BY ORDER OF THE COMMANDER
AIR FORCE MATERIEL COMMAND
AIR FORCE MATERIEL COMMAND
MANUAL 23-101 VOLUME 1
17 NOVEMBER 2016
Certified Current 12 January 2017Materiel Management
GENERAL D200A/N INFORMATION
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
ACCESSIBILITY: Publications and forms are available for downloading or ordering on the e-
publishing website at www.e-Publishing.af.mil
RELEASABILITY: There are no releasability restrictions on this publication
OPR: AFMC/A4RM
Supersedes: AFMCMAN 23-1,
12 June 2008
Certified by: AFMC/A4R
(Col Deirdre A. Mahon)
Pages: 146
This publication implements Air Force Instruction (AFI) 23-101, Air Force Materiel
Management. It prescribes guidance and procedural instructions for computing XD2, XB3, and
XF3 secondary item requirements. It applies to Secondary Item Requirements System
(SIRS)(D200A) and Central Secondary Item Stratification (CSIS)(D200N) users. This
publication does not apply to Air Force Reserve units and the Air National Guard (ANG). Refer
recommended changes and questions about this publication to the Office of Primary
Responsibility (OPR) using an AF Form 847, Recommendation for Change of Publication; route
AF Forms 847 from the field through the appropriate functional’s chain of command. This
publication may be supplemented at any level, but must be routed to the OPR for coordination
prior to certification and approval. The authorities to waive wing/unit level requirements in this
publication are identified with a Tier (“T-0, T-1, T-2, T-3”) number following the compliance
statement. Submit requests for waivers using AF Form 679, Air Force Publication Compliance
Item Waiver Request/Approval, through the chain of command to the appropriate Tier waiver
approval authority, or alternately, to the Publication OPR for non-tiered compliance items.
Request for waivers must be approved by the publication OPR prior to implementation. Ensure
that all records created as a result of processes prescribed in this publication are maintained In
Accordance With (IAW) Air Force Manual (AFMAN) 33-363, Management of Records, and
disposed of IAW Air Force Records Information Management System (AFRIMS) Records
Disposition Schedule (RDS). The use of the name or mark of any specific manufacturer,
commercial product, commodity, or service in this publication does not imply endorsement by
the Air Force
2 AFMCMAN23-101V1 17 NOVEMBER 2016
SUMMARY OF CHANGES
This publication has been substantially revised and must be completely reviewed. The previous
manual has been restructured into six separate volumes. Volume 1 incorporates previous
Chapter 1, 2, 7, and 33 respectively. Some of the more significant changes include: exclusion
requests for no compute coded items, Inventory Management Specialist/Materiel Manager roles
and responsibilities, electronic AFMC Form 318, termination reviews, signature requirements,
and the addition of system roles and responsibilities and access requirements.
Chapter 1— GENERAL 5
1.1. Applicability. .......................................................................................................... 5
1.2. Purpose.................................................................................................................... 5
1.3. Types of Items. ....................................................................................................... 7
1.4. Roles and Responsibilities. ..................................................................................... 10
1.5. Requirements Segments. ......................................................................................... 15
1.6. Categories of Requirements. ................................................................................... 15
1.7. Schedule. ................................................................................................................. 16
1.8. Computation Time Span. ........................................................................................ 16
1.9. Initial and Follow-On Spares. ................................................................................. 17
1.10. Stock Number Establishment. ................................................................................. 18
1.11. Review and Adjustment Actions. ........................................................................... 19
1.12. Life-of-Type (LOT) Buys. ...................................................................................... 23
1.13. Identifying Candidates and Requirements for Multiple Year Contracting. ............ 25
1.14. Item Contracting History Record. ........................................................................... 26
1.15. Documentation Requirements. ................................................................................ 26
Table 1.1. Item Purchases Were Initiated Destroy Documents and Products 2 Years After
Contract Closure IAW Paragraph 1 15 2. ................................................................ 27
Table 1.2. Destroy After 2 Years. ............................................................................................ 28
Table 1.3. Pushed Products Destroyed After 2 Years Unless Needed to Support Buy or
Terminations. ........................................................................................................... 28
Table 1.4. Destroy Initial D200A Product After Receipt of Final D200A Product Unless
Pen and Ink Documentation Required to Support Actions Taken. .......................... 29
AFMCMAN23-101V1 17 NOVEMBER 2016 3
Table 1.5. Destroy Final D200A Products After Receipt of Summary D200A Product
Unless Signature Document. .................................................................................... 30
Table 1.6. Destroy on Receipt of Next Cycle’s Products. ....................................................... 30
1.16. Performance-Based Logistics (PBL) Contracts. ..................................................... 31
1.17. “Dead Items” in D200A. ......................................................................................... 32
Chapter 2— USING RMS 33
2.1. Introduction. ............................................................................................................ 33
2.2. Roles and Responsibilities. ..................................................................................... 33
2.3. System Access. ....................................................................................................... 33
Table 2.1. Requestor Types Authorizations, and Approving Authorities. ............................... 34
Table 2.2. D200A N Unique SAAR Instructions. .................................................................... 35
2.4. RMS Applications Access. ..................................................................................... 36
2.5. SIRS GUI Navigation. ............................................................................................ 37
2.6. Organization of the SIRS Online Screens. .............................................................. 37
2.7. Display Screens. ...................................................................................................... 38
2.8. File Maintenance Screens. ...................................................................................... 45
2.9. Output Products Screens. ........................................................................................ 46
2.10. Source Reference Codes. ........................................................................................ 47
Chapter 3— QUALITY REVIEWS 48
3.1. General. ................................................................................................................... 48
Table 3.1. IMS MM PMS Quality Review Checklist For Items with ERRC Code “T”. ......... 50
Table 3.2. IMS MM Quality Review Checklist For Items with ERRC “N” or “P”. ................ 59
Table 3.3. AF Secondary Inventory Control Activity SICA) Nonconsumable Item Materiel
Support Code (NIMSC) 5 Checklist. ....................................................................... 66
Table 3.4. Factors and Usage Quality Review Checklist For Items with ERRC “T”. ............. 70
Table 3.5. Factors and Usage Quality Review Checklist For Items with ERRC “N” or “P”. . 77
Table 3.6. Repair Quality Checklist. ........................................................................................ 84
Table 3.7. Termination Review Checklist. .............................................................................. 89
Table 3.8. MISTR Repair and Repair Data Checklist Note Does not apply to AF SICA
NIMSC 5 items. ....................................................................................................... 91
4 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.9. AFMC Review Summary. ...................................................................................... 94
Table 3.10. Depot Review Team Summary. .............................................................................. 95
Table 3.11. Review Package. ..................................................................................................... 96
Chapter 4— TERMINATION ACTIONS 98
4.1. Introduction. ............................................................................................................ 98
4.2. Overview. ................................................................................................................ 98
4.3. Procedures. .............................................................................................................. 100
4.4. Reporting and Analysis. .......................................................................................... 104
Table 4.1. Termination Codes. ................................................................................................. 106
Table 4.2. Required Electronic Termination (RIR) Log Fields. .............................................. 110
4.5. The SIRS Termination Model. ................................................................................ 111
Table 4.3. Termination Model Results – Recommendations. .................................................. 117
Attachment 1— GLOSSARY OF REFERENCES AND SUPPORTING INFORMATION 118
Attachment 2— SIGNATURE REQUIREMENTS 144
AFMCMAN23-101V1 17 NOVEMBER 2016 5
Chapter 1
GENERAL
1.1. Applicability. This manual applies to HQ AFMC, AFSC and AFLCMC personnel
responsible for the development, adjustment, computation, review, and approval of requirements
for recoverable and consumable secondary items and management actions that result from those
requirements. Procedures contained in this manual apply primarily to Materiel Managers (MM),
Inventory Management Specialists (IMS), Equipment Specialists (ES), Production Management
Specialists (PMS) and AFSC management. NOTE: An MM performs the functions of a PMS
and is included in the responsibilities/actions whenever PMS is referenced in this volume.
1.2. Purpose. This manual provides basic guidelines for computing replenishment requirements
for secondary items, both recoverable and consumable items, using the Secondary Item
Requirements System (SIRS)(D200A). Requirements computed with these procedures reflect
the average materiel support requirements for Air Force (AF) operations.
1.2.1. Items computed in SIRS/D200A use data that is current on the last calendar day of
each calendar quarter (qtr). The purpose of SIRS is to determine what management actions
will be taken immediately to support operations, and to provide a baseline for budget
submission and analysis. SIRS provides all the input data for the Central Secondary Item
Stratification (CSIS) system. The purpose of the CSIS is to display budget and repair deficits
for each requirements segment by Fiscal Year (FY). The CSIS provides data on asset
distribution against requirements and is used as a baseline for inventory analysis. This
system has been assigned Data System Designator (DSD) D200N and will be referred to as
CSIS throughout this manual. SIRS and CSIS are part of the Requirements Management
System (RMS).
1.2.2. Procedures, forms, computation worksheets, and supporting data developed in this
process make up the official record to substantiate the acquisition program, budget
projections, and other logistics actions.
1.2.3. This manual provides descriptions of the various automated methodologies associated
with the requirements process, as well as policies and procedures that apply to those
processes.
1.2.4. Items covered by this manual are those assigned Expendability, Recoverability,
Reparability Category (ERRC) codes XD2 or “T,” XB3 or “N,” and XF3 or “P.” These are
usually secondary items installed in a higher assembly such as an aircraft, vehicle, piece of
equipment, or another recoverable secondary item. Upon failure, these items are removed
and replaced with serviceable assets. The unserviceable assets for recoverable items are
turned into a maintenance facility for repair and eventually reissued or condemned. Under
normal circumstances, any unserviceable assets for a consumable item are disposed.
1.2.5. Weighted Unit Repair Cost (URC) exceeding 75% of the replacement price - Forecast
Unit Price (FUP) for a reparable item (ERRC “T”).
1.2.5.1. When an item’s weighted repair cost exceeds 75% of the FUP, there are no
contracts for the item within the last 5 years, and the annual repair requirement for the
item is $1 million or more and the item can still be procured; the IMS/MM will request
6 AFMCMAN23-101V1 17 NOVEMBER 2016
Contracting obtain a unit price quote from the contractor. If the procuring activity
communicates a quote cannot be obtained due to the item being competitive or the
contractor will not provide without cost, then the IMS/MM is to document the AF Form
318 and follow directions in para 1.2.5.2 If the item is expected to have future
procurement, the IMS/MM will file maintain the unit price quoted as the actual unit price
and date of the quote as the Date of Last Procurement (DOLP) into SIRS. When the
IMS/MM does not expect to procure the item in the future, the information on new
procurement pricing is to be used in the Notepad to justify retaining the item as
recoverable while the price in D200A remains the last actual procurement cost/DOLP. If
after the receipt of the quote, the weighted repair cost still exceeds 75% of the quoted unit
price or the item was bought within the last 5 years and the weighted repair cost exceeds
75% of the FUP, the item management team will conduct an evaluation of procurement
and repair history to determine if the item will be retained as a recoverable item (ERRC
“T”) or be converted to a consumable item (ERRC “N” or “P”), and document their
rationale and how they arrived at their decision. The IMS/MM will document the
rationale in the D200A Notepad and maintain the documentation until 2 years after the
price has been superseded. If the analysis supports conversion to a consumable item, the
ES will initiate the cataloging action and follow guidance for factors forecasting for
ERRC change items. If unexpected circumstances later require procurement on an item
previously not expected to be procured, the IMS/MM will revert to the methods described
above (for items with expected future procurement) to arrive at a representative price and
DOLP.
1.2.5.2. If a quote cannot be obtained from a contractor as outlined in the preceding
paragraph or the annual repair requirement for the item is less than $1 million and a like
item has a unit price from a more recent purchase, use the FUP (unit price and DOLP)
from a like item to perform the comparison. If the weighted repair cost of the like item
also exceeds 75% of the FUP, the item management team will conduct an evaluation of
procurement and repair history to determine if the item must be retained as a recoverable
item (ERRC “T”) or be converted to a consumable item (ERRC “N” or “P”), document
their rationale and how they arrived at their decision. The IMS/MM will document the
rationale in the D200A Notepad and maintain the documentation until 2 years after the
price has been superseded. If the analysis supports conversion to a consumable item, the
ES will initiate the cataloging action and follow guidance for factors forecasting for
ERRC code change items.
1.2.5.3. Items still in use that are no longer procurable, but are reparable, will not be
converted from recoverable items to consumable items. If the weighted repair cost
exceeds 75% of the FUP for these items, the IMS/MM will document the fact that they
are no longer procurable in the D200A Notepad as rationale for keeping them as
recoverable items and retain the information as an audit trail.
1.2.5.4. For further information, see AFMAN 21-106, Joint Regulation Governing the
Use and Application of Uniform Source, Maintenance, and Recoverability Codes; AFH
23-123, Volume 1, Materiel Management Reference Information, and Volume 2, Part
Two, Integrated Logistics System-Supply (ILS-S), Standard Base Supply System
Operations; AFMCMAN 23-3, Cataloging and Standardization; AFMCI 23-112,
Management of Items Subject To Repair (MISTR); Technical Order (T.O.) 00-20-3,
AFMCMAN23-101V1 17 NOVEMBER 2016 7
Maintenance Processing of Reparable Property and The Repair Cycle Asset Control
System; and T.O. 00-25-195-WA-1, AF Technical Order System Source, Maintenance,
and Recoverability Coding of Air Force Weapons, Systems, and Equipments.
1.3. Types of Items. Time-phased computations are done for all Subgroup Master (SGM) stock
numbers that have been recorded in SIRS; Exceptions: obsolete items, Insurance (INS) items,
Numeric Stockage Objective (NSO) items, no compute coded items, and special items listed in
paragraph 1.3.6. SIRS produces the INS/NSO Item Status Listing for items coded INS or NSO.
See AFMCMAN 23-101, Volume 3, Computational Results (D200A, D200N), Chapter 5. A
CSIS is available in D200N for every item. Requirement computation worksheets are produced
for Acquisition Advice Code (AAC) “V” items (use until exhausted), and buy computations
could be generated which must be scrubbed.
1.3.1. Obsolete items (SGM and interchangeable). All reported assets are identified in
management reports and output to other systems as excess quantities available for disposal.
When the SGM stock number is coded obsolete, all stock numbers interchangeable with this
SGM stock number are considered obsolete and their assets are processed as excess. All
obsolete on-order assets are termination candidates.
1.3.2. Contingency items. These items do not have an application to a current system or
Next Higher Assembly (NHA), which is in use or planned to be in use. However, a decision
has been made to retain the items for military contingency plans that have not been finalized.
These items are identified by an “M” in the deferred disposal field on the front page of the
computation. See AFMCMAN 23-101, Volume 4, IMS/PMS/MM Data and Reports
(D200A, D200N), paragraph 1.3.1.8.5.4. Contingency items are computed by comparing
total assets to the deferred disposal level. If assets on hand exceed that level, the quantity
which exceeds the level is identified as excess, plus all on-order assets are candidates for
termination. If assets on hand are less than the level, the level is reduced to equal the assets,
since SIRS is programmed to ensure that no buy quantities are developed for contingency
items. If assets on hand are less than the level, but there are also on-order assets available,
the on-order quantity required to fill the level deficit is retained, and the balance of the on-
order assets are identified for termination. A zero level indicates that all assets, on hand and
on order, equal the requirement. Repair of contingency-coded assets is not authorized.
1.3.3. INS items. These items have been identified through cataloging as not subject to
normal failures, but are retained in SIRS to support losses which may occur as a result of
accidents or acts of nature. (See AFMCMAN 23-101, Volume 3, Chapter 5)
1.3.4. NSO items. These items are expected to fail as a result of normal use or operations;
however, such failures are expected to be low or sporadic. This NSO code is reviewed at
least annually to determine if the code must be deleted or retained. When usage increases
and the code is removed, the item becomes a normal active demand-based item and is
computed normally. (See AFMCMAN 23-101, Volume 3, Chapter 5)
1.3.5. No compute coded items. No compute items have missing key data or are obsolete.
When the item is assigned a compute code “B,” “N,” “P,” or “X,” or an active item is
assigned a compute code of “R,” SIRS will not compute requirements. The item’s assets are
used in preparing management reports. (See AFMCMAN 23-101, Volume 4, paragraph
1.14.3.)
8 AFMCMAN23-101V1 17 NOVEMBER 2016
1.3.6. Items Excluded From SIRS. The Requirements Item Identification Data (RIID)
system (D200E) assigns a value to the System Compute Code (SCC) for the National Stock
Number (NSN) that determines which other segments of D200 get sent information on that
NSN. A D200E SCC of “A” designates that SIRS will get data for that NSN. The current
exclusions from transmission in the RIID snapshot to D200A can be viewed on the SCCA
SYS COMP CD “A” EXCLUSIONS screen in RIID. The exclusions are based on Materiel
Management Aggregation Code (MMAC), Source Of Supply (SOS), cataloging Budget Code
(BC), program select code or AAC. National Item Identification Numbers (NIIN) beginning
with ND or K and NSNs assigned BC K are excluded. Exclusions cannot be input based on
an entire NSN or NIIN. Requests for exclusion will be sent to HQ AFMC/A4 for approval
prior to implementation. The justification for exclusion will include the rationale for the
exclusion and how requirements, budgeting, the CSIS, and the Supply System Inventory
Report (SSIR) will be accomplished when the items are excluded.
1.3.7. Quick Engine Change (QEC) Kits. A QEC kit is a group of stock listed Consolidated
Sustainment Activity Group-Supply (CSAG-S) and General Support Division (GSD)
accessory items required to attach an engine to an aircraft. Some QEC kits are assigned
NSNs rather than kit numbers. The QEC kit is stock fund exempt and must have a Budget
Program (BP) code of “1E” if it is in SIRS (see AFMCMAN 23-101, Volume 4).
Requirements for QEC kits are not computed in SIRS and the IMS/MM must delete all
reported assets and any offsetting requirements. It is the stock listed components of the QEC
kits on which requirements are based.
1.3.7.1. One QEC kit is authorized for each spare engine. The kits as a whole are
normally procured during the acquisition of the engines, not as follow-on spares. Once
the Initial complement of QEC kits are acquired, the only spares procurement required is
for the component parts.
1.3.7.2. While installed on the engine or aircraft, the kit loses its identity as an NSN.
Under the normal three-level maintenance concept, when the engine is prepared for
shipment to Engine Overhaul (EOH) repair, the QEC kit is removed and reported at the
base. QEC NSNs only appear in the reported asset data when separated from the engine.
The kits stay at the owning activity until the engine is returned and the kit is reinstalled.
Since the QEC is comprised of stock listed components which can be removed and
replaced at field level, they are virtually 100% base repaired. There is no programmed
depot repair for QEC kits.
1.3.7.3. Under a remove and replace concept of engine repair (Jet Engine Intermediate
Maintenance (JEIM) “A” and “I” jobs), the QECs are returned with the engine to the
depot. The depot job routes the QEC, never condemning a whole kit, resulting in no
demands on depot supply for the QEC NSN.
1.3.7.4. CSAG-S component items of the QEC kits. Because QEC kits come in attached
to engines under the remove and repair concept, demands on supply may occur (also
called depot reparable generations [Dep Rep Gen]) for CSAG-S recoverable component
items. In addition to appropriate Organizational and Intermediate Maintenance (OIM)
and Programmed Depot Maintenance (PDM) program(s), the appropriate applications
must be added to the item application record in the Applications, Programs, Indentures
(API) system (D200F) to cover any changes in the repair concept.
AFMCMAN23-101V1 17 NOVEMBER 2016 9
1.3.7.5. QECs may be shipped to the IMS/MM as extras when an engine is destroyed or
disposed. These kits are most often always in reparable condition, as the number of
component parts present or missing and their serviceability is unknown. The cost to
restore a reparable kit containing unserviceable and missing components with stock
funded serviceable assets would be prohibitive. Repair is rare and accomplished only on
AFMC Form 206, Temporary Work Request, funded with appropriate Program Office or
engine funds if a critical need is established by the Program Office or engine manager.
1.3.7.6. Serviceable kits at the depot usually only occur at the time of provisioning
awaiting shipment to the spare engine.
1.3.8. Afterburners are authorized for each spare engine and although base assets are
reported, the requirements are not computed in SIRS. The IMS/MM must delete all reported
assets and any offsetting requirements if the NSN for the afterburner appears in SIRS. It is
the stock listed components of the afterburners on which requirements are based.
1.3.9. An item with a shelf-life code will be bought on an Indefinite Delivery/Indefinite
Quantity (ID/IQ) contract unless contracting is unable to negotiate this type of contract with
the contractor. This will allow the IMS/MM to exercise options to put the parts on contract
as they are needed; reference AFMCI 20-102, Requirements Definition andictectPurchase
Instrument Development.
1.3.10. Calendar Time Change Items. AF bases send the IMS/MM the projection for
selected time change items on AFTO Form 223, Time Change Requirements Forecast
(reference T.O. 00-20-9-WA-1, Forecasting Replacement Requirements For Selected
Calendar And Hourly Time Change Items). The normal requirements are adequate in most
cases for peaking time change demands on the system. In other cases where peaks are offset
by levels, additive requirements are input to the requirements computation to compensate for
the deficiency. Intensified management must be applied to all time change items until either
random or predictable patterns can be established. Reviews must be made of these selected
items to make sure only valid additive requirements are input to adjust requirements
computations. For requirements to be computed automatically, the IMS/MM and ES prepare
the following data and input it to API and SIRS. A 5-digit Program Element Code (PEC)
will be assigned to each time change item. The IMS/MM or program monitor develops a
future program for each qtr. The time change removal dates from data submitted under T.O.
00-20-9-WA-1 must be obtained. Then the retention program is developed by multiplying
qtr 38 by 12. The new item code of “N” must be retained to prevent loss of estimated
demand rates in the item’s records. To retain this code, the application program begin date is
filed maintained to limit the past usage to less than 24 months. The application Program
Select Code (PSC) is 3000. The application Quantity Per Application (QPAPPL) is 1 and the
application percent is 100. Total OIM demand rate is 1.000. Base Not Reparable This
Station (NRTS) percent is 100, current and forecast. Base stock level days are zero. Depot
stock level days are zero. Depot Repair Cycle (DRC) reflects the time required to generate
economic repair lot quantities in addition to actual shop flow days. All other factors are
input as in normal processing of recoverable items. Additives are developed for Cartridge
Actuated Devices/Propellant Activated Devices (CAD/PAD) life support time change items.
Production quantities are qualified for delivery by expending a predetermined portion of each
lot. If this sample fails, the entire lot is rejected. Therefore, an additive requirement equal to
10 AFMCMAN23-101V1 17 NOVEMBER 2016
the greater of one lot size or 150 calendar days’ time change requirement is authorized. This
quantity is an additive requirement in the first qtr of the computation.
1.3.11. 100% Base Repair Recoverable Items. For recoverable ERRC code “T” items that
are always repaired at base level and never returned to the depot for repair, the IMS/MM
must file maintain any reported unserviceable assets to serviceable to prevent D200A from
erroneously projecting a depot level repair requirement. This includes reported unserviceable
base and unserviceable in-transit assets. This situation is unusual as most recoverable items
have depot level repair, but there are instances where the recoverable item is always
disassembled at base level and only the failed recoverable component(s) are returned to the
depot for repair. Prior to taking this action, the IMS/MM must verify with the ES that the
item is one that is always repaired at a base or Centralized Repair Facility (CRF) and never
returned to the depot for repair.
1.4. Roles and Responsibilities.
1.4.1. The Supply Requirements Branch (AFSC/LGPS) will:
1.4.1.1. Perform duties as the SIRS Functional OPR and Advocate.
1.4.1.2. Perform duties as the SIRS Termination OPR.
1.4.2. The IMS/MM will:
1.4.2.1. For the D200A products output to or pulled by them, review the data for
assigned items. Exception: The data the ES reviews and file maintains (see paragraph
1.4.3.1). This includes surveillance of data provided by interfacing systems, online file
maintenance, and review of SIRS output products. The IMS/MM will concentrate on
working the exceptions that have been generated for each item. When changing any data
element, the reason for the change will be documented using the D200A Notepad. (See
AFMCMAN 23-101, Volume 4 for details.)
1.4.2.2. Review/work asset reconciliation products output to them every qtr using the
Interactive Requirements Information Services (IRIS). The Item Review Listing (IRL)
pulls a personalized list of NSNs for review in order of importance.
1.4.2.3. Track the following throughout the qtr: condemnations, transfers to the Defense
Logistics Agency (DLA) Disposition Services, shipments to and receipts from
contractors, shipments from stock to Foreign Military Sales (FMS) customers and
shipments to non-reporting activities in order to facilitate the asset reconciliation process.
These actions can be tracked using: the Item Manager Wholesale Requisition Process
system (D035A)/Wholesale and Retail Receiving/Shipping system (D035K) transaction
registers, Distribution Standard System (DSS), Center of Parts Activity (COPA), and
TRACKER (D087T).
1.4.2.4. Review data elements with Source Reference Code (SRC) E on their products.
SRC "E" represents "Entered" and indicates that the data being shown have been received
through a file maintenance action. This review will ensure the file maintained data is still
current and valid.
1.4.2.5. Use the SGM Computation Worksheet Requirements as the signature, review,
and approval document for computing items. Note: The IMS/MM may use the
INS/NSO Item Status Listing as the signature, review, and approval document for
AFMCMAN23-101V1 17 NOVEMBER 2016 11
INS/NSO items. (Some organizations have developed a signature page that is attached
on top of the computation, recomputation or INS/NSO Item Status Listing. This product
may be used in lieu of the computation, recomputation or INS/NSO Item Status Listing
as long as the current date appearing on the D200A product appears on the signature
page.) A signature signifies that the IMS/MM has reviewed the information contained in
the SGM Computation Worksheet Requirements, recomputation or INS/NSO Item Status
Listing, that the IMS/MM worked the item (as needed) and that to the best of the
knowledge of the IMS/MM the information is correct. It also signifies that the indicated
management actions (with annotated adjustments, if required) are correct and will be
taken (see paragraph 1.4.2.9). If the signature cannot be easily read, the IMS/MM’s
printed name must be included on the documents. See paragraph 1.15 and
subparagraphs for documentation and product retention requirements.
1.4.2.6. Sign (literally or with signature stamp), date, and obtain required signatures per
Attachment 2 within 10 calendar days of print of the products anytime that the item
shows a termination.
1.4.2.7. Sign (literally or with signature stamp), date, and obtain required signatures per
Attachment 2 within 35 calendar days of print of the products anytime the item shows a
buy or repair requirement or the first time it computes excess or if the excess quantity is
greater than the previous cycle.
1.4.2.8. Sign (literally or with signature stamp), date, and obtain required signatures per
Attachment 2 within 60 calendar days of print of these documents if the computed
excess is equal to or less than the previous cycle’s excess or if the item is in an optimum
position, but requires review based on its Item Activity Code (IAC).
1.4.2.9. Initiates management actions indicated by SIRS outputs after coordinating with
the other members of the item management team and obtaining any other required
signatures specified in Attachment 2.
1.4.2.10. Initiates acquisitions in a timely manner to ensure that assets are available when
they are required. If any changes are made to the requirement in the computation, the
buy code must be annotated on the computation or INS/NSO Item Status Listing. The
buy code must be the same as the code used in the Automated Budget Compilation
System (ABCS) and a short explanation for the change must be made on the product as
well.
