bandra-worli sea link _ce152_sld

Post on 07-Apr-2018

228 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 1/68

 Presentation on

TRANSPORTATION IN INDIA - CHALLENGES IN

FUTURE 

 By

Prof. S. L. Dhingra Transportation Systems Engineering

Civil Engineering Department

Indian Institute of Technology, Bombay 

Organised by

Research Scholars‟ Forum 

Indian Institute of Technology Bombay 

23rd Oct. 2002, Institute Auditorium 

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 2/68

Overview 

National Highway Development Projects (NHDP)

Pradhan Mantri Gram Sadak Yojana (PMGSY)

Urban Transport Projects

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 3/68

National Highways Development Project (NHDP)

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 4/68

Golden Quadrilateral - Comprising NHs Connecting

Delhi, Mumbai, Chennai, and Kolkata.Length - 5,952 Kms

Year of Completion - 2003

North-South & East-West Corridor - Comprising NHsConnecting Srinagar to Kanyakumari and Silchar to

Porbandar.

Length - 7,300 Kms

Year of Completion - 2007

Total Estimated Cost = Rs.54,000 Crores (at 1999 Prices)

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 5/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 6/68

Mumbai--Pune Expressway Map 

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 7/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 8/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 9/68

Environment Protection 

All conditions for environment are followed.

One thousand trees trans planted.

Extensive tree plantation , and median verge

plantation plant. Separate dumping area is acquired for surplus

material.

Separate land is acquired for labour camp.

Provision of recycling material and used forwork.

Provision for additional lead for transport ofsurplus material.

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 10/68

Special item to use surplus rock – gabbian, rockembankment.

Murum from adjoining land and dumping blackcotton soil from road – creation of new fertileagriculture land.

Rain water drainage .

Terracing to quarry area.

Continued… 

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 11/68

Social Problem 

Tendency of villagers to cross expressway, useof cycles & two wheelers in spite the provision of

cart track & pedestrians crossing Tendency to overtake wrong side over speeding

Observing no lane discipline

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 12/68

Advantages of the Expressway 

Time savings - Mumbai-Pune distance will be coveredin 2 hours as against 4 to 6 hours in the presentsituation

Estimated fuel and other savings to the extent ofRs.500 crores per year

Reduction in environmental pollution due to vehiclesrunning at rated capacity and less fuel consumption

Reduction in Accidents

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 13/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 14/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 15/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 16/68

Only 48 % of villages are connected by all-weather roads.

Nearly 50 % of villages lack proper connectivity.

Proper rural road connectivity is a must for development. Why ? Benefits – economic, social, political etc.

Rural people can have easy access to

Trade

Education

Health

Employment

Current Scenario & need for

providing road connectivity: the PMGSY Approach

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 17/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 18/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 19/68

• Flyovers

• Bandra-Worli sea link• Western Freeway link/ 

• Hajiali-Wilson college viaduct

• Metro System (TCS Study)

• Elevated Railway System (by E. Sreedharan)

• MUTP II (MRVC Study)

• Mass Transit System (by MMRDA)

• Thane MRTS• Sky Bus

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 20/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 21/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 22/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 23/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 24/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 25/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 26/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 27/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 28/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 29/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 30/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 31/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 32/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 33/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 34/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 35/68

GPO 

sewri 

CST 

MPT 

Bandra 

Worli 

Wadala 

WESTERNFREE WAYSEA LINK 

BANDRA

WORLISEA LINK 

Hutatma Chowk 

Gateway of India 

Senapati Bapat Marg 

Savarkar Marg 

Ambedkar Marg 

Western rail 

Central rail 

Harbour rail 

Rafi Ahmed Kidwai Margs 

The Fourth Corridor 

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 36/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 37/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 38/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 39/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 40/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 41/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 42/68

Value and life of assets under major heads or groups

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 43/68

NOTE : „N.A.‟ denotes Not Applicable.

Sr.

No.

Major Head or Group Cost

Crores

Life in

Years

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

DPR

Land

Running Tunnels

Other Underground Cavities

Miscellaneous works in

Tunnels

Carshed Works

Cut and Cover construction

Administrative OfficeBuilding

Ballastless Tracks

Residential quarters

Temporary track connection

Power supply

Electrical equipments

S & T equipments

Rolling stock 

General charges

Contingencies

50.00

500.00

1177.05

633.77

344.09

114.42

242.60

20.00

46.51

27.00

25.00

89.60

1045.95

366.87

1950.00

554.40

216.22

N.A.

Infinite

100

100

100

50

50

50

15

50

50

40

20

15

30

N.A.

N.A.

Total 7423.48 

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 44/68

 

S. No. Main HeadAmount 

(Rs. Crores)

1.

2.

3.

4.

5.

6.

7.

8.

Preliminary expenses

Land and right of way

Structural engineering works

Power supply and electrical equipments

Signaling and telecom equipments

(including automatic fare collection and checking

system)

Rolling stock

Total

Add general charges, (supervision and direction) @8.33%

Total

Add contingencies

Total

50.00 

500.00

2650.44

1135.55

366.87

1950.00

6652.86

554.40

7207.26

216.22

7423.48

Abstract estimate for 7th corridor 

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 45/68

MRVC

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 46/68

Components

Increase in corridors

Longer (12 rake) EMUs

Station area improvement schemes

Removal of level crossings

The resettlement and relocation of theproject affected persons and structures

all along Central and Western Railwaycorridors and the Harbour Line

Total cost of the project is 5618.36 crores.

ToKasara

Virar

To Dahanu

Rd.

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 47/68

To Karjat/ Khopoli

Kalyan

Diva Jn.

THANE

Kurla

Belapur

Panvel

To Karjat

To Roha

Andheri

Santacru

z

DADAR

BANDRA

Mumba

i

Central

Churchgate

Mumbai CST

Rd.

Turbhe

CENTRAL RAILWAY

LOCAL LINE

THROUGH LINE

HARBOUR LINE 

OTHER LINES

WESTERN RAILWAY

LOCAL LINE

THROUGH LINE

5TH LINE

Vasai

Rd.

Wadala Rd.

Borivali

Vashi Nerul

Uran

Mumbai Suburban System Map

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 48/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 49/68

Non-Rail Projects

Reduction in traffic congestion, increase invehicular speeds and reduction in delays

Increased carrying capacity for bus usersSafe and smooth flow of vehicular and

pedestrian traffic

Minimizing delays and accidents

Improved environment through reduction inair pollution

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 50/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 51/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 52/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 53/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 54/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 55/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 56/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 57/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 58/68

Thane is one of the fastest growing cities. Thecity, spread over an area of 128 sq.km. has apopulation of 15.5 lakhs.

High travel demand.

Population doubling every decade.

City expected to hit 30 lakhs by 2031.

Development has increased the traffictremendously.

Need:

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 59/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 60/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 61/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 62/68

30m wide circular MRTS corridor proposed through majorwork and industrial area

Total Route Length - 21 kmElevated - 12.25 kmSurface Level - 8.75 km

Total stations - Eleven (11)On ground - 8Elevated Stations - 3

Estimated Project Cost: Rs 1000 crores

Modern Traffic Management & Surveillance Systems

Environmentally better system

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 63/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 64/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 65/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 66/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 67/68

8/4/2019 Bandra-worli Sea Link _ce152_sld

http://slidepdf.com/reader/full/bandra-worli-sea-link-ce152sld 68/68

top related