump trucksand a concrete pump truck. Some of the main materialsrequired include brick mortar block concrete steel, plumb-
ing, electrical, drainage, asphalt and roofing.The auditorium will be concrete footer, concrete slab
tapered toward the stage, heavy steel structure and masonrywalls with large HVAC equipment.
The educational space consists of classrooms on bothfloors. The kitchen/cafeteria/auditorium will be on the firstfloor. There are regular classrooms, computer labs, chem-istry, biology and science labs, a band rooms, choral rooms,administrative space and nurse’s aid rooms. The new schoolwill also feature a large media room with adjoining comput-er lab and smart boards. Also at the new campus, there willbe new drainage, which will include a large storm water
retention pond.The current Citronelle High School facility will become a
comprehensive career technical program facility. The stand-alone cafeteria also will be renovated. In addition, there willbe a new football practice field, a band practice field, a newgirls' athletic facility and a new boys' athletic facility, alongwith a completely renovated gymnasium and dressing facil-ity. There are several buildings getting makeovers, includ-ing the gymnasium, culinary, consumer science, agricultureand engineering classrooms.
For crews on site, wet conditions in recent months have
New $22M School Highlights Mobile County’s Efforts
ALABAMA STATE EDITION A Supplement to:
Your Alabama Connection • Rich Olivier, Atlanta, GA • 1-800-409-1479
“The Nation’s Best Read Construction Newspaper… Founded in 1957.”
see CITRONELLE page 2
The Architects Group photoLocated across the street from the existing campus, the new $22 million Citronelle High School in south Alabamais a highlight of the Mobile County Public School System’s ongoing construction efforts.
September 162015
Vol. XXVIII • No. 19Mobile
Dothan
Auburn
Anniston
Gadsden
HuntsvilleFlorence
Decatur
BirminghamBessemer
Tuscaloosa
SelmaMontgomery
Phenix City
65
65
65
65
10
85
20
20
59
59
565
220
72
31
231
43
78
5
72
431
280
82
231
31
43
80
82
231
84
84
52
431
331
45
98
84
82
Page 2 • September 16, 2015 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Educational Space Consists of Classrooms on Both Floorsbeen a concern, but have not sidetracked theproject, according to Belaire.
“Weather is always a huge factor in con-struction, especially in Mobile. We get lotsof rain. Weather affects all trades until thebuilding is dried in.”
Belaire also remarked that reaction to theconstruction so far has been extremely sup-portive, as work continues on the new build-ing.
“We have received lots of feedback fromthe community and parents. All has beenpositive.”
Hoar Program Management is serving asconstruction manager.
According to Hoar Program Managementproject manager Matt Denaburg, progress onthe construction of the new building is wellunderway.
“The contractor is making great strides,completing scheduled activities on time andmaking valiant efforts in preparation forwork ahead. Ensuring a quality project for
our client within the approved budget andschedule remains our top priority.
“The new Citronelle High School projectis the first of several stepping stones ofprogress for the Mobile County PublicSchools System, as well as the City ofCitronelle. Along with the new construction,approximately 73,500 square feet of theexisting facility will be renovated to bring itup to current standards,” said Denaburg.
According to Denaburg, one of the great-est challenges was to identify a suitable loca-tion, which would utilize the existing highschool’s facilities.
“Prior to design completion, soil condi-tions for the initial building site were foundto be unacceptable and required swift andprecise planning to locate available land.Our team undertook an enormous effort tofind acceptable land to purchase and keep
the new construction project on track for aspring 2016 completion. We considered thissetback an opportunity to provide value toour client and share sound solutions to over-come this obstacle.”
White-Spunner Construction Inc. ofMobile is serving as the general contractor.The Architects Group (TAG), also headquar-tered in the Port City, designed the new highschool.
“TAG wanted to design a new highschool that would have an identity all itsown,” said Robert Krchak, principal anddirector of project management at TAG.“The design needed to meet all of the pro-gramming specifications of the MobileCounty Public School System and the needsof the students, faculty and community. Thearchitect wanted to design the high school toreflect a learning environment, but at thesame time distinguish Citronelle HighSchool from any other high school or educa-tional facility.
Krchak also cited the inappropriate soilconditions early in the creative process.
“TAG was able to adapt the design tomeet the specifications and enhance ameni-ties of the adjacent property,” said Krchak.“Another challenge has been working with-in a bustling part of the center of town andmaking sure all flows without interruption.”
