8/13/2019 BTS3012 Site Maintenance Guide
1/106
BTS3012
V200R013
Site Maintenance Guide (for -48V/
+24V)
Issue 01
Date 2011-12-10
HUAWEI TECHNOLOGIES CO., LTD.
-
8/13/2019 BTS3012 Site Maintenance Guide
2/106
Copyright Huawei Technologies Co., Ltd. 2011. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: support@huawei.com
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
i
http://www.huawei.com/ -
8/13/2019 BTS3012 Site Maintenance Guide
3/106
About This Document
Purpose
After the BTS is deployed and accepted, the site starts the commercial operation. To ensure
smooth operation, you need to perform the routine maintenance on the BTS.
This document mainly describes the routine maintenance items of the BTS3012 hardware,
including the equipment room, cabinet, power supply system, grounding system, and antenna
system. This document also describes the procedures for replacing parts, modules, boards, and
cables.
Product Versions
The following table lists the product versions related to the document.
Product Name Product Version
BTS3012 V200R013
Intended Audience
This document is intended for:
l Technical support engineers
lMaintenance engineers
Organization
1 Changes in BTS3012 Site Maintenance Guide (for -48V/+24V)
This provides the changes in the BTS3012 Site Maintenance Guide (for -48V/+24V).
2 Preparations for Site Maintenance
This describes the preparations for site maintenance. The preparations for site maintenance are
obtaining site information, selecting maintenance items, and arranging maintenance tools andspare parts.
BTS3012
Site Maintenance Guide (for -48V/+24V) About This Document
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
ii
-
8/13/2019 BTS3012 Site Maintenance Guide
4/106
3 BTS3012 Hardware Maintenance
This topic describes the BTS3012 hardware maintenance. The BTS3012 hardware maintenance
refers to the maintenance of the equipment room environment, cabinets, power supply,
grounding system, and antenna system of the BTS3012.
4 Powering On and Powering Off a BTS3012 Cabinet (-48 V/+24 V)
This describes how to power on and power off a BTS3012 cabinet (-48 V/+24 V). It is associated
with the power-on, normal power-off, and emergency power-off of the BTS3012 cabinet (-48
V/+24 V).
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V) (Capacity Expansion)
This describes how to install the BTS3012 boards and modules for capacity expansion. The
capacity expansion involves the hardware installation on the BTS side and the data configuration
on the BSC side. After installing hardware on the BTS side, you must configure data on the LMT
on the BSC side. The boards and modules involved in the capacity expansion of the BTS3012
(-48 V/+24 V) are the DDPU, DCOM, DTRU, DFCU, DFCB, DELC, and PSU (DC) (+24 V)
6 Installing the Combined BTS3012 Cabinets and BTS3012Cabinet Groups (-48 V/+24 V)
(Capacity Expansion)
This describes how to install the combined BTS3012 cabinets and BTS3012 cabinet groups. The
BTS3012 supports the combination of two cabinets to form one group and the combination of
three cabinet groups. One cabinet supports 12 TRXs in full configuration. With three combined
groups, the S12/12/12 cell configuration can be achieved. The capacity expansion disrupts the
services carried by the BTS.
7 Replacing the BTS3012 Boards and Modules (-48 V/+24 V)
This describes how to replace the BTS3012 boards and modules (-48 V/+24 V). The BTS3012
boards that can be replaced are the DTMU, DCCU, DCSU, DATU, DEMU, DELC, DMLC, and
DSAC. The BTS3012 modules that can be replaced are DTRU, DDPU, DCOM, DFCU, DFCB,
and PSU (DC) (+24 V).
8 Cleaning the Parts of a BTS3012 Cabinet
This describes how to clean the parts of a BTS3012 cabinet. The parts of a BTS3012 cabinet
include the fan box and the air filter. The parts must be cleaned periodically.
9 Replacing the Parts of a BTS3012 Cabinet
This describes how to replace the parts of a BTS3012 cabinet. The parts of a BTS3012 cabinet
include the fan box, air filter, and busbar power switch.
10 Replacingthe Parts of the Antenna System
This describes how to replace the parts of the antenna system. The parts of the antenna system
are antennas, TMA, and feeders.
11 Replacing the BTS3012 Cables (-48 V/+24 V)
This describes how to replace the BTS3012 cables (-48 V/+24 V). BTS3012 cables (-48 V/+24
V) are E1 cables, optical cables, power cables (-48 V/+24 V), signal cables, and indoor 1/2-inch
jumpers.
Conventions
Symbol Conventions
BTS3012
Site Maintenance Guide (for -48V/+24V) About This Document
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
iii
-
8/13/2019 BTS3012 Site Maintenance Guide
5/106
The symbols that may be found in this document are defined as follows.
Symbol Description
Indicates a hazard with a high level of risk, which if not
avoided, will result in death or serious injury.
Indicates a hazard with a medium or low level of risk, which
if not avoided, could result in minor or moderate injury.
Indicates a potentially hazardous situation, which if not
avoided, could result in equipment damage, data loss,
performance degradation, or unexpected results.
Indicates a tip that may help you solve a problem or save
time.
Provides additional information to emphasize or supplement
important points of the main text.
General Conventions
The general conventions that may be found in this document are defined as follows.
Convention Description
Times New Roman Normal paragraphs are in Times New Roman.
Boldface Names of files, directories, folders, and users are in
boldface. For example, log in as user root.
Italic Book titles are in italics.
Courier New Examples of information displayed on the screen are in
Courier New.
Command Conventions
The command conventions that may be found in this document are defined as follows.
Convention Description
Boldface The keywords of a command line are in boldface.
Italic Command arguments are in italics.
[ ] Items (keywords or arguments) in brackets [ ] are optional.
{ x | y | ... } Optional items are grouped in braces and separated by
vertical bars. One item is selected.
BTS3012
Site Maintenance Guide (for -48V/+24V) About This Document
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
iv
-
8/13/2019 BTS3012 Site Maintenance Guide
6/106
Convention Description
[ x | y | ... ] Optional items are grouped in brackets and separated by
vertical bars. One item is selected or no item is selected.
{ x | y | ... }* Optional items are grouped in braces and separated byvertical bars. A minimum of one item or a maximum of all
items can be selected.
[ x | y | ... ]* Optional items are grouped in brackets and separated by
vertical bars. Several items or no item can be selected.
GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention Description
Boldface Buttons, menus, parameters, tabs, window, and dialog titles
are in boldface. For example, click OK.
> Multi-level menus are in boldfaceand separated by the ">"
signs. For example, choose File> Create> Folder.
Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format Description
Key Press the key. For example, press Enterand press Tab.
Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+Ameans the three keys should be pressed concurrently.
Key 1, Key 2 Press the keys in turn. For example, pressing Alt, Ameans
the two keys should be pressed in turn.
Mouse Operations
The mouse operations that may be found in this document are defined as follows.
Action Description
Click Select and release the primary mouse button without moving
the pointer.
Double-click Press the primary mouse button twice continuously and
quickly without moving the pointer.
BTS3012
Site Maintenance Guide (for -48V/+24V) About This Document
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
v
-
8/13/2019 BTS3012 Site Maintenance Guide
7/106
Action Description
Drag Press and hold the primary mouse button and move the
pointer to a certain position.
