bamboo housing manufacturing process

Post on 06-Aug-2015

662 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

HIMALAYAN BAMBOO PVT.LTD

MANUFACTURING PROCESS

LOW COST BAMBOO HOUSING

Primary Plinth Of The House

Basic foundation of the house.

15 days for the plinth to be ready for other construction.

Assembly of the house

The side assembling. The support to the side walls.

Roofing of the bamboo house

Support to the roof. Upper View

Plastering of the bamboo House

Plastering and support Controlling the plaster level

Varnishing/Painting/ Final Touch

Final Ready House Ready to Handover

top related