An-Najah National UniversityAn-Najah National University
Building Engineering DepartmentBuilding Engineering Department
Integrated Design for Clinics Integrated Design for Clinics ComplexComplex
Prepared by : Reham Asaa’dPrepared by : Reham Asaa’d
Saja OdehSaja Odeh
Wala’ Abu HadeedWala’ Abu Hadeed
Supervisor : Arch. Moa’yad Salhab Supervisor : Arch. Moa’yad Salhab
2
Site descriptionSite description Architectural Design.Architectural Design. Environmental Design.Environmental Design. Structural DesignStructural Design Mechanical designMechanical design Electrical designElectrical design Safety designSafety design Quantity surveyingQuantity surveying
OutlineOutline
Site description :Site description :
3
• The site is located in Tulkarm cityThe site is located in Tulkarm city• The site area about 5500 m ².The site area about 5500 m ².• The site is surrounded on three sides of The site is surrounded on three sides of
main street and sub ways .main street and sub ways .
ArchitecturalArchitectural DesignDesign
4
Architectural DesignArchitectural Design
5
Site planSite plan
6
Ground floor Ground floor planplan
7
First floor planFirst floor plan
8
ElevationElevation
9
ElevationElevation
10
SectionsSections
11
SectionsSections
EnvironmentalEnvironmental DesignDesign
12
((Sun path) Sun path)
13
In JanuaryIn January
In JulyIn July
Solar AnalysisSolar Analysis
Natural ventilationNatural ventilation
14
- water ponds also used around the building as a factor to help to control the relative humidity in the site also lead to purification and cooling the air and moistened
- Air movement in waiting area
AcousticsAcoustics
15
Polystyrene sheets used Polystyrene sheets used in the exterior and in the exterior and interior walls contributeinterior walls contribute
Acoustic roofing Acoustic roofing sheet perforated sheet perforated gypsum ceilinggypsum ceiling
16
Acoustics and thermal:Acoustics and thermal:
Acoustic foam sound Acoustic foam sound insulation used in insulation used in Chandelier in the main Chandelier in the main hole in the waitinghole in the waiting
DaylightDaylight
17
The material that will use in The material that will use in the skylight is Polycarbonate the skylight is Polycarbonate Sheet .Sheet .
skylight used in the waiting areaskylight used in the waiting area
ShadingShading
18
In the south walls In the south walls horizontal solar shading horizontal solar shading windows (overhang), made windows (overhang), made of aluminum material.of aluminum material.
And in west, east walls And in west, east walls windows vertical solar windows vertical solar shading windows shading windows (shutters) was made of (shutters) was made of aluminum. aluminum.
((thermal insulation) thermal insulation)
19
Solar AnalysisSolar Analysis
Ecotect analysisEcotect analysis
the external wall section and U value the external wall section and U value “Thermal Conductivity” =0.83 W/m2.K.“Thermal Conductivity” =0.83 W/m2.K.
20
Solar AnalysisSolar Analysis(Ecotect analysis)(Ecotect analysis)
The monthly load consumption for heating and cooling for The monthly load consumption for heating and cooling for zone D:zone D:
Heating: 18578 W at 21:00 on 11th JanuaryHeating: 18578 W at 21:00 on 11th JanuaryMax Cooling: 23330 W at 14:00 on 21st AugustMax Cooling: 23330 W at 14:00 on 21st August
21
Solar AnalysisSolar Analysis
HEATIN
G
COOLIN
G
TOTAL
MONTH (Wh) (Wh) (Wh)
Jan 1751683 0 1751683
Feb 1335664 0 1335664
Mar 1163132 0 1163132
Apr 593165 183596 776762
May 54438 1239349 1293787
JUN 0 2213834 2213834
Jul 0 2693538 2693538
Aug 0 2880356 2880356
Sep 0 1853797 1853797
Oct 1316 1304305 1305621
Nov 378517 56747 435264
Dec 1458903 0 1458903
------------ -------- --------- ---------
TOTAL 6736819 12425523 19162342
PER M² 22516 41528 64044
Floor Area 299.205 m2
MONTHLY MONTHLY HEATING/COOLING HEATING/COOLING
LOADSLOADS
Structural Structural DesignDesign
22
23
Structural DesignStructural Design
Design DataDesign Data
• f’c =28 MPa FY=420 MPa Qall = 250 f’c =28 MPa FY=420 MPa Qall = 250
KN/mKN/m22
Loads :Loads :
D.L (super imposed) = 4 D.L (super imposed) = 4 KN/m2
L.L (based on the function of the building ) L.L (based on the function of the building )
24
Function Live Load ( KN/m2 )
Reception and corridors 4Clinical and Support Services 4
Laboratory Service 7.5
Structural System : Structural System : One way ribbed slab with drop beams.One way ribbed slab with drop beams.