1.4.2.11. Annotate the dollar value of organic and contractor repair actions (Peacetime
Operating Stock (POS) + Readiness Spares Package (RSP)) for each year (Current Year
[CY], Apportionment Year [AY], Budget Year [BY] or Extended Year [EY]) on the
computation or INS/NSO Item Status Listing. If any changes are made to the repair
requirement in the computation, the repair code must be annotated on the computation,
recomputation or INS/NSO Item Status Listing. The repair code must be the same as the
code used on the Quarterly Projection Worksheet (ABCS B21 report) and in ABCS and a
short explanation of the change must be made on the product as well.
1.4.2.12. Review the SGM Computation Worksheet or the INS/NSO Item Status Listing
from the Final computation review to ensure that the data is correct. If the data is not
correct, the IMS/MM and ES will correct the erroneous data and request a For Real Item
12 AFMCMAN23-101V1 17 NOVEMBER 2016
Record (FRIR) recomputation. If the item is still in termination, the IMS/MM advises the
Contracting activity that an amendment may be forth coming to cancel or modify all
associated PR(s) or quantity(s), and contract award(s) should be delayed until after the
Summary SIRS computation or a What If Item Recomputation (WTIR) and term model
have been approved through the review process when a definite termination quantity will
be known.
1.4.2.13. The RCO will work and review all termination actions and decisions within 10
calendar days of the print date of the Summary products. The PR amendment or the
Termination Authority Template will be initiated within this 10-day working period when
the on-order quantities are no longer required for support and a decision is made to
reduce or terminate the quantity, and in order to recover funds. The appropriate
termination code (see Chapter 4) must be annotated on the computation/computation
signature coversheet, recomputation or INS/NSO Item Status Listing and must match the
code used in ABCS. A brief explanation or the reason for using the term code and any
actions taken must also be documented, and a notation of action made on the generic
Notepad for this item. Note: Termination codes and appropriate documentation are
required on all items that were in termination on the Summary computation even if a
recomputation or WTIR results in the item being removed from termination status
(Termination Quantity [Qty] = 0).
1.4.2.14. Document what they intend to do with the excess on the computation or
INS/NSO Item Status Listing.
1.4.2.15. File maintain the disposal or retention codes in the Reutilization and
Disposition System (RDS)(D035G) and ensure appropriate actions are taken for disposal
of assets excess to requirements.
1.4.3. The ES will:
1.4.3.1. For the D200A products output to or pulled by them, review each item’s usage,
factors, programs, application program designators/standard program designators,
application program begin dates, QPA, application percent, application Mission Item
Essentiality Codes (MIEC), application PSCs and Factor Indicator Codes (FIC) for
accuracy and completeness and must file maintain any needed corrections. This includes
surveillance of usage data and noting any trends, determination if historical data are
indicative of future activity, and computation of estimated factors. When changing any
data element, the reason for the change will be documented using the D200A Notepad.
See AFMCMAN 23-101, Volume 5, Equipment Specialist Data and Reports (D200A,
D200N), for details.
1.4.3.1.1. Perform an annual review of application PECs assigned to the items the ES
manages and associated program data. This review will evaluate: the continued need
for the application PEC and associated program data; the adequacy of documentation
explaining the rationale for the use of the application PEC; and the accuracy of the
application PEC program data for those PECs for which the ES is responsible. The
ES will perform online file maintenance of this data in D200F.
1.4.3.2. When changing any data element in SIRS, thoroughly and clearly document on
the D200A Notepad the rationale used to arrive at final decision. Each Notepad entry
AFMCMAN23-101V1 17 NOVEMBER 2016 13
will include the computation cycle, date change was made, what the change was, why it
was changed, and how it was verified so that a reviewer or auditor can easily understand
the file maintenance that was performed.
1.4.3.3. Provide the IMS/MM the changes made to the initial Factors/Usage Printouts
before the end of the file maintenance period passing along changes as they are made.
1.4.3.4. Document the Factors/Usage Printout with any changes made to data file
maintained on the Program Select screen in D200F including the rationale for the
changes.
1.4.3.5. Sign (literally or with signature stamp), date, and retain the original file copy of
Summary Factors/Usage Printouts within 35 calendar days of the printed product. The
ES will also sign and retain the original marked up copy of the ES Initial Factors/Usage
Printout for which changes were notated. If the signature cannot be easily read, the ES’s
printed name must be included on the documents. A signature on the Factor Printout
signifies the ES has reviewed the information contained in the Factors/Usage Printout,
the ES worked the item and that to the best of knowledge of the ES the information is
correct.
1.4.3.6. Also sign (literally or with signature stamp) and date all Summary computations,
recomputation or INS/NSO Item Status Listing within 10 calendar days of print of the
products for terminations, and within 35 calendar days of the print of the products for
buys, repair, and excess. Their signature on the computation products signifies that the
ES, as a member of the item management team, concurs with the indicated management
actions (e.g., this is the correct configuration for procurement, rationale for
retention/disposal is correct, etc.) and that they have provided all known relevant
technical information to the IMS/MM and PMS that would influence those decisions.
This information includes, but is not limited to, issues concerning interchangeability and
substitutability of NSNs, repair concepts, ERRC coding, and reliability. See paragraph
1.15 and subparagraphs for documentation and product retention requirements.
1.4.3.7. Sign (literally or with signature stamp) and date within 60 calendar days of print
of the products if the computed excess is equal to or less than the previous cycle’s excess
or if the item is in an optimum position.
1.4.4. The PMS:
1.4.4.1. Or MM will schedule repair of unserviceable recoverable assets through organic
or contractor facilities. Contract repair must be considered prior to procurement of new
parts when no organic repair capability is available.
1.4.4.2. For the D200A products output to or pulled by them, review each item’s
reported repair quantities and any condemnations and assets at all repair facilities
[organic, contract and Depot Maintenance Inter-Service Support Agreement [DMISA]),
repair costs, repair lead times, and Source Of Repair (SOR) percent for accuracy and
completeness and must file maintain any needed corrections on the MISTR Repair and
Repair Data (MRPR) screen.
1.4.4.3. Or MM, during surveillance of repair data, will note any trends that would affect
future repair support and spares requirement.
14 AFMCMAN23-101V1 17 NOVEMBER 2016
1.4.4.4. When changing any data element in SIRS, thoroughly and clearly document on
the D200A Notepad the rationale used to arrive at final decision. Each Notepad entry
will include the computation cycle, date change was made, what the change was, why it
was changed, and how it was verified so that a reviewer or auditor can easily understand
the file maintenance that was performed
1.4.4.5. Provide any changes to the reported repair quantities and assets to the IMS/MM
and will provide changes to reported condemnations (i.e., condemnations that occur at the
repair contractor that are not passed by CAV AF or D035A) to the IMS/MM and ES
before the end of the file maintenance period, passing along changes as they are made.
1.4.4.6. Sign (literally or with signature stamp) and date the PMS file copy of all
summary MISTR Repair and Repair Data (MRRD) reports within 35 calendar days of
print of the product. If the signature cannot be easily read, the PMS’s printed name must
be included on the documents. A signature signifies the PMS has reviewed the
information contained in the MRRD, the PMS worked the item (as needed) and that to
the best of knowledge of the PMS, the information is correct. When the IMS/MM brings
the computation products to the PMS for coordination, the PMS must also sign (literally
or with signature stamp) and date all computations, recomputations and INS/NSO Item
Status Listings within 35 calendar days of print of the products. Their signature on the
computation products signifies that the PMS, as a member of the item management team,
concurs with the indicated management actions (e.g., this is the correct configuration(s)
for repair, rationale for retention/disposal is correct, etc.) and that they have provided all
relevant information pertaining to depot level repair that would influence those decisions.
This information includes, but is not limited to, issues concerning potential change in
source(s) of repair and/or capacity, change in repair costs, and changes in future repair
lead times. See paragraph 1.15 and subparagraphs for documentation and product
retention requirements.
1.4.5. Management/Supervisors:
1.4.5.1. All levels are responsible for the overall integrity of computed requirements
within their area of responsibility. The authority to review and validate item
computations and to provide advice to senior managers may be delegated; however, it
does not release them from their overall responsibility.
1.4.5.2. To ensure management oversight on decisions regarding excess, the IMS/MM’s
supervisor must review and coordinate on the retention and disposal decisions made in
the RDS.
1.4.6. The IMS/MM, PMS, and ES will:
1.4.6.1. Work every item managed by them during the file maintenance cycle that
requires review. The following review priority sequence is recommended for working
every item during the file maintenance window:
1.4.6.1.1. Termination items must be worked first as they are time sensitive.
1.4.6.1.2. Buy items
1.4.6.1.3. Repair items
1.4.6.1.4. No compute items
AFMCMAN23-101V1 17 NOVEMBER 2016 15
1.4.6.1.5. Excess.
1.4.6.1.6. Other items based on their IAC.
1.4.6.2. Work down the IRIS IRL, working every item during the March, June,
September, and December cycles.
1.5. Requirements Segments. SIRS uses historical failure and program data to determine a
failure rate to be applied to a future program. Refer to AFMCMAN 23-101, Volume 3, Chapter
1 for a detailed description of the computation methodology and procedures. Historical pipeline
and lead time data are also recorded and applied to future activity. Requirements are broken
down into the following segments, each of which is computed separately:
1.5.1. Operating requirement - to ensure that all assets removed due to failure will be
replaced at the time of removal.
1.5.2. Condemnations - to replace assets that cannot be repaired.
1.5.3. Lead times - to ensure that a supply of assets is available to replace condemnations
during the time required to order and receive replenishment spares.
1.5.4. Pipeline requirements - to cover the times assets may be unavailable for issue while
they are in-transit between using and maintenance activities.
1.5.5. Repair cycle requirements - to cover the time required to restore unserviceable
recoverable assets to a serviceable condition in a maintenance facility.
1.5.6. Safety level - to cover unexpected fluctuations in demands or variations in pipeline
times. This is the only segment of the computation that does not represent a firm
requirement. It is set according to support and backorder reduction goals determined by HQ
USAF.
1.5.7. Additive requirements - to support special projects, programs, or any other
requirement that do not fit into one of the above categories (see AFMCMAN 23-101,
Volume 4, Chapter 5).
1.5.8. War Reserve Materiel (WRM) requirements and RSP requirements - to support
contingencies and scenarios established by USAF wartime planning documents. SIRS
receives some of this data from interfacing systems and computes the remaining
requirements separately from the above requirements segments.
1.6. Categories of Requirements. SIRS compares computed requirements with available assets
and determines what actions are required to ensure support for future operations. SIRS
determines the most economical use of the existing inventory and provides visibility of quantities
for which there is no anticipated need. SIRS computes the following requirements categories,
also referred to as management actions.
1.6.1. Repair. The quantity of unserviceable recoverable assets to be repaired to ensure that
serviceable assets will be available to replace projected failures.
1.6.2. Buy. The quantity to be considered for acquisition to ensure continued support lead
time from the latest quarterly computation asset cutoff date.
16 AFMCMAN23-101V1 17 NOVEMBER 2016
1.6.3. Termination. When available assets are more than sufficient to support computed
requirements, SIRS recommends that all or part of a Purchase Request (PR) or an
undelivered contract quantity of new acquisition be considered for cancellation.
1.6.4. Excess. When SIRS determines that available assets are more than sufficient to
support computed requirements through the foreseeable future, it will display a quantity to be
considered for disposal.
1.7. Schedule. SIRS has four quarterly cycles a year that are keyed to computation asset cutoff
dates of 31 December, 31 March, 30 June, and 30 September. Data from interfacing systems are
input to SIRS after the computation asset cutoff date and at the start of the Initial computation.
Three computations are ran each qtr for SIRS: Initial, Final, and Summary. The IMS/MM,
PMS, and ES will attempt to do all their D200A file maintenance during the D200A file
maintenance cycle (four weeks), which starts after the Initial computation is completed and ends
with the start of the Final computation. There may be a week for file maintenance after the Final
computation is completed and before the start of the Summary computation, but the Summary
computation must be ran as soon as the Final computation is run. The Initial and Summary
computed requirements are sent to the sites for printing. The SIRS online database is file
maintained real time and reflects the latest data from interfacing systems or file maintained data,
whichever was input last. After the Summary computation, neither the SIRS database nor the
CSIS can be updated for that qtr. The SIRS file maintenance screens are closed from the start of
the Summary computation until after the next cycle’s Initial computation is completed. They
are available for the current and previous three consecutive qtrs and for the Mar and Sep cycles
for the 2 years prior to that. The Final and Summary computation run produces the output files
to D200N (CSIS). The Summary computation produces the output files to other interfacing
systems.
1.8. Computation Time Span. To support the budget function, SIRS projects requirements by
FY. Requirements are computed on a quarterly cycle. The computation process includes a
peacetime computation and an Other War Reserve Materiel (OWRM) computation (see
AFMCMAN 23-101, Volume 3, Chapter 4). Both peacetime and OWRM requirements are
computed three times during each quarterly processing cycle. The computations are
programmed to run as Initial requirements computation, Final requirements computation, and
Summary computation.
1.8.1. Cutoff Dates. Requirements are computed on a time-phased basis for a maximum
span of 38 qtrs. The starting point of each quarterly peacetime requirements computation is
the first qtr following the computation asset cutoff date. Once a year, during the 31 March
cycle, the data headings in the computation and the FYs are shifted to the left, and the
various pick-off points for buy, termination, retention, and stratification are established for
that year. On the 30 September cycle, factors are shifted. The time periods described below
are identified in the computation for applying assets and additive requirements, for selecting
data for print, and for determining summary positions. There are periods of the computation
and segments of the computation. The three periods are: buy, termination, and retention.
These are displayed on the computation worksheet and include requirements from the
computation asset cutoff date through a point in time. Segments are discrete blocks of time
not necessarily starting as of the computation asset cutoff date.
AFMCMAN23-101V1 17 NOVEMBER 2016 17
1.8.2. CY. The requirement for the CY that is computed on the 31 March cycle includes
data for two qtrs (31 March and 30 June). The requirement for the CY that is computed on
the 30 June cycle includes data only for that qtr that ends on 30 September. There is no CY
requirement developed during the 30 September and 31 December cycles.
1.8.3. AY. Requirements are computed for the full year during the 31 March, 30 June, and
30 September cycles. On the 31 December cycle, three qtrs of data are computed for the AY.
1.8.4. BY. BY identifies the requirements computed for the FY following the AY.
1.8.5. EY. EY identifies the requirements computed for the FY following the BY.
1.8.6. Buy period. This period includes all the requirements computed from the computation
asset cutoff date of the computation through the CY and the AY, plus the Procurement Lead
Time (PCLT). The PCLT may vary from a minimum of one month to the maximum system
capability of 72 months.
1.8.7. BY buy point. This point is selected 12 months beyond the buy period and is used to
determine the computed requirements that would require a BY projection of funds. Another
method for determining this point is that it is PCLT beyond the end of the BY. It is used for
planning purposes.
1.8.8. EY buy point. This point is selected 12 months beyond the BY buy point and is used
to determine the computed requirements that would require a second BY or EY projection of
funds. Another method for determining this point is that it is PCLT beyond the end of the
EY. It is also used for planning purposes.
1.8.9. Termination period. This period identifies the requirements computed from the
computation asset cutoff through the 12 months immediately following the buy period.
1.8.10. Retention period. This period identifies the requirements computed from the
computation asset cutoff date through 3 years beyond the 38th qtr. The retention program is
a single quantity of program that contains 12 qtrs of data based on the projected life of the
weapon and support system.
1.8.11. Retention segment. SIRS computes requirements through the computation program
span of 38 qtrs.
1.9. Initial and Follow-On Spares. SIRS is a replenishment spares computation system. SIRS
normally does not compute the initial spares requirements. Its purpose is to compute follow-on
spares requirements for established items that apply to active systems. Follow-on spares support
normally involves replenishment of assets that have been lost due to condemnations. During the
weapon system provisioning process, the Initial Requirements Determination (IRD) system
(D200H) computes minimum spares requirements to support a weapon system through a
program forecast period, which is the PCLT plus three months past a weapon system’s
preliminary operating capability. These minimum requirements include condemnations through
the procurement lead time, pipeline requirements, and other levels that must be in place to
support newly fielded systems. The Program Office places spares quantities computed in the
IRD against the provisioning contract. The contracting function reports these quantities in the
Acquisition and Due-in System (J018R), which in turn passes them to SIRS as on-order assets.
The IMS/MM ensures these quantities are included in the asset reconciliation. Even though the
IRD computes spares to support pipeline and other initial requirements, SIRS also computes
18 AFMCMAN23-101V1 17 NOVEMBER 2016
these requirements once the Non-Cataloged (NC) numbers or NSNs are fed to it, which the on-
order assets will offset.
1.10. Stock Number Establishment. Each item will have an assigned NSN. In some cases,
RIID/D200E will identify two or more NSNs that may be used interchangeably and these items
will be categorized into subgroups. When there is a single subgroup, the most preferred item is
designated the SGM stock number and is also called the family master stock number. When
there is more than one subgroup within an Interchangeable and Substitutable Group (I&SG), then
the most desirable item of the I&SG is the family master stock number. An interchangeable
stock number is an item that is completely (two-way) interchangeable with the SGM stock
number. The Current Stock Number (CSN) or actual NSN is the most CSN assigned to an item;
it may be either a SGM or an interchangeable stock number. The reference stock number is a
stock number that was previously assigned to a CSN. A bachelor stock number is the SGM and
family master stock number for an item that does not have any interchangeable NSNs. A one-
way interchangeable stock number is an item that is related but not exactly a fit. SIRS treats a
one-way interchangeable NSN as a bachelor item, since SIRS operates on SGM NSNs and their
two-way interchangeable NSNs only. A separate computation is made for each completely (two-
way) interchangeable subgroup within an I&SG.
1.10.1. SIRS computes requirements at SGM level including INS and NSO items. After
these SGM requirements have been computed, SIRS performs an additional series of
computations for items that are in an Interchangeability and Substitutability (I&S) family
with more than one SGM. It begins with the least preferred SGM and if it has a buy deficit
(3rd Short) in any qtr of the computation time span, it passes that deficit up to the next
preferred SGM. This is done in the form of a non-recurring “additive” requirement divided
into peacetime, RSP, and OWRM values. SIRS then recomputes the requirements including
repair of the next preferred SGM. This process continues until each SGM in the I&S family
has been recomputed. This ensures that repair is accomplished at the lowest level possible
while at the same time ensuring that only the latest configuration (I&S master) is bought.
The buy deficits on lesser-preferred items are passed to the CSIS (D200N) as a “Buy Not
Required.” SIRS must be allowed to automatically compute the I&S requirement unless: the
item is in an approved forced attrition or forced generation and replacement program (see
AFMCMAN 23-101, Volume 5, paragraph 2.2.3.); all replacement parts have already been
delivered; sufficient assets have been bought to cover the spare requirements; or repair
procedures have been established for the replacement item. Note: If any of the
aforementioned take place, the scheduled replacements have successfully begun, and all the
applications for the item are part of the approved forced attrition or forced generation and
replacement program, the IMS/MM must zero out any minimum depot stock level, additives
and special levels for the lesser preferred item(s) in D200A and zero the repair requirements
from the lesser preferred item(s) on the B21. The ES must zero the application percentage
associated with the lesser preferred item(s). These actions will keep the lesser preferred
item(s) from computing requirements. The ES also must initiate all necessary cataloging
actions; reference AFMCMAN 23-3 and DoD 4100.39-M, Federal Logistics Information
System (FLIS) Procedures Manual.
1.10.2. The RIID file is the sole source for establishing, changing, and deleting NSNs in
SIRS. RIID receives cataloging information from the Item Management Control System
(IMCS)(D043). NSNs cannot be established or deleted in SIRS through file maintenance. A
AFMCMAN23-101V1 17 NOVEMBER 2016 19
record is established in the SIRS file when the catalog management data file from RIID
contains a master or current NSN that has not been previously established in SIRS. Each
new master NSN in the RIID file results in a skeleton record in SIRS that contains data from
RIID (see AFMCMAN 23-101, Volume 2, System Level Data and OPR Reports (D200A,
D200N), paragraph 1.8.) pertinent to the master NSN. Each new current NSN in the RIID
file results in a skeleton record in SIRS that contains data from RIID pertinent to that current
NSN. Stock number or catalog changes in the RIID file result in changes to the current or
master NSNs in SIRS.
1.10.3. IMS/MM, also called Manager Designator Codes (MDC), and ES codes are
established and changed in the D035A using the Item Data File Maintenance (MIRB) screen.
D035A passes these codes (using Document Identifier Code [DIC] ZAB) toD043, which
passes the data to RIID, which passes the codes to SIRS.
1.10.4. For a new NSN, SIRS assigns standard default values to some data elements that are
variables for calculating certain requirements segments. In order for SIRS to compute
requirements for an item, the IMS/MM and ES must ensure that the unit cost, BP/System
Management Code (SMC) and at least one application PSC are not blank. These actions will
cause SIRS to assign a compute code Y.
1.10.5. When SIRS computes requirements it will consider failure data for all items in the
subgroup. All computed requirements will be aggregated to the SGM NSN and rolled by
SIRS to the I&S SGM NSN. This allows acquisition of the most preferred I&S SGM NSN to
replenish all NSNs in the subgroup. Customer refusal to use standard interchangeable items
instead of the preferred item is not sufficient grounds for acquiring the preferred item if
assets of interchangeable items are available. Maintenance engineering must resolve the
problems of unacceptable substitution to establish that available assets are unsuitable and will
not be used before any acquisition actions are initiated or adjusted. If an item is determined
to be an unsuitable substitute for all applications, initiate cataloging action to code the item
for disposal (see AFMCMAN 23-3). The ES must also ensure that repair requirements are
not projected on the unsuitable item. If the item has not been removed from all NHAs in use,
the ES must file maintain the forecast MISTR condemnation percents to 100%.
1.11. Review and Adjustment Actions. When any of the following cases apply, repair and
acquisition actions must be adjusted. If applicable, budget requirements projected by SIRS must
also be adjusted before submission to higher headquarters.
1.11.1. First and second replenishment acquisitions.
1.11.1.1. When SIRS computes an acquisition action for an item for the first time, the
safety level and projected condemnations can be budgeted. These requirements are not
acquired until actual failures are reported. However, if condemnations can be completely
justified (engineering analysis, like items with significant condemnation rates, etc.), and
staffed through appropriate Supply Chain Management Group (SCMG) budget offices at
the site (include Funds Management at the site for non-CSAG-S items), prudent
management dictates that acquisition may occur. If actual failures or condemnations are
reported, the base and depot level requirements are based on the percentage of actual data
used in computing the total demand rate.
20 AFMCMAN23-101V1 17 NOVEMBER 2016
1.11.1.2. Acquisition of safety levels may be considered when determining provisioning
integrated with production quantities. Initial lay-in issues are not considered failures for
this purpose.
1.11.1.3. When buy quantities are deferred due to the above guidance, the subsequent
year (BY) quantities on the budget CSIS Item Deficit Listing must be increased by the
same quantity to ensure that funds are projected in the proper fiscal period.
1.11.1.4. Repeated deferral of buys for the same items is not allowed. If an item does
not exhibit a demand pattern indicated by the provisioning factors, a reevaluation of the
item factors by the engineering function must be initiated. If after this reevaluation, it is
determined that the factors are accurate, then the item deficit must be deferred outside the
budget window (beyond the EY).
1.11.2. Authorized RSP requirements are budgeted and acquired in the first replenishment
acquisition unless HQ AFMC/A4RM directs deferred acquisition.
1.11.3. Restrictions on uneconomical acquisitions. Acquisition action is not initiated if the
net buy is less than 5% of the annual operating requirement (known as the buy operating
level), unless deferment will cause supply support problems. When the net buy quantity is
less than 5% of the buy operating level, an asterisk appears in the dollar value field of the
Index of Actions printout. Budget submissions will defer uneconomical buys to the
following FY.
1.11.4. Screening Assets. Since SIRS computes worldwide requirements, all available assets
in the Department of Defense (DoD) must be considered to fill those requirements to
preclude unnecessary acquisitions and repairs. Before an acquisition or a repair action is
initiated, the IMS/MM must determine that assets cannot be obtained from any of the below
sources or if use of these sources are not in the best interest of the Government due to shelf-
life, safety, cost/benefit analysis, etc. One example of cost/benefit analysis is: which is less
expensive, repair of the item or using a temporary work request to pull the item from a NHA
that is excess and having the item condition checked Documentation explaining the decision
reached must be retained in the IMS/MM folder for 2 years after the delivery of assets IAW
AFRIMS.
1.11.4.1. Modification. This may include modification of excess inventories, assembly
of excess components, or assets removed as a result of modification programs.
1.11.4.2. NHA assets stratifying to OWRM or Long Supply (Economic Retention,
Contingency or Potential DoD Excess). NHA OWRM or long supply assets may be used
to support lower assembly requirements when there are not or will not be sufficient assets
of the lower assembly to fill the requirement. One of the methods in the following
subparagraphs will be used to determine if the NHA has OWRM or long supply assets
available. Work with the NHA IMS/MM to determine this. If NHA OWRM or long
supply assets are available, conduct a cost-benefit analysis comparing the acquisition cost
of the component item to the cost of removing the component item from the NHA,
conducting a condition check and, if necessary, repairing the component item to
determine whether it is economically feasible to obtain component items using this
method. An attempt will be made to obtain lower assembly assets from NHA
unserviceable assets prior to attempting to obtain then from NHA serviceable assets. The
AFMCMAN23-101V1 17 NOVEMBER 2016 21
lower assembly items requested will not exceed the number installed within the NHA
NSN quantity reported as OWRM and long supply.
1.11.4.2.1. For computing NHA items, the Buy Operating Breakout section of the
SGM Comp Worksheet is used (see AFMCMAN 23-101, Volume 3, Computational
Results). Using the data in the EY PD column (EY buy period; procurement lead
time beyond the EY), the OWRM Requirement is subtracted from the Total Buy
Operating Level. The difference provides the POS and RSP requirement. Then, the
Serviceable Assets, Serviceable Due-In Assets, and Net Depot Unserviceable Assets
are added together from the same EY PD column to arrive at the total assets. The
POS and RSP requirement is subtracted from the total assets. If the result is positive,
it equals the OWRM and long supply assets potentially available; if the result is
negative, no assets are available. Note: Serviceable due-in assets can be the result of
a negative asset variance and may not actually be available.
1.11.4.2.2. For INS/NSO NHA items, the Buy/Retention Detail section of the
INS/NSO Item Status Listing is used. Using data in the EY column, the serviceable
assets and assets available from depot repair are added together. Next, the
Buy/Retention Level quantity in the EY are subtracted from the assets. If the result is
positive, it equals the long supply assets potentially available; if the result is negative,
no assets are available. Note: Serviceable due-in assets can be the result of a
negative asset variance and may not actually be available.
1.11.4.2.3. If it is determined that OWRM and long supply assets are available and
the cost benefit analysis says that it is feasible, reclamation of the NHA will be
conducted removing all required components. The ES can request a Full Range List
for the NHA. This will provide a list of the components that could possibly be
reclaimed from the breakdown of the NHA item. Sufficient components may be
reclaimed to cover deficits and economic retention requirements for the component
NSNs. The remainder of the NHA item will be disposed after demilitarization.
1.11.4.3. Reclamation. Sources of reclamation may include:
1.11.4.3.1. Equipment being considered for disposal, or damaged aircraft or
equipment at the 309th Aerospace Maintenance and Regeneration Group.
1.11.4.3.2. Assets being held by other Services and excess to their needs.
1.11.4.3.3. Assets on loan to contractors or other Government agencies and
scheduled to be returned.
1.11.4.3.4. Assets that may be bought back from FMS customers. Reference
AFMCMAN 20-2, Security Assistance Program (SAP) Logistics Procedures, for
additional information.
1.11.4.3.5. Contract repair of unserviceable assets when no organic repair is
available.