While Citronelle High School is not purs-ing LEED certification, it will incorporategreen features such as energy efficient sys-tems, automatic lighting controls and lowwater usage fixtures.
As part of the design, the new CitronelleHigh School features administrative areas,classrooms, a 300-seat cafeteria with kitchenand a 500-seat auditorium with stage. It is atraditional design with brick veneer andcolumns. The project also includes the reno-vation of the existing one-story, 58,480-square foot building to provide upgrades and
see CITRONELLE page 6
The Architects Group photoA rendering of the completed CitronelleHigh School.
The Architects Group photoThe 96,000 sq. ft. (8,918 sq m) building won’t be completed until mid-2016, but is already getting plenty of attention.
CITRONELLE from page 1
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 16, 2015 • Page 3
Contact your local dealer:
Birmingham, AL205.841.6666
Madison, AL256.350.0006
Mobile, AL251.633.4020
Montgomery, AL334.262.6642
Oxford, AL256.832.5053
Pensacola, FL850.479.3004
Atlanta, GA404.696.7210
1.800.239.2694www.cowin.com
Smart Works.You’re interested in performance and productivity. So are your machines.
Cowin Equipment Company is a full-service distributor with a deep-seated history of providing customers with complete satisfaction. Invest in superior Volvo Construction Equipment machines with the con!dence you deserve and the quality you demand.
4 4:22 PM
Page 4 • September 16, 2015 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 16, 2015 • Page 5
Thompson Tractor is offering
some serious deals on two of
our most popular compact
construction equipment
machines and coupled them
with a trailer package so you
can load up and get to work.
LOAD UP
WITH SOME SERIOUS DEALS ›
›
››
››
›
PACKAGE INCLUDES:
$59,999 price includes: trailer, binders, bucket, set of forks, cooler and ratchet strap to tie down additional tool. Offer ends June 30, 2016. See Thompson Tractor for more details.
259D $59,999›
››››
›
›
›
PACKAGE INCLUDES:
$47,900 price includes: trailer, binders, buckets, manual coupler, cooler and ratchet strap to tie down additional tool. Offer ends June 30, 2016. See Thompson Tractor for more details.
303E $47,900
LOA
AD UP
P
DESHACRU PEAR
T AHS TEGAKCAP
E VIT FSRIE FHT
R OL FWON BORI
5 10E 2HO TS TTEKCIT
F R OIAE PERF
s aenihcam
tucrtsnoc
tso mruo
iree smos
ospmohT
imir a loF
m ehd telpuod cns a
tnepmiuq enoi
tcampo carlup po
f o own ts olaes duo
g nireffs or iotcarn T
,ylne omid tet
259D
$59,999259D
59 9
WITH
ME SERIO H SO OME SERIOUS DEALS
› OUS DEALS
303E
WT
4$$4303E
OFSESAN CUN GACILEO PW
F A FE OCIOHR CUOY
9779447
CRUE PGAKCAY PREVR EO
R R OELOON CACILEE PER
DESAHC
R d uaon lac
arh a ttiw
s aenihcam
.kroo wt ted gnp ad u
u oo ye sgakcar peli
m ehd telpuod cns a
ACKA P PACKAGE INCLUDES:259DD
259D
ACKAGE INCLUDES:
$59,999259D
59,9
AC P PACKAGE INCLUDES:303EE
303E
ACKAGE INCLUDES:
4$$4303E
ACKAGE INCLUDES:
,977,900447
er ends June 30ool. Offtchet staooler and rorks, cf
e includes: tr,999 pric9$5
LITAEVODR WELIAR’ T’ X 78 1›UH BTOOM” S6 6›CAR TWORNAR
Y PONAD C95 2›
acthompson T16. See T, 20er ends June 30wn additional o tie doap ttrchet s
et, set of , binders, buckailerr, binders, bucke includes: tr
IT KM P›SPATRS
IS / BNIAH C›F FT OE” S2 4›
’ / 2R W W/ 2TEKCU
KC
S / REDNSKROF F
er ends June 30ool. Offtooler and r, couplerr, cc
e includes: tr,900 pric77,900 pric$4
H TALU MAN›O CALU MAN›TEKCU4” B 2›
ETKC BU”2 1›HTBGIATRS
POAN CE3 30›
hompson T16. See T, 20er ends June 30wn additional o tie doap ttrchet staooler and r
ets, manual , binders, buckailerr, binders, bucke includes: tr
IT KM P›SPATRSS / BNIAH C›
TAEVO D’2AR’ T’ X 78 1›
BMURELPUO
T
EDAL/YY/P
actwn additional
ets, manual
S / REDNIS / BLITA
/ R W W/ ELIA
e details.or morfer ends June 30ool. Offt
or actrhompson T16. See T, 20er ends June 30
or
e details.or morfer ends June 30ool. Offt
hompson T16. See T, 20er ends June 30
or actr
Page 4 • September 16, 2015 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 16, 2015 • Page 5
Thompson Tractor is offering
some serious deals on two of
our most popular compact
construction equipment
machines and coupled them
with a trailer package so you
can load up and get to work.