Design DataDesign Data
Tulkarm City, in zone 2A where Z=0.15.Tulkarm City, in zone 2A where Z=0.15.
The soil was classified as Sc.The soil was classified as Sc.
CV=0.25 Ca=0.18CV=0.25 Ca=0.18
R (R (indeterminate structure indeterminate structure )= 5.5.)= 5.5.
I = 1.25 V= 353 ton.I = 1.25 V= 353 ton.
The Response spectrum scale factor = 2.23.The Response spectrum scale factor = 2.23.
• Structural Code :Structural Code : ACI 318 .ACI 318 . UBC 97 .UBC 97 .
25
SAP Model AnalysisSAP Model Analysis
26
Checks from SAP program:Checks from SAP program:
27
• 1.1. Compatibility check: Compatibility check:
Checks from SAP program:Checks from SAP program:
28
• 2.2. Equilibrium Equilibrium CheckCheck
SAP resultSAP result manual manual resultresult
% %of of errorerror
Weight Weight 21963 20998 4.4%
Live LoadLive Load 3985.258 3985.28 O%
DL (super DL (super imposed)imposed)
3985.258 3985.258 O%
Internal forcesInternal forces SAP resultSAP result manual manual resultresult
% %of of errorerror
columncolumn 796.08 1213 >10%
Beams Beams 272.9 260.5 10%
Slabs Slabs 83.6 32.3 >10%
• 3.3.
SAP resultSAP result manual manual resultresult
% %of of errorerror
T T 0.35426 0.354 sec. 0%
• 4.4.
Beams and column LayoutBeams and column Layout
29
sector Asector A
Footing and Tie beams LayoutFooting and Tie beams Layout
30
sector Asector A
ReinforcementReinforcement detailing (sector A)detailing (sector A)Slab DesignSlab Design
31
ReinforcementReinforcement detailing (sector A)detailing (sector A)Slab DesignSlab Design
32
ReinforcementReinforcement detailingdetailingBeams DesignBeams Design
33
ReinforcementReinforcement detailingdetailingBeams DesignBeams Design
34
4 Ø 18 4 Ø 18
8 Ø 16 8 Ø 16
2 Ø 18 2 Ø 18
section K-Ksection K-K
Double stirrups 2Ø 10 / 15 cmDouble stirrups 2Ø 10 / 15 cm
section L-Lsection L-L
4 Ø 18 4 Ø 18
4 Ø 18 4 Ø 18
8 Ø 16 8 Ø 16
Double stirrups 2Ø 10 / 15 cmDouble stirrups 2Ø 10 / 15 cm
ReinforcementReinforcement detailingdetailingColumn DesignColumn Design
35
C20 , C4C20 , C4 (30 *50 )cm(30 *50 )cm
8 Ø 16 8 Ø 16
Double stirrups 1Ø 10 / 15 Double stirrups 1Ø 10 / 15 cm cm
C15 , C5C15 , C5 (30 *60 )cm(30 *60 )cm
12 Ø 16 12 Ø 16
Double stirrups 1Ø 10 / 15 Double stirrups 1Ø 10 / 15 cm cm
ReinforcementReinforcement detailingdetailingFrame DesignFrame Design
36
C4C5
ReinforcementReinforcement detailingdetailingShear wall DesignShear wall Design
37
Footing and Tie beams LayoutFooting and Tie beams Layout
38
ReinforcementReinforcement detailingdetailing Single Footing Design Single Footing Design
39
ReinforcementReinforcement detailingdetailingcombinedcombined Footing DesignFooting Design
40
ReinforcementReinforcement detailingdetailingcombined Footing Designcombined Footing Design
41
ReinforcementReinforcement detailingdetailingshear wall Footing Designshear wall Footing Design
42
MechanicalMechanicalDesignDesign
43
Mechanical System Mechanical System
• HVAC SystemHVAC System
• Drainage systemDrainage system
• Water supply system: Water supply system:
44
calculation of # of radiator needs for ground calculation of # of radiator needs for ground floorfloor
Zone Q (conv+infl) Qr (w) mp #of sec.