1.11.5. Economic Procurement Quantities. Consideration must be given to a vendor’s
minimum quantity or value requirements, which, if ignored, can result in excessive unit
costs. Requirements computations, while reflecting specific quantities to be acquired, cannot
determine the most economical buy in terms of minimum quantities or the most cost effective
22 AFMCMAN23-101V1 17 NOVEMBER 2016
method of acquisition. The IMS/MM decides this, based on documentation that contracting
personnel furnish. In addition, Title 10 USC § 2306b requires that each spare part
acquisition action be considered for Multiple Year Procurement (MYP), which allows
acquisition of more than one year's requirement with a single acquisition action. Paragraph
1.13. provides MYP guidance as it pertains to recoverable spares. Reference Title 10 USC §
2210 and 2213 also prohibit the IMS/MM from initiating procurement of CSAG-S items (BC
8) that when added to the inventory would cause the inventory to exceed 2 years of operating
stocks (excluding war reserves). The head of the procuring activity may approve the
procurement of inventory that would not exceed 3 years of operating stocks (excluding war
reserves) if certain exceptions delineated in the USC are met. The head of the procuring
activity is HQ AFMC/CC or as designated by that office. For CSAG-S items, the IMS/MM
must not move out year requirements forward.
1.11.6. Management Review Actions. The AFSC staff will conduct periodic item level
reviews of computed requirements.
1.11.7. All items with a peacetime and/or RSP CY and/or AY buy requirement that also
have a positive asset reconciliation variance may be subject to a complete or partial buy
deferral. A positive asset reconciliation variance indicates that there are more reported on-
hand assets than the known accountable balance of worldwide spares. The buy quantity, up
to the amount of that variance, will be considered for possible deferral until it can be
determined if these additional assets truly exist. If the variance could not be resolved through
research and corrective file maintenance, the buy quantity will be reduced by the amount of
the variance quantity in the ABCS using Code 02W with a corresponding increase in the BY.
1.11.7.1. If the variance quantity is equal to or larger than the combined peacetime/RSP
buy quantity, the entire buy will be deferred to the BY.
1.11.7.2. If the combined peacetime/RSP buy quantity is greater than the variance
quantity, the buy quantity will be reduced by the amount of the variance, beginning with
the peacetime portion of the buy. The variance quantity will be deferred to the BY.
1.11.7.3. Exceptions: To the above guidance are:
1.11.7.3.1. If the positive variance percent is less than or equal to 5%, the dollar
value of the variance is less than or equal to $10,000, and the IMS/MM has
determined that deferral of the buy would significantly affect their ability to support
the customer, they can document the SGM Comp Worksheet with their rationale and
proceed with the buy action after obtaining flight leader approval.
1.11.7.3.2. If the positive variance percent is greater than 5% and/or the dollar value
of the variance is greater than $10,000 and the IMS/MM has determined that deferral
of the buy would significantly affect their ability to support the customer, they must
document the SGM Comp Worksheet with their rationale and obtain squadron level
signature concurring with that decision prior to proceeding with the buy action.
1.11.8. All items with a negative asset reconciliation variance may be automatically
subjected to a complete or partial buy deferral by the internal calculation done within
D200A. A negative asset reconciliation variance indicates that there are less reported on-
hand assets than the net accountable balance of worldwide spares. The computed buy
quantity, up to the amount of that variance, is offset by the serviceable due ins automatically
AFMCMAN23-101V1 17 NOVEMBER 2016 23
added by D200A for items with a negative variance. If the variance could not be resolved
through research and corrective file maintenance, any potential buy quantity is reduced by
the amount of the variance quantity.
1.11.8.1. If the absolute value of the negative variance percent is less than or equal to 5%
and the absolute dollar value of the variance is less than or equal to $10,000, and the
IMS/MM has determined that not reducing the assets to the reported quantity would
significantly affect their ability to support the customer, they can document the SGM
Computation Worksheet with their rationale and proceed with the buy/repair action after
obtaining flight leader approval.
1.11.8.2. If the absolute value of the negative variance percent is greater than 5%, and/or
the absolute dollar value of the variance is greater than $10,000, and the IMS/MM has
determined that not reducing the assets to the reported quantity would significantly affect
their ability to support the customer, they must document the SGM Computation
Worksheet with their rationale and obtain squadron level signature concurring with that
decision prior to proceeding with a buy/repair action.
1.12. Life-of-Type (LOT) Buys.
1.12.1. This paragraph describes the process and procedures to be used by the IMS/MM, ES,
and the site Director of Financial Management for LOT buys. Prior to making a LOT buy,
other manufacturing source alternatives addressed in DoDM 4140.01, Volume 3, DoD
Supply Chain Materiel Management Procedures: Materiel Sourcing, paragraph 6e must be
considered. When a LOT buy is necessary, procurement must occur as close as possible to
one PCLT away. AFMCI 23-103, Diminishing Manufacturing Sources and Materiel
Shortages (DMSMS) Program, paragraph 2.3. and AFMCI 23-106, Initial Requirements
Determination, paragraph 1.10.7. authorize the acquisition of spare parts to cover the
anticipated operational life of a weapon system under certain conditions. A LOT buy is
authorized in cases where such actions can be economically justified. A LOT buy is
normally initiated at the end of a production run for initial spares when reestablishment of
production capability for follow-on spares would not be economically feasible or when an
item has been identified as having diminishing manufacturing sources.
1.12.2. Procedures. The decision to apply LOT buy procedures requires evaluation of
support consideration, cost and benefits, and alternative acquisition actions. For new
systems, requirements for items bought under LOT buy provisions will be computed using
the IRD/D200H. If access to IRD is not available, they may be manually computed on
AFMC Form 614, Recoverable Item Initial Requirements Computation Worksheet, per initial
requirements instructions found in AFMCI 23-106. For items already in D200A, a “what if”
re-computation can be run using the weapons system life field on the Basic Management
Data (BMD) screen (see AFMCMAN 23-101, Volume 4, paragraph 1.13.).
1.12.2.1. The following types of items are excluded from LOT buy consideration.
1.12.2.1.1. Items subject to design change or technical obsolescence, except when
dealing with diminishing manufacturing sources and DoDM 4140.01, Volume 3,
paragraph 6e provides no viable cost effective alternatives and the system on which
the item is used will not be phased out near the time of delivery of spares.
24 AFMCMAN23-101V1 17 NOVEMBER 2016
1.12.2.1.2. Items that are assigned Acquisition Method Codes (AMC) that indicate
they are to be acquired competitively.
1.12.2.1.3. Items that exhibit an unstable demand history, or with a demand history
that is insufficient to predict long-range demands.
1.12.2.1.4. Items that may be subsequently acquired from the prime contractor at a
price substantially less than the current standard unit cost.
1.12.2.1.5. Items subject to shelf-life deterioration.
1.12.2.2. When a LOT buy is considered for programs that involve other Services or
FMS, the concurrence of the agency or country being supported is required.
1.12.2.3. The following must be taken into account when considering a LOT buy:
1.12.2.3.1. Assets that may be available from reclamation.
1.12.2.3.2. Related costs, such as those for hardware and technical data, and
administrative costs.
1.12.2.3.3. The cost to retain production tooling and test equipment, production start-
up costs, and spares costs.
1.12.2.3.4. The cost of future acquisitions of spares, using the FUP.
1.12.2.3.5. The effects that the costs in paragraphs 1.12.2.3.2., 1.12.2.3.3., and
1.12.2.3.4 may have on spares support.
1.12.2.3.6. The costs to administer and manage excess stocks that would result from
a LOT buy.
1.12.3. Responsibilities for LOT buy.
1.12.3.1. The IMS/MM will:
1.12.3.1.1. Validate the cost effectiveness of a proposed LOT buy, taking into
account the cost considerations in paragraph 1.12.2.3 and its subparagraphs above.
1.12.3.1.2. Obtain the concurrence of other services and FMS customers, if
applicable.
1.12.3.1.3. Prepare a letter containing the justification for the LOT buy, unit cost,
repair cost, quantity on-hand (serviceable and unserviceable), years of usage,
summary of quantities previously purchased and yearly repaired quantities,
recommended quantity to buy, and justification for sole source. The notice from the
contractor is an attachment to this letter.
1.12.3.2. The ES will validate:
1.12.3.2.1. That none of the exclusions in paragraph 1.12.2.1 and its subparagraphs
apply. 1.12.3.2.2. The weapon system’s projected lifespan program projection.
1.12.3.3. The SIRS site OPR and appropriate site financial manager will coordinate on
LOT buys. The 448th Supply Chain Management Wing (SCMW) commander, or
equivalent for non-AFSC managed items, retains final approval for all LOT buys except
as noted in the last sentence of this paragraph. If approved, the 448 SCMW commander
AFMCMAN23-101V1 17 NOVEMBER 2016 25
or equivalent must sign and return the LOT buy letter. The signed LOT buy letter
notifies the IMS/MM that the IMS/MM can file maintain the weapons system life field on
the BMD screen (see AFMCMAN 23-101, Volume 4, paragraph 1.13.). If the item is a
CSAG-S item, see additional higher signature level requirements in paragraph 1.11.5.
1.12.4. LOT buys in the Requirements Computation. To preclude approved LOT buy
quantities that have not been delivered from computing into termination, the weapon system
life needs to be file maintained on the BMD screen (see AFMCMAN 23-101, Volume 4,
paragraph 1.13.). If a quantity that has been acquired as part of an approved LOT buy
computes into termination, it must be assigned termination code 07 due to the failure to file
maintain the weapon system life. Do not terminate.
1.13. Identifying Candidates and Requirements for Multiple Year Contracting.
1.13.1. Introduction. Title 10 USC § 2306b authorizes the DoD to enter into multiyear
contracts in order to achieve economic-lot purchases. When appropriate, the IMS/MM’s first
choice must be the use of a Multiple Year Contract (MYC). The MYP program is one way
to satisfy several years’ requirements for spare parts with a single contract. The primary
purpose of the MYP program is to reduce unit cost and lead time. Other potential benefits
include: reduced administrative workload for the IMS/MM, Contracting personnel, and the
PR/MIPR control function; reduced paperwork, better prices and discounts due to larger
quantities; ensured production continuity; and contractor incentive for investment in capital
equipment and facilities. Reference AFMCI 20-102 for additional information. Squadrons
managing spare parts must conduct periodic (at least annual) reviews of multiple year
candidate items. The reviews must determine how well multiple year guidance is being
implemented and identify potential problems with existing guidance. Multiple year
contracting must be a budget requirements review area of interest.
1.13.2. Item Selection. To be considered for the MYP program, an item must meet all of the
following conditions:
1.13.2.1. The item program must be forecastable. A forecastable program is one which
can be determined with a reasonable degree of certainty. Most SIRS items have
forecastable programs.
1.13.2.2. The item must compute into a deficit buy position in the AY and the BY, as
indicated on the CSIS Deficit Listing. Items may also compute deficits beyond the BY
and still be eligible for the MYC. However, they must compute into a deficit in the AY
and the BY.
1.13.2.3. For an item to be considered for a 3-year multi-year contract, the item must be
in a buy position in the apportionment, budget, and extended years on the CSIS listing.
RSP and OWRM (if OWRM funds are available) deficits may be included as part of the
first year’s buy.
1.13.2.4. For 4 or 5-year buys, consider items that compute condemnations (base, depot
overhaul, and Job Routed JR]) greater than 10% of the computed OIM operating
requirement plus the total Depot Level Maintenance (DLM) program. The quantities to
be procured in the fourth and fifth years must never exceed the forecasted condemnations
(condemnation percent times forecasted reparable generations). In addition, the item
26 AFMCMAN23-101V1 17 NOVEMBER 2016
must be of stable design and configuration. It will not be scheduled for replacement or
for a modification that would affect the failure rate.
1.14. Item Contracting History Record. For reference purposes, the IMS/MM will keep a
record of significant acquisition process events for their items using an AFMC Form 318, Item
Contracting History Record. Mandatory item contracting history records will be retained
utilizing AFMC Form 318 (paper or electronic) or the E-318 in J018R; documentation will be
maintained in a location readily available for audits/inspections. The IMS/MM will review the
AFMC Form 318 header information annually for accuracy and currency, and update if
necessary.
1.15. Documentation Requirements.
1.15.1. The IMS/MM will retain an item folder. This requirement includes all AFMC Forms
318 and Asset Reconciliation reports. For D200A Asset Reconciliations, retain March
Summary only - Final if Summary is not printed. Copies of the D200A Asset
Reconciliations for June, September, and December may be thrown away upon receipt of the
products for the following March Computation Cycle. If the June, September or December
products have documentation for actions taken that are not on the March Asset
Reconciliation Notepad, that documentation must also be retained and attached to the Asset
Reconciliation. Retain historical AFMC Form 247, Asset Reconciliation - Investment Items,
and historical AFLC Form 47, Asset Reconciliation - Investment Items, as long as the item is
in the AF inventory. If the Summary computation is not printed, keep the products from the
Final computation. Reference Table 1.1 for when item purchases were initiated.
AFMCMAN23-101V1 17 NOVEMBER 2016 27
Table 1.1. Item Purchases Were Initiated Destroy Documents and Products 2 Years After
Contract Closure IAW Paragraph 1.15.2.
Product D200 Product Number
1 Copy of contract (or electronic file copy of the contract
-- must be readily accessible and easily readable and
printable by anyone needing the information)
2 PR/MIPRs (attach to the PR/MIPR a copy of the
computation, recomputation, or INS/NSO Item Status
Listing on which the PR/MIPR is based)
3 D220 Provisioning Documents
4 Provisioning Item Order (PIO)
All supporting documentation such as:
5 IRD Item Worksheet AD200.H40108ZP
6 IRD Programming Checklist AD200.H60108ZP
D200A Products:
7 Initial MISTR Repair and Repair Data (IMS/MM) ** AD200.AFCA#8IH
8 Initial MISTR Repair and Repair Data (PMS) ** having
annotations
9 Initial Factors/Usage Printout having annotations (see
paragraph 1.15.10.)
AD200.AFDA#85U
(Keep the summary products listed below, or final products if summary products are
not available, containing approval signatures)
10 SGM Computation Worksheet Requirements AD200.AIDA#88I
11 Consolidated Assets and Additive Requirements AD200.AHBA#87B
12 Adjusted Level Verification Worksheet AD200.ACKA#8BO
13 MISTR Repair and Repair Data (IMS/MM) ** AD200.AFCA#8IH
14 MISTR Repair and Repair Data (PMS) **
15 Factors/Usage Printout A-D200.AFDA#85U
16 SGM OWRM Computation Worksheet AD200.AIPA#88K
17 INS/NSO Item Status Listing AD200.ANBAX82B
18 Entire signed “What If” Item Recomputation (if
applicable)
Note: ** MISTR Repair and Repair Data reports are
not required to be retained for AF SICA NIMSC 5 items
since the AF doesn’t perform depot level repair.
1.15.2. Destroy documentation supporting terminations after 2 years or after termination is
closed, whichever is greater. Documentation includes: all cataloging data and source
material, documentation supporting applications, and termination model.
1.15.3. Destroy documentation 2 years after data is superseded or obsolete in D200A.
Documentation includes: all cataloging data and source material and documentation
supporting applications.
1.15.4. Destroy after 2 years. Reference Table 1.2
28 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 1.2. Destroy After 2 Years.
Document or Product Product Number
1 Backorder List (if used as basis for validating and/or
changing requirement in D200A or ABCS Repair)
2 Cooperative Logistics Supply Support Arrangement
(CLSSA) Requirements Listing
U-W001.-GBK product
3 FMS Retention Levels U-W001.-RAA product
4 J018R Category I and IIR Requirement Data Report A-J018R.-5YB-M5-850
product
5 Processing Master Record Quarterly Asset Listing A-D035B-1LX-Q7-GAE
product
6 Contract Repair Reports
1.15.5. Destroy the following pushed products after 2 years (unless needed to support buy or
terminations, per paragraph 1.15.2 and paragraph 1.15.3). (See Table 1.3)
Table 1.3. Pushed Products Destroyed After 2 Years Unless Needed to Support Buy or
Terminations.
Product Product Number
1 Initial MISTR Repair and Repair Data (IMS/MM) ** AD200.AFCA#85V
2 Initial MISTR Repair and Repair Data (PMS) ** having
annotations
3 Initial Factors/Usage Printout having annotations (see
paragraph 1.15.10.)
AD200.AFDA#85U
(Keep the summary products listed below, or final products if summary products are
not available, containing approval signatures.)
4 SGM Computation Worksheet Requirements AD200.AIDA#88I
5 Consolidated Assets and Additive Requirements AD200.AHBA#87B
6 Adjusted Level Verification Worksheet AD200.ACKA#8BO
7 MISTR Repair and Repair Data (IMS/MM) ** AD200.AFCA#85V
8 MISTR Repair and Repair Data (PMS) **
9 Factors/Usage Printout AD200.AFDA#85U
10 Item Future Peace Program AD200.AEBA#8AC
11 SGM OWRM Computation Worksheet AD200.AIPA#88K
12 INS/NSO Item Status Listing AD200.ANBA#82B
13 Entire Signed “What If” Item Re-computation (if
applicable)
14 All Final Indices of Action for Term ***
15 All Final Indices of Action for Excess ***
16 All Final Indices of Action for Buy ***
17 All Final Indices of Action for Repair ***
18 Any executive management summary reports
19 Any reports documenting repair of D200A items
20 ABCSB21 Quarterly Projection Worksheet
AFMCMAN23-101V1 17 NOVEMBER 2016 29
21 Any reports documenting excess D200A items
22 Quarterly Base Repair Cycle Time report
23 Quarterly Order and Shipping Times report
24 Quarterly Reparable Item Transportation Time report
25 ES Review List AD200.AKEA#8ES
26 IMS/MM Review List AD200.AKBA#8DS
Note 1: *** According to AFSC local guidance
Note 2: ** MISTR Repair and Repair Data reports are not required to be retained for
AF SICA NIMSC 5 items since the AF doesn’t perform depot level repair.
1.15.6. Destroy Initial D200A product after receipt of Final D200A product unless they
contain pen and ink documentation required to support actions taken (*** According to local
guidance). Reference Table 1.4
Table 1.4. Destroy Initial D200A Product After Receipt of Final D200A Product Unless
Pen and Ink Documentation Required to Support Actions Taken.
Product Product Number
1 SGM Computation Worksheet Requirements AD200.AIDA#88I
2 INS/NSO Item Status Listing AD200.ANBA#82B
3 MISTR Repair and Repair Data (ES) ** AD200.AFBA#85V
4 Factors/Usage Printout AD200.AFDA#85U
5 SGM OWRM Computation Worksheet AD200.AIPA#88K
6 Asset Reconciliation – Investment Items AD200.AKAA#8AK
7 Item Past Program AD200.AE3A#8AA
8 Item Future Peace Program AD200.AEBA#8AC
9 Predictive Logistics (PRELOG) Equations AD200.ADSA#86E
10 All Indices of Action for Term ***
11 All Indices of Action for Excess ***
12 All Indices of Action for Buy ***
13 All Indices of Action for Repair ***
Note 1: *** According to AFSC local guidance.
Note 2: ** MISTR Repair and Repair Data reports are not required to be retained for
AF SICA NIMSC 5 items since the AF doesn’t perform depot level repair.
1.15.7. Destroy Final D200A products after receipt of Summary D200A product (unless
signature document). Reference Table 1.5
30 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 1.5. Destroy Final D200A Products After Receipt of Summary D200A Product
Unless Signature Document.
Product Product Number
1 *SGM Computation Worksheet Requirements AD200.AIDA#88I
2 *INS/NSO Item Status Listing AD200.ANBA#82B
3 *Factors/Usage Printout AD200.AFDA#85U
4 MISTR Repair and Repair Data (ES) ** AD200.AFBA#85V
5 MISTR Repair and Repair Data (IMS/MM) ** AD200.AFCA#85V
6 MISTR Repair and Repair Data (PMS) **
7 SGM OWRM Computation Worksheet AD200.AIPA#88K
8 Asset Reconciliation – Investment Items AD200.AKAA#8AK
9 Item Past Program AD200.AE3A#8AA
10 Item Future Peace Program AD200.AEBA#8AC
11 PRELOG Plots AD200.AFVA#86B
12 All Indices of Action for Term ***
13 All Indices of Action for Excess ***
14 All Indices of Action for Buy ***
15 All Indices of Action for Repair ***
Note 1: *If used for the signature document, follow rules
for paragraphs 1.15.2., 1.15.3. or 1.15.6. as applicable.
Note 2: ***According to AFSC local guidance.
Note 3: ** MISTR Repair and Repair Data reports are not
required to be retained for AF SICA NIMSC 5 items since
the AF doesn’t perform depot level repair.
1.15.8. Destroy on receipt of next cycle’s products (see Table 1.6 ).
Table 1.6. Destroy on Receipt of Next Cycle’s Products.
Product Product Number
1 Job Order Production Master System (G004L) Exception
Notice
2 Final Item Past Program AD200.AE3A#8AA
3 Final Item Future Peace Program AD200.AEBA#8AC
4 Final PRELOG Equations AD200.ADSA#86E
5 Summary PRELOG Plots AD200.AFVA#86B
6 Exception Report for Quarterly Repair Input Data
(IMS/MM) AD200.AANAC87@
7 Exception Report for Quarterly Repair Input Data
(IMS/MM) AD200.AAPAC88@
1.15.9. All documentation for estimated factors, rates, and percents including studies,
methodology, and calculations used to arrive at them and documentation of key assumptions,
facts, specific details, decision makers’ names and signatures, and dates of decisions will be
retained for 2 years after any resultant buy quantities are delivered or for 2 years after any
resultant termination action has been completed. If no buy or termination resulted, the
documentation will be retained for 2 years after repair actions resulting from them have been
AFMCMAN23-101V1 17 NOVEMBER 2016 31
completed. Before the ES discards products, the ES will check with the IMS/MM to
determine if buy, repair or termination actions were taken based on the products and if so
when the products can be discarded based on the preceding information.
1.15.10. The ES will retain information provided by the PMS or IMS/MM that the ES uses
for a basis of file maintenance for 2 years after delivery of assets or termination of contract.
If no buy, repair, or termination action resulted from the ES file maintenance of the
information provided by the PMS or IMS/MM, the information may be destroyed after 2
years. Before the ES discards products, the ES will check with the IMS/MM to determine if
buy, repair or termination actions were taken based on the products and if so when the
products can be discarded based on the preceding information.
1.15.11. The IMS/MM will retain information provided by the PMS or ES that the IMS/MM
uses for a basis of file maintenance for 2 years after delivery of assets or termination of
contract. If no buy, repair, or termination action resulted from the IMS/MM file maintenance
of the information provided by the PMS or ES, the information may be destroyed after 2
years.
1.15.12. Before the PMS discards products, the PMS will check with the IMS/MM to
determine if buy, repair, or termination actions were taken based on the products and if so
when the products can be discarded based on the preceding information.
1.16. Performance-Based Logistics (PBL) Contracts.
1.16.1. When a PBL contractor is required by the contract to do all the demand and supply
planning, including requirements calculation for the items, and is using its own data systems
to fulfill the obligation, the PBL contractor and depot IMS/MM, ES, and PMS are not
required to check within D200A/F the inputs of Government systems overlaying to D200A/F
for those items covered by the PBL contract. The personnel responsible for inputting the
data into the input systems are responsible for the accuracy of the data provided. The
IMS/MM will ensure that the appropriate PBL BP code “Px” and the appropriate PBL SMC
are file maintained into D200A (see AFMCMAN 23-101, Volume 4, Chapter 1). The PBL
contract will require the PBL contractor to provide the following for each of the NSNs on the
contract: Government assets by Supply Condition Code (SCC) at the contractor facility,
units repaired, condemnations, repair shop flow time, Administrative Lead Time (ALT),
Production Lead Time (PLT), URC, and unit purchase costs for the NSNs on the contract to
the existing AF systems.
1.16.2. The AFSC/LG will ensure the PBL contract arrangement fulfills DoDM 4140.0,
Volume 10, DoD Supply Chain Materiel Management Procedures: Metrics and Inventory
Stratification Reporting, mandates for a CSIS on every item and the SSIR covering all items
regardless of funding. This provides for the general accounting requirement in 50 USC §
412. For the SSIR, variances on NSNs for which a PBL contractor is responsible, the site
SSIR OPR must use the explanation: “Item is managed by a PBL contractor.”
1.16.3. The site must incorporate in the PBL contract, stipulations requiring the PBL
contractor to comply with 10 USC § 2213 when stock funds are used to procure assets (see
paragraph 1.11.5).
32 AFMCMAN23-101V1 17 NOVEMBER 2016
1.16.4. The site must incorporate in the PBL contract, stipulations requiring the PBL
contractor to accept and respond to Air Force Audit Agency and US Government
Accountability Office audits on the items they are managing under the PBL contract.
1.17. “Dead Items” in D200A.
1.17.1. A dead item meets all of the following criteria:
1.17.1.1. No usage in the past 3 years.
1.17.1.2. No assets reported during the last 8 qtrs.
1.17.1.3. Does not have new item code N.
1.17.1.4. No non-recurring additives.
1.17.1.5. No Requirements Data Exchange (RDE) recurring additives.
1.17.1.6. No special levels.
1.17.1.7. No minimum depot safety level.
1.17.1.8. No estimated rates and percents.
1.17.1.9. Does not have a program begin date within the last 7 years.
1.17.1.10. Item PSC is all zeroes.
1.17.1.11. Application percent is zero.
1.17.1.12. Quantity per assembly is zero.
1.17.1.13. Federal Supply Classification (FSC) does not begin with 814.
1.17.2. The IMS/MM must review the “dead items.” The “dead item” NSN must be
assigned a “not stocked” AAC, or AAC Y. If the “dead item” NSN has other Service users,
it must be requested that they assume management for the item. If it is decided to retain the
“dead item” without taking one of these actions, such action must be approved by the center
commander or his/her delegated representative.
AFMCMAN23-101V1 17 NOVEMBER 2016 33
Chapter 2
USING RMS
2.1. Introduction. The RMS operates on a computer at Hill Air Force Base (AFB), Utah.
Access to view data and file maintain data can be done using Personal Computers (PCs) at any
site.
2.2. Roles and Responsibilities.
2.2.1. The SIRS Functional Advocate and Site Functional Advocates at Hill, Robins, and
Tinker AFBs will serve as the Information Owner/OPRs for their applicable subsystems.
The SIRS Functional Advocate performs the same functions as the Information Owner/OPRs
when the personnel requiring access are not assigned to Hill, Robins, or Tinker AFBs.
2.2.2. Site Functional Advocates approve AFMC ICP D200A/N access requests for locally
assigned DoD Component personnel and DoD contractors at their site location.
2.2.3. The SIRS Functional OPR approves D200A/N access for DoD Components, AF
Major Commands (MAJCOM), AFSC Logistics Directorate (LG), Air Force Life Cycle
Management Center (AFLCMC) Program Office, DoD contractors, and Site Functional
Advocates.
2.3. System Access.
2.3.1. Authorization to access D200A/N is determined by the requestor’s government
affiliation and security clearance, and is controlled by a User Identification (USERID).
2.3.1.1. Potential D200A/N users are DoD employees (military, civilian, or Advisory &
Assistance Service [A&AS] Contractors). Table 2.1 identifies requestors that may/may
not gain system access.
34 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 2.1. Requestor Types Authorizations, and Approving Authorities.
Requestors Authorized
Access
Approving Authority
Other Service/Agency Yes SIRS Functional OPR
MAJCOMs
HQ AFMC Yes HQ AFMC/A4RM
AFSC/LG Yes SIRS Functional OPR.