BTS3012
Site Maintenance Guide (for -48V/+24V) About This Document
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
vi
-
8/13/2019 BTS3012 Site Maintenance Guide
8/106
Contents
About This Document.....................................................................................................................ii
1 Changes in BTS3012 Site Maintenance Guide (for -48V/+24V)...........................................1
2 Preparations for Site Maintenance.............................................................................................2
3 BTS3012 Hardware Maintenance...............................................................................................4
4 Powering On and Powering Off a BTS3012 Cabinet (-48 V/+24 V).....................................9
4.1 Powering On the BTS3012 Cabinet (-48 V/+24 V).........................................................................................10
4.2 Powering Off a BTS3012 Cabinet (-48 V/+24 V)............................................................................................10
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V) (Capacity Expansion)........12
5.1 Installing the BTS3012/BTS3012AE DDPU (Capacity Expansion)...............................................................14
5.2 Installing the BTS3012/BTS3012AE DCOM (Capacity Expansion)..............................................................16
5.3 Installing the BTS3012/BTS3012AE DTRU (Capacity Expansion)...............................................................19
5.4 Installing the BTS3012/BTS3012AE DFCU (Capacity Expansion)................................................................225.5 Installing the BTS3012/BTS3012AE DFCB (Capacity Expansion)................................................................24
5.6 Installing the BTS3012 DELC (Capacity Expansion)......................................................................................27
5.7 Installing the BTS3012 PSU (DC) (Capacity Expansion)................................................................................28
6 Installing the Combined BTS3012 Cabinets and BTS3012 Cabinet Groups (-48 V/+24 V)(Capacity Expansion).....................................................................................................................31
7 Replacing the BTS3012 Boards and Modules (-48 V/+24 V)................................................35
7.1 Replacingthe BTS3012/BTS3012AE Boards and Modules (Common Operations).......................................38
7.1.1 Preparations for Replacing BTS3012/BTS3012AE Boards and Modules..............................................38
7.1.2 Removing a Faulty BTS3012/BTS3012AE Board..................................................................................40
7.1.3 Installing a BTS3012/BTS3012AE Board..............................................................................................41
7.1.4 Checking the Installed BTS3012/BTS3012AE Board............................................................................43
7.1.5 Handling the Replaced BTS3012/BTS3012AE Board or Module..........................................................44
7.2 Replacing a BTS3012/BTS3012AE DTMU.......................................................................... ..........................45
7.3 Replacing a BTS3012/BTS3012AE DPTU......................................................................................................47
7.4 Replacing a BTS3012/BTS3012AE DABB.....................................................................................................49
7.5 Replacing a BTS3012/BTS3012AE DCCU.....................................................................................................50
7.6 Replacing a BTS3012/BTS3012AE DCSU.....................................................................................................52
7.7 Replacing a BTS3012/BTS3012AE DATU.....................................................................................................54
7.8 Replacing a BTS3012/BTS3012AE DTRU.....................................................................................................55
BTS3012
Site Maintenance Guide (for -48V/+24V) Contents
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
vii
-
8/13/2019 BTS3012 Site Maintenance Guide
9/106
7.9 Replacing a BTS3012/BTS3012AE DDPU.....................................................................................................57
7.10 Replacing a BTS3012/BTS3012AE DCOM..................................................................................................59
7.11 Replacing a BTS3012/BTS3012AE DFCU...................................................................................................60
7.12 Replacing a BTS3012/BTS3012AE DFCB....................................................................................................62
7.13 Replacing a BTS3012/BTS3012AE DEMU..................................................................................................64
7.14 Replacing a BTS3012/BTS3012AE DGPS....................................................................................................65
7.15 Replacing a BTS3012 DELC.........................................................................................................................66
7.16 Replacing a BTS3012 DMLC........................................................................................................................68
7.17 Replacing a BTS3012 DSAC.........................................................................................................................69
7.18 Replacing the BTS3012 PSU (DC)................................................................................................................71
8 Cleaning the Parts of a BTS3012 Cabinet................................................................................73
8.1 Cleaning the Fan Box.......................................................................................................................................74
8.2 Cleaning the Air Filter of a BTS3012 Cabinet.................................................................................................75
9 Replacing the Parts of a BTS3012 Cabinet..............................................................................78
9.1 Replacing the Fan Box of a BTS3012/BTS3012AE Cabinet...........................................................................79
9.2 Replacing the Air Filter of a BTS3012 Cabinet...............................................................................................80
9.3 Replacing the Busbar Power Switch of a BTS3012 Cabinet............................................................................81
10 Replacing the Parts of the Antenna System.........................................................................83
10.1 Replacing the BTS Antenna...........................................................................................................................84
10.2 Replacing the TMA........................................................................................................................................85
10.3 Replacing the Feeder......................................................................................................................................87
11 Replacing the BTS3012 Cables (-48 V/+24 V).......................................................................88
11.1 Replacing the BTS3012 E1 Cables................................................................................................................89
11.2 Replacing the BTS3012 Optical Cables.........................................................................................................90
11.3 Replacing the BTS3012 Power Cables (-48 V/+24 V)...................................................................................91
11.4 Replacing the BTS3012 Signal Cables...........................................................................................................93
11.5 Replacing the BTS3012 Indoor 1/2-Inch Jumpers.........................................................................................95
BTS3012
Site Maintenance Guide (for -48V/+24V) Contents
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
viii
-
8/13/2019 BTS3012 Site Maintenance Guide
10/106
1Changes in BTS3012 Site MaintenanceGuide (for -48V/+24V)
This provides the changes in the BTS3012 Site Maintenance Guide (for -48V/+24V).
01(2011-12-10)
This is the initial commercial release.
Compared with issue Draft A(2011-07-15), this issue does not include any changes.
Draft A(2011-07-15)
This is the draft A release.
BTS3012
Site Maintenance Guide (for -48V/+24V)
1 Changes in BTS3012 Site Maintenance Guide (for -48V/
+24V)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
1
-
8/13/2019 BTS3012 Site Maintenance Guide
11/106
2Preparations for Site MaintenanceThis describes the preparations for site maintenance. The preparations for site maintenance are
obtaining site information, selecting maintenance items, and arranging maintenance tools and
spare parts.
Obtaining Site Information
Before maintaining a site, obtain the following information:
l Current faults and alarms
l Hardware configurations
l Software version
lTransmission and networking
l Timeslot consolidation equipment if any
l Local environment
l Spare parts
Selecting Maintenance Items
Based on actual conditions, select suitable maintenance items. The maintenance items are as
follows:
l Maintaining the room environment
l Maintaining a BTS cabinet
l Replacing BTS boards and modules
l Maintaining BTS power supply and grounding
l Maintaining the BTS antenna system
l Cleaning the fan box
l Clean the air filters
Arranging Tools and Spare Parts
Based on the site information and maintenance items, arrange the following maintenance toolsand spare parts:
BTS3012
Site Maintenance Guide (for -48V/+24V) 2 Preparations for Site Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
2
-
8/13/2019 BTS3012 Site Maintenance Guide
12/106
l Frequency test devices
The frequency test device consists of a frequency generator, a spectrum analyzer, and
various connectors and cables.
A frequency meter and a rubidium clock are usually used.
l Power test devices
The power test devices are used to measure and analyze the output power of a BTS. The
output power determines the effect of downlink coverage.
A power meter is usually used.
l Antenna and feeder test devices
The antenna and feeder test devices are used to measure the standing wave ratio, return
loss, and cable insertion loss, and to locate faults.
A SiteMaster is usually used.
l Other devices
Measuring tools: One 50 m ribbon tape, one 5 m measuring tape, and one 400 mm level bar
Marking pen
Drilling tools:
One percussion drill and a few matching bits
One cleaner
One power connector board (with three 2-phase sockets and three 3-phase sockets,
current capacity greater than 15 A)
Fastening tools
Three cross screwdrivers (4', 6', and 8' respectively) and three straight screwdrivers(4', 6', and 8' respectively)
Four adjustable wrenches (6', 8', 10', and 12' respectively), combination wrenches
(17' and 19' respectively), and one set of inner hexagon spanners.
