Basic Contract Law for Successful ProjectsAPM London
11 March 2013
Lawyers & Parliamentary Agents
Basic Contract Law for successful projects
• Welcome
• Protecting your Position Pre-contract
• Intellectual Property
• Contract Formation and Good Practice
• Refreshments
• Unfair Contract Terms & Best Endeavours
• Public Procurement Law – Rules and Risks
Protecting your Position Pre-contract
Huw Morgan, Partner
Lawyers & Parliamentary Agents
Protecting your position pre-contract
• Confidential information
• Contract negotiations
• Heads of terms
• Letters of intent
Confidential Information
• Commercial position
• The very existence of a project might be confidential
• Feasibility studies and site visits
• Correspondence
• You cannot consider the possibility of a breach of confidence too early
• Legal Position
• The Law recognises a secret!
• Confidential information is protected
• But what is confidential information?
What is Confidential Information?
• Is the information public property?
What is Confidential Information?
• Is the information public property?
• Has any value been added?
What is Confidential Information
• Is the information public property?
• Has any value been added?
• Was the information transmitted in confidence?
Please vote now using your keypads
Were the technical details of ‘Invisigrip’ described by Mr Seager confidential information?
1. Yes2. No
• Mr Seager won
• Invisigrip details were confidential
• The details were not in the public domain and were transmitted in confidence
Please vote now using your keypads
Was the ‘sales information’ used by Mr Fowler confidential information?
1. Yes2. No
• Mr Fowler won
• The sales information was not confidential
• The sales information was never treated as confidential or transmitted confidentially
• Practical Protection
• Be clear what is confidential and treat it as such
• Legal Protection
• Consider a confidentiality agreement
Confidentiality Agreement
• It does not make all information confidential
• Permitted disclosure
• Permitted uses
• Duration
• Termination of the project
Please vote now using your keypads
Which statement will give you the best protection during your pre-contract negotiations?
1. Without prejudice2. Subject to approval3. Subject to more complete documentation4. Subject to contract
Heads of Terms
• Records the underlying principles of the deal
• Cover the key issues
• Time
• Cost
• Quality
• Recognises a watershed in the negotiations
• Saves time and money in drafting
Binding or Non-binding?
“These Heads of Terms are not intended to be legally binding between the parties except as expressly set out in the Heads of Terms”
• Cons
• hostage to fortune
• duplication
• parties may treat it as a substitute for the contract
Heads of Terms
• Pros
• record underlying principles of the deal
• provides less wriggle room
• recognises a watershed in the negotiation
• a useful summary of the whole deal
Heads of Terms
Letters of Intent
• Why?
• Commercial issues
• Pitfalls
Please vote now using your keypads
Which of these phrases would encourage you to commit funds to an IT upgrade prior to signing the contract?
1. I may possibly give you the contract2. I instruct you to purchase the IT upgrade and will
pay you for it3. I promise to give you the contract
Commercial issues
• I, the Customer, will pay you, the Supplier, for Materials up to [financial limit]
• If the contract is not signed
• I will still pay for the materials
• They will become mine
• I will not pay for loss of profit
Pitfalls
• “I promise to give the Contract”
• The Customer may be liable to pay the Supplier for work carried out and loss of profit upon the entire contract if it does not go ahead
Pitfalls
• “I may possibly give you the Contract but please go ahead”
• The Customer pays for the work carried out but without recourse if performed poorly
• The Customer pays upon the basis of “Quantum Meruit” – “what he deserves”
Protecting your position pre-contract
• A properly drafted Letter of Intent is itself a contract but limited
• In time
• In cost
• In work/materials/services
Protecting your position pre-contract
• Is any information confidential?
• Is correspondence subject to contract?
• Is the purpose of the Heads of Terms clear?
• Is a Letter of Intent needed?
Huw Morgan, Partner
hmorgan@vwv.co.uk 0117 314 5293
Intellectual Property
Doug Locke, Partner
Lawyers & Parliamentary Agents
Types of right
• Trade marks
• Copyright
• Patents
Trade marks
Canberra Harwell
Copyright
PatentsGame playing apparatus comprising sheet material defining a confined playing area, a plurality of columns of loci delineatedon said playing area, the loci being of such size and spacing asto permit the placing of different portions of the human anatomyon different loci, different groups of loci being of different colors, a chance controlled selection device comprising a spinner board bearing indicia designating different group colorsand different ones of said portions of the human anatomy and a spinner or pointer pivotally mounted centrally on the board and adapted to be spun and then allowed to come to rest to select indicia designating a group color and a portion of the human anatomy.
Please vote now using your keypads
Which of the following do not exist?
