atlas incinerator

Post on 28-Feb-2018

248 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 1/28

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 2/28

• The Marine Industry

• The Offshore Industr 

MARKET

• Power Plants

• Industry Plants

• Transportable Containerized Incinerators

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 3/28

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 4/28

as on a ner zeIncinerators10’ & 20’ ISO containers

Standard Equipment:

Incinerator 

Oil Sludge TankDiesel Oil Tank

Lighting System

Fire Fighting

Equipment

Ventilation

Chimney

External Emergency Switch

Plus external hook up for

electrical power and all pipe

connections

Container Options:

Sunroof  Airconditioning

 Air compressor 

Generator 

Seperate Funnel

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 5/28

INSTALLATION

PRINCIPLEIncinerator  Atlas

OPTION A

 

Bottom Tank

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 6/28

Incinerator  Atlas

INSTALLATION

 

PRINCIPLE

OPTION B

Bottom Tank

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 7/28

INCINERATOR

FUELOIL

SLUDGEMIXING/HEATING

TANKSYSTEMWASTE

OILTANK

BILGEWATER

SEWAGEPLANT

SEPARATORSLUDGE

BILGE WATER

SEPARATOR

TANK

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 8/28

3 CHAMBERDESIGN

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 9/28

.

SLUDGE AND SOLID WASTE.

2. PREVENT AFTERBURNING AND

SPARKS IN THE CHAMNEY PIPE.

 CHAMBER3. LONG RENTENTION TIME GIVES

CLEAN FLUE GAS.

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 10/28

g. i.

COMPONENTS:

1. Charging Door 

.

16.

.

3. Afterburning Chamber 

4. Second Afterburning Chamber 

5. Oil Burner with Built in Pump

6. Ash cleaning Door 7. Air Blower 

8. Induced Drau ht Air E ector 5.

.

8.19.

9.9. Sludge Burner 

10. Double Wall for Air Cooling

11. Combustion Air Inlets

12. Oil Sludge Mixing Tank13. Mill Pump

14. Circulation Pumpl.

h.20.

1.

2. 3.5.

15. Compressed Air

16. Sludge Dosing Pump17. Heating Element

18. Diesel Oil Tank19. Damper

20. Sluice

6.11. 4.

CONNECTIONS:

a. Sludge Oil Inlet

b. Steam Inletc. Steam Outlet

d. Sludge Tank Ventilation

a.d.k.

.

f.e.

 j.

.

f. Diesel Oil Tank Ventilation

g. Compressed Air Inlet

h. Electric Power Supplyi. Flue Gas Outlet

 j. Overflow Diesel Oil Tank

k. Overflow Slud e tank

12.

18.

l. Emergency Switch

- - - - - - - - - - Yard pipe connection

.

b.c.

. .

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 11/28

BASICPRINCIPLE

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 12/28

S IM U L T A N E O U S B U R N IN G O F

O IL S L U D G E & S O L ID W A S T E

    P

   V +

  -

Hot Loading

SluiceL O A D I N G

    P

   V +

  -

WorkingB U R N I N G

    P

   V

 +  -

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 13/28

Self-cleaning strainer 

Dosing pumpSludge burner 

SLUDGESYSTEM

Circulation pump

Heating elements

Mill pump

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 14/28

 

CLEANING

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 15/28

SLUDGE

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 16/28

INDUCED

EJECTOR

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 17/28

 ATLAS INC.1200 SL WS M

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 18/28

g. i.

COMPONENTS:

1. Charging Door 

2. Combustion Chamber 

3. Afterburning Chamber 

.

16.

4. Second Afterburning Chamber 

5. Oil Burner with Built in Pump

6. Ash cleaning Door 

7. Air Blower 

8. Induced Draught Air Ejector 9. Slud e Burner 5.

.

8.19.

9.  

10. Double Wall for Air Cooling

11. Combustion Air Inlets

12. Oil Sludge Mixing Tank

13. Mill Pump

14. Circulation Pumpl.

h.20.

1.

2. 3.5.

. ompresse r

16. Sludge Dosing Pump

17. Heating Element

18. Diesel Oil Tank

19. Damper

20. Sluice

6.11. 4.

CONNECTIONS:

a. Sludge Oil Inlet

b. Steam Inlet

c. Steam Outlet

a.d.k.

.

f.e.

 j.

.

e. Diesel Oil Inlet

f. Diesel Oil Tank Ventilation

g. Compressed Air Inlet

h. Electric Power Supply

i. Flue Gas Outlet

12.

18.

. ver ow ese an

k. Overflow Sludge tank

l. Emergency Switch- - - - - - - - - - Yard pipe connection

.

b.c.

. .

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 19/28

• Multi Chamber 

• solid waste

• er urner  

• One PC Oil Sludge Treatment tank forcomm nu on an ag a on o an

contents

• e c ean ng s ra ner  

• Atomizing, non blocking sludge burner   ADVANTAGES

• Exhaust draft eliminates flue gas fan

•formation of harmful dioxides

•Up to 50% water content without pilot fuel

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 20/28

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 21/28

 

INCINERATORS

CERTIFICATES

FUNNEL DESIGN

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 22/28

 

Production on merchant ships:

2 kg per person per day

Product ion on cruise and passenger vessels:

3 kg per person per day

• Heating value: app. 2400 Kcal/Kg

DIMENSIONINGOF

• Density: app. 130 kg/m3

 

The oil sludge production depends on the quality of the fuel oil

 – as a rule of thumb the calculation is:

1-1,5 % of total fuel oil consumption

• .

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 23/28

 Appendix 2 point A1.4 – fuel/waste specification forIMO type approval test (% by weight):

Sludge oil consisting of:

75 % Sludge oil from heavy fuel oil. 

•20 % Emulsified water 

Solid waste (class 2) consisting of:

DIMENSIONINGOF•50 % Food waste•50 % Rubbish containing app.:

- .

- App. 40 % Cardboard

- App. 10 % Rags

- App. 20 % Plastic

The mixture will have up to 50 % moisture

and 7 % incombustible solids.

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 24/28

IMO / MED by DNV

Type approvals:

-

- ABS

CERTIFICATES

- USCG

- GERMANISCHER LLOYD

Other classification society approvals on a

case to case basis

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 25/28

x. w e u e e u e

funnel system is:

FUNNELDESIGN

60 mm WG

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 26/28

Counterpressure in funnel system consists ofthe following single pressure losses:

- Change of diameters

- Com ensators

- Pressure loss in straight pipe

FUNNELDESIGN

- ressure oss n en s

- Free outlet pressure loss

Recommended gas velocity in funnel system:

15 - 25 m/sec

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 27/28

Required information:- Type of incinerator 

- Diameter of funnel pipe

-outlet

- Total len th of funnel i e

FUNNELDESIGN

- Angel and number of bends

Calculation of counterpressure/

recommendation for funnel diameter 

7/25/2019 Atlas Incinerator

http://slidepdf.com/reader/full/atlas-incinerator 28/28

ra e name: nc nera ors

Co., Ltd.

No. 4, Lane 330

PRODUCTIONIN CHINA

 

Zhong Shan Street

 

Shanghai, China

top related