ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project DT 175-02 ARCHITECTURAL TECHNOLOGY
Emma Harrington 12/20/18 Student Number: C17750321
TDS PROJECT 3: Passive House Development DT 175 ARCHITECTURAL TECHNOLOGY
Date: 20 December 2018 Page 1 Student Name: Emma Harrington Student Number: C17750321
List of Drawings
Drawing 300 Site Plan / Location Plan (1: 500 /1:200)
Includes Drainage for Foul Water, Surface Water and Mains Water
Drawing 301 Block (A, B, C & D) – Ground & 1st Floor Plans (1:50) Drawing 302 Block (A, B, C & D) – 2nd & 3rd Floor Plans (1:50)
1st Floor Construction
Drawing 303 Block (A, B, C or D) – Roof & 1st Floor Construction Plans (1:50) Drawing 304 Block (A, B, C or D-) – Elevations: North, South & West (1: 50)
Drawing 305 Section AA- East Elevation (1:50) Drawing 306 Section BB – Façade Elevation (1:20) Drawing 307 Section CC – Façade Elevation (1:20) Drawing 308 Details – External Wall Types & Change of Material (Vertical) (1:5)
Brick, Render, Stone & Party Wall Drawing 309 Details – Ground Floor Foundations & Cold Roof Eaves (1:5) Drawing 310 Details – Window Detail (Cill, Head & Jamb) (1:5) Drawing 311 3D Views – North & South Elevations (NTS)
North
SURFACE WATER DRAINAGE
FOUL WATER DRAINAGE
MAINS WATER H
NOTE: PIPES MUST BE AT LEAST 1M APART
ARMSTRONG JUNCTION300X 300MM
MANHOLE FOUL WATER600MM X 600MM
MANHOLE SURFACE WATER600MM X 600MM
BLOCK B
BLOCK A
BLOCK C
BLOCK D
BARROW ROAD
NOTE: FALL OF SURFACE WATER: 1:80FALL OF FOUL WATER 1:60
HIGH LEVEL OVERVIEW OF FOUL WATER & SURFACE WATE DRAINAGE - BROOMBRIDGE APARTMENTS
GROUND LEVEL: 36.44INVERT LEVEL: 33.40
AJ 1CL: 36.44IL: 36.14
AJ 2: CL: 36.14IL: 36.04
AJ 3:CL: 36.04IL:35.904
MH1: CL: 35.94IL: 35.816
MH2: CL: 35.94IL: 35.592
MH3: CL: 35.592IL: 35.288
AJ 5:CL: 35.664IL: 35.548
AJ 4:CL: 35.78IL: 35.664
MH 4:CL: 35.548IL: 35.427
MH5:CL: 35.427IL: 35.353
MH6: CL: 35.592IL: 35.218
MH7: Main DrainCL: 35.218IL: 33.4
H
H
SW AJ 1CL: 36.44IL: 36.14
SW AJ 2CL: 36.14IL: 35.93
SW MH1: CL: 35.93IL: 35.65
SW MH2: CL: 35.65IL: 35.41
1000 SW MH2: Main Drain CL: 35.41IL: 33.44
Location of Site Notice North
BLOCK CBLOCK D
BLOCK B
BLOCK A
Scale
Submitted to
Drawn byDateProject numberOrganisation Name
Project NameSheet Name
Client NameEmma Harrington
DT175-02 2018_19
Asindicated
Site / Location &Drainage Plan
03
Passive House
DT175 02 20th December 2018
DT175 02
DITEmma Harrington
1 : 200Site Plan with Proposed Drainage
1 : 500Site Location Plan2
UP UP
19
18
17
16
15
14
13
12
11 10 9 8 7 6 5 4 3 2 1 11 10 9 8 7 6 5 4 3 2 1
19
18
17
16
15
14
13
12
UP UP UP UP
UP11 10 9 8 7 6 5 4 3 2 1
19
18
17
16
15
14
13
12
11 10 9 8 7 6 5 4 3 2 1
19
18
17
16
15
14
13
12
8
7
6
5
4
3
2
1
13 12 11 10 9
8
7
6
5
4
3
2
1
131211109
8
7
6
5
4
3
2
1
8
7
6
5
4
3
2
1
13 12 11 10 9
131211109
1
3830
114975
0
400
1200
13 m²BEDROOM
2 m²UTILITY
4 m²BATHROOM
4 m²HALL
30 m²
KITCHEN / DINING /LIVING ROOM
1200
TGD M ACCESSIBLE ENTRANCE