One hex screwdriver (for BTS3012AE only, used for removing the anti-theft screws
on the rear door of the BTS3012AE cabinet)
Small tools
Sharp-nose pliers (8')
Pincer pliers (8')
Diagonal pliers (8')
NOTE
When some parts incur errors and need to be replaced, you need to arrange related tools and new
parts.
BTS3012
Site Maintenance Guide (for -48V/+24V) 2 Preparations for Site Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
3
-
8/13/2019 BTS3012 Site Maintenance Guide
13/106
3BTS3012 Hardware MaintenanceThis topic describes the BTS3012 hardware maintenance. The BTS3012 hardware maintenance
refers to the maintenance of the equipment room environment, cabinets, power supply,
grounding system, and antenna system of the BTS3012.
Maintaining the Equipment Room Environment
Table 3-1lists the maintenance of the BTS3012 equipment room environment.
Table 3-1Maintenance of the BTS3012 equipment room environment
MaintenanceItem
Interval Operation Guide Reference Standards
Checking
environmental
alarms
Every day Check whether power
supply alarms, fire alarms,
or smoke alarms are
reported.
NOTEThis maintenance item is
performed on the LMT. For
other maintenance items,
you need to perform them in
the equipment room.
No power supply alarms,
fire alarms, or smoke
alarms are reported.
Checking the
temperature in
the equipment
room
Each time site
maintenance is
performed
Record the temperature
read on the thermometer in
the equipment room.
-5C to 45C
Checking the
temperature in
the equipment
room
Each time site
maintenance is
performed
Record the humidity read
on the hygrometer in the
equipment room.
5%95% RH
Checking the
illumination in
the equipment
room
Every two
months
Check whether the routine
and emergency
illumination in the
equipment room is normal.
-
BTS3012
Site Maintenance Guide (for -48V/+24V) 3 BTS3012 Hardware Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
4
-
8/13/2019 BTS3012 Site Maintenance Guide
14/106
MaintenanceItem
Interval Operation Guide Reference Standards
Checking
sockets
Every two
months
Check whether sockets are
normal.
-
Checking the air
conditioner
Every two
months
Check whether the air
conditioner works
properly.
-
Checking
protective
devices
Every two
months
Check whether anti-
disaster devices,
equipment protection
devices, and fire fighting
devices are in good
condition.
l There are portable and
qualified foam
extinguishers in the
equipment room.
l There is no danger of
damage to the
equipment by rats or
insects.
Cleaning the
equipment room
Every two
months
Check whether cabinets,
equipment housing,
equipment interior, tables,
floor, doors, and windows
are clean.
All the check items are
clean.
Maintaining the Cabinet
Table 3-2lists the maintenance of the BTS3012 cabinet.
Table 3-2Maintenance of the BTS3012 cabinet
MaintenanceItem
Interval Operation Guide Reference Standards
Checking the
fan box
Every week,
every month, or
every quarter
Check the fan box. No alarms related to the
fan box are reported.
Checking the
air filter
Every quarter If there is too much dust on
the air filter, clean the airfilter. For details, refer to
8.2 Cleaning the Air Filter
of a BTS3012 Cabinet.
-
Checking the
exterior of the
cabinet
Every month or
every quarter
Check whether there are
dents, cracks, holes, or
corrosion on the surface of
the cabinet and whether the
cabinet label is legible.
-
BTS3012
Site Maintenance Guide (for -48V/+24V) 3 BTS3012 Hardware Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
5
-
8/13/2019 BTS3012 Site Maintenance Guide
15/106
MaintenanceItem
Interval Operation Guide Reference Standards
Checking the
lock and door
of the cabinet
Every month or
every quarter
Check whether the lock is
normal and the door can be
opened and closed easily.
-
Checking the
cleanliness of
the cabinet
Every month or
every quarter
Check whether the cabinet
is clean.
The cabinet surface is
clean. The subracks are
not dusty.
Checking the
cleanliness of
the fan box
Every year If there is too much dust on
the surface and inside of the
fan box, clean the fan box.
For details, refer to 8.1
Cleaning the Fan Box.
-
Checkingboard LEDs
Every month orevery quarter
Check whether the boardLEDs are normal.
For details about thestatus of indicators, refer
to the BTS3012 Hardware
Description.
Checking the
ESD wrist
strap
Every quarter Use either of the following
methods:
l Use an ESD wrist strap
tester to test the ESD
wrist strap.
l Use a multimeter to test
the grounding
resistance of the ESD
wrist strap.
If you use an ESD wrist
strap tester, the LED
GOOD is on.
If you use a multimeter,
the grounding resistance
is between 0.75 megohm
and 10 megohms.
Maintaining the Power Supply and Grounding System
Table 3-3lists the maintenance of the BTS3012 power supply and grounding system.
Table 3-3Maintenance of the BTS3012 power supply and grounding system
Maintenance Item Interval Operation Guide Reference Standards
Checking
power cables
Every month
or every
quarter
Check the connections of
power cables carefully.
The connections are
secure. The power cables
are in good condition and
the connection points are
not corroded.
Checking the
voltage
Every month
or every
quarter
Use a multimeter to measure
the voltage of the power
supply.
The voltage is within
standard range.
BTS3012
Site Maintenance Guide (for -48V/+24V) 3 BTS3012 Hardware Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
6
-
8/13/2019 BTS3012 Site Maintenance Guide
16/106
Maintenance Item
Interval Operation Guide Reference Standards
Checking
PGND cables
Every month
or every
quarter
Check whether the
connections of PGND cables
and the grounding bar are
secure.
The connections are secure
and the connection points
are not corroded. The
PGND cables and the
grounding bar are in good
condition and corrosion
preventive.
Checking the
grounding
resistance
Every month
or every
quarter
Use an earth resistance meter
to measure the grounding
resistance and record it.
Conduct the test before the
rainy season.
The grounding resistance is
less than 10 ohms.
Checking thestorage
batteries
Every year Check the storage batteriesand rectifiers every year.
The battery capacity iswithin the normal range
and the batteries are
correctly connected. The
performance parameters of
rectifiers are normal.
Maintaining the Antenna System
Table 3-4lists the maintenance of the BTS3012 antenna system.
CAUTION
l The BTS antenna system requires periodic maintenance.
l You need to check all the antenna and feeder equipment after a storm of scale eight or
above, an earthquake, or other exceptional cases.
Table 3-4Maintenance of the BTS3012 antenna system
Maintenance Item
Interval Operation Guide Reference Standards
Checking the
tower
Every six
months
Check the conditions of the
tower, connections of
mechanical bolts, and the
anti-rust and anti-corrosion
conditions.
There is no damage to the
tower or sinking of the base,
the mechanical bolts are
properly connected, and the
tower is not rusted or
corroded.
BTS3012
Site Maintenance Guide (for -48V/+24V) 3 BTS3012 Hardware Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
7
-
8/13/2019 BTS3012 Site Maintenance Guide
17/106
Maintenance Item
Interval Operation Guide Reference Standards
Checking the
pole
Every six
months
Check the installation of pole
fasteners, the stress
resistance of the staying
wires and anchors, and the
anti-corrosion and anti-rust
conditions of the pole.
The pole fasteners are
secure, the stress of the
staying wires and anchors is
balanced, and the pole is not
corroded or rusted.
Checking the
antenna
Every two
months
Check whether the antenna is
within the protection
coverage of the lightning rod
and whether the antenna
stand is securely installed on
the tower or the rooftop.
The antenna is within the
protection coverage of the
lightning rod (a deviation of
30 downward from the top
of the lightning rod). The
antenna stand is securely
installed on the tower or the
rooftop.