Note: Site Functional
Advocates at Hill, Robins,
and Tinker Air Force Bases
may approve locally
assigned AFMC, DoD
services personnel, and
contractors at their sites.
635th Supply Chain Operations Wing (SCOW) and
subordinate units Yes
448 SCMW and subordinate units Yes
AFMC Inventory Control Points (ICP) Yes
AFLCMC Program Office Yes
Air Force Audit Agency (AFAA) Yes
A&AS Contractors Yes
Foreign Nationals No
Government Furnished Equipment
(GFE)/Government Furnished Material (GFM)
Repair and Production Contractors
No
Contractor ICPs and PBL Contractors (Level III) No
2.3.1.2. IAW DoD 5200.2-R, Personnel Security Program, subsystem access is limited
to those individuals determined trustworthy as a result of the favorable completion of a
National Agency Check (NAC) or Entrance NAC (ENTNAC) or who are under the
escort of cleared personnel. Where escorting such persons is not feasible, a NAC shall be
conducted and favorably reviewed by an appropriate DoD Component Agency or activity
prior to permitting system access. Requestors pending security clearance must complete
and provide a Letter of Responsibility (LOR) along with the SAAR. The LOR must be
signed by the requestor’s government supervisor and maintained by the applicable
system’s Functional Advocate.
2.3.2. Authorized personnel gain access to D200A/N by submitting a DD Form 2875, System
Authorization Access Request (SAAR), along with a LOR (if applicable) to the SIRS
Functional Advocate.
2.3.2.1. Individuals requiring access to more than one RMS subsystem must document
each subsystem required on the DD Form 2875.
2.3.2.2. A&AS contractors must submit Sponsor and Non-Disclosure Letters (signed by
their government supervisor or representative) along with the SAAR and LOR (if
applicable) to gain system access. See Table 2.1 for D200A/N approval authorities.
Note: Contractors must reaccomplish SAAR and associated letters prior to contract
expiration date.
2.3.2.3. Requestors will complete DD Form 2875 IAW instructions provided on page
three of form template and Table 2.2
AFMCMAN23-101V1 17 NOVEMBER 2016 35
Table 2.2. D200A/N Unique SAAR Instructions.
Block Field Name Input Value
N/A Location “Hill AFB” (this is the location
where the database resides – not the
requestor’s duty location)
13 Justification for Access 1. Narrative explaining how
requestor will use access and/or why
access is required.
2. Provide the applicable type access
required (i.e., Read Only or File
Maintenance capability for
IMS/MM, ES, or PMS; site
Functional Advocate or AFMC
Functional Advocate) and the
applicable domain(s) required (i.e.,
production, test or training region).
Data Query for certain personnel.
Note: This requirement may not
apply to all subsystems.
14 Type of Access Required Place an “X” in the “Authorized”
box
Note: Privileged access is reserved
for individuals responsible to amend
or change system configuration,
parameters or settings.
27 Optional Information Provide a four-digit (all numeric)
Personal Identification Number
(PIN) to be used for verification
when requesting password reset
from the Defense Information
Systems Agency (DISA). Note:
The Functional Advocate will assign
PINs for SAARs submitted without
them.
2.3.2.4. Once the supervisor, Security Manager, and Information Assurance Officer
(IAO) have completed their blocks and digitally signed the DD Form 2875, the form is
returned to the requestor.
2.3.2.5. The requestor sends the DD Form 2875 and associated documents via electronic
mail (E-mail) to the appropriate system Functional Advocate (Information Owner/OPR).
2.3.2.6. The Functional Advocate E-mails the digitally-signed DD Form 2875 to Ogden
DISA POC to obtain the requestor’s USERID.
2.3.2.7. Upon return of the requestor’s credentials from DISA:
2.3.2.7.1. The D200A/N program office establishes the profile parameters within
D200A/N.
36 AFMCMAN23-101V1 17 NOVEMBER 2016
2.3.2.7.2. The Functional Advocate annotates user credentials on the DD Form 2875,
saves the form, and returns it and the instructions for obtaining a temporary password
to the requestor, requestor supervisor, or unit access request OPR.
2.3.3. DD Form 2875 Maintenance. The D200A/N program office will maintain DD Forms
2875 for every active user of D200A/N. The SIRS and Site Functional Advocates will
maintain DD Forms 2875 for those active D200A/N users they granted access approval. The
IAO will have access to these files as needed.
2.3.4. Annual D200A/N Access Authorization Reconciliation.
2.3.4.1. October of each year, the SIRS Functional Advocate will perform a system
reconciliation by providing a list of all current D200A/N system user accounts to Site
Functional Advocates.
2.3.4.2. SIRS and Site Functional Advocates will use this list to:
2.3.4.2.1. Identify unauthorized users and request account deletion actions by
submitting the DD Form 2875 directly to Ogden DISA. All accounts for users who
have been reassigned, terminated, separated from the government, or who no longer
require system access will be deleted.
2.3.4.2.2. Validate the roles of remaining authorized users. User roles may have to
be adjusted depending on nature of requestor’s assigned duties. DD Forms 2875 with
modified user roles will be submitted to the appropriate D200A/N Functional
Advocate, and will follow the same procedures as required for initial access.
2.4. RMS Applications Access. The procedures to access the RMS applications differ
depending on the communications package used and whether or not the mainframe or Graphic
User Interface (GUI) is selected. The CSIS is available via both methods, but due to screen
width requirements, the mainframe is the preferred method of access. The other applications are
available via mainframe or GUI which are described below.
2.4.1. Access to RMS via the Mainframe. One method to access the mainframe is via the
DISA Multi-Host Internet Access Portal (MIAP) https://miap.csd.disa.mil/. Users follow
the account registration and MIAP Login instructions on the main MIAP page. Informational
links to include Online Support and the MIAP User’s Manual are located on the home page.
A MIAP account may be created if the user has a Common Access Card (CAC). The user
will still be issued a USERID, but login is allowed with a CAC and Personal Identification
Number (PIN). When setting up an account, select Ogden as the Community of Interest.
Once registered and logged in, the user will be asked to select from a list of links they are
authorized to use. For RMS, double click on OGD MODEL5. At the Enter logon prompt,
the user will enter their RMS USERID and password. At the RMS Main Menu, type an “X”
in the blank before IOE (Initial Operating Environment) or type “IOE” at the Command
(CMD) line to get to the CSIS; see AFMCMAN 23-101, Volume 6, Central Secondary Item
Stratification (D200A, D200N). To reach the other RMS applications, type an “X” in the
blank before FOE (Final Operating Environment) or type “FOE” at the CMD line. The FOE
screen appears and depending on USERID permissions, users can access DIS (Display) and
may be able to also access DQ (Data Query), FM (File Maintenance), OP (Output Products),
and TRND (Trend Analysis). Typing in DIS brings up the DISPLAY screen, which provides
access to the following systems: AI – Application/Indenture portion of Applications,
AFMCMAN23-101V1 17 NOVEMBER 2016 37
Programs, Indentures (API) (D200F), EQP – Equipment (EQP) (Equipment Item Process
[EIP], D200C), PRGM – Programs (PRGM) portion of API (D200F), SIRS –D200A, and
RIID –D200E.
2.4.1.1. To access SIRS, type an “X” in the blank before SIRS or type in SIRS at the
CMD line. For function keys see paragraph 2.7. The entire command string (e.g., DIS
SIRS Stock Number Data [SND] War Data [WARD]) can be typed in followed by a
period even if the typing goes over the F1 and F10 data displayed.
2.4.1.2. To log off of SIRS, users can back out, screen by screen, using either the F10 or
F11 key, or type DONE on the CMD line. Log off the RMS using local procedures.
2.4.2. Access to RMS Using GUI. The most common and easiest method is to access RMS
with the GUI. The GUI capability serves as a screen template over the basic RMS to provide
a Windows environment with mouse “point and click” access to RMS screens and data
elements. The screen shots and screen access instructions in this manual are based on the
GUI access method.
2.4.3. To access RMS using GUI, the GUI software must be loaded onto the user’s PC.
Instructions can be accessed via the RMS GUI Help link on the D200A web page.
2.4.4. Once logged on, the Display News screen appears. Users may also access an
application by double clicking on it at the top of the screen. RMS can be navigated using the
drop down menus (paragraph 2.5.1) or screen by screen (paragraph 2.5.3). OP-REVIEW
allows users to check on the status of their output print product job.
2.5. SIRS GUI Navigation.
2.5.1. GUI Navigation Using Drop Down Menus. Users, who know their final screen
destination, will find the SIRS drop down menus to be a quick and convenient form of
navigation. From the RMS Main Menu, select SIRS from the menu selections across the
very top of the screen by pointing and clicking on “SIRS”.
2.5.2. After selecting SIRS, additional levels of screen menus will appear that will allow
users to select the mode and type of data desired. The arrow to the right of the menu
selection indicates that there are additional menu levels available. Hold the left mouse key
down to navigate through the menu selections. Once the desired selection is highlighted,
release the mouse button, and the selected screen will appear. When viewing most SIRS
data, “DIS” is selected at the first level menu; “SND” is at the second or mid-level, and the
menu for accessing the lowest level screens is displayed.
2.5.3. GUI Navigation Screen By Screen. Users who do not know their final screen
destination may navigate screen by screen. Navigation is intuitive and acronyms are spelled
out. From the RMS Main Menu, select “FOE Final Operating Environment.” On the next
screen, select the desired mode, such as “DIS Display” or “FM File Maintenance,” then
select “SIRS Secondary Item Requirements System.” The next screen will list the same
menu selections offered by the multiple levels drop down menu, but the acronyms are spelled
out. Point and double click at the selection and that screen will appear, with the acronyms
again spelled out.
2.6. Organization of the SIRS Online Screens. After logging onto the RMS, the first screen
offers a choice of FOE or IOE. The CSIS or D200N is the only system under the IOE (see
38 AFMCMAN23-101V1 17 NOVEMBER 2016
AFMCMAN 23-101, Volume 6, Chapter 7). Selecting the FOE screen gives the user a menu
with five choices: DIS, DQ, FM, OP, and TRND. The DIS menu is explained in paragraph
2.7. DQ is only available to the AFSC OPR and is not covered in this manual. The FM menu is
explained in paragraph 2.10. The OP menu is explained in paragraph 2.11. The TRND
selection is only for the weapon systems program data of the API (D200F) which is explained in
AFMCMAN 23-101, Volume 2, paragraph 6.2.
2.7. Display Screens. The user must have a valid USERID and password for each RMS system
to view the data on the DIS screens. To view SIRS data from the DIS main menu, select the
SIRS menu.
2.7.1. Interrogation information is available as of the computation asset cutoff date, which is
displayed in the upper right corner of each screen. The online interrogation screens also
provide a 2-digit code to indicate the segment of the quarterly SIRS computer run. The first
position indicates the segment of the qtr: “I” for Initial, “F” for Final, and “S” for Summary.
The second position indicates the number of times the item has been re-computed for that
computation cycle. Individual data element file maintenance changes are updated
immediately on the display screens upon the successful input of file maintenance actions.
However, the use of the updated data values in the computation is not reflected on the display
screens until either a FRIR screen computation is run (see paragraph 2.10.5), or a Final
computation or Summary computation is run. For example, the revised quantity that resulted
from the file maintenance of an additive requirement would be reflected on the Display
Additive Requirements (ADRQ) screen, but the revised quantity would not appear on the
Display Subgroup Master Computation Worksheet (SMCW) screen until either the For Real,
Final or Summary computations were run.
2.7.2. The following display screens are available to view SIRS data. The screen string
commands required to access the data are also listed. Using GUI, the user can point and
click on the “drop down” boxes to select the desired Display screen. Note: The screen
strings displayed below are the commands to be used with the mainframe and with the GUI
menus. With the GUI “drop down” boxes, the sequence for the “DIS” and “SIRS” is
reversed. The Product Format Information (PFI) selection brings up only one screen, the IRL
selection screen.
2.7.3. The following are summaries about the data on each display screen.
2.7.3.1. The AAMD (reference AFMCMAN 23-101, Volume 3) menu provides access to
the five screens displaying data from the Aircraft Availability Model (AAM)
computation. The SIRS Functional OPR uses this data.
2.7.3.2. The CW menu has three selections.
2.7.3.2.1. The INIS Listing displays the computational results for INS and NSO
items. It provides computed buy, repair, termination, and excess results by FY (CY,
AY, BY, EY), and retention. The screen has four pages: 1) Basic Management Data
- buy and repair requirements, termination and excess quantities; 2) Repair detail; 3)
Buy/retention detail; and 4) Interchangeable and substitutable grouping (see
AFMCMAN 23-101, Volume 3, Chapter 5).
2.7.3.2.2. SMCW displays the computational results for all computing items. It
provides computed buy, repair, termination, and excess results by selected future
AFMCMAN23-101V1 17 NOVEMBER 2016 39
“pick-off points” that follow the computation asset cutoff date. The selected pick-off
points are the 1st qtr (the immediate qtr following the computation asset cutoff date),
the PCLT (the future qtr that is PCLT beyond the computation asset cutoff date), CY
PD (the future qtr that is PCLT beyond the end of the CY), AY PD (the future qtr that
is PCLT beyond the end of the AY), BY PD (the future qtr that is PCLT beyond the
end of the BY), EY PD (the future qtr that is PCLT beyond the end of the EY), and
RETN (the Retention segment of the computation). The 15 screens are described in
AFMCMAN 23-101, Volume 3, Chapter 1.
2.7.3.2.3. SOCW displays the computational results of the SGM OWRM
computation. The screen has three pages: 1) Basic Management Data; 2) War and
peace rates and percents used in the OWRM computation; and 3) OWRM
computation lines for months 1, 2, 3, 6, 9, and 12. See AFMCMAN 23-101, Volume
3, Chapter 4.
2.7.3.3. The Data Type Interrogations (DTI) menu has two frequently used selections.
2.7.3.3.1. In Service Asset (ISA) SRAN Assets displays the base asset balances,
levels, and Due-Out to Maintenance (DOTM) by CSN, account code, and individual
Stock Record Account Number (SRAN). The data is displayed on left and right
screens. The right screen displays SCC X assets as an informational entry (see
AFMCMAN 23-101, Volume 4, paragraph 6.5.14.
2.7.3.3.2. SUD displays the base and depot usage data by CSN, account code, and
individual SRAN and provides the gains and losses data used in the asset
reconciliation process. The data is displayed on left and right screens (see
AFMCMAN 23-101, Volume 5, paragraph 1.2.).
2.7.3.4. The Factors/Usage Data (FUD) menu has 11 selections.
2.7.3.4.1. The FAD displays the application data for the item that was input to the
API system and then passed to SIRS. The application data reflected is the application
designator (called the Standard Program Designator in API), application PSC, MIEC,
program begin date, QPA, and the application percent. This is page 7 of seven
screens that shows the data reflected on the Factors/Usage Printout (see AFMCMAN
23-101, Volume 5, paragraph 2.23.).
2.7.3.4.2. FBD (see AFMCMAN 23-101, Volume 5, paragraph 2.19.) displays Basic
Management Data (manager codes, item PSC, Interim Contractor Support
(ICS)/Reliability Improvement Warranty (RIW) code and expiration date, base
Reparable This Station (RTS) exclusion indicator, safety level exclusion code, FIC,
SOR percents, unit price, and URC, and SCC X assets). This screen also displays the
part number, Contractor And Government Entity (CAGE) code and can be accessed
by either the SGM stock number or by part number and CAGE. FBD is the first of
seven screens that display the data on the Factors/Usage Printout (see Volume 5).
These seven screens are linked and can be accessed from any of the seven screens by
pointing and clicking to the page number at the bottom of each screen. The seven
screens and their applicable page numbers are: 1) FBD 2) Rates and percents; 3)
Forecast rates and percents; 4) Usage History; (5), Total SGM Usage History; (6),
Past Factors; (7), and FAD (7).
40 AFMCMAN23-101V1 17 NOVEMBER 2016
2.7.3.4.3. FRAP displays the current, 1st, 2nd, 3rd, 4th, and 5th forecasted values for
the 16 rates and percents and Mean Time Between Demands (MTBD) used in the
SIRS computation. This is page 3 of the seven screens that show the data reflected on
the Factors/Usage Printout (see AFMCMAN 23-101, Volume 5, paragraph 2.21.).
2.7.3.4.4. MRPR displays the past 12 qtrs of overhaul MISTR repair quantities by
SOR, production/contract number, Contract Line Item Number (CLIN), and the
associated URC, supply to maintenance days, shop flow days, and serviceable turn-in
days. Qtrs 1-8 are displayed on the left screen, where qtr 1 is the most recent past qtr,
and qtrs 9-12 are displayed on the right screen (see AFMCMAN 23-101, Volume 4,
paragraph 8.5.).
2.7.3.4.5. PE PRELOG Equations displays the equations used by PRELOG.
PRELOG is one of the five methods in SIRS for computing the Total Organizational
and Intermediate Maintenance Demand Rate (TOIMDR) used for computing
requirements. The ES and OPR use this data (see AFMCMAN 23-101, Volume 5,
paragraph 4.5.).
2.7.3.4.6. PF displays the past factor computed values for the past 2 years (eight qtrs)
for all of the rates and percents. Also the Moving Average History (MAH) and the
individual qtr values are displayed on two vertical pages (top and bottom). The first
PF screen is page 6 of the seven screens that show the data reflected on the
Factors/Usage Printout (reference AFMCMAN 23-101, Volume 5, paragraph 2.22.).
2.7.3.4.7. PP displays a plot for an SGM. PRELOG is one of the five methods in
SIRS for computing the TOIMDR used for computing requirements. The ESs and
OPRs use this data (see AFMCMAN 23-101, Volume 5, paragraph 4.4.).
2.7.3.4.8. PPH is the first of three screens that displays PRELOG data and allows the
user to view a single plot header for a specific SGM. The three screens are linked and
can be accessed from any of the three screens by pointing and clicking to the page
numbers at the bottom of each screen. The three screens and their applicable page
numbers are: 1) PPHs; 2) PPs; and 3) PRELOG Equations (see AFMCMAN 23-101,
Volume 5, paragraph 4.3.).
2.7.3.4.9. RAP displays the 16 rates and percents used in the computation, plus the
MTBD. The last used, 24-month, 12-month, PRELOG, and exponential smoothing
computed values for each of the 16 rates and percents and MTBD are displayed. This
is page 2 of the seven screens that show the data reflected on the Factors/Usage
Printout (see AFMCMAN 23-101, Volume 5, paragraph 2.20.).
2.7.3.4.10. TSUH displays the past 12-qtr base period of usage data totaled for the
SGM. This screen displays the total SGM usage data used in the computation of
SIRS rates and percents, and includes file maintained data, if applicable. The two
screens also display the past installed program for OIM, PDM, EOH, and MISTR.
The left screen displays the latest eight qtrs (qtrs 1-8) of total usage history and
program. It also displays the “Quarter of Last Demand” from D035, which is the last
qtr a requisition was received for the item. The ES and IMS/MM use this data to
determine how active the item is. The right screen displays the oldest four qtrs (qtrs
AFMCMAN23-101V1 17 NOVEMBER 2016 41
9-12) of usage data. This is page 5 of the seven screens that show the data reflected
on the Factors/Usage Printout (see AFMCMAN 23-101, Volume 5, paragraph 1.3.3.).
2.7.3.4.11. UH displays the past 12-qtr base period of usage data, which includes
base RTS, base NRTS, base condemnations, base reparable generations, Dep Rep
Gens, MISTR repairs, MISTR condemnations, and total depot condemnations, by
current and SGM stock number. The UH screen has a left and right screen and
vertically scrolls between top and bottom. The left screen displays the latest eight
qtrs (qtrs 1-8) of usage history, and the right screen displays the oldest four qtrs (qtr
9-12) of usage data. The screen shows both the actual data received from interfacing
systems and data file maintained by the ES. This is page 4 of the seven screens that
show the data reflected on the Factors/Usage Printout (see AFMCMAN 23-101,
Volume 5, paragraph 1.3.2.).
2.7.3.5. The Index of Actions (IOA)(INDX) selection screen has 11 selections. The
screen allows the user to select the display of buy, termination, excess, and repair
quantities by various sites (or ALC), BP, SMC, MMAC, FSC, division, IMS/MM, and
ES sequences and summaries (see AFMCMAN 23-101, Volume 3, Chapter 6.).
2.7.3.6. The Miscellaneous (MISC) menu has three selections.
2.7.3.6.1. ISID displays the dates when each interfacing system file was received for
input to the SIRS database. The system OPRs primarily use this data (see
AFMCMAN 23-101, Volume 2, paragraph 5.1.1.).
2.7.3.6.2. Interface System Multiple Input Dates (ISIM) displays the dates when
interfacing system files were received for input to the SIRS database for the Initial,
Final, and Summary computations, if applicable. The system OPRs primarily use this
data.
2.7.3.6.3. The OSTD screen displays the comparison between the past RDE demands
provided by the Wholesale management Efficiency Reports System
(WMER)(D035B) and the RDE future requirements projected by the other Services.
The past 8 qtrs of data and 20 qtrs of future RDE requirements are displayed. The
Service (Army, Navy, Marines, or Other) must be selected to view the comparison
data (see AFMCMAN 23-101, Volume 4, paragraph 9.3.7.).
2.7.3.7. The PD PRELOG Data menu has three selections. Reference AFMCMAN 23-
101, Volume 5, Chapter 4.
2.7.3.7.1. PEL displays PRELOG error data. Data can be accessed by site ID; site
and division; or by site, division, and ES code (see AFMCMAN 23-101, Volume 5,
paragraph 4.7.).
2.7.3.7.2. PES displays summary PRELOG error data. Data can be accessed by site
ID, site and division, or by site, division and ES code (see AFMCMAN 23-101,
Volume 5, paragraph 4.8.).
2.7.3.7.3. PSI displays information about the SGMs that were selected for PRELOG
screening. Data can be accessed by site ID, division, or ES code (see AFMCMAN
23-101, Volume 5, paragraph 4.6.).
42 AFMCMAN23-101V1 17 NOVEMBER 2016
2.7.3.8. Selecting PFI from the SIRS menu displays the IRL menu (reference
AFMCMAN 23-101, Volume 4, paragraph 12.2.). The IRL menu provides the
capability to select stock numbers that need to be reviewed by site, division, IMS code,
and ES code. The user must select “no computes,” terminations, buys, excesses, or
repairs. The screen will re-appear with the selected data and any informational messages
to identify possible discrepancies in the data elements.
2.7.3.9. Selecting Repair Products (RPR) from the SIRS menu displays data if there is a
JR item and the item has more serviceable assets than are currently required, and the
assets could be issued to the JR line to save money and time.
2.7.3.10. The Safety Level Table Data (SLTD) menu has six selections. The BSBS
BP/SMC/BSO table lists the BP and SMC combinations used by SIRS. The Mission
Design Goal/Floor Factor Table (MGFT) lists the aircraft target/goals. The IMS/MM and
ESs use these tables. The D200A OPRs use the other tables (see AFMCMAN 23-101,
Volume 2, Chapter 3, paragraph 3.2.1.).
2.7.3.10.1. BKBV BSO KEY/BSO Value Results Table looks like the file
maintenance BVRT table (see AFMCMAN 23-101, Volume 2, paragraph 3.5.) and
displays the Budget Support Objective (BSO) values and results that are used in the
AAM computation.
2.7.3.10.2. The BSBS BP/SMC/BSO Table looks like the file maintenance BSBT
table and displays all BPs and SMCs along with the BSO for each BP-SMC
combination. The BSBT table contains the additional field Start Comp (see
AFMCMAN 23-101, Volume 2, paragraph 3.2.2.).
2.7.3.10.3. The BSMD BP/SMC/Pseudo MD screen looks like the file maintenance
BSMD screen (see Volume 2) and displays the BPs and SMCs along with a 7-
position alphanumeric value for the Mission Design (MD).
2.7.3.10.4. The BSTF BP/SMC Target Fill Rate Table looks like the file maintenance
BTRT table (reference AFMCMAN 23-101, Volume 2, paragraph 3.4.) and displays
the target fill rates for each BP-SMC combination.
2.7.3.10.5. The MAMD Aircraft Availability Model MDS/MD screen looks like the
file maintenance MAMD table (reference AFMCMAN 23-101, Volume 2, paragraph
3.7.) and displays data sorted by Mission Design Series (MDS), then by MD within
an MDS.
2.7.3.10.6. The MGFT looks like the file maintenance MGFT table (see AFMCMAN
23-101, Volume 2, paragraph 3.8.) and displays data used by the Aircraft Availability
computation.
2.7.3.11. The SND menu has 18 selections.
2.7.3.11.1. ADRQ Additive Requirements displays all time-phased additive
requirements that have been input for the CSN. The additives are listed two per page
until all applicable additives are displayed. The Forward key is used to scroll through
all of the additives that have been input for a selected stock number (see AFMCMAN
23-101, Volume 4, paragraph 5.2.).
AFMCMAN23-101V1 17 NOVEMBER 2016 43
2.7.3.11.2. ALVW displays the time-phased adjusted levels by SRAN for all SRANs
with adjusted levels. It is used to identify all of the SRANs with adjusted levels or to
access a specific SRAN. The Forward key is used to scroll through all of the adjusted
levels (see AFMCMAN 23-101, Volume 4, paragraph 4.5.2.).
2.7.3.11.3. ARCR displays the A-R computational results of using data from the
previous screens. The ARCR is page 3 of the A-R series of display screens (see
AFMCMAN 23-101, Volume 4, paragraph 7.6.).
2.7.3.11.4. ARD displays the past four qtrs of Asset Reconciliation data and provides
the total acquired and starting asset position. The ARD is page 1 of six screens that
display A-R data. The six screens of the Asset Reconciliation and their applicable
page numbers are: 1) ARD, 2) Asset Reconciliation Losses and Gains, (ARLG), 3)
ARCR, 4) Asset Reconciliation On-Order Assets (AROO) 5), Asset Reconciliation
Due-In (ARDI) Assets, and 6) Asset Reconciliation On-Hand (AROH) Assets. Any
of the six screens can be accessed from any of the other Asset Reconciliation screens
by pointing and clicking to the page numbers at the bottom of the screens (see
AFMCMAN 23-101, Volume 4, paragraph 7.4.).
2.7.3.11.5. ARDI Assets displays the due-in asset quantities that were reported and
updated for the past four qtrs. The ARDI is page 5 of the Asset Reconciliation series
of display screens (see AFMCMAN 23-101, Volume 4, paragraph 7.8.).
2.7.3.11.6. ARLG displays the past four qtrs of asset gains and losses by individual
category. The ARLG is page 2 of the A-R series of display screens (see AFMCMAN
23-101, Volume 4, paragraph 7.5.).
2.7.3.11.7. AROH Assets displays the on-hand asset quantities that were reported
and updated for the past four qtrs. Use the scroll feature to see additional lines of
data. The AROH is page 6 of the asset reconciliation series of display screens (see
AFMCMAN 23-101, Volume 4, paragraph 7.9.).
2.7.3.11.8. AROO Assets displays the on-order quantities that were reported and
updated for the past four qtrs. The AROO is page 4 of the A-R series of display
screens (see AFMCMAN 23-101, Volume 4, paragraph 7.7.).
2.7.3.11.9. BMD displays the BMD assigned to an individual CSN. Data elements
are site code, IMS code, ES code, item name, ERRC, item PSC, budget code, SMC,
item category, comp code, safety level exclusion indicator, unit price, FUP, ICS/RIW
code and expiration date, Deferred Disposal Code (DDC) and level, weapon system
life code, Other War Reserve Materiel Exclusion (OWRM EXCL) indicator, FIC,
new item code, and lot size quantity (see AFMCMAN 23-101, Volume 4, Chapter
1).
