Arctic2007Arctic2007 NASA FR: 7P001NASA FR: 7P001

NASA Goddard Space Flight CenterNASA Goddard Space Flight CenterWallops Flight FacilityWallops Flight Facility

Principal Investigator: Dr. Ken Jezek; OSU Byrd Polar Principal Investigator: Dr. Ken Jezek; OSU Byrd Polar Research CenterResearch Center

Mission Manager: John Valliant CSC – NASA WFF Code 840Mission Manager: John Valliant CSC – NASA WFF Code 840

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Potential Co-Principal Potential Co-Principal InvestigatorsInvestigators

• Dr. Prasad Gogineni - gogineni@ittc.ku.eduDr. Prasad Gogineni - gogineni@ittc.ku.edu

• Mr. William Krabill – William.B.Krabill@nasa.govMr. William Krabill – William.B.Krabill@nasa.gov

• Dr. Keith Raney - Keith.Raney@jhuapl.eduDr. Keith Raney - Keith.Raney@jhuapl.edu

• GSFC GreenbeltGSFC Greenbelt

• Others??Others??

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Documentation Documentation RequirementsRequirements• Flight Requests – OSU and WFF in; Flight Requests – OSU and WFF in;

others ?? (JHU… suborbital.nasa.gov) others ?? (JHU… suborbital.nasa.gov) • Danish/Canadian Over-flight ClearancesDanish/Canadian Over-flight Clearances• General Experiment Information and General Experiment Information and

Request Worksheet (PIs)Request Worksheet (PIs)• Project Plan (840)Project Plan (840)• Mission Operations Safety Directive (840)Mission Operations Safety Directive (840)• ECF MOSD (548)ECF MOSD (548)• Approval to Proceed (800/840)Approval to Proceed (800/840)

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Reviews / MeetingsReviews / Meetings

• Airworthiness Review Board (840/548)Airworthiness Review Board (840/548)

• Mission Readiness Review (840)Mission Readiness Review (840)

• Final Installation Inspection Review Final Installation Inspection Review (840/548) – Subsequent Safety of (840/548) – Subsequent Safety of Flight ReleaseFlight Release

• Weekly/Monthly Technical Flight Weekly/Monthly Technical Flight teleconstelecons

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Preliminary Mission TimelinePreliminary Mission Timeline• ARB Review January 16, 2007ARB Review January 16, 2007• Receive instrumentation March 6, 2007Receive instrumentation March 6, 2007• Begin upload March 13, 2006Begin upload March 13, 2006• Complete upload April 13, 2007Complete upload April 13, 2007• Final Installation and Inspection Review April 16, Final Installation and Inspection Review April 16,

20072007• Safety of flight Release April 17, 2007Safety of flight Release April 17, 2007• Mission Readiness Review April 18, 2007Mission Readiness Review April 18, 2007• Engineering Check Flight April 19, 2007Engineering Check Flight April 19, 2007• Begin Mission April 23, 2007Begin Mission April 23, 2007• Return to WFF on May 14, 2007 Return to WFF on May 14, 2007 • Question; Test flight requestsQuestion; Test flight requests

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Arctic2007 Basing OptionsArctic2007 Basing Options

• Thule AFBThule AFB

• KangerlussuaqKangerlussuaq ( (Sondrestrom)Sondrestrom)• Canada ??Canada ??• Iceland ??Iceland ??

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Mission CostsMission Costs

• P-3 Subsidized rate at $ 2,500/hrP-3 Subsidized rate at $ 2,500/hr

• Transit time ~ 16 hrs round tripTransit time ~ 16 hrs round trip

• ECF ~ 1-3 hrsECF ~ 1-3 hrs

• Test Flights ??Test Flights ??

• ~ $ 50K non-science hours (ECF, ~ $ 50K non-science hours (ECF, transit)transit)

• + MPCs + MPCs

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Mission Peculiar Costs Mission Peculiar Costs

• Aircrew Per-Diem (Lodging/M&IE)Aircrew Per-Diem (Lodging/M&IE)

• Airfield Costs Airfield Costs – DeicingDeicing– Ramp chargesRamp charges– Administrative FeesAdministrative Fees

• Crew OvertimeCrew Overtime

• Fuel Exceeding Subsidized rate $ 3.00Fuel Exceeding Subsidized rate $ 3.00

• Shop SuppliesShop Supplies

• Engineering/FabricationEngineering/Fabrication

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Estimated Basing Costs Estimated Basing Costs (MPCs)(MPCs)

• Assumptions; Assumptions; – 7 air-crew members7 air-crew members– 15 hours overtime/day 15 hours overtime/day

• Thule (per week)Thule (per week)– Aircrew Per-Diem (Lodging/M&IE) = $ 64/day = ~ $ 3KAircrew Per-Diem (Lodging/M&IE) = $ 64/day = ~ $ 3K– Airfield Costs = $ 0Airfield Costs = $ 0

• DeicingDeicing• Ramp chargesRamp charges• Administrative FeesAdministrative Fees

– Crew Overtime = $ 5K Crew Overtime = $ 5K – Fuel Exceeding Subsidized rate of $ 3.00 = $0Fuel Exceeding Subsidized rate of $ 3.00 = $0

• WAG for Thule = 8K/weekWAG for Thule = 8K/week

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Estimated Basing Costs Estimated Basing Costs (MPCs)(MPCs)• Assumptions; Assumptions;

– 7 air-crew members7 air-crew members– 15 hours overtime/day 15 hours overtime/day

• Sonde (per week)Sonde (per week)– Aircrew Per-Diem (Lodging/M&IE) = $ 313/day = ~ $ 15KAircrew Per-Diem (Lodging/M&IE) = $ 313/day = ~ $ 15K– Airfield Costs = $ 1700/day = ~$ 12KAirfield Costs = $ 1700/day = ~$ 12K

• Deicing ( not included)Deicing ( not included)• Ramp chargesRamp charges• Administrative FeesAdministrative Fees

– Crew Overtime = $ 5K Crew Overtime = $ 5K – Fuel Exceeding Subsidized rate of $ 3.00 (fuel rate $3.70-$4.50) = Fuel Exceeding Subsidized rate of $ 3.00 (fuel rate $3.70-$4.50) =

$4K / day = $4K / day = ~$ 28K~$ 28K

• WAG for Sonde = WAG for Sonde = $ 60K/week$ 60K/week

Arctic20070 TIM 10/10/2007 Arctic20070 TIM 10/10/2007

Cost ??Cost ??

• Assumption; 40 flight hours/weekAssumption; 40 flight hours/week

• 300K + 50K non-science = $350K300K + 50K non-science = $350K

• 2 weeks Thule = $ 20 K2 weeks Thule = $ 20 K

• 1 week Sonde = 1 week Sonde = $ 60 K$ 60 K

• Total scenario cost ~ $ 430KTotal scenario cost ~ $ 430K