Checking the
feeder
Every two
months
Check whether the fixing
clips of the feeder are loose
and the feeder is flattened or
deformed.
The fixing clips of the feeder
are securely installed and the
feeder is in good condition.
There is no exposed copper
wire.
BTS3012
Site Maintenance Guide (for -48V/+24V) 3 BTS3012 Hardware Maintenance
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
8
-
8/13/2019 BTS3012 Site Maintenance Guide
18/106
4Powering On and Powering Off a BTS3012Cabinet (-48 V/+24 V)
About This Chapter
This describes how to power on and power off a BTS3012 cabinet (-48 V/+24 V). It is associated
with the power-on, normal power-off, and emergency power-off of the BTS3012 cabinet (-48
V/+24 V).
4.1 PoweringOn the BTS3012 Cabinet (-48 V/+24 V)
This describes how to power on the BTS3012 cabinet (-48 V/+24 V). Before powering on the
BTS3012 cabinet (-48 V/+24 V), ensure that the power cables are properly installed in thecabinet. The input power ranges from 40 V DC to 60 V DC, or from +21 V DC to +29 V DC.
Set all the switches on the busbar in the cabinet to OFF.
4.2 PoweringOff a BTS3012 Cabinet (-48 V/+24 V)
This describes how to power off a BTS3012 cabinet. The power-off of a BTS3012 cabinet (-48
V/+24 V) is of two types: normal power-off and emergency power-off. In special cases, such as
an equipment swap and a foreseeable regional power cut, the normal power-off of the equipment
is required. In the cases when a fire, smog, or water immersion occurs, emergency power-off of
the equipment is required. The power-off operation disrupts all the services carried on the BTS.
BTS3012
Site Maintenance Guide (for -48V/+24V)
4 Powering On and Powering Off a BTS3012 Cabinet (-48
V/+24 V)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
9
-
8/13/2019 BTS3012 Site Maintenance Guide
19/106
-
8/13/2019 BTS3012 Site Maintenance Guide
20/106
WARNING
For the cabinet using +24 V power supply, set the power control switch on the PSU
(DC) to OFF before cutting off the external power supply.
l Perform the emergency power-off.
1. Cut off the external power supply.
2. Set all the power switches on the busbar to OFF if time allows.
----End
BTS3012
Site Maintenance Guide (for -48V/+24V)
4 Powering On and Powering Off a BTS3012 Cabinet (-48
V/+24 V)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
11
-
8/13/2019 BTS3012 Site Maintenance Guide
21/106
5Installingthe BTS3012 Boards and Modules(-48 V/+24 V) (Capacity Expansion)
About This Chapter
This describes how to install the BTS3012 boards and modules for capacity expansion. The
capacity expansion involves the hardware installation on the BTS side and the data configuration
on the BSC side. After installing hardware on the BTS side, you must configure data on the LMT
on the BSC side. The boards and modules involved in the capacity expansion of the BTS3012
(-48 V/+24 V) are the DDPU, DCOM, DTRU, DFCU, DFCB, DELC, and PSU (DC) (+24 V)
5.1 Installingthe BTS3012/BTS3012AE DDPU (Capacity Expansion)This describes how to install the BTS3012/BTS3012AE DDPU. The DDPU is placed in the
DAFU subrack. If the cells or the TRXs in the BTS require capacity expansion, you need to add
DDPUs. Adding DDPUs disrupts cell services.
5.2 Installing the BTS3012/BTS3012AE DCOM (Capacity Expansion)
This describes how to install the BTS3012/BTS3012AE DCOM. The DCOM is installed in the
DAFU subrack. If the cells in the BTS require capacity expansion or there are more than four
TRXs in a cell, you may need to add DCOMs. Adding DCOMs disrupts the cell services.
5.3 Installing the BTS3012/BTS3012AE DTRU (Capacity Expansion)
This describes how to install the BTS3012/BTS3012AE DTRU. The DTRU is installed in the
DTRU subrack. When TCHs are congested because the BTS traffic volume rises, or TRXs
require capacity expansion, you need to add DTRUs. Adding DTRUs disrupts the cell services.
5.4 Installing the BTS3012/BTS3012AE DFCU (Capacity Expansion)
This describes how to install the BTS3012/BTS3012AE DFCU. The Filter Combiner Unit for
DTRU BTS (DFCU) of the BTS3012/BTS3012AE is installed in the Antenna Front-end Unit
for DTRU BTS (DAFU). If the cells or the TRXs in the BTS require capacity expansion, you
may need to add DFCUs. Adding DFCUs disrupts the cell services.
5.5 Installing the BTS3012/BTS3012AE DFCB (Capacity Expansion)
This describes how to install the BTS3012/BTS3012AE DFCB. The Filter Combiner Unit for
DTRU BTS type B (DFCB) of the BTS3012/BTS3012AE is installed in the Antenna Front-end
Unit for DTRU BTS (DAFU) subrack. If the cells or the TRXs in the BTS require capacity
expansion, you may need to add DFCBs. Adding DFCBs disrupts the cell services.
5.6 Installing the BTS3012 DELC (Capacity Expansion)
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
12
-
8/13/2019 BTS3012 Site Maintenance Guide
22/106
This describes how to install the BTS3012 DELC. The E1 signal Lightning-protection Card for
DTRU BTS (DELC) of the BTS3012 cabinet is installed in the signal lightning protection
subrack on the top of the cabinet. When the BTS requires TRX capacity expansion (that is, the
number of TRXs exceeds the capacity of the four E1 cables for the DELC), or when the onsite
BTS networking uses multi-BTS tree topology, you need to add DELCs. Adding DELCs disrupts
the services carried on the BTS.
5.7 Installing the BTS3012 PSU (DC) (Capacity Expansion)
This describes how to install the PSUs of the BTS3012. The PSUs are placed in the power
subrack. When the capacity of the main cabinet is expanded and its load increases, you need to
add PSUs if the number of existing PSUs cannot meet requirements. You also need to add PSUs
during capacity expansion of the batteries. Adding PSUs does not affect the services of the BTS.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
13
-
8/13/2019 BTS3012 Site Maintenance Guide
23/106
5.1 Installing the BTS3012/BTS3012AE DDPU (CapacityExpansion)
This describes how to install the BTS3012/BTS3012AE DDPU. The DDPU is placed in the
DAFU subrack. If the cells or the TRXs in the BTS require capacity expansion, you need to add
DDPUs. Adding DDPUs disrupts cell services.
Prerequisites
l You have obtained the status of the board or the module and the information about the
corresponding slot.
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
Context
The entire capacity expansion takes about 20 minutes.
Handle the DDPU carefully because it is heavy.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Block all the DTRUs in the cabinet by referring to Change the management status of the BTS.Block the related DTRUs.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
14
-
8/13/2019 BTS3012 Site Maintenance Guide
24/106
Step 2 Power off the DAFU subrack.
If... Then...
Power-off is performed on the BTS3012 Set the DAFU MCB on the busbar to OFF.
Power-off is performed on the BTS3012AE Set the DAFU MCB on the DC power
distribution box to OFF.
Step 3 Install a new DDPU by referring to Installing a New DDPU.
WARNING
The screws on the DDPU must be secure to ensure the current discharging function of the DDPU.
If the screws are not secure, the DDPU cannot fully perform the lightning protection function.
Therefore, the equipment cannot work reliably.
Step 4 Install the cables on the new DDPU panel.
1. Install the power cable.
a. Remove the dustproof caps of the power cables for DDPUs.
b. Connect the power cables to the POWER ports on the panels of DDPUs.
c. Tighten the two fastening bolts on each cable connector.
d. Place the removed protective caps at the bottom of the cabinet for future use.