2.7.3.11.10. The CARD screen displays the asset position, by category and “pick-off
point,” of the item by CSN. The screen contains five pages, which can be accessed
by pointing and clicking to the page numbers at the bottom of the screen. SCC X
assets are displayed on page 1 (see AFMCMAN 23-101, Volume 4, paragraph 6.11.)
The five pages of the CARD screen are: 1) Non time-phased assets for serviceable
and unserviceable assets, 2) Time-phased assets by pick-off points, 3) Total asset
44 AFMCMAN23-101V1 17 NOVEMBER 2016
quantities by pick-off points, 4) Total asset quantities at the buy point, and 5)
Obsolete CSNs.
2.7.3.11.11. IPD displays the past and future peacetime item installed programs and
future wartime item installed programs by application, type, and service. The data
can be accessed by all or individual applications, types, or Service codes (see
AFMCMAN 23-101, Volume 5, paragraph 3.5.2.).
2.7.3.11.12. NTPD displays the serviceable, unserviceable, and Technical Order
Compliance (TOC) assets by individual asset category and CSN. Also, it provides
SCC X assets (see AFMCMAN 23-101, Volume 4, paragraph 6.7.).
2.7.3.11.13. PLD displays the pipeline days, and the lead times (administrative and
production) in both days and months. The pipeline days included are the base Order
and Shipping Time (O&ST) days, base repair cycle days, JR stock level days, Non-
Job-Routed (NJR) stock level days, and the five elements of the DRC days. The
time-phased DRC days, along with the time-phased effective date, are also displayed
(see AFMCMAN 23-101, Volume 4, Chapter 3).
2.7.3.11.14. RDEO to Other Services displays four qtrs of projected RDE recurring
and non-recurring demands, and unserviceable returns that have been forwarded to
another Service as the AF requirement (see AFMCMAN 23-101, Volume 4,
paragraph 9.2.).
2.7.3.11.15. The SNIC screen consists of two pages. Page 1 displays the site gains
and changes for stock numbers where the FSC, MMAC, AF Manager, or ERRC have
changed. Page 2 displays the losing data for items that have been replaced by or
consolidated with another stock number. Either page may be accessed by pointing
and clicking to the page numbers at the bottom of the screen (see AFMCMAN 23-
101, Volume 4, paragraph 12.4.2.).
2.7.3.11.16. TPAD displays the due-in and on-order assets, by category, by CSN,
that are used in the computation (see AFMCMAN 23-101, Volume 4, paragraph
6.10.).
2.7.3.11.17. TRND displays the past four qtrs of data element values that were
resident in the history files for the Summary computations, for the SGM, to indicate
trends over time. There are seven pages of trend data that can be accessed by
pointing and clicking to the page number at the bottom of the screen. The type of
trend data is available on the following pages: page 1 – BMD, page 2 – PLD, page 3
– computed requirements at the buy point, page 4 – assets used in the computation at
the buy point, page 5 – MISTR input requirements, page 6 – MISTR output
requirements and page 7 – factors (rates and percents) used in the computation (see
AFMCMAN 23-101, Volume 2, Chapter 6).
2.7.3.11.18. WARD displays the rates, percents, pipelines, and number of users
values that were used in the OWRM computation (see AFMCMAN 23-101, Volume
3).
2.7.3.12. The Table Data (TBLD) menu has 16 selections. The Inflation Index (INI)
table lists the inflation factors used to compute the FUPs. The OWRM table lists the
AFMCMAN23-101V1 17 NOVEMBER 2016 45
values used by the OWRM computation. The three standard data tables contain data used
as default values in the SIRS computation. The IMs and ESs use these tables. The OPRs
use the other tables (see AFMCMAN 23-101, Volume 2, Chapter 3).
2.8. File Maintenance Screens. From the File Maintenance Main menu, select the SIRS
“menu.” The SIRS File Maintenance menu has seven selections. The IMS/MM and ES will use
the SND selection to do most of their file maintenance (see paragraph 2.10.6).
2.8.1. The user must have a valid USERID and password to file maintain SIRS data. The
SIRS Functional OPR user profile allows access to all SIRS file maintenance screens,
including the only access to the Group Recomputation screen and to the Table Data (see
AFMCMAN 23-101, Volume 2, paragraph 2.10.). The site OPR and IMS/MMs’ user
profiles allow access to most SIRS file maintenance screens. The ES’s user profile allows
access to a few of the SIRS file maintenance screens. The ES also requires a USERID and
password that allows access to the API system’s AI and PRGM file maintenance screens.
The ES file maintains applications and program data (see AFMCMAN 23-101, Volume 5,
paragraphs 3.19., 3.20., and 3.26.). In SIRS, if the IMS/MM or ES can access a screen,
access is granted for any stock number. If file maintenance is done, the USERID for the
person will be recorded on the Notepad.
2.8.2. The SIRS file maintenance screens can only be accessed after the Initial computation
is done and before the Final computation has started, and after the Final computation is done
and before the Summary computation has started. When using GUI, spaces will not be input
in the numeric fields. Users will enter the number and SIRS will right justify it. If not using
GUI, file maintenance of numeric fields can be done three ways: fill the numeric field with
numbers; space over to the first column that requires a number and enter the number; or enter
the number in the first position and space out the rest of the field.
2.8.3. Notepad. The Notepad is not a word processor. For each data element, SIRS can
store 10 lines of 79 characters each. The user must use the Tab key to move from line to line.
Notepad text can be altered in several different ways. If the user chooses not to input text, a
confirmation message appears stating that the file maintenance action will be disregarded. If
text exists, the user can type over existing lines, add, or delete data. Text cannot be totally
blanked out if a file maintained value exists for this cycle. Only those lines with non-blank
text are retained on the database. The Notepad displays the old value (as of the last
computation) along with the SRC and the new value. SIRS will not accept file maintenance
without an explanation on a Notepad, for the data element. The documentation will remain
in SIRS until it is removed or changed during the current processing cycle. The Notepad
documentation is printed at the end of some products. After the Summary computation is
run, the documentation stays with the history file and cannot be changed.
2.8.3.1. There are three generic Notepads in SIRS. File maintenance is not required to
update them. They can be used for general information that will be noted for the item or
when an item level Notepad is not available. For example, the SIRS user may want to
explain why a record was deleted, or why an unusual actual data value was not changed.
Element level Notepads do not exist in these cases, and the generic Notepad can be used
in their place. The generic Notepads are located on the Factor Data screen (menu
selection SIRS FM SND FACD), on the Asset Reconciliation Data screen (menu
selection SIRS FM SND ARD), and on the SGM Comp Worksheet Rqmts screen (menu
46 AFMCMAN23-101V1 17 NOVEMBER 2016
selection SIRS FM CW). (Note: The generic Notepad is not available on the SIRS FM
CW screen for INS and NSO items.)
2.8.4. SMCW. Selecting the CW option, takes the user to page 1 of the SMCW file
maintenance screen (see AFMCMAN 23-101, Volume 3, paragraph 1.16.1.). The IMS/MM
can file maintain the FMS RQMT and FMS PR QTY. The IMS/MM will select “PUSH
RDE TO PICA” when they want to send revised Projected Recurring Demands to the
Primary Inventory Control Activity (PICA) from the March, June or December cycles (see
AFMCMAN 23-101, Volume 4, paragraph 9.2.2.).
2.8.5. FRIR. OPRs, IMS/MMs, and ESs with valid SIRS file maintenance USERIDs and
passwords can initiate a computation on an individual item. This is done after data has been
file maintained in SIRS. Therefore, when the SIRS file maintenance screens are closed, a
“For Real” recomputation cannot be done. The “For Real” updates the computation results
that can be viewed online in the SIRS. This recomputation does not change data sent to
interfacing systems including CSIS. Only data resulting from a SIRS computation (Initial,
Final, and Summary) are used to update CSIS (see AFMCMAN 23-101, Volume 3,
paragraph 2.2.).
2.8.6. SND. The IMS/MM and ES use the file maintenance screens to file maintain SIRS
data. Using GUI, the user can point and click on the “drop down” boxes to select the desired
file maintenance screen. Without GUI, the command string must be entered in the CMD line
at the bottom left hand side of the screen. Note: The screen strings displayed below are the
commands to be used without the GUI capability. With GUI, the access sequence for the
“FM” and “SIRS” is reversed on the “drop down” boxes.
2.8.7. Table Data. The SIRS Functional OPR file maintains the table data used by SIRS (see
AFMCMAN 23-101, Volume 2, Chapter 3.)
2.8.8. What If Item Recomputation (WTIR). OPRs, IMS/MMs, and ESs with valid SIRS
file maintenance USERIDs and passwords can initiate a “simulation” computation on an
individual item. The “What If” is used to temporarily change data elements on the
simulation database and produce results that can only be seen on a hard copy product. The
“WTIR does not permanently change any SIRS data element, nor is the data used to update
CSIS. The “What If” can be run any time the database is available, and when the SIRS file
maintenance screens are closed. When an error is not corrected during the file maintenance
process prior to the SIRS Summary computation or when the user wants to see the impact of
a management decision on the item, the user can request a “What If” recomputation to
simulate the computational results with the corrected or projected data elements (see
AFMCMAN 23-101, Volume 3, paragraph 2.3.).
2.9. Output Products Screens. Users must have valid USERIDs and passwords to obtain
output products from SIRS. Select OP from the RMS-FOE menu, then select SJR, then select
SIRS to get the Output Products Submit Job Request SIRS menu.
2.9.1. The AAM reports are selected from the SIRS Secondary Item Requirements Product
Selection screen. These reports are described in AFMCMAN 23-101, Volume 3, paragraphs
3.2.7. - 3.2.12. The SIRS Functional OPR uses these reports.
2.9.2. The ES Report (EPSS) screen allows the user to select the factors/usage printout, the
PRELOG Equations product, the PRELOG plots, the MISTR RPR and Repair Data product
AFMCMAN23-101V1 17 NOVEMBER 2016 47
or the SRAN Usage product by SGM, or by part number, or by site, division, and ES code
(see AFMCMAN 23-101, Volume 5, paragraph 5.4.).
2.9.3. The IPD product screen allows the user to select past peacetime, future peacetime, or
future wartime item installed programs. It is possible to limit the product by selecting an
application or a program type (see AFMCMAN 23-101, Volume 5, paragraph 3.5.1.).
2.9.4. The Input System Data (ISD) Product Selection screen allows an OPR to request ISD
reports for a site, one report at a time. These reports provide summary information about the
data received from interfacing system (see AFMCMAN 23-101, Volume 2, paragraph 4.4.).
2.9.5. The Major Command (MAJCOM) Usage reports selection screen allows an OPR to
request hard copies of the Spares Requirements Review Board (SRRB) MAJCOM usage data
that is reported via the Base Consumption Data Report Format (7SC transaction); reference
AFH 23-123, Volume 2, Part 1, Integrated Logistics System-Supply (ILS-S), Materiel
Management Operations. There are two types of products that can be printed: MAJCOM
usage history and MAJCOM breakout percentage (see AFMCMAN 23-101, Volume 5,
paragraph 1.14.).
2.9.6. The OPR Reports (OPSS) menu allows the OPR to select a product by SGM; site and
division; site, division and IMS code; or by site, division and ES code. The products are
SGM CW, SGM OWRM CW, A-R, Consolidated Assets, INS/NSO Item Status Listing,
Factors/Usage Printout, Adjusted Level Verification worksheet, SRAN Assets, SRAN Usage,
PRELOG Equations, PRELOG Plots, PRELOG Selected Information, and PRELOG Error
List and Summary (see AFMCMAN 23-101, Volume 2, paragraph 4.2.).
2.9.7. The IMS Reports screen allows the user to select any of the following products, by
SGM, or by site, division, and IMS code: Asset Reconciliation, SGM CW, SGM OWRM
CW, Consolidated Assets, Factors/Usage Printout, Adjusted Level Verification, MISTR RPR
and Repair Data, INS/NSO Status Listing, SRAN Assets and SRAN Usage Product (see
AFMCMAN 23-101, Volume 4, paragraph 12.5.).
2.9.8. The Quality Control Checklist Selection screen allows the site SIRS OPR to get a list
of items with various conditions (i.e., all items coded INS). See AFMCMAN 23-101,
Volume 2, paragraph 4.3.
2.9.9. Changing the default printer: The users’ default printer can be changed in D200 at the
User Function Keys screen. This screen can be reached by selecting Main, UDV, FM,
UVFK from the RMS GUI software (FM UDV UVFK). Note: It is not recommended the
user change any of the user function keys on the screen. More information on how to print
can be found on the D200A web site.
2.10. Source Reference Codes. Many data elements in SIRS have an SRC. SRCs are system
generated and cannot be file maintained.
48 AFMCMAN23-101V1 17 NOVEMBER 2016
Chapter 3
QUALITY REVIEWS
3.1. General.
3.1.1. These procedures apply to personnel responsible for developing, adjusting and
reviewing SIRS requirements data. The site management will ensure adherence to these
procedures and take action as deemed necessary in response to the quality review team’s
reports and recommendations.
3.1.2. As part of an on-going process, the site SIRS quality review teams will:
3.1.2.1. After the summary, review the items comprising the top 10% of the total a) buy
dollar requirement and b) repair dollar requirement (POS plus RSP requirements) using
the highest dollar value in the CY + AY at each site starting with the largest dollar
requirements and working down the list before any budget submission. This review may
be conducted as part of the signature cycle.
3.1.2.2. Each cycle, the review team will conduct a quality review on the million dollar
terminations and the million dollar buys within 35 calendar days of the print date of the
Summary computation. Each budget cycle, the review team will conduct a quality
review on the million dollar repairs within 60 calendar days of the print date of the
Summary computation. Based on the IAC, the review team will conduct a quality review
on the million dollar Potential DoD Excess (from the CSIS Approved Force Acquisition
Objective and Retention Position line 21, sum of columns 3, 4 and 5) within 90 calendar
days of the print date of the Final/Summary computation. This review may be conducted
as part of the signature cycle.
3.1.2.3. Review a random selection of items twice a year at each site to include buy,
termination (including termination requests), excess (including the retention and disposal
decisions on excess assets), repair, DDCs, modification, demand forecast accuracy, one-
way interchangeable items and other items of interest such as items with
estimated/median factors. Items may be selected from the IOA listings, CSIS or ABCS.
3.1.2.4. Use the Quality Review Checklist, shown in Table 3.1 through Table 3.11 for
reviewing items and reporting errors.
3.1.2.5. Involve the item management team in the review process. When necessary,
personnel from other functions (e.g., engineering, contracting and manufacturing, etc.)
will be involved.
3.1.2.6. Report review findings in writing to first line supervisors.
3.1.2.7. Retain Review Checklist and management briefing for at least one year.
3.1.2.8. Take corrective action as appropriate.
3.1.2.9. Summarize review results and present to wing management; indicate error
trends, recurring errors, type (data element) errors, or any other error category that can be
used as a baseline for improving the effectiveness of the SIRS.
3.1.2.10. Refer SIRS and/or SIRS User Manual deficiencies to the AFMC SIRS OPR.
AFMCMAN23-101V1 17 NOVEMBER 2016 49
3.1.3. The IMS/MMs, ESs, and PMSs will:
3.1.3.1. Make available to the SIRS quality review team, on an item basis, all data
necessary for review, analysis, and evaluation. The documentation must contain a
detailed audit trail of all actions affecting an item’s position.
3.1.3.2. Upon request, participate in reviews.
3.1.3.3. Correct reported errors as soon as possible.
3.1.3.4. Comply with this manual regarding retention and retirement of documentation.
3.1.4. Sites are not required to use the checklists in this chapter to conduct reviews on PBL
contract items in which the contractor is required to perform all the demand and supply
planning for the items.
3.1.5. Each squadron responsible for working items in D200A will conduct internal reviews.
A review will be conducted on the items comprising the top 10% of the total:
3.1.5.1. Termination dollars for the items within their squadron starting with the largest
dollar value and working down the list prior to the computation asset cutoff date for
coding the terminations in ABCS after the Summary computation.
3.1.5.2. Buy dollar requirement (POS plus RSP requirements) for the items within their
squadron using the highest dollar value in the CY + AY, BY or EY starting with the
largest dollar requirements and working down the list prior to the beginning of the next
D200A quarterly cycle after the Summary computation on budget cycles.
3.1.5.3. Repair dollar requirement (POS plus RSP requirements) for the items within
their squadron using the highest dollar value in the CY, AY, BY or EY starting with the
largest dollar requirements and working down the list prior to the beginning of the next
D200A quarterly cycle after the Summary computation on budget cycles.
3.1.5.4. Excess dollars for the items within their squadron starting with the largest dollar
value and working down the list prior to the beginning of the next D200A quarterly cycle
after the Summary computation on non-budget cycles. This review may be conducted as
part of the signature cycle.
50 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.1. IMS/MM/PMS Quality Review Checklist For Items with ERRC Code “T”.
NSN IMS/MM Computation
Cycle
Impacting Errors Non-Impacting
Errors
Reason
for
Review
Buy
Repair
Terminat
ion Other
ERRC Item Category Dollar Value Impact Recomputation
Required?
Element OK Error Nature of Error Comments/
Recommended
Corrective
Action
1. Budget Code A. BP does not reflect
the item ERRC code and
applications.
B. SMC does not reflect
applicable weapon
system(s) shown as
applications in the item
future programs.
2. Unit Price A. Latest price not
used.
B. Price is not
documented by AFMC
Form 318, or historical
AFMC Form 339, Due-
In Assets Status Record.
C. Estimated price is
not documented.
3. DOLP A. AFMC Form 318 or
339 does not verify
DOLP.
B. DOLP does not
match unit price
contract award date.
C. No documentation
for not using latest AF
contract award date.
4. ALT A. ALT does not come
from AFMC Form 318,
339 or PR and contract
and equal time from
initiation of latest PR to
contract award plus 7
AFMCMAN23-101V1 17 NOVEMBER 2016 51
calendar days.
B. No documentation
for using default or file
maintained data.
C. Did not use actual or
estimated.
D. Acquisition and
Due-In System (J018R)
code 65 awaiting funds
delay not deducted.
E. In error.
5. PLT A. Actual PLT did not
come from AFMC Form
318, 339 or contract and
equal time from contract
line item award to 10%
delivery. RIID adds 15
calendar days for items
that have not obtained
10% delivery.
B. No documentation
for using default or file
maintained data.
C. In error.
6. OWRM EXCL No documentation for
use of this code.
7. Safety Level
Exclusion
Indicator (SFTY
LVL EXCL
IND)
No documentation for
use of this code.
****N/A to
INS/NSO****
8. Item Category
Code (ICC)
A. Item has too many
demands to remain
NSO.
B. NSO code not
correctly used for low
demand item.
C. LOT code L
incorrect.
D. Demand pattern
indicates “I” incorrect.
Cataloging action not
submitted to change
AAC.
9. Activity Code Not representative of
item’s demands.
52 AFMCMAN23-101V1 17 NOVEMBER 2016
10. ICS/ RIW A. Not coded/correct in
D200A.
B. Not coded/correct in
ABCS.
11. ICS/RIW
EXPIR DATE
A. Not present with
ICS/RIW Indicator.
B. Not correct.
12. DDC/Level Documentation to
support IMS/MM-
assigned DDC F, G, M
or R inadequate or
missing.
13. O&ST Days No explanation for file
maintained data.
****N/A to
INS/NSO****
14. Overhaul Stock
Level Job-
Routed
(JR)/NJR
A. Blank.
B. No documentation
for using other than
defaults.
****N/A to
INS/NSO****
15. Base Repair
Cycle Days
Using other than actual
or default without
documentation. No
explanation for file
maintained data.
****N/A to
INS/NSO****
16. Base Processing
Days
No explanation for file
maintained data.
****N/A to
INS/NSO****
17. Reparable
Intransit Days
No explanation for file
maintained data.
****N/A to
INS/NSO****
18. Supply To
Maintenance
Days
Shop Flow Days
Serviceable
Turn-In Days
A. Supply to
Maintenance Days -
other than default value
without documentation.
B. Shop Flow Days
1) Weighted average
incorrect due to errors
contained in the Report -
MISTR Repair and
AFMCMAN23-101V1 17 NOVEMBER 2016 53
Repair Data:
a) Actual shop flow
days incorrect on
production number or
CLIN level.
b) Production incorrect.
2) Incorrectly used
default when actual data
available.
3) Did not use default
when no actual data was
available.
C. Serviceable Turn-in
Days - other than 1 day
used without
documentation.
****N/A to
INS/NSO****
19. Time -Phased
Days
DRC Effective
Date
When changing from
organic to contract or
vice versa, time-phased
DRC times/date were
not used.
****N/A to
INS/NSO****
20. URC/Latest
Repair Cost
(LRC)
A. Not correct for
CSIS/Customer Pricing/
Materiel Cost Recovery
(MCR) development
1) Weighted average
incorrect due to errors
contained in the Report -
MISTR Repair and
Repair Data:
a) Actual URC in error
on production number
or CLIN level.
b) Production incorrect.
2) Incorrectly used
default when actual data
available.
3) No justification for
using other than actual
or default.
B. Does not match
ABCS weighted price
54 AFMCMAN23-101V1 17 NOVEMBER 2016
due to file maintenance
difference between
D200A and ABCS.
21. On-Order Assets A. On-order quantities
do not concur with
AFMC Forms 339.
B. PR funded is not
correct.
C. PR unfunded is not
correct.
D. Inadequate
documentation of on-
order assets.
22. Due-In Assets A. In error IAW
supporting
documentation.
B. Not documented
properly.
23. On-Hand
Assets/Asset
Reconciliation
A. No documentation
for why reported assets
were adjusted.
B. Inadequate
documentation for
adjustments to starting
position.
C. Incorrect adjustment
to starting position.
D. Inadequate
documentation for
losses/gains.
E. Losses/gains
incorrect.
F. Condemnations on
Asset Reconciliation
Report do not match
Factor Printout and ES
has not removed any
condemnations not
caused by “fair/wear”.
H. Variance greater
than allowed without
research or correction.
I. Third consecutive
variance not taken or
taken without adequate
justification/research.
AFMCMAN23-101V1 17 NOVEMBER 2016 55
24. OIM/DLM
Program
A. First digit of PSC
not zero, but OIM
program missing.
B. Digits 2, 3 or 4 of
PSC not zero, but DLM
program missing.
25. Special Levels A. No
documentation/justificat
ion for IMS/MM file
maintained information.
B. Adjusted Level
Verification Worksheet
for the special level is
missing and/or
supporting documents
are missing (i.e.,
Adjusted Stock Level
Master Summary, AF
Form 1996, Adjusted
Stock Level).
26. WRM A. No documentation/
justification for
IMS/MM file
maintained information.
B.
Requirements/Execution
Availability Logistics
Module (REALM)
(D087H) Prime Item
Print to support RSP
requirement is missing.
27. Additives A. No documentation/
justification for
IMS/MM file
maintained information.
B. Additive is missing,
incorrect, or not in
compliance with policy.
C. Copy of annual
validation or supporting
documentation missing.
D. FMS H-coded
backorder additive in
error. Backorders not
documented or attached.
E. No documentation
56 AFMCMAN23-101V1 17 NOVEMBER 2016
when RDE requirements
do not match RDE
Generations.
F. I&S additive
requirement passed from
sub NSN:
1) Computation not
provided for review.
2) Errors in the sub
computation result in
additive error.
G. DOTM in error.
28. Number Of
Users/Time-
Phased Users
A. Number of users do
not match ISA screen.
B. There is no
documentation for any
variance.
C. Time-phased users
are missing or incorrect.
D. No Adjusted Level
Verification Worksheet
for users greater than
ISA screen.
****N/A to
INS/NSO****
29. One-Way
Interchangeable
Item meets criteria in
paragraph 1.10.1. and
additives, special levels,
minimum depot stock
level and/or B21 have
not been zeroed.
30. Lot Size Lot size not 1. No
documentation for
change.
31. Computation
Other (applies
after Summary
computation is
run)
A. “What If”
recomputation required,
but is missing.
B. All corrections not
made during file
maintenance.
C. Manual corrections
incomplete/incorrect.
D. Change to factors on
recomputation not made
to OWRM computation.
32. Signatures and A. Signatures are not
AFMCMAN23-101V1 17 NOVEMBER 2016 57
Documentation
(applies after
Summary
computation is
run)
IAW Attachment 2.
B. Previous signature is
no longer valid. (Good
for 1 year if dollar
threshold is not
breached.)
C. For Terminations:
1) Termination code
and a narrative
explanation are not
annotated on the
computation.
2) No Termination
Model.
3) Decision not to
terminate on-order
assets is not adequately
justified.
D. For Unfunded PR/
MIPRs - Justification
for not
reducing/canceling or
note indicating date of
amendment to
reduce/cancel is not on
the computation.
E. For Excess Assets -
Retention/disposal
quantity with
appropriate coding is
not annotated on
computation. Disposal
document number is not
on the computation and
Asset Reconciliation
Report nor added to
Notepad on Asset
Reconciliation next
cycle. Have not been
coded in RDS.
For Repair – CY, AY,
BY, and/or EY repair
dollar not annotated on
computation.
33. Standard Buy
Format (applies
A. Is not filled out
completely.
58 AFMCMAN23-101V1 17 NOVEMBER 2016
after Summary
computation is
run)
B. Deferrals are not
scrubbed and /or not
documented.
C. With adequate file
maintenance, not in buy.
D. Mathematical error
in buy.
34. ABCS (applies
after Summary
computation is
run and ABCS
worked)
A. ABCS does not
match D200A Summary
or “What If”
recomputation.
B. ABCS changed
without documentation.
C. ABCS FUP is in
error.
Additional Comments
Reviewer
Office Symbol Date
AFMCMAN23-101V1 17 NOVEMBER 2016 59
Table 3.2. IMS/MM Quality Review Checklist For Items with ERRC “N” or “P”.
NSN IMS/MM Computation
Cycle
Impacting Errors Non-Impacting
Errors
Reason
for
Review
Buy
Repair
Termin
ation
Other
ERRC Item Category Dollar Value Impact Recomputation
Required?
Element OK Error Nature of Error Comments/
Recommended
Corrective
Action
1. Budget Code A. BP does not reflect
the item ERRC code
and applications.
B. SMC does not
reflect applicable
weapon system(s)
shown as applications
in the item future
programs.
2. Unit Price A. Latest price not
used.
B. Price is not
documented by AFMC
Form 318 or 339.
C. Estimated price is
not documented.
3. DOLP A. AFMC Form 318
or 339 does not verify
DOLP.
B. DOLP does not
match unit price
contract award date.
C. No documentation
for not using latest AF
contract award date.
4. ALT A. ALT did not come
from AFMC Form
318, 339 or PR and
contract and equal
time from initiation of
latest PR to contract
60 AFMCMAN23-101V1 17 NOVEMBER 2016
award plus 7 calendar
days.
B. No documentation
for using default or
file maintained data.
C. Did not use actual
or estimated.
D. J018R code 65
awaiting funds delay
not deducted.
E. In error.
5. PLT A. Actual PLT did not
come from AFMC
Form 318, 339 or
contract and equal
time from contract line
item award to 10%
delivery. RIID adds
15 calendar days for
items that have not
obtained 10%
delivery.
B. No documentation
for using default or
file maintained data.
C. In error.
6. OWRM EXCL No documentation for
use of this code.
7. SFTY LVL
EXCL IND
No Documentation for
use of this code.
***N/A to
INS/NSO***
8. ICC A. Item has too many
demands to remain
NSO.
B. NSO code not
correctly used for low
demand item.