LOAD UP
WITH SOME SERIOUS DEALS ›
›
››
››
›
PACKAGE INCLUDES:
$59,999 price includes: trailer, binders, bucket, set of forks, cooler and ratchet strap to tie down additional tool. Offer ends June 30, 2016. See Thompson Tractor for more details.
259D $59,999›
››››
›
›
›
PACKAGE INCLUDES:
$47,900 price includes: trailer, binders, buckets, manual coupler, cooler and ratchet strap to tie down additional tool. Offer ends June 30, 2016. See Thompson Tractor for more details.
303E $47,900
LOA
AD UP
P
DESHACRU PEAR
T AHS TEGAKCAP
E VIT FSRIE FHT
R OL FWON BORI
5 10E 2HO TS TTEKCIT
F R OIAE PERF
s aenihcam
tucrtsnoc
tso mruo
iree smos
ospmohT
imir a loF
m ehd telpuod cns a
tnepmiuq enoi
tcampo carlup po
f o own ts olaes duo
g nireffs or iotcarn T
,ylne omid tet
259D
$59,999259D
59 9
WITH
ME SERIO H SO OME SERIOUS DEALS
› OUS DEALS
303E
WT
4$$4303E
OFSESAN CUN GACILEO PW
F A FE OCIOHR CUOY
9779447
CRUE PGAKCAY PREVR EO
R R OELOON CACILEE PER
DESAHC
R d uaon lac
arh a ttiw
s aenihcam
.kroo wt ted gnp ad u
u oo ye sgakcar peli
m ehd telpuod cns a
ACKA P PACKAGE INCLUDES:259DD
259D
ACKAGE INCLUDES:
$59,999259D
59,9
AC P PACKAGE INCLUDES:303EE
303E
ACKAGE INCLUDES:
4$$4303E
ACKAGE INCLUDES:
,977,900447
er ends June 30ool. Offtchet staooler and rorks, cf
e includes: tr,999 pric9$5
LITAEVODR WELIAR’ T’ X 78 1›UH BTOOM” S6 6›CAR TWORNAR
Y PONAD C95 2›
acthompson T16. See T, 20er ends June 30wn additional o tie doap ttrchet s
et, set of , binders, buckailerr, binders, bucke includes: tr
IT KM P›SPATRS
IS / BNIAH C›F FT OE” S2 4›
’ / 2R W W/ 2TEKCU
KC
S / REDNSKROF F
er ends June 30ool. Offtooler and r, couplerr, cc
e includes: tr,900 pric77,900 pric$4
H TALU MAN›O CALU MAN›TEKCU4” B 2›
ETKC BU”2 1›HTBGIATRS
POAN CE3 30›
hompson T16. See T, 20er ends June 30wn additional o tie doap ttrchet staooler and r
ets, manual , binders, buckailerr, binders, bucke includes: tr
IT KM P›SPATRSS / BNIAH C›
TAEVO D’2AR’ T’ X 78 1›
BMURELPUO
T
EDAL/YY/P
actwn additional
ets, manual
S / REDNIS / BLITA
/ R W W/ ELIA
e details.or morfer ends June 30ool. Offt
or actrhompson T16. See T, 20er ends June 30
or
e details.or morfer ends June 30ool. Offt
hompson T16. See T, 20er ends June 30
or actr
Page 6 • September 16, 2015 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
Makeover to Benefit Countless Students for Years to Comeadditional seating in the gymnasium,upgraded varsity locker rooms, and to pro-vide for business education, health sciences,agriculture, ROTC, engineering and manu-facturing classrooms.