TGD M ACCESSIBLE HALL
900
1200
1000
1770
TGD M ACCESSIBLE BATHROOM
5070
1215
0
5915
1200
2
50
3830
1149 75
0
400
1200
14 m²BEDROOM
2 m²UTILITY
4 m²BATHROOM
3 m²HALL
30 m²
KITCHEN / DINING /LIVING ROOM
1200
TGD M ACCESSIBLE ENTRANCE
TGD M ACCESSIBLE
HALL
95017
70
TGD M ACCESSIBLE BATHROOM
5070
5915
1200
3
3830
114975
0
400
1200
13 m²BEDROOM
2 m²UTILITY
4 m²BATHROOM
4 m²HALL
30 m²
KITCHEN / DINING /LIVING ROOM
1200
TGD M ACCESSIBLE ENTRANCE
TGD M ACCESSIBLE HALL
900
1200
1000
1770
TGD M ACCESSIBLE BATHROOM
5070
5915
1200
50
4
3830
1149 75
0
400
1200
14 m²BEDROOM
2 m²UTILITY
4 m²BATHROOM
3 m²HALL
30 m²
KITCHEN / DINING /LIVING ROOM
1200
TGD M ACCESSIBLE ENTRANCE
TGD M ACCESSIBLE
HALL
900
1200
950
1770
TGD M ACCESSIBLE BATHROOM
5915
1200
5070
5
5908 5586 5586 5580
622937
A
B
C
D
E
1200
900
103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS
50MM SANDSTONECLADDING ON, 50MMVENTILATED CAVITY ONBREATHER MEMBRANE ON,22MM STRUCTURAL OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLANK PLASTERBOARDON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY ON,12.5MM PLASTERBOARDWITH 3MM SKIM - APPLIEDIN 2 LAYERS
PARTY WALLCONSTRUCTION: 3MM SKIM- APPLIED IN 2 LAYERS ON,12.5MM PLASTERBOAR ON50MM SERVICE CAVITY ON,12.5 PLASTERBOARDSOUND BLOC ON, 19MMPLANK PLASTERBOARDON, VAPOUR CONTROLLAYERS ON, 18MM OSB ON,100MM X 50MM TIMBERFRAME FILLED WITHLOOSE CELLLOUSE ON18MM OBS BOARD (REPEATFOR 2ND HOUSE)
FLOOR CONSTRUCTION150MM CONCRETE ON,100MM EPS (X3) ON,COMBINED RADON/DPMON 50MM BLINDINGLAYER ON 150MMHARDCORE
EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH
North
1215
0
5908
22937
103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS
1
13 m²Outdoor Deck
9 m²Kitchen
18 m²
Dining Room / LivingRoom
400
10822846
2 3 4 5
13 m²Outdoor Deck
9 m²Kitchen
18 m²
Dining Room / LivingRoom
400
2796
5070
5070
5070
13 m²Outdoor Deck
9 m²Kitchen
18 m²
Dining Room / LivingRoom
400
10502846
5070
5070
13 m²Outdoor Deck
9 m²Kitchen
18 m²
Dining Room / LivingRoom
400
1050 2796
5070
5070
1200
6
A A
B B
C C
D D
E
EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH
PARTY WALLCONSTRUCTION: 3MM SKIM- APPLIED IN 2 LAYERS ON,12.5MM PLASTERBOAR ON50MM SERVICE CAVITY ON,12.5 PLASTERBOARDSOUND BLOC ON, 19MMPLANK PLASTERBOARDON, VAPOUR CONTROLLAYERS ON, 18MM OSB ON,100MM X 50MM TIMBERFRAME FILLED WITHLOOSE CELLLOUSE ON18MM OBS BOARD (REPEATFOR 2ND HOUSE)
103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD
EXTERNAL PARTY WALLCONSTRUCTION: 7MMBREATHABLE RENDERON,15MM OSB BOARD ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 18MM OSB,100MM XPSINSULATION ON, VAPOURCONTROL LAYER ON 18MMOSB ON 7MM RENDER
PRIVATE STAIRS: (COMPLY WITH TGD K)900MM WIDTH, 210MM RISER, 250MM GOING. NO MORE THAN 16 STEPS PER FLIGHT. 50MM HANDRAIL - ON BOTH SIDES FOR LESS AMBULANT USERS. (CLEAR AREA BETWEEN STAIRS 800MM). HANDRAIL OVERRUN 300MM AT TOP & BOTTOM OF STAIRS.400MM CLEAR & UNOBSTRUCTED AREA AT TOP OF STAIRS.
