board of trustees and administration
Post on 28-Jan-2016
44 Views
Preview:
DESCRIPTION
TRANSCRIPT
Board of Trustees
and Administration
Board of Trustees
Louis Q. Reyes III…………………………………………………......…..…..President
Jeffrey Koehler……………………..……………………………...…….Vice President
Ishmael Flores……………………………………………………………...….Secretary
Stan C. Ledbetter…………………………………………………...………...…Trustee
Nancy Ayotte……………………………………………………...……..……....Trustee
Ernesto M. Leal………………………………………………………………..…Trustee
Irma Lewis……………………………………..………………………..…...…..Trustee
Administration
Dr. Irene Garza……………………...……………………………….....Superintendent
Sandy Hill…………….……………………………………..…..Chief Financial Officer
Rene S. Ramos……………….…………………………...…Chief Operations Officer
W.B. Ball Early Childhood CenterSeguin Independent School District
Acknowledgement
We wish to express our sincere thanks to the numerous individuals that have played an important role in the planning of this new facility. A very special thanks to the Early Childhood Center Design Team Members, for their input has been most valuable.
W.B. Ball Early Childhood CenterSeguin Independent School District
W.B. Ball Early Childhood CenterSeguin Independent School District
The Partners, Principals, Associates, and staff of PBK Architects, Inc. wish to express our sincere appreciation to the Seguin Independent School District for allowing our firm the opportunity to be involved in W.B. Ball Early Childhood Center. We also extend our utmost gratitude to the administrators, educators, and staff who have attended the numerous meetings and provided important information during the design phases of this project. Their input and guidance have been most valuable.
_____________________________Joel E. Hernández, AIA, REFPPartner
_____________________________Carlos Alexander, AIAAssociate Principal
_______________________________Juan J. LópezPrincipal
________________________________Paul Molina, RAProject Manager
Project Summary
W.B. Ball Early Childhood CenterSeguin Independent School District
Introduction
The information presented herein represents the Design Development documents for the proposed W.B. Ball Early Childhood Center. The purpose of the Design Development process is to incorporate the basic functional and spatial relationships into a detailed building plan with materials and building systems established.
Site Plan
Located at 620 W. Krezdorn st., the existing Ball Elementary School has vehicular and pedestrian access from four streets, Krezdorn St., Dolle Ave., San Antonio Ave. and Shannon Ave. Visitor Parking is located on Shannon St. outside the fenced area and staff parking is located at the corner of Krezdorn St. And Dolle Ave. Within the fenced area. Due to access to the school from multiple points of entry and an existing multi-building campus not physically connected with enclosed corridors, security and safety are a concern to staff and the district.
W.B. Ball Early Childhood CenterSeguin Independent School District
The W.B. Ball Early Childhood Center is a new facility that incorporates all the functional components that have been developed at the Juan Seguin Pre-K Center into a new facilty whose teaching spaces and auxiliary spaces are physically connected by secure conditioned corridors. The new W.B. Ball Early Childhood Center is a single level facility with visitor/staff parking, parent drop-off, a bus loop and two playgrounds within a secured fenced site. The facility is designed to accommodate 300 students.
Guided by the recommendations of the District the design of the new W.B. Ball Early Childhood Center incorporates a separation of classrooms from administration and special needs facilities. The Main Entry corridor, which runs to the center of the facility courtyard, is flanked on each side by the Administrative Suite and the Library. The Entry foyer is a secured entry with access to the Administration Area only during school hours. The Life Skills Areas are in close proximity to the Administrative Suite, as well as the Cafetorium and Gymnasium and have their own parent drop-off area. The classrooms are concentrated in two distinct building wings immediately adjacent to the bus drop-off canopy and have student restrooms within close proximity.