“The architectural style is generally whatwould be considered traditional,” Krchaksaid. “This is in keeping with the generaldesign philosophy of the Mobile CountySchool System and the city of Citronelle.Certainly within that general design framework, the very special functional needs of amodern educational environment are provid-ed.”
Exterior construction is load bearing con-crete masonry units with brick veneer, steelframed concrete second floor, steel framingand bar joist roof with metal deck , insulatedsheathing and asphalt shingle roofing.Exterior glazing is impact-resistant insulat-ing glass in aluminum storefront and cur-tainwall. Interior is generally load-bearingand non-load bearing concrete masonryunits, acoustical ceilings in metal grid, VCT,quarry tile and carpet flooring, hollow metaldoor frames and wood doors.
Citronelle High School serves the largestgeographical attendance zone in the MobileCounty Public Schools, from I-65 in Creola,
north to the Washington County line, west tothe Mississippi line, south to Chunchula andTurnerville and over to Creola. Other com-munities served include Mount Vernon,Calcedeaver, Browntown, Gulfcrest,Georgetown, Axis, Bucks, Chastang andCalvert.
The new high school is being built on a13-acre site, which is bordered by LebaronAvenue, Highway 45 and Centre Street.The project is one of several included in theMobile County Public School System's planto complete $100 million in school construc-tion over the next two years.
Denaburg said in addition to the newbuilding, the makeover of the existing spacewill benefit countless students for years tocome.
“The renovation of the existing highschool facilities will further the opportunitiesfor the students of Citronelle High and theMobile County Public School System.Hoar Program Management is honored tohelp them realize a legacy project such asthis,” said Denaburg.
(This story also can be found onConstruction Equipment Guide’s Web site atwww.constructionequipmentguide.com.)CEG
CITRONELLE from page 2
The Architects Group photoA groundbreaking ceremony was held in January 2015 to mark the start of con-struction, which some may consider long overdue.
The Alabama State Department of Transportationreceived bids for transportation-related improvementprojects.
Following is a list of some of the projects let.
County: LeeContract ID: 20150327003Project: Bridge replacement and additional lanes.Location: On CR-146 (Moore.S Mill Road) at the I-85overpass in Auburn.Contractors and Bid Amounts:
• Scott Bridge Company Inc. — $11,299,045• McInnis Construction LLC — $11,850,828
County: TuscaloosaContract ID: 20150327005Project: Additional lanes (grade, drain, base, pave, barrierrail).Location: On I-59 (I-20) from the CR-85 (ButtermilkRoad) interchange to the SR-7 (U.S.-11) interchange.Contractors and Bid Amounts:
• Midsouth Paving Inc. — $25,885,569• S. T. Bunn Construction Company Inc. —
$27,532,065
County: JeffersonContract ID: 20150327007Project: Bridge replacement and approaches.Location: On 31st Street north over I-59/20 and on 12thAvenue north over I-59/20 in Birmingham.Contractors and Bid Amounts:
• Bell & Associates Construction L.P. — $19,281,545• Brasfield & Gorrie LLC — $19,731,289• Wright Brothers Construction Company Inc. —
$21,631,280• Dement Construction Company LLC — $22,734,763• R. R. Dawson Bridge Company LLC — $23,034,098• Tanner Inc. — $23,943,813
County: PikeContract ID: 20150327016Project: Resurfacing and bridge replacement.Location: CR-26 (Elm Street) from intersection of GeorgeWallace Drive to the junction of CR-14 (Swindall Road).Contractors and Bid Amounts:
• W .S. Newell & Sons Inc. and Newell & Bush Inc. JV— $1,943,534
• S. A. Graham Company Inc. — $1,972,803• Midsouth Paving Inc. — $2,111,478
County: ColbertContract ID: 20150327018Project: Bridge replacement.Location: On CR-65 (Frankfort Road) over Little BearCreek southwest of Tuscumbia.Contractors and Bid Amounts:
• B. H. Craig Construction Company Inc. —$1,433,920
• The Bridge Builders Of Alabama LLC — $1,485,003• Dement Construction Company LLC — $1,509,936• Wright Brothers Construction Company Inc. —
$1,550,479• Jones Bros. Inc. — $1,566,898.