BALCONY FLOORCONSTRUCTION 160MMCONRETE WITHCORUS-COM FLOR 51
EXTERNAL DECK: 50MMSTONE PAVING ONPROPRIETARY FOOTINGSON, 50MM CRUSHEDAGGREGATE (20-40MMTHICK) ON, PLYWOODBACKED XPS 100MMRIGID INSULATION ON,VAPOUR CONTROLLAYER ON, 30MM OFASHPALTWEATHERPROOF LAYERS(X2) ON, PROTECTIVELAYER ON, 18MM OSBBOARD ON,225MM X63MM JOISTS WITH225MM MINERAL WOOLINSULATION (BETWENJOISTS) ON, VAPOURCONTROL LAYER ON,19MM GYPROC PLANKPLASTERBOARD ON,12.5MM GYROCSOUNDBLOCKPLASTERBOARD ON, 50 X38MM BATTENS (SERVICECAVITY) ON 12.5MMGYPROC CEILING BOARDWITH 3MM SKIM APPLIEDIN TWO LAYERS
Emma HarringtonDT175-02 2018_19
Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date
Passive House 03 DT175 02 GA - Ground & 1st Floor Plan 301 Emma Harrington 12/19/18
1 : 500 Ground FFL1
1 : 501 First FFL2
UP UP UP UP
12 11 10 9
8
7
6
5
4
3
2
1
8
7
6
5
4
3
2
1
131211109 12 11 10 9
8
7
6
5
4
3
2
1
8
7
6
5
4
3
2
1
1211109
1
2349
2686
3130
1552
1426
622
4 m²MAIN BATHROOM
10 m²BEDROOM 1
4 m²ENSUITE
12 m²BEDROOM 2
3 m²STORE11
10
23761735
900
420
3 4 5
2349
2686
3130
1376
622
4 m²MAIN BATHROOM
10 m²BEDROOM 1
4 m²ENSUITE
12 m²BEDROOM 2
3 m²STORE 11
10
2326 1735
967
420
2349
2686
3130
1520
1426
622
4 m²MAIN BATHROOM
10 m²BEDROOM 1
4 m²ENSUITE
12 m²BEDROOM 2
3 m²STORE11
10
23761735
900
420
2349
2686
3130
1520
1376
622
4 m²MAIN BATHROOM
10 m²BEDROOM 1
4 m²ENSUITE
12 m²BEDROOM 2
3 m²STORE 11
10
2326 1735
900
420
6
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
PRIVATE STAIRS: (COMPLY WITH TGD K)900MM WIDTH, 210MM RISER, 250MM GOING. NO MORE THAN 16 STEPS PER FLIGHT. 50MM HANDRAIL - ON BOTH SIDES FOR LESS AMBULANT USERS. (CLEAR AREA BETWEEN STAIRS 800MM). HANDRAIL OVERRUN 300MM AT TOP & BOTTOM OF STAIRS.400MM CLEAR & UNOBSTRUCTED AREA AT TOP OF STAIRS.
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD
1
2656
13 m²BEDROOM 3
6 m²STORE
12 m²Store
1970
5154
2040
2385
2910
2 3 4 5
12 m²Store
90
2656
13 m²BEDROOM 3
6 m²STORE
1970
5153
2040
2385
2910
5070
12 m²Store
90
2656
13 m²BEDROOM 3
6 m²STORE
1970
5154
2385
2910
5070
12 m²Store
90
2656
13 m²BEDROOM 3
6 m²STORE
1920
5154
2385
2910
5070
6
A
B
C
D
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
PRIVATE STAIRS: (COMPLY WITH TGD K)900MM WIDTH, 210MM RISER, 250MM GOING. NO MORE THAN 16 STEPS PER FLIGHT. 50MM HANDRAIL - ON BOTH SIDES FOR LESS AMBULANT USERS. (CLEAR AREA BETWEEN STAIRS 800MM). HANDRAIL OVERRUN 300MM AT TOP & BOTTOM OF STAIRS.400MM CLEAR & UNOBSTRUCTED AREA AT TOP OF STAIRS.
INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD
Emma HarringtonDT175-02 2018_19
Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date
Passive House 03 DT175 02 GA - 2nd & 3rd Floor Plans 302 Emma Harrington 12/19/18
1 : 502 Second FFL1
1 : 503 Third FFL2
UP
1 2 3 4
200
6
A
B
C
D
PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.
ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM), WITH 9OMM LAP - AS PITCH <350 ON;50 X 36MM S/F BATTENS @ ON; 150MM X 47MM RAFTERS @ 400MM CENTRES WITH 150MM X 2 MINERAL WOOL INSULATION WEDGED BETWEEN RAFTERS ON;VAPOUR CONTROL LAYER ON;50 X 38MM BATTENS ON 19MM GYPROC PLANK BOARD ON 12.5MM GYPROC CEILING BOARD WITH 3MM SKIM APPLIED IN 2 LAYERS
NOTE: WHEN SPECIFICYING A CLOSE FITTING COVERING (SUCH AS FIBRE CEMENT TILES) THERE IS A RISK OF INTERSTITIAL CONDENSATION FORMING ON THE UNDERSIDE OF THE UNDERLAY AND THE EXTERNAL COVERING - THEREFORE SPECIFY A LR (LOW RESISTANCE <0.25MNs/g) UNDERLAY AND ENSURE THE BATTEN SPACE IS VENTILATED IN ACCORDANCE WITH BS 5250:2011 USING A VENTILATED COUNTERBATTEN VOID
5908 5586 5586 5580
6494
22912
ROOF DRAINAGE;(AS PER TGD H - PARA 1.5.1.2)EFFECTIVE ROOF AREA >103M2, THEREFORE THE GUTTER SIZE SHOULD BE 150MM WITH RWO WITH OUTLETS OF 89MM MIN. 2 X RWO PER HOUSE - IN CASE THERE IS A BLOCKAGE IN ONE.