C. LOT code L
incorrect.
D. Demand pattern
indicates “I” incorrect.
Cataloging action not
initiated to change
AAC.
9. Activity Code Not representative of
AFMCMAN23-101V1 17 NOVEMBER 2016 61
item’s demands.
10. ICS/RIW A. Not coded/correct
in D200A.
B. Not coded/correct
in ABCS.
11. DDC/Level Documentation to
support IMS/MM -
assigned DDCs of “F,”
“G,” “M” or “R”
inadequate or missing.
12. O&ST Days A. No explanation for
file maintained data.
***N/A to
INS/NSO***
13. Overhaul Stock
Level JR/NJR
A. Blank.
B. No documentation
for using other than
defaults.
***N/A to
INS/NSO***
14. Base Repair
Cycle Days
A. Only applicable to
ERRC “P” NSNs.
B. Using other than
actual or default
without
documentation. No
explanation for file
maintained data.
***N/A to
INS/NSO***
15. On-Order
Assets
A. On-order
quantities do not
concur with AFMC
Forms 339.
B. PR funded not
correct.
C. PR unfunded is not
correct.
D. Inadequate
documentation of on-
order assets.
16. Due-In Assets A. In error IAW
supporting
documentation.
B. Not documented
properly.
62 AFMCMAN23-101V1 17 NOVEMBER 2016
17. On-Hand
Assets/Asset
Reconciliation
A. No documentation
for why reported
assets were adjusted.
B. Reparables not
sent to disposal or no
documentation for
retaining
unserviceable assets.
18. OIM/DLM
Program
A. First digit of PSC
not zero, but OIM
program missing.
B. Digits 2, 3 or 4 of
PSC not zero, but
DLM program
missing.
19. Special Levels A. No documentation/
justification for
IMS/MM file
maintained
information.
B. Adjusted Level
Verification
Worksheet for the
special level is
missing and/or
supporting documents
are missing (i.e.,
Adjusted Stock Level
Master Summary, AF
Form 1996).
20. Prepositioned
Requirement
(RSP)
No documentation/
justification for
IMS/MM file
maintained
information.
21. Additives A. No documentation/
justification for
IMS/MM file
maintained
information.
B. Additive is
missing, incorrect, or
not in compliance with
policy.
C. Copy of annual
AFMCMAN23-101V1 17 NOVEMBER 2016 63
validation or
supporting
documentation
missing.
D. FMS H-coded
backorder additive in
error. Backorders not
documented or
attached.
E. Security Assistance
Management
Information System
(SAMIS)(W001) not
provided for backup.
F. I&S Additive
requirement passed
from sub NSN:
1) Computation not
provided for review.
2) Errors in the sub
computation result in
additive error.
G. Unauthorized
backorders used.
H. Backorders not
documented or
attached.
22. Number Of
Users/Time-
Phased Users
A. Number of users
do not match ISA
screen, or ISA data not
provided to verify.
B. There is no
documentation for any
variance.
C. Time-phased users
are missing or
incorrect.
D. No Adjusted Level
Verification
Worksheet for users
greater than ISA
screen.
****N/A to
INS/NSO****
23. One-Way
Interchangeable
Item meets criteria in
paragraph 1.10.1.
64 AFMCMAN23-101V1 17 NOVEMBER 2016
and additives, special
levels and/or
minimum depot stock
level not zeroed.
24. Signatures and
Documentation
(applies after
Summary
computation is
run)
A. Signatures are not
IAW Attachment 2.
B. Previous signature
is no longer valid.
(Good for 1 year if
dollar threshold is not
breached.)
C. For Terminations -
1) Termination code
and a narrative
explanation are not
annotated on the
computation.
2) No Termination
Model.
3) Decision not to
terminate on-order
assets is not
adequately justified.
D. For Unfunded
PR/MIPRS -
Justification for not
reducing/canceling or
note indicating date of
amendment to
reduce/cancel is not on
the computation.
E. For excess assets-
retention/disposal
quantity with
appropriate coding is
not annotated on the
computation.
Disposal document
number is not on
computation. Has not
been coded in RDS.
25. Standard Buy
Format (applies
after Summary
computation is
run)
A. Is not filled out
completely.
B. Deferrals are not
scrubbed and/or not
documented.
AFMCMAN23-101V1 17 NOVEMBER 2016 65
C. With adequate file
maintenance, not in
buy.
D. Mathematical error
in buy.
26. ABCS (applies
after Summary
computation is
run and ABCS
worked)
A. ABCS does not
match D200A
Summary or “What If”
recomputation.
B. ABCS changed
without
documentation.
C. ABCS FUP is in
error.
27. Other (applies
after Summary
computation is
run)
A. Computes an
erroneous
Management of Items
Subject To Repair
(MISTR) requirement
for consumable item.
B. What If
recomputation is
required, but is
missing.
C. Manual corrections
incomplete/incorrect.
Additional Comments
Reviewer Office Symbol Date
66 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.3. AF Secondary Inventory Control Activity (SICA) Nonconsumable Item
Materiel Support Code (NIMSC) 5 Checklist.
NSN IMS/MM Computation
Cycle
Impacting Errors Non-Impacting
Errors
Reason
for
Review
Buy
Repair
Termina
tion
Other
ERRC Item
Category
Dollar Value Impact Recomputation
Required?
Element OK Error Nature of Error Comments/
Recommended
Corrective
Action
1. Budget Code A. Does not have budget
code NIM5.
B. AF SICA, but
NIMSC is not 5. Item
must not have NIM5 in
the budget code.
2. Unit Price D043 price not used and
backup documentation
missing.
3. DOLP Julian date is not 00000.
4. SFTY LVL
EXCL IND
No documentation for
use of this code.
**N/A to INS/NSO**
5. Number Of
Users/ Time-
phased Users
A. Number of users does
not match on ISA screen
and there is no
documentation for the
variance.
B. Time-phased users
are missing or incorrect.
C. No Adjusted Level
Verification Worksheet
for users greater than ISA
screen.
**N/A to INS/NSO**
6. Activity Code A. Code does not meet
usage/dollar criteria.
B. Code does not ensure
that item will be
reviewed as a minimum
AFMCMAN23-101V1 17 NOVEMBER 2016 67
in the September cycle.
7. DDC/Level Documentation to
support IMS/MM-
assigned DDC F, G, M or
R inadequate or missing.
8. O&ST Days A. Actual exceeds
default by more than 10
calendar days without
documentation.
B. No explanation for
file maintained data.
9. Overhaul Stock
Level JR/NJR
Days
JR values are not zero or
NJR missing. (AF depot
repair is not authorized
for AF SICA NIMSC 5
items.)
10. Base Repair
Cycle Days
A. Actual exceeds
default by more than 10
calendar days without
documentation.
B. Using other than
actual or default without
documentation. No
explanation for file
maintained data.
C. Days are not zero for
100% NRTS items.
11. Assets A. Asset reconciliation
NOT required.
B. Disposition
instructions needed for
assets in computation.
12. OIM/DLM
Program
A. First digit of PSC not
zero, but OIM program
missing.
B. Digits 2, 3 or 4 of
PSC not zero, but DLM
program missing.
13. Special Levels A. No
documentation/justificati
on for IMS/MM file
maintained information.
B. Adjusted Level
Verification Worksheet
for the special levels is
missing and/or
68 AFMCMAN23-101V1 17 NOVEMBER 2016
supporting documents are
missing (i.e., Special
Level Master Summary,
AF Form 1996).
14. WRM A. No documentation/
justification for IMS/MM
file maintained
information.
B. D087H product to
support computation RSP
requirement is missing.
15. Additive
Requirements
A. No documentation/
justification for IMS/MM
file maintained
information.
B. Additive is missing or
incorrect.
C. Copy of annual
validation missing.
16. One-Way
Interchangeable
Item meets criteria in
paragraph 1.10.1. and
additives, special levels,
and/or minimum depot
stock level not zeroed.
17. Signatures and
Documentation
(applies after
Summary
computation is
run)
A. Signatures are not
IAW Attachment 2.
B. Previous signature is
not still valid. (Good for
1 year if dollar threshold
of next signature level
not breached.)
C. For Terminations -
1) Termination code
and a narrative
explanation are not
annotated on the
computation.
2) No Termination
Model.
D. For Unfunded
PR/MIPRS - Justification
for not
reducing/canceling or
note indicating date of
amendment to
reduce/cancel is not on
AFMCMAN23-101V1 17 NOVEMBER 2016 69
computation.
E. For Excess -
Retention/disposal
quantity with appropriate
coding is not annotated
on computation. (Has
request for disposition
instructions been sent to
the PICA for the excess
assets? Will not dispose
of items on which AF is
SICA without written
direction or concurrence
from the PICA.)
Disposal document
number is not annotated
on the computation.
18. Standard Buy
Format (applies
after Summary
computation is
run)
A. Is not filled out
completely.
B. Deferrals are not
scrubbed and/or
documented.
19. ABCS (applies
after Summary
computation is
run and ABCS
is worked)
A. ABCS in error.
B. ABCS does not match
computation.
20. Computation
(applies after
Summary
computation is
run)
A. A re-computation is
needed, but there is not
one.
B. A “What If” re-
computation was used on
Sep cycle after the
summary computation,
but no documentation
that PICA notified to
amend RDE List.
Additional Comments
Reviewer Office Symbol Date
70 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.4. Factors and Usage Quality Review Checklist For Items with ERRC “T”.
NSN ES Computatio
n Cycle
Non-Impacting
Errors
Impacting
Errors
FIC ERRC RTS
Exclusion
ECS/RIW Item Category
Element OK Error Nature of Error Comments/
Recommended
Corrective
Action
1. Item PSC Not compatible with
usage.
2. Application Data
A. Application
1) Application is
missing.
2) Erroneous
applications present.
B. PGM SEL 1) Active program
missing from PSC.
2) Erroneous PSC
used.
3) No OIM program
when OIM usage
reported.
4) No DLM program
requested, yet DLM
usage reported.
C. PGM DEV Field is other than
blank and not
documented.
D. Program Begin
Date
1) Application is
time- phased and
skips qtrs where
application data is
changing.
2) Program begin
date is too old; NSN
or subs not cataloged
at that time.
3) Is less than 2
years back and usage
has reported in qtr
prior to the begin
date.
E. QPA QPA records not
compatible with rest
of application data.
AFMCMAN23-101V1 17 NOVEMBER 2016 71
F. Application
Percent
1) Application
percent is incorrect.
2) Application
percent is not zero
and item meets
criteria in paragraph
1.10.1.
G. Documentation Inadequate
documentation/
justification.
3. Usage
A. Base RTS
1) File maintained
usage is inaccurate or
not adequately
documented.
2) File maintenance
actions inconsistent
from qtr-to-qtr.
3) Other.
B. Base NRTS 1) File maintained
usage inaccurate or
not adequately
documented.
2) File maintenance
actions inconsistent
from qtr-to-qtr.
3) Other.
C. Base
Condemnations
1) Condemnations(s)
are sporadic and have
not been moved to
base NRTS, MISTR
condemnations and
total depot
condemnations.
2) Condemnation(s)
are of non-recurring
nature and have not
been removed.
3) File maintenance
changes not
adequately
documented.
4) Other.
D. Dep Rep Gens 1) No DLM program
identified in PSC.
2) PDM
replacements for
72 AFMCMAN23-101V1 17 NOVEMBER 2016
cause have not been
moved to base NRTS.
3) File maintained
usage inaccurate or
not adequately
documented.
4) File maintenance
actions inconsistent
from qtr-to-qtr.
5) Other.
E. MISTR Repair 1) File maintained
usage inaccurate or
not adequately
documented at
production number or
CLIN level.
2) File maintenance
actions inconsistent
from qtr-to-qtr.
3) Other.
F. MISTR
Condemnations
1) File maintained
usage inaccurate or
not adequately
documented.
2) File maintenance
actions inconsistent
from qtr-to-qtr.
3) Other.
G. Depot
Condemnation
Total
1) Less than MISTR
condemnations.
2) Item is NJR DLM
only and total
condemnation
(CNDM) not equal to
MISTR CNDM.
3) File maintained
usage inaccurate or
not adequately
documented.
4) File maintenance
actions inconsistent
from qtr-to-qtr.
5) Other.
4. OIM Factors
A. Total OIM
Demand Rate
1) Trend in demand
rate is more than
normal, but was
AFMCMAN23-101V1 17 NOVEMBER 2016 73
considered/used.
2) Current rate not
reflective of current
usage.
3) Estimated rates
are considerably
higher or lower than
computed rates, are
not based on any
segment of recent
past history, and are
straight-lined rather
than time-phased.
4) File maintained
usage was not
considered in
estimated rates.
5) Estimates not
adequately
documented.
6) Other.
B. NRTS Percent 1) Does not match
time frame used for
total OIM demand
rate.
2) Equal to zero,
change of ERRC
code not considered/
documented.
3) File maintained
usage was not
considered in
estimated rates.
4) Estimates not
adequately
documented.
C. Base
Condemnation
Percent
1) Not reflective of
actual usage; not file
maintained IAW
AFMCMAN 23-101,
Volume 5, paragraph
2.26.
2) File maintained
usage was not
considered in
estimated rates.
74 AFMCMAN23-101V1 17 NOVEMBER 2016
3) Estimates not
adequately
documented.
D. Base RTS
Exclusion
1) Used but not
documented.
2) Used erroneously
in lieu of research
into erroneous
reporting.
5. MISTR
Condemnation
Percent
A. 100%
condemnation with
no forecasted lower
rate on recoverable
item without change
of ERRC
documentation
provided.
B. Estimates not
adequately
documented.
C. Estimate
considerably higher
than past history,
indicating possible
item replacement
without approved
Improved Item
Replacement
Program (IIRP) or
modification.
D. Other.
6. DLM Factors
A. PDM
1) JR
Condemnation
Percent
2) NJR
Replacement
Percent
3) NJR Program
Percent
a) Invalid split of JR
and NJR for a single
SOR.
b) Trend in depot
usage is more than
nominal, but was not
considered/used.
c) Estimated rates
are considerably
higher or lower than
computed rates, are
not based on any
segment of recent
past history, and are
straight-lined rather
AFMCMAN23-101V1 17 NOVEMBER 2016 75
than time-phased.
d) File maintained
usage was not
considered in
estimated rates.
e) Estimated rates
are not adequately
documented.
f) Rate over 100%
not documented.
B. Engine
Overhaul (EOH)
1) JR
Condemnation
Percent
2) NJR
Replacement
Percent
3) NJR Program
Percent
a) Invalid split of JR
and NJR.
b) Trend in depot
usage is more than
nominal, but was not
considered/used.
c) Estimated rates
are considerably
higher or lower than
computed rates, are
not based on any
segment of recent
past history, and are
straight-lined rather
than time-phased.
d) File maintained
usage was not
considered in
estimated rates.
e) Estimated rates
are not adequately
documented.
f) Rate over 100%
not documented.
C. Nest Higher
Assembly (NHA)
MISTR
1) JR
Condemnation
Percent
2) NJR
Replacement
Percent
3) NJR Program
Percent
a) Invalid split of JR
and NJR for single
SOR.
b) Trend in depot
usage was not
considered.
c) Estimated rates
are considerably
higher or lower than
computed rates, are
not based on any
segment of recent
76 AFMCMAN23-101V1 17 NOVEMBER 2016
past history, and are
straight-lined rather
than time-phased.
d) File maintained
usage was not
considered in
estimated rates.
e) Estimated rates
are not adequately
documented.
f) Rate over 100%
not documented.
7. FIC A. Does the FIC
indicate the
consideration of
usage trends, e.g., 4
qtrs vs. 8 qtrs? (N)
for No.
B. Documentation is
incorrect/incomplete.
8. Signature A. Printout has not
been signed/dated by
the ES.
B. ES has not
signed/dated the
computation,
recomputation,
INS/NSO Item Status
Listing for an item
computing buy or
repair in CY, AY, BY
or EY or termination
or excess.
ADDITIONAL COMMENTS
REVIEWER DATE
AFMCMAN23-101V1 17 NOVEMBER 2016 77
Table 3.5. Factors and Usage Quality Review Checklist For Items with ERRC “N” or “P”.
NSN ES Computatio
n Cycle
Non-Impacting
Errors
Impacting Errors
FIC ERRC RTS
Exclusion
ECS/RIW Item Category
Element OK Error Nature of Error Comments/
Recommended
Corrective Action
1. Item PSC Not compatible
with usage.
2. Application Data
A. Application
1) Application is
missing.
2) Erroneous
applications
present.
B. PGM SEL 1) Active program
missing from PSC.
2) Erroneous PSC
used.
3) No OIM
program when
OIM usage
reported.
4) No DLM
program requested,
yet DLM usage
reported.
C. PGM DEV Field is other than
blank not
documented.
D. Program Begin
Date
1) Application is
time-phased and
skips qtrs where
application data is
changing.
2) Program begin
date is too old,
NSN or subs not
cataloged at that
time.
3) Is less than 2
years back and
usage has reported
in the qtr prior to
the begin date.
E. QPA QPA records not
78 AFMCMAN23-101V1 17 NOVEMBER 2016
compatible with
rest of application
data.
F. Application
Percent
1) Application
Percent is
incorrect.
2) Application
Percent is not zero
and item meets
criteria in
paragraph 1.10.1.
G. Documentation Inadequate
documentation/
justification.
3. Usage
A. Base RTS
1) RTS on ERRC
“N” not removed.
2) File
maintenance
actions
inconsistent from
qtr-to-qtr.
B. Base NRTS NRTS left in
consumable item
usage history. No
NRTS authorized
for ERRC “N” or
“P.”
C. Base
Condemnations
File maintenance
changes not
adequately
documented.
D. Dep Rep Gens 1) Do not match
JR condemnations.
2) Erroneous NJR
replacements not
removed.
E. Depot
Condemnation
(Note: by NSN)
1) Not equal to
Dep Rep Gens.
2) File maintained
usage inaccurate or
not adequately
documented.
3) File
maintenance
actions
inconsistent from
AFMCMAN23-101V1 17 NOVEMBER 2016 79
qtr-to-qtr.
F. MISTR Repair Erroneous
reporting not
researched or
corrected.
No MISTR repairs
allowed for ERRC
“N” or “P.”
G. MISTR
Condemnations
Erroneous
reporting not
researched or
corrected.
H. Depot
Condemnation
Total
Not equal to Dep
Rep Gens.
I. FIC 1) Does the FIC
show the
consideration of
usage data trends
(e.g., 4 qtrs vs. 8
qtrs)?
2) Documentation
is incorrect/
incomplete.
4. OIM Factors
A. Total OIM
Demand Rate
1) Trend in
demand rate is
more than normal,
but was
considered/used/
documented.
2) Current rate not
reflective of
current usage.
3) Estimated rates
are considerably
higher or lower
than computed
rates, are not based
on any segment of
recent past history,
and are straight-
lined rather than
time-phased.
4) File maintained
usage was not
considered in
80 AFMCMAN23-101V1 17 NOVEMBER 2016
estimated rates.
5) Estimates not
adequately
documented.
B. NRTS Percent Other than zero,
not corrected by
ES (correct usage
or change ERRC
code).
C. Base
Condemnation
Percent
1) Not reflective
of actual.
2) File maintained
usage was not
considered in
estimated rates.
3) Estimates not
adequately
documented.
4) Other than
100%
condemnations for
ERRC “N.”
5) Higher than
100% without
justification.
6) File
maintenance
actions
inconsistent from
qtr-to-0qtr.
D. Base RTS
Exclusion
Used for ERRC
code “N” & “P.”
5. MISTR
Condemnation
Percent
1) Other than
100% (ERRC code
“N”).
2) Other than
100% without
justification
(ERRC code “P”).
6. DLM Factors
A. PDM
1) JR
Condemnation
Percent
2) NJR
Replacement
a) NJR program
or replacement
percent other than
zero.
b) Trend in depot
usage is more than
nominal, but was
AFMCMAN23-101V1 17 NOVEMBER 2016 81
Percent
3) NJR Program
Percent
not
considered/used.
c) Estimated rates
are considerably
higher or lower
than computed
rates, are not based
on any segment of
recent past history,
and are straight-
lined rather than
time-phased.
d) File maintained
usage was not
considered in
estimated rates.
e) Estimated rates
are not adequately
documented.
f) Rate over 100%
not documented.
g) Inadequate
documentation
(N).
h) Other.
B. EOH
1) JR
Condemnation
Percent
2) NJR
Replacement
Percent
3) NJR Program
Percent
a) NJR program
or replacement
percent other than
zero.
b) Trend in depot
usage is more than
nominal, but was
not
considered/used.
c) Estimated rates
are considerably
higher or lower
than computed
rates, are not based
on any segment of
recent past history,
and are straight-
lined rather than
time-phased.
d) File maintained
usage was not
82 AFMCMAN23-101V1 17 NOVEMBER 2016
considered in
estimated rates.
e) Estimated rates
are not adequately
documented.
f) Rate over 100%
not documented
(without
justification).
g) Inadequate
documentation
(N).
h) Other.
C. NHA MISTR
JR
1) NJR program
or replacement
percent other than
zero.
2) Trend in depot
usage is more than
nominal, but was
not
considered/used.
3) Estimated rates
are considerably
higher or lower
than computed
rates, are not based
on any segment of
recent past history,
and are straight-
lined rather than
time-phased.
4) File maintained
usage was not
considered in
estimated rates.
5) Estimated rates
are not adequately
documented.
6) Rate over
100% not
documented.
7) Inadequate
documentation
(N).
8) Other.
AFMCMAN23-101V1 17 NOVEMBER 2016 83
7. FIC A. Does the FIC
indicate the
consideration of
usage trends, e.g.,
4 qtrs vs. 8 qtrs?
(N)
B. Documentation
is
incorrect/incomple
te.
8. Signature A. Printout has
not been
signed/dated by
the ES.
B. ES has not
signed/dated the
computation,
recomputation,
INS/NSO Item
Status Listing for
an item computing
buy in CY, AY,
BY or EY or
termination or
excess.
ADDITIONAL COMMENTS
REVIEWER DATE
84 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.6. Repair Quality Checklist.
SGM NSN IMS/MM Site AFMC
Impacting Impacting
Non-Impacting Non-Impacting
URC: PMS: ES:
Element Site
OK
HQ
OK
Nature of Error Comment/ Recommended
Corrective Action
1. PMS Code A. If organic repair, no
buyer PMS code
assigned.
B. If contract repair, no
seller/buyer PMS code
assigned.
C. If dual
organic/contract, both
buyer/seller PMS not
assigned.
2. SOR/PCN A. Product Control
Number (PCN) not
assigned to current
SOR.
B. SOR on ABCS.B21
which is not doing
repair of item.
C. D200A, Depot
Maintenance
Consolidated
Operational Database
System (Q302)
Contractor Visibility
List do not all agree.
3. Repair Cost A. URC incorrect
weighted improperly or
in error.
B. URC changed but no
documentation.
C. URC is > 75% of
FUP without
justification.
D. Does not agree with
ABCS.
E. Does not agree with
Factors Printout.
F. Does not agree with
AFMCMAN23-101V1 17 NOVEMBER 2016 85
Q302/Commercial Asset
Visibility System Air
Force (CAV
AF).
4. ABCS URC
SOR 1 ____%
SOR 2 ____%
SOR 3 ____%
SOR 4 ____%
A. URC incorrect.
B. URC changed but no
documentation.
C. URC is 75% of FUP
without justification.
D. If unweighted, does
not agree with D200A.
E. If unweighted, does
not agree with Factors
Printout.
F. Does not agree with
Q302/CAV AF.
5. Family
Stratified
Repair
Requirement -
Input
A. Changes not per re-
computation or other
supporting
documentation.
B. Changes not
documented on MISTR
lines of computation.
C. Wrong/no
adjustment reason code
for change.
D. Does not agree with
ABCS.
E. Error in calculating
lump sum adjustment
6. Family
Stratified
Repair
Requirement -
Output
A. Changes not per re-
computation or other
supporting
documentation.
B. Changes not
documented on MISTR
lines of computation.
C. Errors on
computation/ Factors
Printout caused
erroneous requirement.
D. Changes not on a
“one-for-one” basis with
input.
E. Error in calculating
lump sum adjustment.
86 AFMCMAN23-101V1 17 NOVEMBER 2016
7. Family Repair
Update - Input
A. Not updated with
contract/ICS update
sheet or other
documentation.
B. Not accurately
manually updated.
C. AFMC Form 804,
Renegotiation And
Drive Adjustment
Record, not documented
or processed.
D. Current negotiation
changed, not justified.
E. Contract carryover in
error/missing.
8. Family Repair
Update -
Output
A. Not updated with
contract/ICS update
sheet or other
documentation.
B. Not accurately
manually updated.
C. Current negotiation
changed, not justified.
D. AFMC Form 206
repairs will be used in
updating.
9. Budget
Documentation
Signatures
A. AY budget not
documented on
computation.
B. AY budget
documentation
incorrect.
C. Repair included in
both column C & I.
D. Not signed by
IMS/MM.
10. Lump Sum
Adjustment
A. Delayed discrepancy
(YBQ or YBG)
backorder requisition
number not documented
on the ABCS B21.
B. H-Coded backorder
requisition number
received after
computation asset cutoff
not documented/error on
AFMCMAN23-101V1 17 NOVEMBER 2016 87
the ABCS B21
computation.
C. Contingency vs. buy
RSP requirement not
documented or in error
on the ABCS B21
computation.
D. Exceeds total
available for repair.
E. Reason for re-
computation not
documented.
F. On Work Order
(OWO)/ Due In From
Overhaul (DIOH)
adjustment incorrect/not
made.
G. Adjustment reason
code missing or in error.
H. RDE adjustment in
error/not made on B21.
11. Over/Under
Induction
A. Over-induction used
in ABCS not authorized.
B. Under-induction
used in ABCS not
authorized.
C. Over/under-
induction should have
been in ABCS.
12. Impact to
Supply
Maintenance
Budget
Authority
(SMBA)
Budget
A. Over-budgeted.
B. Under-budgeted.
13. Possible
Impact to
(Depot
Maintenance
Budget
Authority)
DMBA
A. Over-budgeted.
B. Under-budgeted.
14. Using
EXPRESS
Not accurately
displaying EXecution
and Prioritization of
88 AFMCMAN23-101V1 17 NOVEMBER 2016
REpair Support System
(EXPRESS)
requirement.
15. Signatures A. No
IMS/MM/supervisor
signature/title on B21.
B. No PMS signature
on B21.
Additional Comments
AFMCMAN23-101V1 17 NOVEMBER 2016 89
Table 3.7. Termination Review Checklist.
SGM NSN NOUN COMP DATE
Original Quantity For Review Original Dollars for Review Correct
Quantity
Correct
Dollars
ES IMS/MM Repeat Termination
Yes No
Element Correct
or N/A
Reason For Error
and Remarks (Circle
letter if error and/or
write comments.)
HQ Comments
1. Termination Status A. With accurate file
maintenance, item
would not have been
in termination.
2. Termination Processing A. Not worked within
10 calendar days of
print of computation.
B. Failure to work
termination.
3. Signatures A. Not obtained IAW
Attachment 2.
B. Not signed by
appropriate level.
4. Termination Model A. Not used when
applicable.
B. Used incorrectly.
C. Recommendations
not followed.
D. Not completed
within 10 calendar
days of print of
computation.
E. Termination costs
input when there was
no written
documentation from
PK.
5. Termination Coding A. Termination code
not assigned.
B. Code incorrect.
C. Back-up
documentation doesn’t
substantiate
termination code.
90 AFMCMAN23-101V1 17 NOVEMBER 2016
D. Management
decision code
shouldn’t have been
used.