1. Moral rights2. Database rights3. Olympic association rights4. Cattle variety rights5. Plant variety rights6. Rights in Peter Pan (that will never expire)
Asserting rights
• Deterrent
• Reduces uncertainty
8Copyright
8Design right
• Registration
Collaborations
• Deal with intellectual property in a written agreement
• “50/50” ownership
• Background and foreground rights
• Be specific
• Don’t agree to assign/license what you don’t have
Enforcement of rights
• Who may enforce?
• Who must assist?
• Who pays?
• Who gets compensation?
Competition law
• Intellectual property is “anti-competitive”
• Things to avoid:
• Price fixing
• Dividing up the market
Summary
• Clear written agreements
• Register trade marks
Doug Locke, Partner
dlocke@vwv.co.uk 0117 314 5602
Contract Formation and Good Practice
Huw Morgan
Lawyers & Parliamentary Agents
Essential Elements
Offer
Offer
• Specific
• Complete
• Capable of acceptance
• Contain the key terms of the contact
• Non negotiable
• Intended to be binding
Invitation to Treat
• simply invites other party to make an offer
• not binding
Essential Elements
Offer
Acceptance
Acceptance
• An offer must be accepted without qualification
• A counter-offer extinguishes the original offer
• Acceptance should be communicated, but sometimes conduct may be considered acceptance
Offer or invitation to treat?
The display of goods for sale in shops:
The display of goods for sale in shops:
Please vote now using your keypads…
1. Offer
2. Invitation to treat
Offer or invitation to treat?
Vending machine:
Vending machine:
Please vote now using your keypads…
1. Offer
2. Invitation to treat
Essential Elements
Offer
Acceptance
Consideration
Essential Elements
Offer
Acceptance
Consideration
Intention to createlegal relations
Offer and Acceptance
British Road Services Ltd v Arthur V Crutchley & Co
• British Road Services v Arthur V Crutchley & Co.
• BRS collect Whisky in Edinburgh
• Delivered to a warehouse in Liverpool
• Whisky stolen overnight
• BRS reimbursed the owner of the Whisky
• Who was liable as between BRS and AVC ?
Offer and Counter Offer
• British Road Services v Arthur V Crutchley & Co.
• BRS claimed to have sent a Contract to AVC
• AVC said they hadn’t received it
• BRS presented a delivery note to the warehouse office on arrival
• AVC stamped it “received on AVC Conditions”
• BRS unloaded the Whisky
Offer and Acceptance
RTS Flexible Systems Limited v Molkerei Alois Müller Gmbh & Co
RTS v Muller
• Muller commissioned RTS to build two new production lines
• Work started without a signed Contract
• Letter of Intent dated 1 March 2005
• Letter of Intent expired 27 May 2005
• July price agreed at £1,682,000
• July MF/1 terms and Schedules almost agreed
• No signed Contract
• November 2005 parties fell out
• RTS wanted to be paid
• Muller counterclaimed for failure of the new production line
• Was there a contract and if so on what terms ?
Please vote now using your keypads
What was the contractual position between RTS and Muller?
1. No contract between them2. Contract on limited terms (i.e. No MF/1 or
Schedules) 3. Full Contract on MF/1 and Schedules
Reasons
• Supreme Court said full M/F Terms
• No Contract – unconvincing as a price had been agreed and work carried out
• Limited Contract terms – Almost all terms of the MF/1 and Schedules agreed do this didn’t reflect the facts
Reasons
• Full Contract on MF/1 and Schedules
• All terms of real importance agreed
• Counterpart clause “contract not effective until each party has executed a counterpart and exchanged it with the other”
• Court found that the parties had waived this restriction by their conduct in carrying out and paying for part of the works
Who won ?
• RTS had the benefit of the limitation clause in the MF/1
• Muller had the benefit of the technical Schedules which they said RTS had breached
• Both parties were in Court for five years before the matter was resolved.
RTS v Muller
“The moral of the story is to agree first and to start work later” Lord Clarke
Good Practice
• Deed – 12 years liability
• Under hand – 6 years liability
• Storage
• Execution – effective from dating
• Commencement of the Services
• Effective Date
Contract Amendments
• Can you amend a contract in manuscript?
Manuscript amendments
Please vote now using your keypads
Is a contract legally binding if amended in manuscript?
