assignment 1 - software (presentation slide)

Post on 23-Jan-2018

69 Views

Category:

Education

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SOFTWARE APPLICATION

Group Member:

NG SIEW QING 0325750

NGIENG TIEN YUNG 0320221

NGO JIA HAUR 0320144

OOI YIN JI (LEADER) 0319962

PANG KAI YUN 0319802

SAM WEI YIN 0320364

SANDRABROOKE GOH 0329884

PART A

BILL OF QUANTITIES

FUNCTIONS

FUNCTIONS

COMPOSITE RATES ANALYSIS

MULTI-LEVEL MARK UP FUNCTION

LIMITATION

PERMANENTLY DELETED VIRUS ATTACK

UNABLE REVIEW BUILDING MODELING

FUNCTIONS

CREATE 3D MODEL

DIRECTLY IMPORT THE ELECTRICAL DRAWING

CHANGES AND VARIATIONS CAN BE DONE QUICKLY

REBAR QUANTITIES

CALCULATION

PRODUCE REBAR SCHEDULE FOR FABRICATION

FUNCTIONS

AUTO IDENTIFY PIPES, WIRES,

CABLES, DUCTS

PROVIDE SUMMARISED

QUANTITY REPORT

FUNCTIONS

COST NEWLY INTRODUCED TO INDUSTRY

LACK OF EXPERTS

LIMITATIONS

SUPPORT 2D TAKING OFF

SUPPORT 3D TAKING OFF WORKBOOK

FUNCTIONS

AUTO-REVISIONING SUB-CONTRACTORCOMPARISON

FUNCTIONS

COST AND LICENSE REBAR DETECTION

LIMITATIONS

TAKEOFF MANAGER

● PRODUCE QUICK AND HIGH ACCURACY OF QUANTITY TAKEOFF

COST PLANNER

● COST ESTIMATING & CALCULATION● VALUE ENGINEERING

MODULE

CONSTRUCTABILITY MANAGER

● DETECT CONSTRUCTABILITY ISSUE

FUNCTIONS

INEFFICIENT

LIMITATIONS

SUMMARY

EFFICIENT BETTER VISUALISATION TIME SAVING

RECOMMENDATION

PART B

BRIEFING STAGE

BIM MEASUREMENT

VISUALIZATION IMPROVED BY 3D

MODEL

IMPROVE THE COMMUNICATION AND THE COORDINATION AMONG DIFFERENT

PARTIES

BENEFITS

CONSTRAINTS

HIGH COST FOR SOFTWARE AND TRAINING

CAD MEASUREMENT

DATABASE FOR

MANUFACTURING

INCREASE VALUE TO

CLIENTVISUALISATION

BENEFITS

CONSTRAINTS

HIGH INITIAL COST

SOFTWARE COMPLEXITY

MANUAL MEASUREMENT

COST EFFECTIVENO TRAINING IS

REQUIRED

BENEFITS

CONSTRAINTS

ERRORS TIME CONSUMING

DESIGN STAGE

BIM MEASUREMENT

HIGH GRAPHIC PERSPECTIVE OF

3D MODELINGIMPROVE

EFFICIENCYREDUCE THE

MATERIAL USAGE

BENEFITS

CONSTRAINTS

REQUIRE TRAINED OR EXPERIENCED TECHNICAL STAFF

CAD MEASUREMENT

BENEFITS

ACCURATE DESIGN COST MODELLING

CONSTRAINTS

LACK OF STANDARDISATION

IN DESIGN

LOSS OF WORK DUE TO NOT

SAVING

MANUAL MEASUREMENT

COST EFFECTIVE NO TRAINING IS REQUIRED

CLIENT’S SATISFACTION

BENEFITS

ERRORSCAN’T PROVIDE

BETTER VISUALIZATION

SHARING OF INFORMATION

CONSTRAINTS

PRE-CONSTRUCTION STAGE

BIM MEASUREMENT

SCHEDULING BY 4D BIM

IMPROVE SAFETY

COST ESTIMATING BY 5D BIM

BENEFITS

CONSTRAINTS

DEFECTIVE OF 4D BIM

CAD MEASUREMENT

BENEFITS

ENHANCE COMMUNICATION

QUICK MEASUREMENT

ACCURATE TAKING OFF

CONSTRAINTS

UNABLE TO PRODUCE BQ

NEED TO BE EXPORTED TO

OTHER SOFTWARE

MANUAL MEASUREMENT

COST EFFECTIVE NO TRAINING IS REQUIRED

FLEXIBILITY IN WORKFLOW

BENEFITS

CONSTRAINTS

ERRORSUNABLE TO

MAKE CHANGES QUICKLY

CONSTRUCTION STAGE

BIM MEASUREMENT

SAVE TIME REDUCE WASTAGE

PROMOTES PREFABRICATION

BENEFITS

CONSTRAINTS

PRICE FLUCTUATIONS

CAD MEASUREMENT

BENEFITS

REDUCE WASTAGE

REDUCE CONFUSION

DETECT INTERFERENCES

CONSTRAINTS

LIMITED TO 2D VOLUME CANNOT BE MEASURED

MANUAL MEASUREMENT

COST EFFECTIVE NO TRAINING IS REQUIRED

SAFE AND SECURED

BENEFITS

CONSTRAINTS

PROJECT TIME EXTENDED

REDUCE ACCURACY OF

DATA

POST CONSTRUCTION STAGE

BIM MEASUREMENT

MODEL DATA RECORDED

SUSTAINABILITY AND FACILITY

MANAGEMENT

BENEFITS

CULTURAL BARRIER TOWARD A NEW TECHNOLOGY

CONSTRAINTS

CAD MEASUREMENT

BENEFITS

DATA MANAGEMENT

EASY TO REPRODUCE

CONSTRAINTS

LIMITED INFORMATION

UNABLE TO VISUALISE

SOFTSCAPE ELEMENT

MANUAL MEASUREMENT

EASY TO OBTAIN INFORMATION

REDUCE THE RISK OF LOSS OF

INFORMATION

BENEFITS

REQUIRE PLACE TO STORE THE

DRAWING

TIME NEEDED AFTER

COMMISSIONINGLIMITED

INFORMATION

CONSTRAINTS

THANK YOU !