2. Install the RF cables.
Install RF cables according to the BTS configurations. The installation procedure consists
of Installing RF Signal Cables and Installing Indoor 1/2-inch Jumpers.
Step 5 Attach the cell label to the panel of the new DDPU.
Step 6 Power on the DAFU subrack.
If... Then...
Power-on is performed on the BTS3012 Set the DAFU MCB on the busbar to ON.
Power-on is performed on the BTS3012AE Set the DAFU MCB on the DC power
distribution box to ON.
NOTE
After the hardware installation is complete, verify the following items:
l The modules are securely inserted.
l The status of the LEDs on the modules is normal.
Step 7 Configure BTS data on the LMT and place the new DDPU module in a proper slot of the BTS.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
15
-
8/13/2019 BTS3012 Site Maintenance Guide
25/106
NOTE
The BTS data must match the actual BTS configuration on site. Huawei recommends that this step be performed
under the instruction of the head responsible person on the BTS side and on the BSC side.
1. Logging In to the LMT.
2. Enter the ADD BTSANTFEEDERBRDcommand in the Command Inputbox, and thenclick Assist.
3. Select DDPM_DDPU(DDPM_DDPU) from the Board Typedrop-down list box and set
other parameters according to the actual situation on site. Then, click Execto add the board.
4. Enter the SET BTSANTFEEDERCONNECTcommand in the Command Inputbox,
and then click Assist.
5. Select DDPM_DDPU(DDPM_DDPU) from the Board Typedrop-down list box and set
other parameters according to the actual situation on site. Then, click Execto configure the
connection of the BTS antenna.
6. Enter the MOD BTSANTFEEDERBRDcommand in the Command Inputbox, and then
click Assist.7. Select DDPM_DDPU(DDPM_DDPU) from the Board Typedrop-down list box and set
other parameters according to the actual situation on site. Then, click Execto modify the
frequency band attributes for the BTS antenna board to complete the configuration of the
DDPU.
Step 8 Querying BTS Board Information. If the software version does not match the current BTSversion, load and activate the software of the new DDPU module by referring to Software
Loading and Software Activation
Step 9 Select the BTS from the navigation tree in the left pane of the BSC6900 Device Maintenancewindow. Then, confirm the data configuration of the new module on the BTS Device Paneltab
page.
Step 10 Unblock all the DTRUs in the cabinet by referring to Change the management status of the BTS.
----End
Follow-up Procedure
After capacity expansion, verify the following items:
1. The module alarms are cleared.
2. The modules run properly.
5.2 Installing the BTS3012/BTS3012AE DCOM (CapacityExpansion)
This describes how to install the BTS3012/BTS3012AE DCOM. The DCOM is installed in the
DAFU subrack. If the cells in the BTS require capacity expansion or there are more than four
TRXs in a cell, you may need to add DCOMs. Adding DCOMs disrupts the cell services.
Prerequisites
l
You have obtained the status of the board or the module and the information about thecorresponding slot.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
16
-
8/13/2019 BTS3012 Site Maintenance Guide
26/106
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
NOTE
The information about traffic statistics for the analysis of the related parameters after capacity expansion are
collected.
Context
The entire capacity expansion takes about 20 minutes.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Change the management status of the BTS. Block all the DTRUs in the cabinet.
Step 2 Power off the DAFU subrack.
If... Then...
Power-off is performed on the BTS3012 Set the DAFU MCB on the power busbar to
OFF.
Power-off is performed on the BTS3012AE Set the DAFU MCB on the DC power
distribution box to OFF.
Step 3 Install new DCOMs.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
17
-
8/13/2019 BTS3012 Site Maintenance Guide
27/106
Step 4 Install cables to the panels of the new DCOMs.
Install RF cables and signal cables according to the BTS configurations. The installation consists
of installing RF transmit signal cables and installing the signal cable between the DCTB and the
DAFU.
Step 5 Power on the DAFU subrack.
If... Then...
Power-on is performed on the BTS3012 Set the DAFU MCB on the power busbar to
ON.
Power-on is performed on the BTS3012AE Set the DAFU MCB on the DC power
distribution box to ON.
NOTE
After the hardware installation is complete, verify the following items:
l The modules are securely inserted.
l The status of the LEDs on the modules is normal.
Step 6 Configure the BTS data on the LMT. Configure the DCOM in the corresponding slot of the BTS.
NOTE
The BTS data must match the actual BTS configuration on site. Huawei recommends that this step be performed
under the instruction of the head responsible person on the BTS side and on the BSC side.
1. Logging In to the LMT.
2. Enter the ADD BTSBRDcommand in the Command Inputbox, and then click Assist.
3. Select DCBM_DCOMfrom the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto add the board.
Step 7 Select the BTS from the navigation tree in the left pane of the BSC6900 Device Maintenancewindow. Then, confirm the data configuration of the new module on the BTS Device Paneltab
page.
Step 8 Change the management status of the BTS. Unblock all the DTRUs in the cabinet.
----End
Follow-up Procedure
After the capacity expansion, verify the following:
1. The module alarms are cleared.
2. The modules run properly.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
18
-
8/13/2019 BTS3012 Site Maintenance Guide
28/106
5.3 Installing the BTS3012/BTS3012AE DTRU (CapacityExpansion)
This describes how to install the BTS3012/BTS3012AE DTRU. The DTRU is installed in the
DTRU subrack. When TCHs are congested because the BTS traffic volume rises, or TRXs
require capacity expansion, you need to add DTRUs. Adding DTRUs disrupts the cell services.
Prerequisites
l You have obtained the status of the board or the module and the information about the
corresponding slot.
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
Context
The entire capacity expansion takes about 20 minutes.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Switch off the related DTRUs.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
19
-
8/13/2019 BTS3012 Site Maintenance Guide
29/106
If... Then...
Power-off is performed on the BTS3012 Set the TRX MCB on the power busbar to
OFF.
Power-off is performed on the BTS3012AE Set the DTRU MCB on the DC power
distribution box to OFF.
Step 2 Install new DTRUs.
Step 3 Install cables to the panels of the new DTRUs.
1. Install power cables.
a. Remove the protective caps of the power cables for DTRUs.
b. Install the power cables to the POWER ports on the panels of DTRUs.c. Screw the two fastening bolts on each cable connector.
d. Place the removed protective caps at the bottom of the cabinet for future use.
2. Install RF cables and signal cables.
Install RF cables and signal cables according to the BTS configurations. The installation
consists of installing RF RX signal cables and installing the cables for combiners on
DTRUs.
Step 4 Switch on the DTRUs.
If... Then...
Power-on is performed on the BTS3012 Set the TRX MCB on the power busbar to ON.
Power-on is performed on the BTS3012AE Set the DTRU MCB on the DC power
distribution box to ON.
NOTE
After the hardware installation is complete, verify the following items:
l The modules are securely inserted.
l The status of the LEDs on the modules is normal.
Step 5 Configure data on the LMT. Configure DTRUs in the related slots by adding TRXs.
1. Logging In to the LMT.
2. Enter the ADD BTSTRXBRDcommand in the Command Inputbox, and then click
Assist.
3. Select TRU(TRU/DTRU)from the Board Typedrop-down list box and set other
parameters according to the actual situation on site. Then, click Execto add the board.
4. Enter the ADD GCELLcommand in the Command Inputbox, and then click Assist. Set
the parameters according to the actual situation on site. Then, click Execto add the cell.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
20
-
8/13/2019 BTS3012 Site Maintenance Guide
30/106
5. Enter the ADD GCELLFREQcommand in the Command Inputbox, and then click
Assist. Set the parameters according to the actual situation on site. Then, click Execto add
frequencies for the cell.