Drawings
Existing Floor Plan
Site Plan/Floor Plan
Composite Floor Plan
Site Plan/Floor Plan - Phase 1
Site Plan/Floor Plan – Phase 2
Image
W.B. Ball Early Childhood CenterSeguin Independent School District
Educational Specifications
W.B. Ball Early Childhood CenterSeguin Independent School District
SPACE/FUNCTION Ball Pre-K Ball Pre-K Ball Pre-K DESCRIPTION
QUANTITY NEW UNIT AREA-SF TOTAL NET AREA-SF
ADMINISTRATIONLobby 1 200 200
Principal 1 200 200
Conference 1 200 200Reception/Secretary 1 300 300
Tardy Space 1 400 400
Nurse Clinic/ W RR 1 275 275
Central Storage 1 400 400
Testing 1 150 150Counselor 1 800 800
Social Worker 1 400 400Teacher's Lounge 1 400 400
Teacher's Workroom 1 350 350
Administration Restrooms 2 90 180
Total Administration 4,255
INSTRUCTIONAL ROOMSPre-K Classrooms 14 800 11,200
Restrooms 14 60 840
Total Instructional Rooms 12,040
W.B. Ball Early Childhood CenterSeguin Independent School District
SPACE/FUNCTION Ball Pre-K Ball Pre-K Ball Pre-K DESCRIPTION
QUANTITY NEW UNIT AREA-SF TOTAL NET AREA-SF
SUPPORT ROOMS
Life Skills Classrooms 2 900 1,800 New Cabinets and Sinks
Restrooms 2 100 200With Vestibule and Changing Table
Speech Lab 1 400 400 May be used as a Classroom or for other purpose
Literacy Lab 1 800 800Literacy at Risk 1 400 400
Physical Therapy 1 400 400
Discovery Room 1 400 400
Total Support Rooms 4,400
ACTIVITY ROOMS
Gym (Activity Room) 1 10,968 10,968Not Required but Available for use
Multi-Purpose 1 1,728 1,728 400 s.f. required
0
Total Activity 12,696 Existing
W.B. Ball Early Childhood CenterSeguin Independent School District
SPACE/FUNCTION Ball Pre-K Ball Pre-K Ball Pre-K DESCRIPTION
QUANTITY NEW UNIT AREA-SF TOTAL NET AREA-SF
KITCHEN AND CAFETERIA
Kitchen 1
Food Prep 1 0 Included in Kitchen
Scullery 1 0 Included in Kitchen
Serving Line 1 0 Included in Kitchen
Locker Room 1 0 Included in Kitchen
Restroom 1 0 Included in Kitchen
Utility Room 1 0 Included in Kitchen
Pantry 1 0 Included in Kitchen
Office 1 0 Included in Kitchen
Refrigerator 1 0 Included in Kitchen
Freezer 1 0 Included in Kitchen
Cafetorium 1 0 15 s.f. per student
Platform (Stage) 1 0
Custodial Room 1 0
Cafetorium Storage 2 0
Student Restrooms 2 0
Total Kitchen and Cafeteria 1 5,497 5,497 Existing
W.B. Ball Early Childhood CenterSeguin Independent School District
SPACE/FUNCTION Ball Pre-K Ball Pre-K Ball Pre-K DESCRIPTION
QUANTITY NEW UNIT AREA-SF TOTAL NET AREA-SF
MEDIA SERVICES
Library 1 2,800 2,800 Including Office and Workroom
Computer Lab 1 900 900
0
0
Total Media Services 3,700 3,700
MECHANICAL/ELECTRICAL
Existing Rooms
Total Mechanical 0
Total Net Area 42,588Percentage mult iplied by TNA
CORRIDORS
STUDENT RESTROOMS
WALLS
ALL SPACES 42,588 0.5 20,655 Allowance
Total Gross Area 63,243
Schedule
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
PROGRAM PROGRAM SCHEMDESIGN
DESIGN DEVELOP
CONST DOCS
2008
2009CONST DOCS
CONST DOCS
CONSTDOCS
CONSTDOCS
GMP & PLAN
REVIEW
CONST ADMIN
CONSTADMIN
CONSTADMIN
CONSTADMIN
CONSTADMIN
CONSTADMIN
CONSTADMIN
Design / Construction ScheduleW.B. Ball Early Childhood Center
Scheduled Completion June 2010
Schematic Design – Rough sketches that develop a feasible conceptual design of the project through creating and evaluating a series of general schemes that take into account the program and budget.
Design Development – Refining the design concept so as to define and resolve all important aspects of the project. Finalize design decisions, building materials, and resolve coordination issues by the end of this phase.
Construction Documents – Communicating the design intent through further refinement of the written and graphic representation of all building materials and components in a format useful to contractors.
Construction Administration – Assisting the owner in getting the project built according to plans and specifications through general administration of the construction contract, including reviewing and certifying the amounts due the contractor, approving contractor submittals, preparing change orders and conducting site observations to determine dates of substantial and final completion.
Programming – Deciding what to build by defining design objectives, constraints, and criteria for a project. This includes space requirements and relationships, special equipment and systems, and site requirements.
CONSTADMIN
CONSTADMIN
CONSTADMIN
CONST ADMIN
CONST ADMIN MOVE-IN OPEN OPEN OPEN OPEN OPEN OPEN