building permission mumbai

Post on 21-Jan-2015

769 Views

Category:

Business

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

ppt

TRANSCRIPT

BUILDING PERMISSION -MUMBAI

• IDENTIFY PROJECT LAND

• CHECK DEVELOPMENT PLAN

• DEVELOPMENT CONTROL REGULATIONS

• PROCUREMENT OF LAND

• DEVELOPMENT AGREEMENT

• POWER OF ATTORNEY

• TAKE CONSENT OF THE STAKEHOLDERS

• N.A. PERMISSION

• PREPARATION OF LAYOUT/BUILDING DRAWINGS

• PREPART STRUCTURAL DRAWINGS AND DETAILING

• SUBMIT LAYOUT/ BUILDING DRAWING

• BUILDING PROPOSAL DEPARTMENT

• MCGM

• INTIMATION OF DISAPPROVAL

• PROCURE VARIOUS APPROVALS, PERMISSIONS, NOC AND CONSENT

• LABOUR LAW PERMISSION

• CRZ PERMISSION

• ENVIRONMENT CLEARENCE

• MPCB CONSENT

• NOC –FIRE BRIGADE DEPARTMENT

• TREE AUTHORITY PERMISSION

• HYDRUALIC ENGINEER

• MINOR MINERAL EXCAVATION PERMISSION

• STROM WATER DRAIN DEPARTMENT

• SEWAGE DEPARTMENT

• AIRPORT AUTHORITY OF INDIA

• HIGH RISE COMMITTEE

• NOC FROM ELECTRICITY SUPPLY COMPANY

• NOC FROM HIGHWAY/PWD/ARCHEOLOGY DEPARTMENTS

• DISTRICT MAGISTRATE PERMISSION

• COMMENCEMENT CERTIFICATE

• PLINTH COMPLETION CERTIFICATE

• CONSTRUCTION OF THE BUILDINGS

• STRUCTURAL AUDIT REPORT

• NOC FROM LIFT ENGINEER

• PLUMBING COMPLETION CERTIFICATE

• MAKE PROVISIONS FOR OVERHEAD TANKS, SEWAGE TANKS, WATER AND ELECTRICITY SUPPLY CONNECTIONS

• BUILDING COMPLETION CERTIFICATE

• FINAL INSPECTION AND CERTIFICATION BY MCGM BUILDING ENGINEERS

• OCCUPATION CERTIFICATE

• HANDOVER POSSESSION OF FLATS

• FORMATION OF CO-OP.HSG SOCIETY

• CONVEYANCE TO THE SOCIETY

• WITH GOODWILL

• LEAVE FROM THE PROJECT

• mylawhouse.in

• Ph:09833843250

• mylawhouse@gmail.com

• mylawhouse@yahoo.com

top related