6. PR Cancellation/Reduction A. Not initiated.
B. Not submitted to
PK within 10 calendar
days of print of
computation.
C. Excessive delays
from PK, not followed
- up by IMS/MM.
7. Termination Log A. Termination Log
not maintained.
B. Weekly follow-up
not accomplished
8. Termination Requests A. Not initiated.
B. Follow-ups not
being done weekly
(See Table 4.2.).
Comments
Reviewer Date
AFMCMAN23-101V1 17 NOVEMBER 2016 91
Table 3.8. MISTR Repair and Repair Data Checklist. Note. Does not apply to AF/SICA
NIMSC 5 items.
SGM NSN Computat
ion Cycle
Non-impacting Errors Impacting Errors
Noun PMS
Buyer
PMS Seller ES: IMS/ MM:
D200A Weighted Values
Repair Cost Shop Flow SVC Turn In
Element Site
OK
HQ
OK
Nature of Error Comment or
Recommended
Corrective Action
1. SOR Percent A. SOR percent not
against record(s)
indicative of future.
B. Iterative List not
considered.
C. Minor/major repair
not considered.
D. Dual repair not
considered.
E. SOR percent on
“T” (Temporary Job
Request) number with
MISTR and/or contract
record.
F. Inadequate or
missing documentation.
G. Other (see
comments).
2. Repair Cost A. Valid price is not
against record with
SOR percent.
B. Iterative List not
considered.
C. Price not indicative
of future.
D. Organic price not
IAW upcoming FY
CSAG-Maintenance
(CSAG-M)
spreadsheet.
E. Dual repair not
considered.
F. Management fees
92 AFMCMAN23-101V1 17 NOVEMBER 2016
(e.g., data) not
considered for contract
repair where applicable
and/or not spread
across all items.
G. Minor/major repair
not considered.
H. Contract/DMISA
does not substantiate
cost used.
I. Inadequate or
missing documentation.
J. Other (see
comments).
3. Repair History A. Repair history
contains invalid repair
data (i.e., inspection,
packaging condition
check, FMS, etc.).
B. Production does not
match G004L/I and or
Temporary job (T-job)
list and no
documentation.
C. Contractor
production reports do
not support repair
history on MRPR.
D. Documentation not
adequate or missing.
E. Other (see
comments).
4. Shop Flow A. Valid Shop Flow
Days not against record
with SOR percent.
B. Not indicative of
future.
C. File maintained and
no documentation to
support.
D. Contract/DMISA
does not support days
used.
E. Major/minor repair
not considered.
F. Documentation not
AFMCMAN23-101V1 17 NOVEMBER 2016 93
adequate or missing.
G. Other (see
comments).
5. Service Turn-In
(SVC T-I)
Valid data not against
record with SOR
percent.
6. SOR A. SOR not indicative
of future.
B. Time phased data
was not furnished to the
IM/MM.
C. Documentation not
adequate or missing.
D. Other (see
comments).
7. Contract
Condemnations
A. Condemnations (by
qtr) not annotated on
MRPR.
B. Condemnations do
not match contractor
reports.
C. Other (see
comments).
Additional Comments
94 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.9. AFMC Review Summary.
NSN Computation Cycle
IMS/M
M
ES PMS Buy Repair Terminat
ion
Excess
1. IMS/MM
Submitted Buy
Budget
AY$ BY$ EY$
2. AFMC Validated
Buy Budget
AY$ BY$ EY$
3. Buy Budget
Difference
AY$ BY$ EY$
4. IMS/MM
Submitted Repair
Budget
AY$ BY$ EY$
5. AFMC Validated
Repair Budget
AY$ BY$ EY$
6. Repair Budget
Difference
AY$ BY$ EY$
7. IMS/MM
Submitted
Termination
$ IMS/MM
Submitted Excess
$
8. AFMC Validated
Termination
$ AFMC Validated
Excess
$
9. Difference Term $ Difference excess $
Comments/Recommendations
Name Office Symbol Date
AFMCMAN23-101V1 17 NOVEMBER 2016 95
Table 3.10. Depot Review Team Summary.
NSN Computation Cycle
IMS/M
M
ES PMS Buy Repair Terminat
ion
Excess
1. IMS/MM
Submitted Buy
Budget
AY$ BY$ EY$
2. Site Validated
Buy Budget
AY$ BY$ EY$
3. Buy Budget
Difference
AY$ BY$ EY$
4. IMS/MM
Submitted Repair
Budget
AY$ BY$ EY$
5. Site Validated
Repair Budget
AY$ BY$ EY$
6. Repair Budget
Difference
AY$ BY$ EY$
7. IMS/MM
Submitted
Termination
$ IMS/MM
Submitted Excess
$
8. Site Validated
Termination
$ Site Validated
Excess
$
9. Difference
Termination
$ Difference Excess $
Comments/Recommendations
Name Office Symbol Date
96 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 3.11. Review Package.
REVIEW PACKAGE
DOCUMENTATION REQUIREMENTS REVIEW
NSN IMS/MM
Folders prepared for the Budget Requirement Review must contain all documentation
necessary to support the recommended action. As a minimum, the following documents
must be included (if applicable) in the review folder. Attach this cover sheet to each folder
and indicate which documents are included by marking the form with an “X.”
Documentation Enclosed Not Applicable
1. Summary D200A computation
2. What if recomputation
3. Consolidated Assets and Requirements
(include initial for consumable items)
4. All AFMC Forms 318 or copies of all
historical AFMC Forms 339 and other
documentation to support assets, ALT, PLT,
and unit prices
5. Historical AFMC Form 339 for any due-in
assets
6. Asset reconciliations (2 years)
7. SRAN Assets and Usage Reports
8. D087H products for RSP and HPMSK
9. Adjusted Level Verification Worksheet
10. D035E Special Levels Master Summary
11. RDE backup
12. Copies of justification for all additives (such
as):
A. End of qtr backorder listing
B. CLSSA listing
C. FMS retention listing
13. MISTR IM Projected Workload Report
(G004L.-23) as of computation asset cutoff
dates in Sep and Dec
14. Reportable Asset Management Process
(RAMP) products that validate pipelines
15. B21 (PMS copy with negotiated QTY)
16. Backup for out-year URC changes in ABCS
17. Summary MISTR Repair and Repair Data
18. Summary Factor Printout (include sub items if
usage moved)
19. All documentation to support ES file
maintenance and estimated rates
20. Budget Item Detail (S01) for buys, excess,
AFMCMAN23-101V1 17 NOVEMBER 2016 97
terminations
21. INS/NSO Item Status Listing
22. Documentation for DDCs (except C and P) and
levels
23. ABCS item interrogation buys and
terminations
24. Print of D043 summary screen
25. Print of BMD screen for INS/NSO items
98 AFMCMAN23-101V1 17 NOVEMBER 2016
Chapter 4
TERMINATION ACTIONS
4.1. Introduction. Mission changes or adjustment to item requirements sometimes reduce or
eliminate the need to commit funds for or accept delivery of spare parts that the AF has already
ordered. Consequently, these quantities must be considered for reduction and, if necessary,
contract termination. The decision to reduce or terminate a quantity on contract is not automatic;
it involves evaluation of economic and mission related factors. This is because termination often
involves a considerable cost to the government to compensate vendors for resources they have
committed to the contract. In many cases it is more advantageous for the government to accept
delivery of the assets rather than pay termination costs. This chapter provides IMS/MMs, PMSs,
Program Offices, RCOs, requirements analysts, site SIRS termination analysts, budget analysts,
AFMC, and site SIRS analysts with the procedures and tools to make a decision to terminate a
contract or to accept delivery of on-order assets.
4.1.1. Items considered for reduction or termination actions are items on production
contracts; items on PRs/MIPRs, but not yet on firm contract; TOC kit spare parts; and
acquisitions from other government agencies.
4.1.2. Items excluded from consideration for reduction or termination are complete aircraft
and missile engines; items on AFMC Form 326, Provisioned Item Order, that are being
processed to establish, confirm, or change contractor interim release actions; and items
ordered to support provisioning integrated with production, unless the items will become
obsolete. Interim release is authorization given a contractor to release support items to
production or procurement simultaneously with production requirements for like items prior
to submission of a PIO.
4.2. Overview.
4.2.1. Every computation cycle, the IMS/MM will review and work all their items
computing in termination starting their review with the highest termination dollar valued
items and work down the IRL in IRIS list of NSNs for review in order of importance. This
requirement ensures that efforts to avoid unnecessary costs to the government focus on items
with the highest termination value most likely to provide the largest recovery of dollars if
terminated first. Lower value termination quantities, more likely to be found uneconomical
to terminate by the termination model, are reviewed next.
4.2.2. The IMS/MM will review all PR quantities for AF spares not yet on contract,
regardless of dollar value at the beginning of the Initial computation cycle. The IMS/MM
will initiate an amendment to the PR to reduce those quantities if they would put the item in
termination if they were included in the requirements computation. Note: An item can have
a termination quantity and have items on PR and items on contract. The IMS/MM will
reduce the PR first and then initiate termination on the contract quantities
4.2.3. Terminations are time sensitive. Delay of even a single day can significantly increase
the cost to terminate. Therefore, management efforts must emphasize early identification of
potential excess on-order quantities. The Initial requirements computation cycle is the
logical starting point to review items with on-order quantities that may exceed AF needs and
AFMCMAN23-101V1 17 NOVEMBER 2016 99
is the first opportunity to recover or avoid spending limited procurement funds. The
IMS/MM must respond to and take action on any changes in AF missions, programmed
objectives, consumption factors, authorizations, etc., that reduce requirements.
Consideration for termination action begins as soon as the IMS/MM becomes aware of
information that may make on-order quantities excess to immediate needs. The IMS/MM
will not wait until the item computes in the next quarterly cycle. This chapter and the
Federal Acquisition Regulation (FAR), Part 49, Termination of Contracts, provides policy
guidance to affect timely termination actions. The term “termination” will be used to refer to
termination actions and to PR reduction and cancellation actions except when the policy or
procedures apply exclusively to PR reductions.
4.2.4. The IMS/MM determines if termination action is to be taken. The IMS/MM who
decides not to terminate will prepare documentation to certify and explain the reasons for
accepting the assets. The documentation will include a statement of facts, considerations,
sources of information, and the logic used to arrive at the decision. The originating activity
keeps the documentation for AFMC and inspection agency review. The following
circumstances will be considered when deciding to terminate, defer a termination decision, or
accept delivery of on-order assets that compute into termination:
4.2.4.1. Technical complexity that may require costly reprocurement.
4.2.4.2. Increasing operating programs or escalating condemnation rates not already
included in the requirements computation that would necessitate a buy in the foreseeable
future.
4.2.4.3. Known increases to FMS requirements. These quantities will be integrated into
the SIRS computation to account for the requirements if they were not already included
in the feed to D200A. (Note: The Arms Export Act prohibits inclusion of non-
programmed FMS requirements in the D200A computation for which the FMS customer
has not established an FMS FMS01 case level or Materiel Repair Requirements List
(MRRL).)
4.2.4.4. New applications that were not considered in the most recent SIRS computation.
These would justify deferral of a termination decision until a later cycle when the new
applications would be integrated into the computation.
4.2.4.5. Projected increases or decreases in demands in the near future that are not yet
reflected in the SIRS computation. These would justify deferral of a termination decision
until a later cycle when the demand projection would be integrated into the computation.
4.2.4.6. Items with a short shelf-life.
4.2.4.7. Items that apply to recently fielded systems and still use estimated demand rates.
This would authorize deferral of a termination decision until a later cycle when the
demand projection is based on mature rates.
4.2.4.8. The termination model concludes that termination is not in the best interests of
the government.
4.2.4.9. Any of the following factors are grounds for termination without regard to
economic considerations:
100 AFMCMAN23-101V1 17 NOVEMBER 2016
4.2.4.9.1. The item has declining programs and no reprocurement predicted in the
SIRS computation (i.e., no third short position through the retention period).
4.2.4.9.2. The item has declining programs and no projected condemnations.
4.2.4.9.3. An engineering change proposal or modification enhances the item’s
reliability or availability.
4.2.4.9.4. The item and/or its NHA is, or will soon be, obsolete.
4.2.4.9.5. The item’s mandatory removal time recently increased or was eliminated.
4.2.4.9.6. The contractor was unable to perform, default termination is possible, and
another source is preferred.
4.2.4.9.7. Organic manufacturing or repair capability is preferred.
4.2.4.9.8. Interchangeable items have been found in the AF inventory that were not
linked in D200A. This may result in an adjustment to the computation that would
reflect the availability of these assets.
4.2.4.9.9. This item is available from other Service/Agencies (S/A) or through DLA
Disposition Services.
4.3. Procedures.
4.3.1. When the ES reviews the summary ES Review Listing from the previous cycle before
the initial cycle they must focus first on items that have compute code “R” (“no-compute”
items) with on-order quantities. The ES will add values to the critical element(s) in D200F to
ensure the system produces a computation worksheet in the Initial computation (see
AFMCMAN 23-101, Volume 4, paragraph 1.14.3. and subparagraphs). The ES file
maintenance period in D200F is open almost continuously except when snapshots are being
made. The ES Review Listing (see AFMCMAN 23-101, Volume 5, paragraph 5.2.) is
displayed on the SIRS DIS.
4.3.1.1. When reviewing the initial IMS/MM Review Listing on the initial cycle, the
IMS/MM will focus first on items that have compute code “B,” “P,” (“no compute”
items) with on-order quantities. The IMS/MM will add values to the critical elements
after the initial cycle to ensure the system produces a computation worksheet on the Final
computation (see AFMCMAN 23-101, Volume 4, paragraph 1.14.3. and subparagraphs).
The IMS Review Listing (see AFMCMAN 23-101, Volume 4, paragraph 12.2.) is
displayed on the SIRS DIS PFI.
4.3.2. The IMS/MM must review the IOA from the Initial computation and determine if any
of the “no compute” items fell into termination. The IMS Review Listing and the ES Review
Listing display items in termination, which are also displayed on the IRL IMS/ES Review
List screen (SIRS DIS PFI IRL). The IMS/MM will determine if the item has a DLM
program (“X” in position “2,” “3,” or “4” of the item PSC), has Dep Rep Gens, or has depot
condemnations that exceed MISTR condemnations.
4.3.3. If the item does not have a DLM program, the IMS/MM will notify the ES that the
item is in termination and enter corrections online. The ES enters any corrections and
notifies the IM after review and corrections are complete. The IMS/MM requests an item
recomputation. “For Real” recomputation, reference AFMCMAN 23-101, Volume 3,
AFMCMAN23-101V1 17 NOVEMBER 2016 101
Chapter 2. If the item is still in termination the IMS/MM advises the contracting activity that
an amendment may be forthcoming to reduce or cancel the PR quantity and requests the
delay of contract award until after the Summary SIRS computation when a definite
termination quantity will be known.
4.3.4. If the item has a NHA MISTR program (“X” in the fourth position of the item PSC),
the IMS/MM will advise the item ES and the IMS/MMs and ESs responsible for each NHA
that the item is in termination.
4.3.4.1. If the NHA is a secondary item managed in SIRS, the IMS/MM and NHA
IMS/MMs will review the SGM Computation Worksheets or the INS/NSO Item Status
Listings from the Initial SIRS computation to ensure that the repair projection is correct.
The ES and NHA ESs will review the Factors/Usage Printouts to ensure the data is
correct.
4.3.4.2. If the NHA is a primary item managed in the D200C system, the NHA IMS/MM
and ES will verify the NHA overhaul program and the inventory data.
4.3.4.3. If the Initial computation data is not correct, the IMS/MM, NHA IMS/MMs, ES,
and NHA ESs will correct the elements for which they have responsibility during the
Initial computation review cycle. After the NHA IMS/MMs, ESs and NHA ESs have
reviewed their items and made corrections, they will notify the component IMS/MM.
The IMS/MM requests an item recomputation. “For Real” recomputation, reference
AFMCMAN 23-101, Volume 3, Chapter 2. If the item is still in termination, the
IMS/MM advises the contracting activity that an amendment may be forthcoming to
reduce or cancel the PR quantity and that contract award needs to be delayed until after
the Summary SIRS computation when a definite termination quantity will be known.
4.3.5. Immediately after receiving the IOA from the Final SIRS computation, the IMS/MM
will review the listing for any items that are in termination. The IMS/MM will review the
SGM Computation Worksheet or the INS/NSO Item Status Listing from the Final
computation to ensure that the data is correct. If the data is not correct, the IMS/MM and ES
will correct the erroneous data and request an item recomputation (“For Real”
recomputation). If the item is still in termination, the IMS/MM will advise the contracting
activity that an amendment may be forthcoming to reduce or cancel the PR quantity and that
contract award should be delayed until after the Summary SIRS computation when a definite
termination quantity will be known.
4.3.5.1. If the on-order excess quantity is not yet on contract, the IMS/MM initiates an
amendment to reduce or cancel the PR.
4.3.5.2. If the on-order excess quantity is on a firm contract, the IMS/MM will run the
termination model. If the termination model recommends termination, the IMS/MM
must submit a Termination Authority Template or fully justify the decision not to
terminate and obtain management approval for not initiating action to terminate the
computed termination quantity.
4.3.5.2.1. The purpose of the Termination Authority Template is to provide an
auditable record of the request of the initiating organization to terminate on-order
asset quantities and the contracting activity’s response to that request. See the Air
Force Federal Acquisition Supplement (AFFARS) 5349.102 for a tailorable
102 AFMCMAN23-101V1 17 NOVEMBER 2016
Termination Authority Template. Also reference AFMC Contracting Mandatory
Procedure (MP) Part 5349 for additional acquisition requirements.
4.3.5.2.2. Within 10 calendar days after the SGM Computation Worksheet or the
INS/NSO Item Status Listing from the Final computation print date, the IMS/MM
will ensure that the computation, INS/NSO Item Status Listing, Factors/Usage
Printout and MISTR Repair and Repair Data are correct, run the termination model,
make the decision of whether or not to reduce/cancel PRs or submit contract
termination/reduction requests to Contracting, sign their product and submit any PR
amendment to reduce/cancel PR and/or contract termination/reduction request to
Contracting. If the decision and PR amendment or Termination Authority Template
(if appropriate) cannot be completed within 10 calendar days, the IMS/MM must
explain why on the final SGM Requirements Worksheet or the INS/NSO Item Status
Listing and on the general Notepad for the item.
4.3.6. IMS/MMs will follow these steps when deciding to terminate or reduce on-order
quantities:
4.3.6.1. Validate all data elements in the SIRS computation that could affect the
termination quantity. If erroneous data caused a termination, make corrections during the
Initial computation cycle or request a “What If” recomputation after the Summary
computation. Analyze the quantity that remains in termination to determine the causes of
termination.
4.3.6.2. Determine if some or all of the on-order quantity was delivered after the asset
cutoff date. If so, decrease the on-order quantity and increase the on hand assets during
the Initial computation cycle or request a “What If” recomputation after the summary
computation.
4.3.6.3. If a contract quantity was terminated, but the computation still includes on-order
assets, the IMS/MM will remove them from the SIRS computation.
4.3.6.3.1. The IMS/MM will research the item to determine if the quantity was in
termination during a prior cycle and what action was taken. If termination action is in
progress, reduce or remove the on-order quantity. The IMS/MM will annotate the
Notepad and the SGM Computation Worksheet or the INS/NSO Item Status Listing
to indicate the reduction. Also, the IMS/MM will ensure that the total acquired and
the starting position on the Asset Reconciliation screen (see AFMCMAN 23-101,
Volume 4, Chapter 7) have been reduced to reflect the anticipated termination. If a
Termination Authority Template was sent to the contracting activity and the
termination was determined to be uneconomical, the IMS/MM will document this in
the Notepad before the end of file maintenance for the Summary computation cycle
and on the SGM Computation Worksheet or INS/NSO Item Status Listing.
4.3.6.3.2. If a decision was made not to terminate during a previous cycle, the
IMS/MM will research the item to determine if the justification is still valid. If so,
the IMS/MM will annotate the Notepad before the end of file maintenance for the
Summary computation cycle and the SGM Computation Worksheet or INS/NSO Item
Status Listing with the date and computation cycle of the previous decision.
AFMCMAN23-101V1 17 NOVEMBER 2016 103
4.3.6.4. Run the termination model if termination is appropriate (see paragraph 4.3.14).
If the model indicates that termination is uneconomical, annotate the SGM Computation
Worksheet or INS/NSO Item Status Listing accordingly and cite the termination model.
If the termination model recommends termination, a Termination Authority Template
will be submitted to the Contracting officer with an attached copy of the termination
model. A copy of the model PDF file will be retained for 2 years or until after the
termination is completed, whichever is longer. The SGM Computation Worksheet or the
INS/NSO Item Status Listing used as a basis for the termination model will be retained
for the same period.
4.3.6.5. Initiate termination action if obsolete items are involved or if a “no cost”
termination settlement can be obtained. To facilitate processing, the IMS/MM will
indicate the reason delivery is not desired on the Termination Authority Template.
4.3.6.6. Request termination without regard to termination costs and without consulting
the termination model if the factors listed in paragraph 4.2.4.9. are present. In such
cases, a Termination Authority Template will be sent to the procuring office with the
reason annotated (e.g., “declining program”) and request termination regardless of cost.
4.3.6.7. Utilizing the same logic, take immediate action to cancel or reduce on-order PR
quantities for these quantities. An item could have a termination quantity and have items
on PR and items on contract. The PR will be reduced first and then termination initiated
on the contract quantities.
4.3.7. Under exceptional circumstances, it may not be in the best interest of the government
to terminate some quantities of items with declining programs. In these cases, the group
commander (or equivalent) has the authority to deviate from the above guidance. The
documentation must include a copy of the termination model and clear, auditable evidence
from an engineering activity or program office that the assets will have a specific need after
delivery. The purpose of this requirement is to allow for the use of good judgment in
exceptional situations and to prevent actions that could waste public funds. If feasible, the
SIRS computation will be adjusted to display the future need.
4.3.8. In some cases, a Procurement Contracting Officer (PCO) or a Termination
Contracting Officer may receive a Termination Authority Template and determine that
termination costs are significantly higher than first estimated. In such cases, the IMS/MM
will conduct an economic re-evaluation upon request from the Contracting Officer.
4.3.9. Any quantities for which termination action has been requested via a Termination
Authority Template will be removed from the Initial SIRS computation. This action will be
taken as soon as the Termination Authority Template has been submitted and before the
Summary computation. Partial termination quantities from the on-order assets at the end of
the projected delivery schedule will be removed. Also, the IMS/MM will ensure that the
total acquired and the starting position on the Asset Reconciliation screen (see AFMCMAN
23-101, Volume 4, Chapter 7) have been reduced to reflect the anticipated termination.
4.3.10. If the contracting officer returns the Termination Authority Template without action
after the IMS/MM has taken the above actions, the IMS/MM must reinstate the assets in the
computation and make corresponding adjustments to the Asset Reconciliation Worksheet.
104 AFMCMAN23-101V1 17 NOVEMBER 2016
These actions must be clearly annotated on the AFMC Form 318. The Termination
Authority Template will be kept available for audit or inspection.
4.3.11. If an amendment was initiated to reduce or cancel a PR quantity, the assets will be
removed from SIRS. Also, the IMS/MM will ensure that the total acquired and the starting
position on the Asset Reconciliation screen (see AFMCMAN 23-101, Volume 4, Chapter 7)
have been reduced to reflect the anticipated termination. If termination quantities were
delivered after the current cycle computation asset cutoff date, the on-order quantities will be
removed and the assets shown as on hand.
4.3.12. The on-order quantity will be removed during the Initial computation cycle if assets
are diverted to other uses in lieu of termination. The asset reconciliation will require
correction. The documentation will be attached to the SGM Computation Worksheet or
INS/NSO Item Status Listing substantiating the diversion and identifying the customer.
4.3.13. Items that compute termination quantities and their stock listed NHAs must be
worked each cycle.
4.3.14. The termination model must be used on all terminations except:
4.3.14.1. When information in the SIRS computation is adjusted or corrected in a way
that eliminates the termination quantity.
4.3.14.2. When a termination decision is deferred pending research because of suspect
data in SIRS, HQ AFMC/A4RM directive, expected new applications, or an anticipated
program increase that is not yet reflected in the latest USAF program authority document.
4.4. Reporting and Analysis.
4.4.1. ABCS – Terminations (ABCS Terms) is a tool to evaluate on-order excess items.
IM/MMs, RCOs, division analysts, site SIRS termination analysts, and budget analysts will
perform the following procedures:
4.4.1.1. The IMS/MM determines the appropriate 2-digit ABCS termination code(s) to
assign to each item that computes a termination quantity in the Summary computation.
The termination code(s) will be annotated on the SGM Computation
Worksheet/computation signature coversheet or on the INS/NSO Item Status Listing
from the Summary computation or the latest “What If” recomputation.
4.4.1.1.1. The termination code will also be annotated on the ABCS – Uncoded
Terms List product distributed to the IMS/MM. More than one code can apply to an
item, in which case, each code will be broken down by quantity.
4.4.1.1.2. For terminations with a value of $1 million or more, the RCO or division
analyst requests an ABCS – Terminations On-Order Excess Format 4 Report for each
termination with a value of $1 million or more and passes it to the IMS/MM. The
IMS/MM adds a narrative that explains the reasons the item computed into
termination and the termination decision for every termination with code “04,” “05,”
“06,” “11,” and “12.” See Table 4.1 for code definitions.
4.4.1.2. RCOs or division analysts will verify termination codes reflect the situation.
They will also enter the codes into ABCS – Terminations. Site personnel will code
ABCS – Terminations every cycle. RCOs or division analysts will also provide
AFMCMAN23-101V1 17 NOVEMBER 2016 105
IMS/MMs with Format 4 reports for all items over $1 million for the addition of a
narrative. Annotated copies of item level Format 4 reports with codes “04,” “05,” “06,”
“11,” and “12” will be forwarded to the site SIRS termination analysts.
4.4.1.3. Site SIRS termination analysts or budget analysts are responsible for providing
narratives by BP and SMCs (see AFMCMAN 23-101, Volume 4, paragraph 1.2.) at each
site when directed by AFSC/LGPS. These reports, including item level reports, will be
forwarded to the SIRS Functional OPR. Site SIRS termination analysts and budget
analysts will maintain the proper SMCs on items placed in the FM (pseudo code) division
account within ABCS.
4.4.2. The termination quantity in ABCS is from the CSIS that is updated from the Summary
SIRS computation and includes terminations and “no compute” items with on-order assets.
Termination quantities stratify as On-Order Contract assets (Column 7) in Potential DoD
Excess (Line 21) in the Budget Item Detail Approved Acquisition Objective (AAO) position.
4.4.3. If the code indicates that a reduction or termination action has been or will be taken
(code “02” or “03”), the RIR log number (paragraph 4.4.6) will be noted in the
documentation.
4.4.4. Termination Codes. Table 4.1 lists the termination codes and the definitions explain
the reason for making a termination decision. Use of several codes per item is allowed. As a
minimum, all non-termination decisions except for termination codes 02, 03, and 13 must be
signed by both the IMS/MM and supervisor. Assistance in coding terminations that are not
covered by the following codes, contact the SIRS Termination OPR.
106 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 4.1. Termination Codes.
Code Explanation
02 Contract Eligible for Termination: A quantity on contract is eligible for
termination action, the termination model has been run, and a Termination
Authority Template has been submitted. The item appears in ABCS because the
on-order quantity could not be adjusted before the Summary computation. The
AFSC will supplement this manual to designate signature level approval
requirements for the SGM Computation Worksheet, the “What If”
recomputation, or the INS/NSO Item Status Listing. Delinquent contracts that
can be terminated for default - all assets on contract are in termination will be
included. See code “17” for contracts that must be terminated for the
convenience of the government.