1. Yes2. No3. It depends
Manuscript Insertions
2.1 The parties agree that the commencement date shall be the date in the Appendix
Appendix
2.1 – The date shall be ………………………
Huw Morgan, Partner
hmorgan@vwv.co.uk 0117 314 5293
REFRESHMENT BREAK
Unfair contract terms & Best endeavours
Doug Locke, Partner
Lawyers & Parliamentary Agents
Unfair Contract Terms Act(UCTA)
• General principle – parties free to contract on any terms
• Unfair Contract Terms Act (UCTA) limits a party’s ability to restrict or exclude its liability
• No restriction of liability for (i) death or injury resulting from negligence or (ii) fraud
UCTA Prohibitions
UCTA also prohibits:
• the restriction of liability caused by negligenceunless the term is reasonable
• in contracts on a party’s written standard terms, clauses which permit that party to restrict liability for breach of contract unless the term is reasonableness
UCTA Reasonableness Test
To be reasonable, a clause must be:
“fair and reasonable having regard to the circumstances which were, or ought reasonably to have been, known to or in the contemplation of the parties when the contract was made”
UCTA Reasonableness Factors
Reasonableness Factors:
• Bargaining strength
• Opportunity to avoid
• Knowledge
• Availability of insurance cover
UCTA Consequences
• Either valid or struck out – no middle ground
• If struck out, normal damages rules apply
• Divide up clauses
Frans Maas v Samsung (2004)
Frans Maas v Samsung (2004)
• Samsung claimed £2.6 million from Frans – theft of 26,000 mobile phones from Frans’ warehouse
• Samsung – theft was an “inside job”• Frans – British International Freight Association (BIFA)
standard terms of contract were incorporated• BIFA terms - Frans’ maximum liability based on weight, not
value • Frans – BIFA terms capped liability at £25,000• Samsung – Cap on liability was unfair and in breach of UCTA
Please vote now using your keypads
Does UCTA apply in principle to the clause stating that Frans should only pay £25,000?
1. Yes2. No
Frans Maas v Samsung (2004)
• Clause subject to UCTA
• Reasons:
• Restricts liability in respect of negligence
• Restricts liability in respect of breach of contract
Frans Maas v Samsung (2004)
Court held:
• Theft was an inside job
• Frans liable for actions of employees and negligent security
• Losses subject to application of limitation clause
Please vote now using your keypads
Applying UCTA, what should Frans pay to Samsung?
1. Nothing2. £25,0003. £2,600,0004. None of the above
Frans Maas v Samsung (2004)
• Court held that clause was fair and reasonable:
• No inequality of bargaining power
• Routine term in freight industry
• Samsung could have agreed higher limit
• Samsung awarded £25,000 – less than 1% of original claim
Yuanda v WW Gear (2010)
Yuanda v WW Gear (2010)
• Contract for fitting of curtain walling
• Incorporated Gear’s “standard amendments to contract” –minor variations agreed between parties
• Clause 9A – if Yuanda commence adjudication then Yuanda would be liable for both parties’ costs irrespective of outcome
• Yuanda – 9A in breach of UCTA as:
• Contract formed on Gear’s standard terms
• Clause an unreasonable restriction
• Gear – No breach of UCTA as contract was a negotiated deal and not on Gear’s written standard terms
Please vote now using your keypads
Was the contract on Gear’s written standard terms and so subject to the provisions of UCTA?
1. Yes2. No
Yuanda v WW Gear (2010)
No – Court held that:
• To be standard terms, must be terms that the company uses for all its contracts without alteration
• Gear’s standard terms (but not the relevant clause) had been varied by negotiation
• No longer standard terms
• UCTA did not apply
St Albans v ICL (1995)
St Albans v ICL (1995)
• ICL supplied computer system to St Albans Council
• Contract negotiated and minor amendments made to ICL’s standard terms
• Software faulty and not enough tax collected
• St Albans claimed £1 million in damages
• ICL standard clause limited liability to £100,000
Please vote now using your keypads
Had the parties contracted on ICL’s written standard terms?
1. Yes2. No
St Albans v ICL (1995)
• Amendments to ICL’s standard terms only very minor so still contracting on standard terms
Please vote now using your keypads
Was the cap on liability clause fair under UCTA?
1. Yes2. No
St Albans v ICL (1995)
• Cap on liability clause unfair:
• ICL was a large company with substantial insurance
• The limitation of £100,000 bore no relation to ICL’s insurance cover of £50 million
• ICL was in a strong bargaining position due to urgency
• St Albans had not been offered any inducement to accept limitation
• St Albans had no opportunity of getting better terms
Enforceability of limits of liability
• A clause that imposes a higher limit liability will stand a better chance of being enforceable
• A clause that purports to impose a lower limit of liability is less likely to be enforceable
• Divide up limitations of liability
• Offer alternatives
• Is the limit justifiable?