1
400
50
400
BRIDGING / STRUTTING:1 x ROW OF SOLID BUT STAGGERED BRIDGING REQUIRED FOR SPANS >2.5M.2 x ROWS OF BRIDGING REQUIRED FOR SPANS >4.5M @ 1.35M CENTRES (max.)BRIDGING SHOULD BE AT LEAST 3/4 depth of JOIST (225MM X 63MM). NO BRIDGING REQUIRED ON OUTER DECK AS SPAN IS LESS THAN 2.5M
1350
2
A
B
C
TRIMMERS:ENSURE TRIMMERS AROUND STAIR OPES (2 X 225MM X 63MM) ON 2ND AND 3RD FLOORS.
DOUBLE JOISTS: TO BE USED UNDER SANITARY FIXINGS (BATH,SHOWER, TOILET ETC.)ALSO TO BE USED WHERE STUD PARTITIONS ARE AT RIGHT ANGLES TO THE JOIST
SPAN OF FLOOR = 5.07MSPAN 1/20 = JOIST DEPTH OF 253MM. ACCORDING TO TRADE SPAN TABLES OPTIMUM JOIST TO SPAN 5M+ = 225MM X 63MM/.
ENSURE 1ST JOIST IS 50MM FOR WALL. USE FOLDING WEDGES (50X75MM) AT GABLE / PARTY WALLS AT EACH ROW OF BRIDGING.
Emma HarringtonDT175-02 2018_19
Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date
Passive House 03 DT175 02 GA - Roof Plan & IntermediateFloor Constrruction
303 Emma Harrington 12/19/18
1 : 504 Roof Plan1
1 : 501 First Floor Construction Plan2
0 Ground FFL0
1 First FFL3150
-1 Top Found-600
1
2 Second FFL5950
4 Roof Plan11550
3 Third FFL8750
1A Balcony Wall4250
5 Top of Parapet12750
23456
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS
0 Ground FFL0
1 First FFL3150
-1 Top Found-600
1
2 Second FFL5950
4 Roof Plan11550
3 Third FFL8750
1A Balcony Wall4250
5 Top of Parapet12750
2 3 4 56
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH
50MM SANDSTONECLADDING ON, 50MMVENTILATED CAVITY ONBREATHER MEMBRANE ON,22MM STRUCTURAL OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLANK PLASTERBOARDON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY ON,12.5MM PLASTERBOARDWITH 3MM SKIM - APPLIEDIN 2 LAYERS
ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM),
PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.
0 Ground FFL0
1 First FFL3150
-1 Top Found-600
2 Second FFL5950
4 Roof Plan11550
3 Third FFL8750
1A Balcony Wall4250
5 Top of Parapet12750
A B C D E
103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
50MM SANDSTONECLADDING ON, 50MMVENTILATED CAVITY ONBREATHER MEMBRANE ON,22MM STRUCTURAL OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLANK PLASTERBOARDON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY ON,12.5MM PLASTERBOARDWITH 3MM SKIM - APPLIEDIN 2 LAYERS
ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM),
PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.
EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH
Scale
Submitted to
Drawn byDateProject numberOrganisation Name
Project NameSheet Name
Client NameEmma Harrington
DT175-02 2018_19
1 : 100
GA - Elevations
03
Passive House
DT175 02 20th December 2018
DT175 02
DITEmma Harrington
1 : 100North2
1 : 100South3
1 : 100West4
0 Ground FFL0
1 First FFL3150
-1 Top Found-600
2 Second FFL5950
4 Roof Plan11550
3 Third FFL8750
3150
2800
2800
1A Balcony Wall4250
5 Top of Parapet12750
ABCDE
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS
103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS
FLOOR CONSTRUCTION150MM CONCRETE ON,100MM EPS (X3) ON,COMBINED RADON/DPMON 50MM BLINDINGLAYER ON 150MMHARDCORE
INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD
EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH
BALCONY FLOORCONSTRUCTION 160MMCONRETE WITHCORUS-COM FLOR 51
ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM),