1 572 657.8 5.527731 6
2 865.3 995.095 8.362143 9
3 560.3 644.345 5.414664 6
4 593.5 682.525 5.735504 6
5 868.8 999.12 8.395966 9
6 470.5 541.075 4.546849 5
7 250.7 288.305 2.422731 3
8 415 477.25 4.010504 5
9 230 264.5 2.222689 3
10 2843 3269.45 27.47437 28
45
Heating system radiator Heating system radiator
46
(Ground(Ground floor)floor)
Result of cooling Result of cooling calculationcalculation
47
zone Qt (KW) V(L/m³)
1 2.1 0.12
2 3.96 0.22628571
4
3 2.93 0.16742857
1
4 2.23 0.12742857
1
5 4.2 0.24
6 1.68 0.096
7 1.31 0.07485714
3
8 1.81 0.10342857
1
9 1.2 0.06857142
9
10 5 0.28571428
6
Cooling systemCooling system
48
(Ground(Ground floor)floor)
Drainage system Drainage system
49
(Ground(Ground floor)floor)
Drainage system Drainage system
50
(Sample of sector)(Sample of sector)
Drainage system Drainage system
51
(Rain slop)(Rain slop)
Water supply system Water supply system
52
(Ground(Ground floor)floor)
Water supply systemWater supply system
53
(Sample(Sample ofof sector)sector)
Water supply system Water supply system ( Roof)( Roof)
54
Electrical Electrical DesignDesign
55
Electrical System Electrical System
• Lighting designLighting design (Using Dialux program) (Using Dialux program)
• Power System designPower System design
• Panel circuit breaker Panel circuit breaker
• Drop voltage systemDrop voltage system camera systemcamera system sound systemsound system
56
Dialux analysis Dialux analysis
57
Ob- gyn ClinicOb- gyn Clinic
Luminaries Wattage: 60.0 W
Lamp Type:Lamp Type:Fluorescent
HELLA IL_PLM2_600x600 Panel Light (2 unite /pieces)
Room need = 1000 lux
We need 6 pieces
1327 lux from luminaries
1153 lux from day light
Lighting distributionLighting distribution(Ground floor)(Ground floor)
58
Socket distribution Socket distribution (ground (ground floor)floor)
59
Camera System Camera System (ground floor)(ground floor)
60
Sound Call System Sound Call System (ground (ground floor)floor)
61
SafetySafety Design Design
62
Fire SystemFire System
• The fire alarm system :The fire alarm system :
1.Manual call point1.Manual call point
2.Heat sensors 2.Heat sensors
3.Smoke sensors3.Smoke sensors
• Fire fighting systems :Fire fighting systems :
1.Fire Extinguisher1.Fire Extinguisher
2.Fire rubber Hoses2.Fire rubber Hoses
63
Ground Ground FloorFloor
64
First FloorFirst Floor
65
Layout Ground Layout Ground FloorFloor
66
Layout First Layout First FloorFloor
67
68
Quantity Quantity surveying surveying
Quantity surveying Quantity surveying
Activity Quantity Units
Excavation 292.6 CM
Back filling 102.4 CM
concrete 253.58 CM
Form work 942.5 SM
Rib 3084 Piece
Steel 52.6 Ton
plaster 852.3 SM
painting 852.3 SM
Tilling 256.8 SM
False ceiling 256.8 SM
skirting 326 LM
Bathroom wall Tiling 68 SM
Doors 28 Piece
windows 66 Piece69
Project Costs Estimate:Project Costs Estimate:
70
• Cost estimate for sector (A) :171000 $
Cost estimate for the project : 741000 $
Thank YouThank You