6. Enter the ADD GCELLOSPMAPcommand in the Command Inputbox, and then click
Assist. Set the parameters according to the actual situation on site. Then, click Execto addthe signaling point mapping relation for the cell.
7. Enter the ADD CELLBIND2BTScommand in the Command Inputbox, and then click
Assist. Set the parameters according to the actual situation on site. Then, click Execto bind
the cell to the BTS.
8. Enter the ADD GTRXcommand in the Command Inputbox, and then click Assist. Set
the parameters according to the actual situation on site. Then, click Execto add the TRX.
9. Enter the ADD TRXBIND2PHYBRDcommand in the Command Inputbox, and then
click Assist. Set the parameters according to the actual situation on site. Then, click
Execto bind the logical TRX to the pass on the TRX board to complete the configuration
of the DTRU.
10. Select the BTS from the navigation tree in the left pane of the BSC6900 DeviceMaintenancewindow. Then, confirm the data configuration of the new module on the
BTS Device Paneltab page.
11. Ensure that the number of added TRUs displayed equals the number of added TRXs.
12. Confirm that the new TRXs are configured in the antenna attributes of the corresponding
module in the DAFU subrack. If the new TRX is not configured, configure the new TRX
in the antenna attributes by referring to Table 5-1.
Table 5-1TRX configuration (in the DAFU subrack)
Module Type Configuration References
DDPU See Antenna feeder property configuration for the
DDPU.
DFCU See Antenna feeder property configuration for the
DFCU.
DFCB See Antenna feeder property configuration for the
DFCB.
Step 6 Query the information of the BTS boards. If the software version does not match the current
BTS version, perform software loading and software activation for the new DTRUs.
----End
Follow-up Procedure
After the capacity expansion, verify the following:
1. The module alarms are cleared.
2. The modules run properly.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
21
-
8/13/2019 BTS3012 Site Maintenance Guide
31/106
5.4 Installing the BTS3012/BTS3012AE DFCU (CapacityExpansion)
This describes how to install the BTS3012/BTS3012AE DFCU. The Filter Combiner Unit for
DTRU BTS (DFCU) of the BTS3012/BTS3012AE is installed in the Antenna Front-end Unit
for DTRU BTS (DAFU). If the cells or the TRXs in the BTS require capacity expansion, you
may need to add DFCUs. Adding DFCUs disrupts the cell services.
Prerequisites
l You have obtained the status of the board or the module and the information about the
corresponding slot.
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
Context
The entire capacity expansion takes about 20 minutes.
The DFCU is heavy. Handle the DFCU carefully.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Change the management status of the BTS. Block all the DTRUs in the cabinet.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
22
-
8/13/2019 BTS3012 Site Maintenance Guide
32/106
-
8/13/2019 BTS3012 Site Maintenance Guide
33/106
2. Enter the ADD BTSANTFEEDERBRDcommand in the Command Inputbox, and then
click Assist.
3. Select DFCU(DFCU)from the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto add the board.
4. Enter the SET BTSANTFEEDERCONNECTcommand in the Command Inputbox,and then click Assist.
5. Select DFCU(DFCU)from the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto configure the connection of
the BTS antenna.
6. Enter the MOD BTSANTFEEDERBRDcommand in the Command Inputbox, and then
click Assist.
7. Select DFCU(DFCU)from the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto modify the frequency band
attributes for the BTS antenna to complete the configuration of the DFCU.
Step 8 Query the information of the BTS boards. If the software version does not match the currentBTS version, perform software loading and software activation for the new DFCUs.
Step 9 Select the BTS from the navigation tree in the left pane of the BSC6900 Device Maintenancewindow. Then, confirm the data configuration of the new module on the BTS Device Paneltab
page.
Step 10 Change the management status of the BTS. Unblock all the DTRUs in the cabinet.
----End
Follow-up Procedure
After the capacity expansion, verify the following:
1. The module alarms are cleared.
2. The modules run properly.
5.5 Installing the BTS3012/BTS3012AE DFCB (CapacityExpansion)
This describes how to install the BTS3012/BTS3012AE DFCB. The Filter Combiner Unit for
DTRU BTS type B (DFCB) of the BTS3012/BTS3012AE is installed in the Antenna Front-end
Unit for DTRU BTS (DAFU) subrack. If the cells or the TRXs in the BTS require capacity
expansion, you may need to add DFCBs. Adding DFCBs disrupts the cell services.
Prerequisites
l You have obtained the status of the board or the module and the information about the
corresponding slot.
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l
If the boards or modules have DIP switches on them, ensure that the settings of the DIPswitches are correct.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
24
-
8/13/2019 BTS3012 Site Maintenance Guide
34/106
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
Context
The entire capacity expansion takes about 20 minutes.
DFCBs are cascaded with DFCUs during the capacity expansion of the DFCU.
The DFCB is heavy. Handle it carefully.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Change the management status of the BTS. Block all the DTRUs in the cabinet.
Step 2 Power off the DAFU subrack.
If... Then...
Power-off is performed on the BTS3012 Set the DAFU MCB on the power busbar to
OFF.
Power-off is performed on the BTS3012AE Set the DAFU MCB on the DC power
distribution box to OFF.
Step 3 Install new DFCBs.
Step 4 Install cables to the panels of the new DFCBs.
1. Install power cables.
a. Remove the protective caps of the power cables for DFCBs.
b. Install the power cables to the POWER ports on the panels of DFCBs.
c. Screw the two fastening bolts on each cable connector.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
25
-
8/13/2019 BTS3012 Site Maintenance Guide
35/106
d. Place the removed protective caps at the bottom of the cabinet for future use.
2. Install RF cables and signal cables.
Install RF cables and signal cables according to the BTS configurations. The installation
consists of installing BTS3012/BTS3012AE signal cables between the DFCB and theDFCU, installing RF TX signal cables, installing RF RX signal cables, installing power
detection cables, installing four-in-one short-circuiting cables, installing diversity receive
short-circuiting cables, and installing indoor 1/2-inch jumpers.
Step 5 Attach the cell labels to the panels of new DFCBs.
Step 6 Power on the DAFU subrack.
If... Then...
Power-on is performed on the BTS3012 Set the DAFU MCB on the power busbar to
ON.
Power-on is performed on the BTS3012AE Set the DAFU MCB on the DC power
distribution box to ON.
NOTE
After the hardware installation is complete, verify the following items:
l The modules are securely inserted.
l The status of the LEDs on the modules is normal.
Step 7 Configure data on the LMT. Configuring DFCBs in the related slots.
NOTE
The BTS data must match the actual BTS configuration on site. Huawei recommends that this step be performed
under the instruction of the head responsible person on the BTS side and on the BSC side.
1. Logging In to the LMT.
2. Enter the ADD BTSANTFEEDERBRDcommand in the Command Inputbox, and then
click Assist.
3. Select DFCB(DFCB)from the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto add the board.
4. Enter the SET BTSANTFEEDERCONNECTcommand in the Command Inputbox,
and then click Assist.
5. Select DFCB(DFCB)from the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto configure the connection of
the BTS antenna.
6. Enter the MOD BTSANTFEEDERBRDcommand in the Command Inputbox, and then
click Assist.
7. Select DFCB(DFCB)from the Board Typedrop-down list box and set other parameters
according to the actual situation on site. Then, click Execto modify the frequency band
attributes for the BTS antenna to complete the configuration of the DFCB.