BALCONY DECK COMPOSITION50MM (MIN.) THICK PAVING SLABS ON PROPRIETARY SUPPORTS ON,[50MM (MIN.) LAYER OF 20-40MM ROUNDED WASHED AGGREGATE ON, IKO WATER CONTROL LAYER ON, IKO ENERTHERM XPS (80MM) ON, PERAFLASH F PROTECTION LAYER ON, 2 X COATS OF PERMATEC ECOWRAP INCORPORATING PERMAFLASH - R REINFORCEMENT (HOT MELT) ON 18MM OSB 3 WITH PERMATEC PRIMER ON, 225MM X63MM TIMBER JOISTS @ 400MM CENTRES WITH 225MM MINERAL WOOL INSULATION BETWEEN JOISTS, ON VAPOUR CONTROL LAYER, ON 19MM GYPROC PLASTERBOARD PLANK ON, 12.5MM GYPROC SOUND BLOC PLASTERBOARD ON, 38MM X 50MM S/W BATTENS (SERVICE CAVITY) ON, 12.5MM GYPROC WALL BOARD WITH 3MM SKIM APPLIED IN TWO LAYERS
Scale
Submitted to
Drawn byDateProject numberOrganisation Name
Project NameSheet Name
Client NameEmma Harrington
DT175-02 2018_19
1 : 50
Section AA
03
Passive House
DT175 02 20th December 2018
DT175 02
DITEmma Harrington
1 : 50East Elevation - Section AA1
0 Ground FFL0
1 First FFL3150
-1 Top Found-600
2 Second FFL5950
4 Roof Plan11550
3 Third FFL8750
1A Balcony Wall4250
5 Top of Parapet12750
BALCONY DECK COMPOSITION50MM (MIN.) THICK PAVING SLABS ON PROPRIETARY SUPPORTS ON,[50MM (MIN.) LAYER OF 20-40MM ROUNDED WASHED AGGREGATE ON, IKO WATER CONTROL LAYER ON, IKO ENERTHERM XPS (80MM) ON, PERAFLASH F PROTECTION LAYER ON, 2 X COATS OF PERMATEC ECOWRAP INCORPORATING PERMAFLASH - R REINFORCEMENT (HOT MELT) ON 18MM OSB 3 WITH PERMATEC PRIMER ON, 225MM X63MM TIMBER JOISTS @ 400MM CENTRES WITH 225MM MINERAL WOOL INSULATION BETWEEN JOISTS, ON VAPOUR CONTROL LAYER, ON 19MM GYPROC PLASTERBOARD PLANK ON, 12.5MM GYPROC SOUND BLOC PLASTERBOARD ON, 38MM X 50MM S/W BATTENS (SERVICE CAVITY) ON, 12.5MM GYPROC WALL BOARD WITH 3MM SKIM APPLIED IN TWO LAYERS
A
FLOOR CONSTRUCTION150MM CONCRETE ON,100MM EPS (X3) ON,COMBINED RADON/DPMON 50MM BLINDINGLAYER ON 150MMHARDCORE
INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD
INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD
PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.
ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM), WITH 9OMM LAP - AS PITCH <350 ON;50 X 36MM S/F BATTENS @ ON; 150MM X 47MM RAFTERS @ 400MM CENTRES WITH 150MM X 2 MINERAL WOOL INSULATION WEDGED BETWEEN RAFTERS ON;VAPOUR CONTROL LAYER ON;50 X 38MM BATTENS ON 19MM GYPROC PLANK BOARD ON 12.5MM GYPROC CEILING BOARD WITIH 3MM SKIM APPLIED IN 2 LAYERS
NOTE: WHEN SPECIFICYING A CLOSE FITTING COVERING (SUCH AS FIBRE CEMENT TILES) THERE IS A RISK OF INTERSTITITAL CONDENSATION FORMING ON THE UNDERSIDE OF THE UNDERLAY AND THE EXTERNAL COVERING - THEREFORE SPECIFY A LR (LOW RESISTANCE <0.25MNs/g) UNDERLAY AND ENSURE THE BATTEN SPACE IS VENTILATED IN ACCORDANCE WITH BS 5250:2011 USING A VENTILLATED COUNTERBATTEN VOID
kKINGSPAN RAISED ACCESS FLOOR RG3 (600MM X 600MM) WITH KINGSPAN EUROPED PEDESTAL
Emma HarringtonDT175-02 2018_19
Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date
Passive House 03 DT175 02 Facade Section BB 306 Emma Harrington 12/19/18
1 : 20Facade Section BB1
7mm Render (Breathable)18mm OSB Board
EXTERNAL INTERNAL
50mm Services Cavity with 50x38mm Battens (not visible in this section) attached with 40mm Ring Shank Nails
Breather Membrane
15mm Aquaboard attached to 50 x 38mm Battens (Not visible in this section with 40mm Exterior Grade Ring Shank nails
50mm Air Cavity
50mm Wood Fibre Board
18mm OSB Board - nailed to 225 x 47mm Timber posts (Not visible in section) using 60mm Exterior Grade Ring Shank nails
225mm Cellouse (Loose) between 225mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer
12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
12.5mm Plasterboard with 3mm Skim coat applied in 2 layers
WALL TYPE 1: RENDER (OUTER LEAF)
Note:Expansion Joints - Ensure there are adequate horizontal expansion joints in the render to accomodate any timber settlement, compressions and shrinkages as required.Insect Mesh - Ensure Insect Mesh is placed at bottom of Rendered section.
