bob harshbarger volunteer naesb update january 16, 2013 icy-cold salt lake

Post on 27-Mar-2015

213 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Bob HarshbargerVolunteer

NAESB Update

January 16, 2013

Icy-Cold Salt Lake

January 20, 2013

Moment for Raymond

• What did the shy little pebble wish for most?

• To be a little boulder.

4

• Wholesale Electric Quadrant (WEQ)o Joint Electric Scheduling Subcommittee (JESS)o OASIS Subcommittee (OS)o Business Practices Subcommittee (BPS)

North American Energy Standards Board (NAESB)

5

• e-Tag 1.8.2 Functional Specification

• WEQ-004 Coordinate Interchange Business Practice Standards

• WEQ Electric Industry Registry Business Practice Standards

NAESB WEQ JESS

6

• Modifications for Network Integration Transmission Service on OASIS

• Many other stuff

e-Tag 1.8.2 Functional Specification

7

• Modified 6.1.1 Transaction Types to include Recallable

• Clarified ramp duration validation in 6.1.4. Included 2 graphics.

• Modified 6.1.5 to allow multiple PSEs and a single Transmission Service Provider (stacked tags).

• Modified 1.4.7 to reference a single Transmission Service Provider.

• Clarified processing of after-the-fact adjustments for DYNAMIC and PSEUDOTIE e-Tags in multiple sections

• Modified 6.1.1 definition of PSEUDOTIE transaction type

• Created Appendix B – After-The-Fact Timing Considerations

• Removed references to 168 hours and one hour durations and replaced them with a reference to Appendix B.

e-Tag 1.8.2 Functional Specification

8

• Created Appendix C – XML e-Tag examples

• Clarified ramp overlap and assorted related topics.

• Modified Section 6.1.5 for tagging of NITS Resources.

• Modified Section 4.6.1.2 to allow any Market Operator on the Physical Path to adjust the Market Level Profile.

• Deleted Interchange Transaction definition; added Tagged Transaction definition in Section 1.2.

• Added Section 1.7, Service Transfers

• Added Creating Purchasing Selling Entity (CPSE) definition

e-Tag 1.8.2 Functional Specification

9

• Modifications to Timing Table including Order 764 support

• Corresponding changes related to NERC INT Rewrite effort (Project 2008-12)

• General clean-up

WEQ-004 Coordinate Interchange Business Practice Standards

10

• Develop business practice standards to drive functionality of the EIR and behavior of its users.

• Also this year, o absorb the WECC registry into EIRo phase-out CSV and mdb publication formats –

end state is XML publications

WEQ Electric Industry Registry

11

• Pre-emption/competition

NAESB WEQ OS

12

• Parallel Flow Visualization

NAESB WEQ BPS

Questions?

top related