Step 8 Query the information of the BTS boards. If the software version does not match the currentBTS version, perform software loading and software activation for the new DFCBs.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
26
-
8/13/2019 BTS3012 Site Maintenance Guide
36/106
Step 9 Select the BTS from the navigation tree in the left pane of the BSC6900 Device Maintenancewindow. Then, confirm the data configuration of the new module on the BTS Device Paneltab
page.
Step 10 Change the management status of the BTS. Unblock all the DTRUs in the cabinet.
----End
Follow-up Procedure
After the capacity expansion, verify the following:
1. The module alarms are cleared.
2. The modules run properly.
5.6 Installing the BTS3012 DELC (Capacity Expansion)
This describes how to install the BTS3012 DELC. The E1 signal Lightning-protection Card for
DTRU BTS (DELC) of the BTS3012 cabinet is installed in the signal lightning protection
subrack on the top of the cabinet. When the BTS requires TRX capacity expansion (that is, the
number of TRXs exceeds the capacity of the four E1 cables for the DELC), or when the onsite
BTS networking uses multi-BTS tree topology, you need to add DELCs. Adding DELCs disrupts
the services carried on the BTS.
Prerequisites
l You have obtained the status of the board or the module and the information about the
corresponding slot.
l You have confirmed the types and number of the required boards or modules as well as thesubrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
Context
It takes about 10 minutes for the entire capacity expansion.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
27
-
8/13/2019 BTS3012 Site Maintenance Guide
37/106
CAUTION
l If you may touch the cabinet (including boards, modules, cables, and components in the
cabinet) in an operation, wear an ESD wrist strap and correctly ground it.l When installing boards, do not touch PCBs or components except jumpers and DIP switches.
l Because the captive screws on the boards in the common subrack are M3 screws, use a #2
cross screwdriver (diameter: 6 mm) when loosen or tighten the screws. If you do not know
the type of the cross screwdriver, try different cross screwdrivers starting from the one with
the greatest diameter until you find a suitable one. Do not use the screwdriver smaller than
the #2 cross screwdriver.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Install new DELCs.
Step 2 Install E1 cables.
NOTE
If you add a site in cascading mode (cascading through E1s of the DELC), you need to configure the port
relation between the new site and its upper-level site.
----End
Follow-up Procedure
After the capacity expansion, verify the following:
1. E1 cables are properly installed.
2. The grounding status of the E1 cables is correct.
3. The E1-related alarms on the Site Maintenance Terminal System are cleared.
5.7 Installing the BTS3012 PSU (DC) (Capacity Expansion)
This describes how to install the PSUs of the BTS3012. The PSUs are placed in the power
subrack. When the capacity of the main cabinet is expanded and its load increases, you need to
add PSUs if the number of existing PSUs cannot meet requirements. You also need to add PSUs
during capacity expansion of the batteries. Adding PSUs does not affect the services of the BTS.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
28
-
8/13/2019 BTS3012 Site Maintenance Guide
38/106
Prerequisites
l You have obtained the status of the board or the module and the information about the
corresponding slot.
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
Context
The capacity expansion takes about 10 minutes.
The PSU applies only to the cabinet using +24 V power supply.
CAUTION
Take correct ESD prevention measures, such as wearing an ESD wrist strap or ESD gloves, to
avoid static damage to boards, modules, and electronic components.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
Step 1 Install a new PSU.
Step 2 Repeat the above steps until all the PSUs (in order of PSU 0, PSU 1, PSU 2, and PSU 3) areinstalled.
Step 3 Configure the BTS data on the LMT. Configure the PSU in the corresponding slot of the DEMUin the BTS.
Step 4 Ensure that the data configuration for the new module is correct.
----End
Follow-up Procedure
After the capacity expansion, verify the following items:
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
29
-
8/13/2019 BTS3012 Site Maintenance Guide
39/106
1. The PSUs are powered on.
2. The status of the PSU LEDs is normal.
3. The BTS services are normal and no related alarm is generated.
BTS3012
Site Maintenance Guide (for -48V/+24V)
5 Installing the BTS3012 Boards and Modules (-48 V/+24 V)
(Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
30
-
8/13/2019 BTS3012 Site Maintenance Guide
40/106
6Installing the Combined BTS3012 Cabinetsand BTS3012 Cabinet Groups (-48 V/+24 V)
(Capacity Expansion)
This describes how to install the combined BTS3012 cabinets and BTS3012 cabinet groups. The
BTS3012 supports the combination of two cabinets to form one group and the combination of
three cabinet groups. One cabinet supports 12 TRXs in full configuration. With three combined
groups, the S12/12/12 cell configuration can be achieved. The capacity expansion disrupts the
services carried by the BTS.
Prerequisites
l
You have obtained the status of the board or the module and the information about thecorresponding slot.
l You have confirmed the types and number of the required boards or modules as well as the
subrack and slots where the boards or modules are located.
l The hardware versions of new boards or modules are correct.
l If the boards or modules have DIP switches on them, ensure that the settings of the DIP
switches are correct.
l You have arranged the key to the front cabinet door and other required tools, such as a #2
cross screwdriver, cable straps, and labels.
l The required material has been delivered on site.
NOTE
l If you need to add a BTS, ensure that there are idle ports on the GEIUB or GOIUB on the BSC side.
l For combined cabinets and cabinet groups, you need to remove the lightning protection failure alarm
cables on the top of the cabinet and replace the short cables with long cables. A 35 mm straight
screwdriver is required.
Context
You can install the combined cabinets on the cement floor with sufficient bearing capacity, on
the ESD floor, or on the cement floor with insufficient bearing capacity.
l The principles you should comply with when placing the cabinets are as follows:
The cabinet can be installed with the side or rear against the wall.
BTS3012
Site Maintenance Guide (for -48V/+24V)
6 Installing the Combined BTS3012 Cabinets and BTS3012
Cabinet Groups (-48 V/+24 V) (Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
31
-
8/13/2019 BTS3012 Site Maintenance Guide
41/106
The cabinets can be installed side by side.
At least 0.8 m of clearance must be reserved in front of the cabinet.
The cabinet must be placed as close as possible to the feeder window to reduce the
length of the feeder.
The levelness of the cabinet must be measured with a level bar. All the cabinets in the
same row must be in a horizontal line.
l In any installation mode, an insulation plate must be added under the lower frame and an
insulation washer must be added to the fastening pieces that fix the lower frame. This is an
effective way to keep the whole set of equipment insolated from the ground before the
PGND cable is connected.
CAUTION
l If you may touch the cabinet (including boards, modules, cables, and components in thecabinet) in an operation, wear an ESD wrist strap and correctly ground it.
l When installing boards, do not touch PCBs or components except jumpers and DIP switches.
l Because the captive screws on the boards in the common subrack are M3 screws, use a #2
cross screwdriver (diameter: 6 mm) when loosen or tighten the screws. If you do not know
the type of the cross screwdriver, try different cross screwdrivers starting from the one with
the greatest diameter until you find a suitable one. Do not use the screwdriver smaller than
the #2 cross screwdriver.
CAUTION
After the operation, remove the ESD wrist strap, arrange its line, and place it on the zig strap of
the air filter inside the door of the cabinet. Confirm that the cables and parts are in position. The
ESD wrist strap must not be connected to the ESD jack when you close the door. Otherwise, the
door will get stuck by the ESD wrist strap and the ESD wrist strap or the cabinet door will be
damaged.
Procedure
l Install the BTS3012 combined cabinets.