County: ChoctawContract ID: 20150327022Project: Resurfacing and traffic stripe.Location: Various locations in Choctaw county.Contractors and Bid Amounts:
• Mobile Asphalt Company LLC — $3,503,118• H. O. Weaver & Sons Inc. — $3,576,305
Montgomery • Jefferson • Talladega • Calhoun • Russell • Walker • Lawrence • Dekalb • Morgan • St. Clair • Tuscaloosa • Morgan • Shelby• Bibb •Hale • Fayette • Marion • Winston • Cullman • Shelby • Chilton • Chambers • Covington • Baldwin • Clarke • Monroe • St. Clair• Chilton • Escambia• Montgomery • Jefferson • Russell • Fayette • Conecuh • Coffee • Geneva • Montgomery • Jefferson • Talladega •Bibb • Coffee • Calhoun • Russell • • Walker• Lawrence• Dekalb • Morgan • St. Clair • Tuscaloosa • Bibb• Hale • Fayette • Monroe •Clarke • Winston • Cullman • Shelby • Chilton • Chambers • Covington • Baldwin • Clarke • Monroe • Montgomery • Jefferson • Talladega
Alabama…
‘The Yellowhammer State’ Highway Project Lettings
Construction Equipment Guide • Alabama State Supplement • www.constructionequipmentguide.com • September 16, 2015 • Page 7
NO DPF. NO REGENERATION.
NO COMPETITION.
THE JOB NEVER STOPS. NEITHER DO WE.
The JCB Backhoe range comes with the best Tier 4 solution, LiveLink telematics and parallel lift all standard. For a limited time, you can choose between an attractive finance package or lease select JCB backhoes from as low as $799/mo*.
042815-JCBCONTRACT #
OU WOR YYOU WORK HARD.
OU WORK HARD.
one selling backhoe and dig it for yourself today!Contact JCB of Alabama to demo the world’s number
backhoes from as low as $799/mo*.
telematics and parallel lift all standard. FThe JCB Backhoe range comes with the best T
OU AND Y YOU DESERVE A BA
one selling backhoe and dig it for yourself today!Contact JCB of Alabama to demo the world’s number
backhoes from as low as $799/mo*.
or a limited time, you cantelematics and parallel lift all standard. FThe JCB Backhoe range comes with the best T
T CKHOE THA AT DOES THE SAME.U DESERVE A BA ACKHOE THA
one selling backhoe and dig it for yourself today!Contact JCB of Alabama to demo the world’s number
or a limited time, you canier 4 solution, LiveLinkThe JCB Backhoe range comes with the best T
T DOES THE SAME.
the exact model and configuration shown. T
*Offer valid until November 30th on select new Backhoe models at participating JCB dealers and is subject to JCB F
(866) 954-6522
axes, freight, set-up, and delivery are excluded. Limited ti on shown. T Taxes, freight, set-up, and delivery are excluded. Limited time offer*Offer valid until November 30th on select new Backhoe models at participating JCB dealers and is subject to JCB F
Montgomery791 Anderson R
(866) 954-6522
, which may not be combined with other programs. Offer subject to change without notice. Please contact your local JCB dealer f ime offer r, which may not be combined with other programs. Offer subject to change without notice. Please contact your local JCB dealer fease example is based on a 60 month term with 1000 operating hours per yearinance approval. $799 L
, AL 36110Montgomeryoad Anderson R Road
(888) 791-3173eeds, AL 35094L
eaver Avenu 8920 W Weaver Avenue
jcbofalabama.com
042815-
, which may not be combined with other programs. Offer subject to change without notice. Please contact your local JCB dealer f. Suggested lease payment is based preconfigured JCB 3CX and may not reflect with 1000 operating hours per year r. Suggested lease payment is based preconfigured JCB 3CX and may not reflect
(256) 312-4639Anniston, AL 3620130 Plunkett Avenue
(888) 791-3173
eaver Avenue
jcbofalabama.com
3890
CT #
or complete program details. f for complete program details.. Suggested lease payment is based preconfigured JCB 3CX and may not reflect
CT #CONTRACONTRA
JCB042815-
Page 8 • September 16, 2015 • www.constructionequipmentguide.com • Alabama State Supplement • Construction Equipment Guide
TEC goes the Extra Mile to hire and train the very best in the business.
We take great pride in recognizing Tem Hogan for his dedication,
hard work, loyalty and personal commitment for becoming a Certified
Master Technician. Our thanks to Tem for going the Extra Mile to earn the prestigious
TEC Certified Master Technician ring for excellence!
top related