by barry james canadian cedar from trees … to shingles

Post on 20-Jan-2016

217 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TM

by Barry James

Canadian CedarFrom Trees … to Shingles

TM

Logs are harvested from local forests then stored on site for

processing

TM

TM

Log storage covers about 12 hectares and represent 5-8 months of raw material stock

TM

TM

Blades used to cut logs and slice to shingles await

sharpening TM

TM

Blades are sharpened after each 5 hours of use and have an overall life span of about 18 months

TM

TM

Logs are first cleared of bark

TM

TM

After bark is removed logs are cut to 400 mm length

TM

TM

Logs are delivered by conveyor for further processing

TM

TM

Technician inserts block to be taper-sawnTM

TM

Saw cutting through 400mm block TM

TM

Technician (1 of 10 stations) for this operationTM

TM

Technician checks tapered shingle

TM

TM

Shingle then cut to appropriate width optimising “good wood”

TM

TM

Technician immediately sorts by category and places in correct “slot”

TM

Sorted shingles are delivered to the appropriate position on

conveyor for packaging or further processing

TM

TM

In R&R “Premium” process, shingles are further trimmed on

three sides

TM

TMFully automated process yields a shingle with perfectly parallel edges and Resquared butt

TM

TM

TM

Shingles are then hand packaged and palletised with final quality control

TM

TM

Some customers request pressure treated shingles to further increase serviceable life TM

TM

Pallet on left exits chamber while pallet on right awaits 3-4 hour turn in chamber.

Greenish appearance will weather first to brown then to the silver grey that is characteristic of Canadian Eastern White shingles.

TM

TM

Shingles palletised and ready for shipment

TM

Shingles applied to a roof in near Quebec City in

Canada

top related