1. Position the cabinet.
2. Install the cabinet. The cabinets must be close to each other and in a horizontal line.
3. Connect the cabinets on the top using connecting pieces, as shown in Figure 6-1.
BTS3012
Site Maintenance Guide (for -48V/+24V)
6 Installing the Combined BTS3012 Cabinets and BTS3012
Cabinet Groups (-48 V/+24 V) (Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
32
-
8/13/2019 BTS3012 Site Maintenance Guide
42/106
Figure 6-1Connecting combined cabinet on the top
1
2
3
4
(1) Bolt (2) Spring washer 12 (3) Flat washer 12 (4) Cover plate
4. Install the power cables and PGND cables, boards and modules, and cables.
5. Connect the lightning protection failure alarm cables for the main cabinet and
extension cabinets.
6. Connect the lightning protection failure alarm cable for the combined cabinet betweenthe main cabinet and the extension cabinets.
NOTE
The onsite personnel need to find the lightning protection failure alarm cable (5 m, black) for the
combined cabinet among the installation related material, make terminals for it on site, and connect
it to the DSAC in the main cabinet.
7. Install cables for the combined cabinet.
8. Install BTS equipotential cables.
9. Transfer the cable between combined cabinets (the cable is on the panel of the DCSU
in the main cabinet) from the CC_IN port to the CC_OUT port.
10. Set DIP switches for the DCSU.
11. Configure the BTS data on the LMT.
BTS3012
Site Maintenance Guide (for -48V/+24V)
6 Installing the Combined BTS3012 Cabinets and BTS3012
Cabinet Groups (-48 V/+24 V) (Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
33
-
8/13/2019 BTS3012 Site Maintenance Guide
43/106
l Install the BTS3012 cabinet group.
1. Position the cabinet.
2. Install the cabinet.
3. Install the power cables and PGND cables, boards and modules, and cables.
4. Install cables for the cabinet group.
Connect the MD36 male connector on one end to the CKB1 or CKB2 port on the
top of the main cabinet group.
Connect the MD36 male connector on the other end to the CKB1 or CKB2 port
on the top of the extension cabinet group.
5. Install BTS equipotential cables.
6. Set DIP switches for the DCSU.
7. Configure the BTS data on the LMT.
----End
Follow-up Procedure
After the capacity expansion, verify the following items:
1. The alarm related to the extension cabinets is cleared.
2. During the service tests, the extension cabinets run properly.
BTS3012
Site Maintenance Guide (for -48V/+24V)
6 Installing the Combined BTS3012 Cabinets and BTS3012
Cabinet Groups (-48 V/+24 V) (Capacity Expansion)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
34
-
8/13/2019 BTS3012 Site Maintenance Guide
44/106
7Replacingthe BTS3012 Boards and Modules(-48 V/+24 V)
About This Chapter
This describes how to replace the BTS3012 boards and modules (-48 V/+24 V). The BTS3012
boards that can be replaced are the DTMU, DCCU, DCSU, DATU, DEMU, DELC, DMLC, and
DSAC. The BTS3012 modules that can be replaced are DTRU, DDPU, DCOM, DFCU, DFCB,
and PSU (DC) (+24 V).
7.1 Replacingthe BTS3012/BTS3012AE Boards and Modules (Common Operations)
This describes how to replace the BTS3012/BTS3012AE boards and modules. Most of theBTS3012/BTS3012AE boards are installed in common subracks and signal lightning-protection
subracks. Most of the BTS3012/BTS3012AE modules are installed in the DTRUs and DAFUs.
Some of the operations performed for replacing the boards and modules are common.
7.2 Replacinga BTS3012/BTS3012AE DTMU
This describes how to replace a BTS3012/BTS3012AE DTMU. The DTMUs are installed in
slots 0 and 1 of the common subrack. If a BTS is configured with only one DTMU, replacing
the DTMU disrupts all the services carried on the BTS. If a BTS is configured with two DTMUs
in active/standby mode, replacing the standby DTMU does not affect the services carried on the
BTS. If you need to replace the active DTMU, switch over the active and standby DTMUs.
During the active/standby switchover, the DTMU is reset and BTS services are disrupted. After
the DTMU is reset, replace the former active DTMU. In this way, replacing the DTMU does
not affect the BTS services.
7.3 Replacing a BTS3012/BTS3012AE DPTU
The DPTU is installed in the common subrack.If only one DPTU is configured in the BTS, the
board replacement disrupts all the services carried on the BTS. If a BTS is configured with two
DPTUs in active/standby mode, replacing the standby DPTU does not affect the services carried
on the BTS. If you need to replace the active DPTU, switch over the active and standby DPTUs.
During the active/standby switchover, the DPTU is reset and BTS services are disrupted. After
the DPTU is reset, replace the former active DPTU. In this way, replacing the DPTU does not
affect the BTS services.
7.4 Replacing a BTS3012/BTS3012AE DABB
The DABB can be installed in slot 2, 3, 4, or 7 in the common subrack. Replacing the DABBdisrupts all the services carried on the BTS.
BTS3012
Site Maintenance Guide (for -48V/+24V)
7 Replacing the BTS3012 Boards and Modules (-48 V/+24
V)
Issue 01 (2011-12-10) Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.
35
-
8/13/2019 BTS3012 Site Maintenance Guide
45/106
7.5 Replacing a BTS3012/BTS3012AE DCCU
This describes how to replace a BTS3012/BTS3012AE DCCU. The DCCU is installed in slot
6 of the common subrack. The replacement of the DCCU disrupts all the services carried on the
BTS.
7.6 Replacing a BTS3012/BTS3012AE DCSUThis describes how to replace a BTS3012/BTS3012AE DCSU. The DCSU is installed in slot 5
of the common subrack. The replacement of the DCSU disrupts all the services carried on the
BTS.
7.7 Replacinga BTS3012/BTS3012AE DATU
This describes how to replace a BTS3012/BTS3012AE DATU. The DATU can be installed in
slots 2, 3, 4, and 7. The replacement of the DATU affects the running of the TMA.
7.8 Replacinga BTS3012/BTS3012AE DTRU
This describes how to replace a BTS3012/BTS3012AE DTRU. The DTRU is installed in the
DTRU subrack. The replacement of the DTRU disrupts all the services provided by the DTRU.
7.9 Replacinga BTS3012/BTS3012AE DDPUThis describes how to replace the BTS3012/BTS3012AE DDPU. The DDPU is installed in the
DAFU subrack. The replacement of the DDPU disrupts some services in the cell where the
DDPU is located.
7.10 Replacing a BTS3012/BTS3012AE DCOM
This describes how to replace a BTS3012/BTS3012AE DCOM. The DCOM is installed in the
DAFU subrack. The replacement of the DCOM disrupts the services carried on it.
7.11 Replacing a BTS3012/BTS3012AE DFCU
This describes how to replace a BTS3012/BTS3012AE DFCU. The DFCU is installed in the
Antenna Front-end Unit for DTRU BTS (DAFU) subrack. The replacement of the DFCU
disrupts the services carried on it.
7.12 Replacing a BTS3012/BTS3012AE DFCB
This describes how to replace a BTS3012/BTS3012AE DFCB. The DFCB is installed in the
DAFU subrack. The replacement of the DFCB disrupts the services carried on it.
7.13 Replacing a BTS3012/BTS3012AE DEMU
This describes how to replace a BTS3012/BTS3012AE DEMU. The DEMU is installed in the
common subrack. During the DEMU replacement, the DEMU cannot monitor environment.
7.14 Replacing a BTS3012/BTS3012AE DGPS
The DGPS can be inserted into a slot of the common subrack. Replacing the DGPS affects the
frame synchronization of the BTS with the entire network. However, the services carried by the
BTS are not interrupted.
7.15 Replacing a BTS3012 DELC
This describes how to replace an E1 Signal Lightning Protection Card for the DTRU BTS
(DELC) of t