• Each contract turns on its facts
Enforceability of limits of liability
• Courts consider what exclusions are in the customer’s own terms
• Beware:
• dealing with smaller customers
• dealing with customers who have little choice but to buy from you
Enforceability of limits of liability
• Preamble/recital may assist – for example:
• “The supplier has obtained insurance cover in respect of its own legal liability for individual claims not exceeding £100,000 per claim. The supplier’s liability is therefore limited to £100,000 and the buyer is responsible for making its own arrangements for the insurance of any excess loss.”
Endeavours
• Best endeavours
• Reasonable endeavours
• All reasonable endeavours
EndeavoursJet2 v Blackpool Airport
Please vote now using your keypads
“All reasonable endeavours”?
1. More than “reasonable endeavours”, but less than “best endeavours”
2. The same as “best endeavours”3. Meaningless
Jet2 v Blackpool Airport
“Jet2 and Blackpool Airport will use their best endeavours to promote Jet2’s low cost services from Blackpool Airport, and Blackpool Airport will use all reasonable endeavours to provide a cost base that will facilitate Jet2’s low cost pricing.”
Endeavours
• Jet2 operated flights outside Blackpool Airport’s normal hours.
• Blackpool Airport made a loss on those flights.
• New management arrived at Blackpool Airport. No more out-of-hours flights.
Endeavours
• “Jet2 and Blackpool Airport will use their best endeavours to promote Jet2’s low cost services from Blackpool Airport, and Blackpool Airport will use all reasonable endeavours to provide a cost base that will facilitate Jet2’s low cost pricing.”
Please vote now using your keypads
Did Blackpool Airport have to stay open for the out-of-hours flights?
1. Yes2. No
Endeavours
• “Endeavours” clauses rarely give a clear answer.
• If possible, be explicit in advance.
Doug Locke, Partner
dlocke@vwv.co.uk 0117 314 5602
Lawyers & Parliamentary Agents
Public procurement law – rules and risks
David Hansom, Partner
Overview
• Introduction to procurement in context
• What rules apply and when?
• What to do if you are unhappy
• The future
Introduction to procurement
• EU law requires public contracts to be competitively tendered
• Public procurement regime applies to all ‘contracting authorities’
• Detailed EU rules apply to some purchasing –can be complex and are driven by case law
• Pitfalls for the unwary
Introduction to procurement
• 3 levels of rules : bigger spend = more detailed
• EU treaty principles of equality of treatment, non discrimination and transparency (apply to all)
• Authority specific internal purchasing rules (apply to all)
• Detailed EU rules (apply to higher value purchases but only to certain services)
Please vote now using your keypads
When were the most recent amendments to the public procurement rules in the UK?
1. 20062. 20083. 2011
Public Contracts Regulations -thresholds
Contract ValueContract type
£4,348.350 ex VATWorks – done for you or to specification
£173,934 ex VATServices – the purchase of services. Not all services covered (Part A / Part B)
£173,934 ex VATSupplies – the purchase and hiring of goods
Values reset every two years by EU – above effective 1 January 2012
Below threshold or exempt contracts
• Limited exemptions to the rules such as
• Land purchase or disposal
• Research and development contracts
• Less onerous rules for “Part B” residual services and below threshold contracts
• Catering, education, health and social care contracts are all Part B services
If the EU rules do not apply
• Authorities still need to follow internal procurement rules e.g contract up to £25k, seek three bids and choose lowest price?
• EU advert needed only if cross border interest
• Needs “relevant and proportionate” advertising and then fair and transparent mechanism to appoint bidder
Ways to market- EU rules
• Three ways for public sector to buy
• Bespoke new procurement process
• Set up new framework or call off existing
• Buying collaboratively and sharing services
Bespoke procurement• 4 routes – open, restricted, competitive dialogue, negotiated
• Open and restricted most common
• Similar except Restricted has a pre qualification stage
• Straightforward spend, commodities or supplies but no negotiation on contract terms
• Government now mandating open for central government
• Competitive dialogue
• For particularly complex contracts
• Negotiated
• Effectively closed off
Timescales under the rules
All routes - contract award notice within 48 days of award
Competitive dialogue
Competitive negotiated
RestrictedOpen Stage
10 days (15 if post), extended if ends on non working day
10 days (15 if post), extended if ends on non working day
10 days (15 if post), extended if ends on non working day
10 days (15 if post), extended if ends on non working day
Standstill
No statutory minimum
No statutory minimum
40 days (35 if electronic) & urgency grounds
52 days (45 if electronic)
Tender
37 days (30 if electronic)
37 days (30 if electronic) & urgency grounds
37 days (30 if electronic) & urgency grounds
NonePQQ
Bespoke new procurement
• Framework agreements under any route
• Minimum timescales to reply to advert, complete tender
• Evaluation criteria must be clear and transparent
• Minimum 10 day “standstill” period after choosing winner and notifying losing bidders
• Minimum levels of information must be provided to all unsuccessful bidders
• You can challenge breach of rules
Frameworks and shared services • Framework is a contract setting up the basic terms with one or
more suppliers with no guarantee of minimum work levels
• Direct call off or mini competition
• Single or multiple supplier
• Can use existing frameworks instead of new process
• Common issues
• Prices and contractors are fixed for term – 4 years max
• Limited scope to change terms and conditions
• Is the authority entitled to use it?
