Capital Beltway Operational TestCapital Beltway Operational Test
August 1999
2 2
Capital Beltway Operational TestCapital Beltway Operational TestOp Test Overview
• I-95 portion of the Capital Beltway
• Multi-jurisdiction partnership
• Approximately 25 test vehicles
• Interoperable network-based communications– voice; data; images
• Three-year development and test project
3 3
Capital Beltway Operational TestCapital Beltway Operational TestALERT System
• Vehicles– Law enforcement, EMS, Fire – Motorist Assistance Vehicles (MAVs)
• Data Network– ALERT.NET server/database and CDPD
infrastructure– ALERT Client software– Interfaces at each agency dispatch or operations
center for ALERT interoperability
4 4
Capital Beltway Operational TestCapital Beltway Operational Test
ALERT In-Vehicle Components
• Core computer with touch screen interface
• ALERT-compliant peripheral equipment
• Standard ITS data bus
• Wireless voice, data and image communications
5 5
Capital Beltway Operational TestCapital Beltway Operational TestUser Interface
Color TouchScreen Display
6 6
Capital Beltway Operational TestCapital Beltway Operational Test
ALERT Capabilities for ALL Vehicles
• Functions– Radio systems management– GPS/GIS and AVL– Video imaging and management– Wireless access to data network
• User interfaces– Touch Screen– In-vehicle printer– Wireless hand-held computer
7 7
Capital Beltway Operational TestCapital Beltway Operational Test
Additional Vehicle Capabilities
• Warning system control– Lightbar; sirens
• Radar control
• Data management– Queries; data collection– Electronic forms
8 8
Capital Beltway Operational TestCapital Beltway Operational Test
ALERTVehicle
ALERTVehicle
HHU
ALERT.NETServer
WLAN
CDPD CDPD
Op/DispatchCenter
ALERT Data Comm Architecture
Op/DispatchCenter
WirelineWireline
Agency Mgr Desktop
Agency Mgr Desktop
Wireline
9 9
Capital Beltway Operational TestCapital Beltway Operational Test
ALERT and Current Communications
MD ALERTL.E. Vehicle
ALERT.NETServer
MD SHA
MD ALERTL.E. Vehicle
Standard VAL.E. Vehicle
VA ALERTL.E. Vehicle
VA ALERTL.E. Vehicle
MD L.E.DispatchVA L.E.
Dispatch
VDOT
Standard MDL.E. Vehicle
10 10
Capital Beltway Operational TestCapital Beltway Operational TestTest Objectives
• Document incident management benefits:– In-vehicle system integration– New in-vehicle capabilities– Multi-jurisdiction interoperability
• Obtain user feedback:– New procedures and organizational frameworks– Enhancements to ALERT system
11 11
Capital Beltway Operational TestCapital Beltway Operational TestAnticipated Benefits
• Incident management effectiveness– Quicker response and clearance– More efficient resource allocation
• Responder safety enhancement
• Responder efficiency– Improved incident data collection– Fast and accurate reporting
• User acceptance
12 12
Capital Beltway Operational TestCapital Beltway Operational TestProject Overview
Major Area• Technical development,
testing and production– ALERT vehicles
– ALERT.NET
– ALERT client software
• Procedures development, testing and implementation
• Operational test preparation and execution
Leads
FHWA/TTI; installation contractor
Beltway agencies
Beltway agencies
13 13
Capital Beltway Operational TestCapital Beltway Operational Test
Beltway Agency Responsibilities
• Own and operate ALERT vehicles
• Develop and implement ALERT operating procedures– vehicle, agency, multi-jurisdiction levels
• Provide non-ALERT baseline and concurrent incident management evaluation data
• Provide assigned personnel– technical liaison, officers, supervisors, support
14 14
Capital Beltway Operational TestCapital Beltway Operational Test
Project Plan and Schedule (1 of 2)
• Phase I (FY 1999-2000)– Complete ALERT vehicle and ALERT.NET design,
development and laboratory testing• Fire, EMS, MAV• Wireless LAN application
– Prepare for operations:• Deliver multiple vehicles to MD & VA State Police• Conduct user training• Develop and test initial operational procedures
– Establish Center/ALERT.NET interoperability for each participating agency
– Prepare test and evaluation plan
15 15
Capital Beltway Operational TestCapital Beltway Operational Test
Project Plan and Schedule (2 of 2)
• Phase II (FY 2001)– Deliver all vehicles to participating law
enforcement, fire, EMS, and MAV agencies– Train all users– Implement and refine operating and data
collection procedures
• Phase III (FY 2002)– Conduct operational test and evaluation– Analyze and report benefits
16 16
Capital Beltway Operational TestCapital Beltway Operational TestOrganization
Field Test Management and Operations
Independent Evaluations
Outreach/PR Project Steering Group
System Development and Production
ALERT In-Vehicle System
Phase I Installation and Testing
Phase II/III Production & Installation
ALERT.NET and Client Software
Engineering and Testing
Installation and Support
Operational and Data Procedure
Development
Project Administration
User Training
FHWA Evaluation
Regional Evaluation