19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)
Note on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance
103mm Brick (Outer Leaf) with 10mm Render, with 40mm Ventilated Cavity 18mm OSB Board
EXTERNAL INTERNAL
50mm Service cavity with 50 x 38mm Battens (Softwood) - Not visible in section attached with 40mm Ring Shank nails
Breather Membrane
22mm Structural OSB
50mm Wood Fibre Board - atttached to Timber studs with 50mm Ring Shank Nails
225mm Cellouse (Loose) between 225mm x 47mm Timber Studs spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer
12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
12.5mm Plasterboard with 3mm Skim (Applied in 2 layers)
WALL TYPE 2: BRICK (OUTER LEAF)
Note: Brick Outer Leaf - Ensure open perpends to ventilate and drain cavity space at max 1.5m centresWall Ties - Ensure all Wall Ties installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27 450mm (max vertically & 900mm horizontally with 300mm (max) around Opes
Stainless Steel Wall Ties attached to Structural OSB Boards and Bricks with 100mm side cramp
19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)
Notes on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance
50mm Stone (Outer Leaf) with 40mm Ventilated Cavity with 5mm gap between stones to befilled with Sealant or Mortar (as per manufacturers specification
18mm OSB Board
EXTERNAL INTERNAL
50mm Service Cavity with 50mm x 38mm Battens (Softwood) - not visible in Section attached with 40mm Ring Shank nails
Breather Membrane
22mm Structural OSB
50mm Cavity
50mm Wood Fibre Board - attached to Timber studs (Not visible in section)
18mm OSB Board
220mm Cellouse (Loose) between 220mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer
12.5mm Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
12.5mm Plasterboard with 3mm Skim applied in 2 layers
WALL TYPE 3: STONE (OUTER LEAF)
Note: Sandstone - Ensure ventilated and drained cavity behind stone cladding. Ensure cladding support system is line with BS8298:2000 and that all supports comply with dead and imposed (wind load etc.). Ensure all Cladding Ties / supports are installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27
Stainless Steel Wall Ties
Note: Ensure Insect Mesh placed at bottom of Stone Cladding to keep cavity clear
5
19mmGyproc Brown Plank Plasterboard (600mm x 2400mm)
18mm OSB Board
Airtight Membrane
50mm Services Cavity. All services to be contained here. No services to enter party wall proper
12.5mm Sound Bloc Blue Plasterboard on 19mm Gyproc Plank Plasterboard. Note: Thicker plasterboard required for acoustic requirements and will also comply with 60 minute Fire Resistance. Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.
18mm OSB Board
100mm Cellouse (Loose) between 100mm x 50mm Battens spaced @ 600mm centres Note: Insulation only required on one party wall for accoustic requirements TGD E).
Metal Ties are recommended if required structurally with specific manufacturers fixing schedule. Accoustic Compliance can be met with metal ties 3mm (max thickness) and 30mm (width), at 1.2m horizontal centres, one per storey height fixed to underside of top railor side of adjacent party wall study within 150mm of top rail. Minimum 600mm from staircase head.
WALL TYPE 4: PARTY WALL WITH INTERMEDIATE FLOORS
22mm Tongue & Groove Flooring
13
300
Airtight Tape (ensure 150mm minimum lapping)
Note: Minimum distance between OBS's in Party Walls 200mm, with no hard connection unless metail ties are required structurally with fixing schedule
Knauf Earthwool Wire Reinforced Wire Barrier to provide 60 minutes Fire Resistance at line of Party Floor, not required at Intermediate floors
Airtight Membrane
19mm Gyproc Plank Plasterboard and 12.5mm Gyproc Sound Bloc (Blue Plasterboard) - See note opposite to see how plasterboard should be fixed.