Practical tips for successful bidding
• Do
• Understand the process, timings and evaluation
• Be clear on minimum hurdles and requirements to make sure you can meet them
• Check and double check your responses
• Check credit rating etc before you bid and get them amended if wrong
Challenging procurement decisions
• Challenges and complaints about procurement increasing
• Economic crisis means fewer new opportunities
• Considerable competition for those remaining
• Frameworks and long term contracts cause exclusion from market
• Often failure to win on retender can mean business closure
Challenging procurement decisions
• There are two legal routes to challenge
• Under the Public Contracts Regulations 2006 –bidders only and strict time limits
• Judicial review – wider reach but remedy of last resort – full three months to bring
• Breach of implied contract?
• Also complaints to Cabinet Office/ European Commission etc – no time limits and free!
Please vote now using your keypads
What remedies do you have as an unhappy losing bidder?
1. Damages2. Automatic suspension before award, damages
before and after award3. Civil Financial Penalties 4. All of the above
Remedies
• Under new rules
• Before contract award – injunctive proceedings, automatic suspension of award decision, damages
• After award – cancellation, damages, unlimited Civil Financial Penalty (fines)
Remedies available
• For Part B services or smaller value procurements
• Damages claims, bad publicity,
• Judicial review - court could stop process
• For EU procurements
• Before award – all above plus suspension of award and fines
• Post award – all above plus cancelled contract/shortening and fines
Time limits to challenge
Provisions unamended6 months from entry of contract:
VEAT – 10 days
CAN – 30 days if no OJEU
Telling all bidders – 30 days
Cancellation
30 days from the date of bidder knowledge
(promptly) and within 3 months of bidder date of knowledge
Damages
New rules (claim from 1/10/11)
Old rules (claim pre 30/09/11)
Type of claim
Automatic suspension
• Suspension of contract award procedure
• Triggered by standstill letter
• Must not award if claim form issued in respect of award decision – automatically ineffective if so
• Must apply to Court to have suspension lifted
• Or will stay in place until first hearing
Automatic suspension
• BUT – Court taking cautious approach
• Suspension only upheld if challenger can meet standard test for injunction under American Cyanamid principles ie
• Strong, not just arguable case
• Damages as adequate remedy
• Balance of convenience
• Status quo
Automatic suspension
• MOST cases so far have approached in this way
• Indigo v Colchester College
• Exel Europe v University Hospitals Coventry
• Halo Trust v SOS International Development
• Only different case in Northern Ireland
• First4Skills v NI Dept for Education & Learning refusal to lift suspension to ensure continuity of similar claims
What to do if you are unhappy• Do
• Engage with the authority during the process
• Interrogate scoring and evaluation criteria immediately –are they clear on hurdles and minimum requirements?
• Seek information where you are entitled to it
• Raise concerns quickly – very strict time limits to challenge
• Seek advice if you want to challenge
• Do not
• Make vexatious claims – risk of costs
Hot topics and cases
• Some key trends in case law
• Transparency
• Mears v Leeds City Council – must disclose all evaluation criteria sub criteria and weightings
• Traffic Signs v Dept for Regional Development (NI) – relevance and proportionality of criteria – logic
Managing when things go wrong
• Apcoa v Westminster City Council – authority can always terminate procurement process. Should be clear in tender documents
• Mermec v Network Rail Infrastructure - time limits will be strictly interpreted
Future reforms
• Reforms to the procurement rules?
• More flexibility to negotiate
• Quicker processes
• Part A/B services distinction abolished
• SMEs and new entrants
• UK position – more freedom to negotiate, exemption for 3 years for new start up social enterprises
• New directive drafted – 2014 in force?
Summary
• Key area of current Government focus
• Understanding procurement is key to access pubic sector contracts
• Use the rules to help you understand procurements and be quick to follow up if not happy
• More changes coming soon
• Training for teams
David Hansom, Partner
dhansom@vwv.co.uk 0207 665 0808
Lawyers & Parliamentary Agents
Basic Contract Law for Successful Projects
APM London
top related