brookhaven science associates u.s. department of energy 1 lecc2005 advanced front end signal...
Post on 20-Jan-2016
213 Views
Preview:
TRANSCRIPT
Brookhaven Science AssociatesU.S. Department of Energy 1
LE
CC
2005
Advanced Front End Signal Processing Electronics for Advanced Front End Signal Processing Electronics for ATLAS CSC System: ATLAS CSC System:
Status and post production performanceStatus and post production performance
Sachin Shrirang Junnarkar, Paul O’Connor, Anand KandasamyBrookhaven National Laboratory
11th Workshop on Electronics for LHC and future Experiments 11th Workshop on Electronics for LHC and future Experiments 12- 16 September 2005, Heidelberg, Germany 12- 16 September 2005, Heidelberg, Germany
Plenary Session B5Plenary Session B5
11th Workshop on Electronics for LHC and future Experiments 11th Workshop on Electronics for LHC and future Experiments 12- 16 September 2005, Heidelberg, Germany 12- 16 September 2005, Heidelberg, Germany
Plenary Session B5Plenary Session B5
Brookhaven Science AssociatesU.S. Department of Energy 2
LE
CC
2005
OverviewOverviewOverviewOverview
1. Introduction to Cathode Strip Chambers (CSCs)2. Amplifier shaper modules’ (ASM) pack 3. Production test setup for ASMpack4. Production test results 5. Conclusion
Brookhaven Science AssociatesU.S. Department of Energy 3
LE
CC
2005
Introduction to CSCsIntroduction to CSCsIntroduction to CSCsIntroduction to CSCs
Brookhaven Science AssociatesU.S. Department of Energy 4
LE
CC
2005
Front end electronics factsFront end electronics factsFront end electronics factsFront end electronics facts
2 ASM-I and 1 ASM-II make one pack
5 ASM packs per chamber• 4 x-strip (2 per side)• 1 y-strip
160 packs for the system (128 x-strip, 32 y-strip)
192 Channels per pack (30720 total channels)
HAMAC/Muon SCAs
ASM-II
AD9042AST
ASM2MUXHDMP1022 and HDMP1024
Optical
Transceivers
SDX-19-4-1-S
Preamp/Shaper ASICASM-I
Brookhaven Science AssociatesU.S. Department of Energy 5
LE
CC
2005
Signal Flow on CSCSignal Flow on CSCSignal Flow on CSCSignal Flow on CSC
ASM-IIASM-ICSC
Brookhaven Science AssociatesU.S. Department of Energy 6
LE
CC
2005
Production Test SetupProduction Test SetupProduction Test SetupProduction Test Setup
Brookhaven Science AssociatesU.S. Department of Energy 7
LE
CC
2005
Labview InterfaceLabview Interface
Brookhaven Science AssociatesU.S. Department of Energy 8
LE
CC
2005
Linearity Linearity
Brookhaven Science AssociatesU.S. Department of Energy 9
LE
CC
2005
RMS Noise Distribution For 96 ChannelsRMS Noise Distribution For 96 Channels
Brookhaven Science AssociatesU.S. Department of Energy 10
LE
CC
2005
Representative Pedestal DistributionRepresentative Pedestal Distribution
Brookhaven Science AssociatesU.S. Department of Energy 11
LE
CC
2005
RMS Noise in ADC count vs. Strip #RMS Noise in ADC count vs. Strip #
Brookhaven Science AssociatesU.S. Department of Energy 12
LE
CC
2005Mean of Maximum Amplitude ADC Count
Distribution for 96 ChannelsMean of Maximum Amplitude ADC Count Distribution for 96 Channels
Brookhaven Science AssociatesU.S. Department of Energy 13
LE
CC
2005
Reconstructed TrackReconstructed Track
Brookhaven Science AssociatesU.S. Department of Energy 14
LE
CC
2005
ConclusionConclusionConclusionConclusion
Production for the front end electronics for the ATLAS CSC is complete
Testing of ASM-Packs is 91% complete
Chamber assembly is underway
We hope to ship assembled CSCs along with the front end electronics to CERN by the end of this month
Brookhaven Science AssociatesU.S. Department of Energy 15
LE
CC
2005
AcknowledgementsAcknowledgements
Vinnie Polychronakos Valeri Tcherniatine
Vadim GratchevAlexander Khodinov
Sri Harsha MarmarajuJack FriedKim Ackley
Ronald RyanJohn Triolo
Kevin WolniewiczRon Angona
Howard Hansen
Brookhaven Science AssociatesU.S. Department of Energy 16
LE
CC
2005
Brookhaven Science AssociatesU.S. Department of Energy 17
LE
CC
2005
Radiation qualified COTs on ASM packsRadiation qualified COTs on ASM packsRadiation qualified COTs on ASM packsRadiation qualified COTs on ASM packs
COTS Responsible StatusAD9042 ADC SMU CompleteAD8042 Dual opamps Nevis Complete
10H116 differential line driver Nevis Complete
HDMP- 1022 serialiser SMU Complete
HDMP- 1024 deserialiser UCI Complete
SDX-19-4-1-S Optical TransceiverTransmitter Nevis Complete
SDX-19-4-1-S Optical TransceiverReciever BNL CompleteLHC-4913 adjustable voltage regulators CERN Complete
Brookhaven Science AssociatesU.S. Department of Energy 18
LE
CC
2005
ASICs on ASM PacksASICs on ASM PacksASICs on ASM PacksASICs on ASM Packs
Radiation qualification statusASICs Responsible For preselectionHAMA/MUON SCA Nevis CompleteASM2MUX BNL Complete
BNL Clock fanout BNLSame as ASM2MUX
Preamplifier Shaper BNL Complete
Brookhaven Science AssociatesU.S. Department of Energy 19
LE
CC
2005
CSC Environment CSC Environment CSC Environment CSC Environment
Brookhaven Science AssociatesU.S. Department of Energy 20
LE
CC
2005ASM-Pack: Front end electronics
requirementsASM-Pack: Front end electronics requirements
Signal to Noise Ratio (SNR) 200:1Dynamic Range 10 bitsL1 Trigger Latency 2.5uS
Brookhaven Science AssociatesU.S. Department of Energy 21
LE
CC
2005ASM-I: Preamplifier Shaper ASIC ASM-I: Preamplifier Shaper ASIC
specificationsspecificationsASM-I: Preamplifier Shaper ASIC ASM-I: Preamplifier Shaper ASIC specificationsspecifications
Brookhaven Science AssociatesU.S. Department of Energy 22
LE
CC
2005
Power Distribution on ASMPackPower Distribution on ASMPackPower Distribution on ASMPackPower Distribution on ASMPack
Brookhaven Science AssociatesU.S. Department of Energy 23
LE
CC
2005
Cooling of ASM packCooling of ASM pack
Brookhaven Science AssociatesU.S. Department of Energy 24
LE
CC
2005
ADC Counts and fc relationsADC Counts and fc relations
Preamp gain = 3.8mV/fc 1700mV=2048 ADC counts 0.83mV=1 ADC Count at the preamp Noise in ADC Count = 2.5RMS Noise in mV= 2.158mV Noise in fC = 0.56fC = 3549 e-
top related