225mm x 47 mm Double Floor Joists at 400mm centres
22mm Structural OSB Flooring Board
50 x 100mm Top Rail with 40mm Dryline Screw 12.5mm Plasterboard with 3mm Skim applied in 2 layers
Knauf Earthwool Wire Reinforced Fire Barrier installed between roof battens to provide 60 minutes Fire Resistance between Roof Finish (not shown) and Membrane
225mm Mineral Wool Insulation
Vapour Control Layer
12.5mm Plasterboard with 3mm Skim Coat (applied in 2 x layers)
HOUSE 1HOUSE 2
50mm x 100mm Bottom Rail and Sole Plate
103mm Brick (Outer Leaf) with 10mm Render, with 40mm Ventilated Cavity
18mm OSB Board
EXTERNAL INTERNAL
50mm Service cavity with 50 x 38mm Battens (Softwood) - Not visible in section attached with 40mm Ring Shank nails
Breather Membrane
22mm Structural OSB
50mm Wood Fibre Board - atttached to Timber studs with 50mm Ring Shank Nails (not visible in Section)
225mm Cellouse (Loose) between 225mm x 47mm Timber Studs spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer
12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
CHANGE IN MATERIAL (VERTICAL)
Note: Brick Outer Leaf - Ensure open perpends to ventilate and drain cavity space at max 1.5m centresWall Ties - Ensure all Wall Ties installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27 450mm (max vertically & 900mm horizontally with 300mm (max) around Opes
Stainless Steel Wall Ties attached to Structural OSB Boards and Bricks with 100mm side cramp
19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)
Notes on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance
EPDM / Vertical DPC on top of Brick (Outer Leaf)
38mm x 50mm Batten Chamfered on Top for Drainage
Insect Mesh at bottom of Render
Min 15mm Gap at bottom of Cladding & Flashing
7mm External Render (Breathable) with Expansion Joints
15mm Aquaboard attached to 50 x 38mm Battens (Not visible in this section with 40mm Exterior Grade Ring Shank nails
62
50
12.5mm Plasterboard with 3mm Skim applied in 2 layers
Emma HarringtonDT175-02 2018_19
Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date
Passive House 03 DT175 02 Wall Types & Change ofMaterial
308 Emma Harrington 11/19/18
1 : 5Wall Type 1 - Render1
1 : 5Wall Type 2 - Brick2
1 : 5Wall Type 3 - Stone3
1 : 5Wall Type 4 - Party Wall4
1 : 5Change of Material - Vertical5
103mm Brick (Outer Leaf) with 10mm Render, (Starts 225mm from GL) with 50mm Ventilated Cavity 18mm OSB Board
EXTERNAL INTERNAL
50mm Service cavity with 50 x 38mm Battens (Softwood) - Not visible in section attached with 40mm Ring Shank nails
Breather Membrane
22mm Structural OSB
50mm Wood Fibre Board - atttached to Timber studs with 50mm Ring Shank Nails
225mm Cellouse (Loose) between 225mm x 47mm Timber Studs spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer
12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
12.5mm Plasterboard with 3mm Skim (applied with 2 layers)
GROUND FLOOR FOUNDATIONS (VIKING RAFT SYSTEM) & WALL
Note: Brick Outer Leaf - Ensure open perpends to ventilate and drain cavity space at max 1.5m centresWall Ties - Ensure all Wall Ties installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27 450mm (max vertically & 900mm horizontally with 300mm (max) around Opes
Stainless Steel Wall Ties attached to Structural OSB Boards and Bricks with 100mm side cramp
Visqueen Combined DPM / Radon Barrier 1200 Gauge
EPS 100
50mm Blinding Layer (Sand)
150mm Hardcore Layers -Clean & Graded (40mm min size of stones)
150mm Concrete Floor with Reinforcement
Land Drain around Perimeter of Building - confirm Distance with Tony
ø 100
GROUND LEVEL
Earth
EPS 200/300
100mmm Concrete Block (High Density) below Ground (Rising Walls) and up to 225mm
Note:300mm minimum amount of Top Soil to be removed (TGD C -Site Preparation)
19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)
Airtight Tape (ensure 150mm lapping)
22mm Tongue & Groove Flooring
120mm x 25mm S/W Skirting Board
200 x 300mm Concrete Strip Foundation (Dimensions as per TGD A)
670
Engineering Bricks from Ground Level 0 to DPC 150mm
DPC (Vertical at 150mm)
225mm x 47mm Sole Plate and Bottom Rails
Min
imum
Dep
th fo
r Vik
ing
Raf
t Fou
ndat
ion
225mm x 300mm Concrete Reinforced Ring Beam
150
40mm Sand Blinding Layer
Note: Ramp is less than 2M, therefore maximum gradient 1:12 (166mm maximum rise) TGD M 1.1. Approach to Buildings
100mm Concrete base for ramp / footpath
7mm Render (Breathable)
18mm OSB Board
EXTERNAL
INTERNAL
50mm Services Cavity with 50x38mm Battens (not visible in this section) attached with 40mm Ring Shank Nails
Breather Membrane
15mm Aquaboard attached to 50 x 38mm Battens (Not visible in this section with 40mm Exterior Grade Ring Shank nails
50mm Air Cavity
50mm Wood Fibre Board
18mm OSB Board - nailed to 225 x 47mm Timber posts (Not visible in section) using 60mm Exterior Grade Ring Shank nails
225mm Cellouse (Loose) between 225mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer
12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
12.5mm Plasterboard with 3mm Skim coat applied in 2 Layers
EAVES & WALL DETAIL
Note:Expansion Joints - Ensure there are adequate horizontal expansion joints in the render to accomodate any timber settlement, compressions and shrinkages as required.Insect Mesh - Ensure Insect Mesh is placed at bottom of Rendered section.
