Breakwater DriveImprovementsCity of New Orleans

652 Papworth AvenueMetairie, Louisiana 70005

504-322-2783www.ascellc.com

Construction Staging

North Berm

Jetty

The Point

West Berm

Ornamental Wall

Boat Launch Parking

BreakwaterDrive

Project Scope

West Berm Rip Rap Cap (Existing Berm) – to 7’ Elevation

Rip Rap Cap & Slurry Topping (Along Launch Parking)

6’ Wide Concrete Walkway

West Parking Areas Drainage Repairs

Boat Launch Parking Base Repairs & Asphalt Overlay

New Lighting, Security Gates, Facility Signage

W. BreakwaterDrive

Asphalt Parking Repairs

Subsurface Drainage

Sidewalk

Sidewalk

Lighting

Gates

Rip Rap Breakwater

Asphalt Repair Mill & Overlay

Jetty Repair

Rip Rap Breakwater

7’ Elevation Rip Rap

Sidewalk

Drainage Repair

West Berm

5’-6’ Elevation Rip Rap

Walkway at Boat Launch Parking

Jetty Repair

Rap Armament

Launch Parking

and Jetty

Project Scope

North Berm Rip Rap Install – 8’ to 10’ Elevation

Additional Fill & Sidewalk Along Breakwater

The Point Parking and Day Use Area

6’ Wide Concrete Walkway

Facility Signage

Subsurface Drainage Inlet Basins, Drain Pipe & Outfall

(Greenspace to Point)

N. BreakwaterDrive

Dumpster and EnclosureSubsurface

Drainage

Sidewalk

Rip Rap Breakwater

Slope

Sidewalk

Day Use AreaParking

Sidewalk

Fill

8’ Elevation Rip Rap

Parking

10’ Elevation Rip Rap

Fill

North Berm

The PointRap Armament

Dumpster and Enclosure

Parking

Rap Armament

Day Use Area

Sidewalk

Project Schedule