bakery square specially planned district preliminary land...

Post on 13-Jul-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

Bakery Square Specially Planned District

Preliminary Land Development Plan

Submitted by:

Walnut Capital/RC Longview Fund

Strada Architecture

August, 2012; revised January, 2013

2Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

Master Plan

commercial

residential

parking

sp district boundary

3Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

Sub-Districts

Sub-district A

Sub-district B

4Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

Urban Open Space

private gardens

public open space

total open space: 19%sub-district a: 14% open spacesub-district B: 25% open space

5Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

MARCHAND STREET

DEN

NISTO

N STR

EET

ELLIS SCHOOL

Existing Bike Trail to Beechwood Blvd.

HOWE STREET

Bike Trail to Beechwood Blvd.

New Bike/Ped Connector

Existing On Street Bike Route

Proposed Bike Track, 2-way

Proposed Bike Connector

Existing Bike Trail

Bicycle Circulation

6Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

On-Street Sidewalk

Pedestrian Way

Major Pedestrian Intersection

MARCHAND STREET

DEN

NISTO

N STR

EET

ELLIS SCHOOL

HOWE STREET

Pedestrian Circulation

7Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

770'-0"115'-0"

140'

-0"

250'

-0"

215'

-0"

300'

-0"

700'-0"170'-0"

170'

-0"

PENN AVENUE

PU

TNA

M S

TRE

ET

DAHLEM PLACE

E. L

IBE

RTY

BO

ULE

VAR

D

MELLONPARK

Property Line

85'

85'

85'

65'

35'

CommercialResidentialExisting Buildings

Legend

Build-To Line15' from Property Line

10' Setback LineSP District Boundary

Build-To Line15' from Curb

N

General Massing Plan

Heights, Build-to & Setbacks

8Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

CommercialResidentialExisting Buildings

Legend

General Massing Aerial

65'35'

85'

85'

Massing Diagram

Section at Penn Avenue

Section at Bouevard

9Bakery Square Specially Planned District – PLDP Submission – revised January, 2013

Street Sections

Section at Putnam StreetSection at New West Street

Section at New Bike ConnectorSection at Mews

top related