19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)
Notes on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance
150mm Mineral Wool Insulation
150mm x 44mm Prefabricated Mono pitch Roof Truss
Vapour Control Layer (Warm side of Insulation)
50mm x 38mm Battens @ 400 centres
30mm x 5mm Stainless Steel Wall Strap(Ensure all Wall Straps are installed in conjunction with TGD A 1.1.3.25)
Calcium Silicate Board Cavity Closer (Fire Resistant) - ensure ventilation in Wall Structure
Tegral Thurtone Endurance Textured Blue Black Fibre cement slates 600mm x 300mm(Note: Ensure there are 3 Slates at Eaves; 1 x 245mm, 1 x 345mm & 1x 600mm)
50mm x 36mm S/W Battens @ 400mm centres at least 1,200mm long
Plastic Cross Flow Ventiliator (50mm x 700mm). Ensure roof void is ventilated at least equal to continuous strip 10mm wide (as per Lean to Roof - TGD F -Diagram 11, Page 28)
Gang Nail Plate -Centred over Top Rails
Tilting Fillet
Roofing Felt / Breather Membrane - Ensure LR Sarking felt - as the roof is a tight construction with Fibre Cement tiles there is a risk of interstitial condensation under the tiles so ensure there is ventilation between sarking felt and battens.
Plaster Gutter -100mm Diameter
25mm Fascia Board
19mm Soffit with Vent (10mm Minimum) to allow continuous ventiation
51
80mm Mineral Wood Insulation
Scale
Submitted to
Drawn byDateProject numberOrganisation Name
Project NameSheet Name
Client NameEmma Harrington
DT175-02 2018_19
1 : 5
Ground FloorFoundations & RoofEaves
03
Passive House
DT175 02 20th December 2018
DT175 02
DITEmma Harrington
1 : 5Ground Floor Foundations1 1 : 5
Eaves / Roof Detail2
50mm Stone (Outer Leaf) with 40mm Ventilated Cavity with 5mm gap between stones to befilled with Sealant or Mortar (as per manufacturers specification
18mm OSB Board
INTERNAL
50mm Service Cavity with 50mm x 38mm Battens (Softwood) - not visible in Section attached with 40mm Ring Shank nails
Breather Membrane
50mm Ventilated Cavity
50mm Wood Fibre Board - attached to Timber studs (Not visible in section)
22mm Structural OSB Board
225mm Cellouse (Loose) between 225mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)
Vapour Control Layer wrapped around reveals and sealed to window frames over airtight tapes
12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)
3mm Skim
Note: Sandstone - Ensure ventilated and drained cavity behind stone cladding. Ensure cladding support system is line with BS8298:2000 and that all supports comply with dead and imposed (wind load etc.). Ensure all Cladding Ties / supports are installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27
Stainless Steel Wall Ties
Note: Ensure Insect Mesh placed at bottom of Stone Cladding to keep cavity clear
19mmGyproc Brown Plank Plasterboard (600mm x 2400mm)
EXTERNAL
225mm x 47mm (x2) Timber Lintels
80mm Xtra Therm Thin-R Timber Frame Insulation Board
50mm x 38mm S/W Timber Batten
100mm x 80mm Generic Timber Frame shown for Illustrative purposes For the project, Munster Joinery O.E.A.A. windows will supplied, installed and certified by manufacture with fixing brackets to manufacturers detail, spec and installation
Alfa Flex Airtight Tape to Window Junction Interval
19mm Painted and Sealed Softwood window board proud of wall edges
Munster Joinery O.E.A.A. fixing brackets to manufacturers detail, spec and installation
80mm Xtra Therm Thin-R Timber Frame Insulation Board
225mm x 47mm Timber Lintels
Vapour Control Layer wrapped around reveals and sealed to window frames over airtight tapes
Treated Timber Fire Stop Batten
Powder Coated pressed metal cill RAL TBC with wrapped DPC fixed to underside of window frame behind cill profile as indicated
EPDM to protect batten and insulation sealed tight to timber frame and window
Line
of W
indo
w R
evea
l
Line
of W
indo
w R
evea
l
Alfa Fultra Airtight / Windtight Tape to Window junction and sealed with EDPM
12 mm Greenspan O.E.A.A Cement Board with 7mm Breathable External Render Note: Ensure cavity remains ventilated
50mm Stone (Outer Leaf) with 40mm Ventilated Cavity with 5mm gap between stones to be filled with Sealant or Mortar (as per manufacturers specification
EXTERNAL
INTERNAL
WINDOW HEAD DETAIL
WINDOW CILL DETAIL
WINDOW JAMB DETAIL
5
50
13
Scale
Submitted to
Drawn byDateProject numberOrganisation Name
Project NameSheet Name
Client NameEmma Harrington
DT175-02 2018_19
1 : 5
Window Detail - Head,Cill & Jamb
03
Passive House
DT175 02 20th December 2018
DT175 02
DITEmma Harrington
1 : 5Window - Head /Cill /Jamb1