03 PR Eligible for Reduction or Cancellation: PR quantity is eligible for reduction
or cancellation, the termination model has been run, and a PR amendment has
been submitted. The item appears in ABCS because the on-order quantity could
not be adjusted before the Summary computation. The AFSC will supplement
this manual to designate signature level approval requirements for the SGM
Computation Worksheet, the “What If” recomputation, or the INS/NSO Item
Status Listing.
04 Will Not Terminate Due to AFSC/LGPS Direction: Item is not eligible for
reduction or termination action.
1. Attach a copy of the AFSC/LGPS direction to the SGM Computation
Worksheet, the INS/NSO Item Status Listing from the Summary computation, or
the latest “What If” recomputation. The AFSC will supplement this manual to
designate signature level policy approval requirements for the SGM
Computation Worksheet, the “What If” recomputation, or the INS/NSO Item
Status Listing. Repeat terminations require same signature level on budget
cycles.
2. This code also applies to consumable items for which the effective date of
transfer to DLA falls within a computation cycle--between the RIID snapshot
and the running of the Summary computation if the termination model results
say to terminate or cancel.
3. This code will be used for items on PBL contracts on which the contractor is
doing all the demand and supply planning for the items.
4. This code also applies to items for which the effective date of transfer to
another S/A falls within a computation cycle -- between the RIID snapshot and
the running of the Summary computation if the termination model results are not
uneconomical to terminate.
05 Will Not Terminate – Provisioning Integrated with Production: Termination
model has been run. (If the termination model determined it was uneconomical
to terminate, use codes 08, 09, or 10 as applicable). The Program Office-
approved production of spare parts to be concurrent with production of parts to
support production of the end item. Although this may result in production of
spare parts that exceed the requirement projected through the apportionment
year, there is a considerable price advantage for doing this. The IMS/MM and
supervisor will sign the SGM Computation Worksheet, the INS/NSO Item
AFMCMAN23-101V1 17 NOVEMBER 2016 107
Status Listing from the Summary computation, or the latest “What If”
recomputation. Repeat terminations require same signature level on budget
cycles.
06 Will Not Terminate, Additional Application Anticipated: Termination action
will not be taken because additional applications not reflected in the most recent
SIRS computation will be added. This code allows a termination decision to be
deferred for one cycle. Group-level approval is required on the SGM
Computation Worksheet, the INS/NSO Item Status Listing from the Summary
computation, or the latest “What If” recomputation.
07 Data Error Adjustments: Item does not require reduction or termination when
data is corrected. Corrections in the Summary SIRS computation could not be
done during the file maintenance cycle. If the data were not corrected before the
Summary SIRS computation and code 07 was entered after the summary CSIS,
code 07 remains in ABCS to explain on-order excess quantities in the CSIS. An
explanation of the error must be annotated on the SGM Computation Worksheet,
the INS/NSO Item Status Listing from the Summary computation, or the latest
“What If” recomputation. The IMS/MM must run a recomputation to show the
item is no longer in termination when the data is corrected. The IMS/MM and
supervisor signature is required for use of this code.
08 Termination Uneconomical – Reprocurement Anticipated: The termination
model has been run, termination was found to be uneconomical, and
reprocurement is anticipated. The SIRS computation displays a third short
quantity between termination point and the retention period. The AFSC will
supplement this manual to designate signature level approval requirements for
the SGM Computation Worksheet, the INS/ NSO Item Status Listing from the
Summary computation, or the latest “What If” recomputation and dollar
threshold for authorizing a decision not to terminate. Repeat terminations
require same signature level on budget cycles. The termination model is run on
repeat terminations every cycle.
09 Termination Uneconomical – No Reprocurement Anticipated: Termination
model has been run and it found termination to be uneconomical. No
reprocurement is anticipated (i.e., the SIRS computation displays a third over
quantity in at least one of the 38 future qtrs). The AFSC will supplement this
manual to designate signature level approval requirements for the SGM
Computation Worksheet, the INS/ NSO Item Status Listing from the Summary
computation, or the latest “What If” recomputation and dollar thresholds for
authorizing non-termination decision. Repeat terminations require same
signature level on budget cycles. The termination model is run on repeat
terminations every cycle.
10 Termination Uneconomical – Initial Provisioning Funding Used: The
termination model was run, termination was found to be uneconomical, and
initial provisioning funds were used to procure assets. The AFSC will
Supplement this manual to designate signature level approval requirements for
the SGM Computation Worksheet, the INS/NSO Item Status Listing from the
Summary computation, or the latest “What If” recomputation and dollar
threshold for authorizing non-termination decision. Repeat terminations require
108 AFMCMAN23-101V1 17 NOVEMBER 2016
same signature level on budget cycle. The termination model is run on repeat
terminations every cycle.
11 Will Not Terminate, Data Suspect Pending Research: Use when the Summary
computation could not be adjusted. Limited to the following data elements:
programs, RSP, or contractor data. This code allows a termination decision to
be deferred for one cycle. Group-level approval is required on the SGM
Computation Worksheet, the INS/NSO Item Status Listing from the Summary
computation, or the latest “What If” recomputation.
12 Other, Will Not Terminate: This code is used when a decision not to terminate
does not fall under termination codes 02 - 11 or 13 - 15. The termination model
has been run. The decision not to reduce or terminate an item must be explained
and justified. The explanation must include the recommendation of the
termination model and why the recommendation should not be followed.
Group-level approval is required on the SGM Computation Worksheet, the
INS/NSO Item Status Listing from the Summary computation, or the latest
“What If” recomputation. The AFSC/CC will approve decisions not to
terminate actions with a value greater $1,000,000. Repeat terminations require
review and approval at the same signature level as the initial termination.
13 Computation–CSIS Variance: This code is used when (1) the Summary SIRS
computation does not compute a termination, but the CSIS displays a
termination quantity in the Budget Item Detail (S01), AAO position, column 7,
line 21, or (2) the quantity in the S01, AAO position, column 7, line 21 is larger
than the computed termination quantity in SIRS. The quantity and dollar
amount from the CSIS will be included under this code. The IMS/MM must
sign the SGM Computation Worksheet, the INS/NSO Item Status Listing from
the Summary computation or the latest “What If” recomputation. The IMS/MM
must also attach a copy of the CSIS S01 or a print screen of the AFAO and
retention position, Line 21 from the CSIS that shows the difference.
14 Economic Order, Will Not Terminate: This code is used for purchases on which
contractor will only bid on a minimum quantity or on which the contractor bid a
quantity discount price and for which the purchase was approved at squadron
level or higher (see paragraph 1.11.5.). The termination model was run and it
recommended termination. If the termination model recommended “do not
terminate,” termination codes 08, 09, or 10 will be used. The squadron-level
signature is required for use of this code. Repeat terminations require same
signature level on budget cycle. Termination model is run on repeat
terminations every cycle.
15 Variable Safety Level Change on Summary: This code is used when the
variable safety level is different on the Summary computation than it was on the
Initial computation and the fluctuation in variable safety level put the item into
termination on the Summary computation. When annotating the ABCS
Uncoded Terminations List, the quantity and dollar value attributable to this will
be indicated on the product. The AFSC will supplement this manual to establish
signature level approval requirements for the SGM Computation Worksheet, the
INS/NSO Item Status Listing from the Summary computation, or the latest
“What If” recomputation.
AFMCMAN23-101V1 17 NOVEMBER 2016 109
16 Delivered After Asset Cutoff Date: This code includes contract deliveries that
occur after the computation asset cutoff date. The IMS/MM was not aware of
the delivery until after the Summary computation processed. The IMS/MM
must run a recomputation showing the item is no longer in termination when the
data is corrected. The IMS/MM and supervisor signature is required for use of
this code.
17 Delinquent Contract Eligible for Termination: This code is used when the
delinquent contract cannot be terminated for default. A quantity on contract is
eligible for termination action and the termination model has been run; however,
the computed termination quantity is less than the total quantity on contract.
Therefore, the contract cannot be terminated for default and has to be terminated
for the convenience of the government. Procurement cannot legally terminate a
delinquent contract for the convenience of the government. Procurement has to
extend the delinquent contract first prior to terminating it. Therefore, in cases
where the IMS/MM wants to terminate a delinquent contract for the convenience
of the government, the IMS/MM must first request in writing for procurement to
do an amendment to the contract extending the delivery schedule on the contract
before submitting the Termination Authority Template. The AFSC will
supplement this manual to designate signature level approval requirements for
the SGM Computation Worksheet, the “What If” recomputation, or the
INS/NSO Item Status Listing.
18 Not Term - Approved IIRP Spares: Termination model has been run. (If the
termination model determined it was uneconomical to terminate, use code “08,”
code “09,” or code “10” as applicable). The spares were approved as part of the
IIRP package. Although this may result in production of spare parts that exceed
the requirement projected through the budget year, there is a considerable price
advantage for doing this. Use AFMCMAN 23-101 for signature level
requirements for signing, but as a minimum, the IMS/MM, RCO and supervisor
will sign the SGM Computation Worksheet, the INS/NSO Item Status Listing
from the Summary computation, or the latest “What If” recomputation. Repeat
terminations require same signature level on budget cycles.
49 Unit Cost Change. This code is used when the unit price was not corrected prior
to the end of the file maintenance cycle.
4.4.5. Repeat terminations. The date, code, and computation cycle on which the decision
was made not to terminate will be annotated. With the exception of code 12, it is not
necessary to resubmit documentation as long as the conditions, code, quantity, and dollar
value do not change. Code 12 requires full documentation every cycle.
4.4.6. Electronic Termination (RIR) Log. Each site will maintain an electronic termination
log and will assign a termination monitor in the SCMG to oversee RIR log number
assignment and review the status weekly of each termination. The supervisor of the
termination monitor will periodically check to ensure the items were worked and/or proper
follow-up action was taken by looking at a sample of the items.
4.4.6.1. The log will have separate fields for the items listed in Table 4.2
110 AFMCMAN23-101V1 17 NOVEMBER 2016
Table 4.2. Required Electronic Termination (RIR) Log Fields.
Item RIR Log Fields
1 RIR log number
2 NSN
3 Contract number
4 CLIN
5 Computation cycle (on which termination is based, i.e., Sep 13)
6 The print date of the requirements computation or INS/NSO Item Status Listing
7 Termination quantity
8 Termination value
9 Date the RIR number is issued
10 MDC or other manager identification.
11 Date termination request was submitted to Contracting
12 Date Contracting received the termination request
13 Date of each weekly follow-up conversation with Contracting by the termination
monitor (until closed)
14 Synopsis of each weekly follow-up conversation with Contracting by the termination
monitor including POC (until closed)
15 Date of review of the RIR log by the supervisor of the termination monitor
16 Date termination action is completed by the contracting activity
17 The date the contracting activity determined termination to be uneconomical, if
applicable. This information is annotated on the returned Termination Authority
Template.
18 For contracts actually terminated by the contractor, termination cost.
19 For contracts actually terminated by the contractor, settlement cost.
20 For contract actually terminated by the contractor, cost savings to Government.
4.4.6.2. The RIR log number includes the FSC, FY, and a numeric sequence number
(i.e., RIR-1560-13-001). The IMS/MM annotates the RIR number in the remarks block
of the Termination Authority Template.
4.4.7. Procedures for assets acquired as follow-on spares. If the computed termination
quantity meets the criteria in paragraph 4.2.4.9 and/or the termination model recommends
termination, the IMS/MM will initiate RIR action within one working day and send the
Termination Authority Template to the contracting activity. Electronic transmission via E-
mail is highly encouraged. This RIR is sufficient to initiate termination action.
4.4.8. Procedures for assets acquired as initial spares. The IMS/MM reviews the IOA, the
IRD computation, the SIRS computation, and all other pertinent documents to validate the
termination quantity. Then the IMS/MM runs the termination model to determine if
termination is economical. If so, the IMS/MM initiates the RIR and annotates the RIR
number on AFMC Form 326 within one working day. The RIR is forwarded to the
provisioning activity at the End Article Item Manager’s (EAIM) or Program Office’s site.
The EAIM or Program Office notifies the Administrative Contracting Officer (ACO) of the
RIR via electronic means within one working day of receipt, providing information copies to
AFMCMAN23-101V1 17 NOVEMBER 2016 111
the Provisioning Procurement Contracting Officer (PPCO) and PCO. The confirming AFMC
Form 326 will be sent to the PPCO as soon as possible. The IMS/MM will pull the adjusted
asset quantity from J018R to indicate completion of termination.
4.4.9. Procedures for termination and reduction of contract repair workload. The IMS/MM
will hold a joint contract review with the PMS to determine necessary action. The IMS/MM
and the PMS will mutually agree on the termination decision. The PMS prepares the
Termination Authority Template or the PR or MIPR amendment. If workload acquired
through a MIPR is to be terminated or reduced, use the Termination Authority Template to
initiate RIR action with a confirming MIPR amendment.
4.4.10. Procedure for termination and reduction of quantities acquired to support FMS
customers. “FMS Case Termination” will be annotated in the remarks section of the RIR.
FMS termination costs will be reported to AFSC/LGPS.
4.5. The SIRS Termination Model.
4.5.1. The SIRS termination model is an online tool to help the IMS/MM determine if
termination of a specific item is economically feasible and to make a decision to proceed
with a termination action. The recommendation is a recommendation only and extenuating
circumstances may justify another course of action regarding a particular termination
decision. These exceptions could involve situations where termination would not be in the
best interest of the government, regardless of cost. The model provides the IMS/MM pre-
loaded essential item information with which to make a termination decision. The model is
available via IRIS.
4.5.2. The SIRS termination model is an interactive web-based application. It has five tabs:
Home, Find Termination Items, Worksheet, Results, and Rates/Storage. The Requirements
Integration Process Improvement Team (RIPIT) updates the data at each point in the
computation cycle (Initial, Mid (Final), and Summary) and daily during the file maintenance
period.
4.5.3. The “Home” tab. This tab includes instructions, along with information about
transportation costs and file maintenance.
4.5.4. The “Find Termination Items” tab. Users begin by selecting this tab and selecting a
SGM NIIN hyperlink from the list or using the filters at the top to select a list by FSC, SGM
NIIN, MMAC, site code, IMS, ERRC, Item Category, or BP Code and then selecting a
specific SGM NIIN. The resulting list is sorted in descending termination quantity dollars
order. When users modify the default settings, their filters are saved for future use. Click the
“Reset” button to return to the default view.
4.5.4.1. During D200A File Maintenance (F/M) periods (Initial or Final computation),
the termination model captures updates that are usually posted daily. (Note: The impact
to the termination quantity in D200A can only be captured if a For Real Computation is
run after changes to other data elements are made.) On the “Find Termination Items” tab,
users may check the “Use D200A F/M values” option to view the latest termination
items. Otherwise, information will be displayed as of the beginning of the file
maintenance period. In order to view the file maintained information on the “Worksheet”
tab, users must click the “Update” button to populate the worksheet with the latest
D200A file maintained values. These values can also be reset to the original values as of
112 AFMCMAN23-101V1 17 NOVEMBER 2016
the beginning of the file maintenance period by clicking the “Reset” button. Note: ALL
user-entered stock number information and computational entries will be overwritten
when the worksheet is updated for file maintenance. Contract and transportation
information is updated quarterly.
4.5.5. The “Worksheet” tab. Selecting a SGM NIIN hyperlink takes the user to this tab. The
Worksheet tab contains the elements the IMS/MM needs to review and/or add to complete
the termination model and displays the recommendation. It has four sections. The top
section of the tab includes item data, ALT, PLT, dimensions, weight, and computation entries
such as storage and termination costs. The middle section of the tab includes the contract
information. The bottom section of the tab includes information from the D200A Comp
Worksheet or INS/NSO Status Listing as appropriate based on the ICC. The very top right of
the tab includes the termination recommendation or error messages regarding required
information to complete the calculation. Color-coding shows where users may input values
or make a selection from the drop down menu; these are the asterisked cells with yellow
backgrounds.
4.5.5.1. Stock Number Information. This section is pre-populated with the following
data elements: NSN, site code, ICC, ERRC, Repair Cost, ALT and PLT (in months), and
new unit costs (Unit Price) as seen on page 1 of the SGM Comp Worksheet or INS/NSO
Item Status Listing. The Termination Quantity is populated from the SGM Comp
Worksheet for active items or the INS/NSO Item Status Listing for insurance and NSO
items. The IM name is populated from D043 on a quarterly basis. Quantity Unit Pack
(QUP), unit pack length (in), unit pack width (in), unit pack depth (in), unit pack weight
(lbs) are fed from the D035T PTIA screen on a quarterly basis. Any manual changes to
this data will be documented and retained for audit purposes. The remaining five items
are not pre-populated and are discussed in the following paragraphs.
4.5.5.2. Settlement Costs and Termination Costs (asterisked with yellow backgrounds)
are defaulted to $0.00 and are not required entries. They must only be input if the
contracting activity returned a Termination Authority Template or other written
communication with the information. Termination costs will only refer to the costs to
cancel the termination quantity.
4.5.5.3. Type of Storage, Bundled Shipping, and Hazardous Material (HAZMAT) (also
asterisked with yellow backgrounds) must be completed in order for the model to
compute. These blocks are completed by selecting the appropriate answer from the drop
down menus. For Type of Storage, the possible answers are Covered, Open, or
HAZMAT. For Bundled Shipping, Yes or No. For Hazardous Material, Yes or No.
4.5.5.4. Termination Model Contract Entries. The contract data is pre-populated
quarterly from J018R and does not update during file maintenance. These data elements
include the PR/contract number, PR unfunded quantity, PR funded quantity, undelivered
quantity, delivered quantity, total quantity, contract unit price, and Free-On-Board (FOB)
information. The FOB field will only accept “Origin” or “Destination” as indicated in
the dropdown menu. (The FOB information appears on contracts and may appear on
PRs.). The FOB data is pre-populated based on the code in the J018R data. If the code is
B, C, E, F, H, J, K, L, M, R, or S, then FOB will equal origin; otherwise, FOB will equal
destination.
AFMCMAN23-101V1 17 NOVEMBER 2016 113
4.5.5.4.1. Additional contracts may be entered with the “Add” button. For each
additional contract or PR line, the IMS/MM is expected to enter the following:
PR/contract number, PR unfunded quantity, PR funded quantity, undelivered
quantity, delivered quantity, total quantity, contract unit price, and FOB information.
4.5.5.4.2. The Undelivered Balance. This is a calculated field based on the sum of
the Undelivered quantity times the Contract Unit Price.
4.5.5.4.3. Weighted Average (Avg) Unit Price. This is a calculated field based on
the sum of the undelivered and delivered quantities times the contract unit price
divided by the total Undelivered and Delivered quantities.
4.5.5.5. Computation Entries – Active Items. This portion of the “Worksheet” tab
includes information from the SGM Computation Worksheet. It is pre-populated and
updated daily during file maintenance and with each computation cycle (Initial, mid
[Final], and Summary). Manual changes of these entries will be supported by a copy of a
computation or recomputation. Entries are mandatory in all fields -- no cell can be blank.
If the computation worksheet displays no value, enter zero in the corresponding cell in
the model. The third short cells cannot have negative values. If data is changed, it will
be retained unless the “Reset” button is pushed.
4.5.5.5.1. Serviceable (SVC) On Order. This line represents the on-order assets from
J018R. This will include the POS, RSP, and OWRM quantities for the PR funded,
and contract on-order categories. The assets that are input are projected on a
quarterly time-phased basis through the span of the computation. The accumulated
quantities are shown on the worksheet.
4.5.5.5.2. Total Available from Depot Repair (Tot Avail Dep Rpr). This entry
represents the total unserviceable assets available for output within the qtr. It will be
the quarterly sum of the TOC assets, net depot unserviceable, OIM generations
available from repair, RDE generations available from repair, NJR generations
available from repair, and due in available from repair assets.
4.5.5.5.3. Third Over. The third over position equals the difference between the sum
of the total serviceable assets, base repairs, and total available depot repair assets, and
the total gross requirement, when the assets exceed the requirements.
4.5.5.5.4. Third Short. The third short position equals the difference between the
sum of the total serviceable assets, base repairs, and total available depot repair
assets, and the total gross requirement, when the gross requirement exceed the assets.
4.5.5.6. Computation Entries – Insurance/NSO Items. This portion of the “Worksheet”
tab is pre-populated from the INS/NSO Status Listing. It is pre-populated and updated
daily during file maintenance and with each computation cycle (Initial, mid [Final], and
Summary). Any manual changes of these entries will be supported by a copy of an
INS/NSO Item Status Listing. Entries are mandatory in all fields -- no cell can be blank.
If the computation worksheet displays no value, enter zero in the corresponding cell in
the model. The third short cells cannot have negative values. If changed, data will be
retained unless the “Reset” button is pushed.
114 AFMCMAN23-101V1 17 NOVEMBER 2016
4.5.5.6.1. Delivery Schedule. This data is pre-populated from the TPAD screen. If
done manually, monthly delivery schedule info (historical AFMC Form 339) will be
used. Aggregate monthly data into qtrs and enter quarterly data in the appropriate
cells.
4.5.5.6.2. Buy or Retention Level. Data is pre-populated from the Buy/Retention
Level, Buy/Retention Detail, and INS/NSO Status Listing (Page 3) (display screen or
printout).
4.5.5.6.3. Serviceable Assets. Data is pre-populated from the Serviceable Assets,
Buy/Retention Detail, and INS/NSO Status Listing (Page 3) (display screen or
printout).
4.5.5.6.4. Total Available Depot Repair (Tot Avail Dep Rpr). Data is pre-populated
from the Assets Avail For Repair, Repair Detail, and INS/NSO Status Listing (Page
3) (display screen or printout).
4.5.5.6.5. Total On Order. Data is pre-populated from the Asset Totals, CARD
screen (Page 3).
4.5.5.6.6. Third Over/Short. Data is pre-populated and calculated as follows:
Serviceable Assets plus Total Available for Repair minus– Buy/Retention Level.
4.5.6. Termination Recommendation. This block, at the top right of the “Worksheet” tab,
provides a termination recommendation based on the calculation of the model. It also
provides messages indicating that additional user action is required for the model to run; e.g.,
N/A - Termination Model needs the following updated: Select Type of Storage; Select
Bundled Shipping; Select Hazardous Material; or Termination Qty cannot exceed the sum of
the PR Unfunded, PR Funded, and Undelivered quantities. If the recommendation is
provided, the user can move to the “Results” tab to see the details of the model results and
the Cost Benefit Analysis (CBA).
4.5.7. The “Results” tab. This tab displays the results of the termination model and the
CBA. It is broken into four parts and includes the costs associated with continuing the
contract and the costs associated with terminating the contract and possibly buying again in
the future. Basic item information such as NSN, IM Name, ERRC, site code, ICC, and Date
Last Updated are also displayed on the page.
4.5.7.1. Termination Request Information. This section lists information that can be
annotated on the Termination Authority Template.
4.5.7.1.1. Undelivered Balance. This is the total dollar value on contract that has not
yet been delivered.
4.5.7.1.2. Total Dollar Value to be Terminated. This is the weighted average unit
price multiplied by the termination quantity in the Termination Model Contract and
Warehousing Entries block. If there is only one contract or if several contracts have
the same unit price, this will be the total dollar value to be terminated. If there are
multiple contracts with different unit prices, this will approximate the total dollar
value to be terminated. Annotate this entry on the Termination Authority Template.
4.5.7.1.3. Max Economical Termination Cost. It would be uneconomical to
terminate a contract when the termination costs exceed this value. If this value is
AFMCMAN23-101V1 17 NOVEMBER 2016 115
negative, it is uneconomical to terminate the contract. This entry on the Termination
Authority Template will be annotated if the termination model recommends
termination of all or part of a contract quantity. The remarks will be annotated with
this statement: “If the sum of the termination costs and settlement costs exceed the
maximum economical termination cost of _________ dollars, do not terminate.”
4.5.7.2. Costs to Continue. This part determines the cost to continue the contract, the
storage costs, and the transportation costs.
4.5.7.2.1. Contract Payment Costs. This is the termination quantity cost (termination
quantity times the contract unit price). The cost is discounted to show approximately
when it will be paid. This is based on the assumption that the contractor is paid when
the assets are delivered. (Refer to the Rate/Storage Tab for current rates included in
the termination model.)
4.5.7.2.2. Storage Costs. This is the cost to store the assets in the warehouse. It is
based on the maximum floor space required to store the assets times the cost per
square foot for storage. The model calculates the cost to store quantities on contract
that are excess to the projected need of the item and then discounts the costs. The
storage cost per square foot is inflated according the inflation indices.
4.5.7.2.3. Transportation Costs. This represents the total cost to transport the assets
from the contractor plant to the depot or other designated site. It is based on the
average weight per asset times the cost per pound to transport. If the item has a FOB
“destination,” the cost is zero since the cost of transportation is already included in
the contract unit price. The cost used is discounted to show approximately when it
will be incurred, based on the projected delivery schedule of the termination quantity.
The transportation cost per pound is inflated in accordance with the inflation indices.
4.5.7.2.4. Total Cost to Continue. Total cost to continue is the sum of the storage
costs and the transportation costs.
4.5.7.3. Costs to Terminate and Reprocure.
4.5.7.3.1. Contract Costs. This is the maximum contractor termination cost. The
cost has been discounted by one year to represent approximately when this would be
paid.
4.5.7.3.2. Termination Settlement Costs. This is the maximum settlement cost to
terminate the contract. The cost has been discounted by one year to represent
approximately when this would be paid.
4.5.7.3.3. Increased AF Unit Price Costs. These are the additional dollars that will be
paid for the remaining assets on contract. If the new unit cost for the item is greater
than the weighted average unit price, then this is equal to the PRs and undelivered
balance quantities times the difference between the new unit cost and the weighted
average unit Price. Since this is a rare occurrence, discounting is not applied.
4.5.7.3.4. AF Administrative Termination Costs. These are the costs to process the
paperwork to terminate. This cost is relatively low and determining when the bulk of
this money is expended is very difficult. Therefore, this cost is not discounted.
116 AFMCMAN23-101V1 17 NOVEMBER 2016
4.5.7.3.5. AF Administrative PR Costs. This is the average cost to process the
paperwork for a PR quantity being reduced or canceled or a PR quantity that has been
awarded and is being considered for termination. This value is not increased for
multiple PRs or contracts. If SIRS does not project reprocurement (i.e., no third short
quantity beyond the end of the BY) this value is $500. If SIRS projects
reprocurement then $1000 is added to the cover part of the costs to initiate a new PR.
Therefore, the minimum AF administrative PR cost is $500 and the maximum is
$1000. This cost is relatively low and determining when the bulk of this money is
expended is very difficult. Therefore, this cost is not discounted.
4.5.7.3.6. Reprocurement Costs. If the reprocurement quantity is greater than zero,
this value is equal to the reprocurement quantity times the inflation factor at the
reprocurement point, times the present value at the reprocurement point, times the
weighted unit price for the item. This entry is zero if there is no reprocurement.
4.5.7.3.7. Reprocurement Transportation Costs. If the reprocurement quantity is
greater than zero, this value is equal to the transportation cost, times the
reprocurement quantity, times the inflation factor at the reprocurement point, times
the present value at the reprocurement point. If the reprocurement quantity equals
zero, the reprocurement costs equal zero. This entry is also zero if the FOB is
“destination.”
4.5.7.3.8. Repair Costs. This is the one-time projected cost to repair available
unserviceable assets if the contract is terminated. It is the result of the repair cost
times the projected repair quantity (the amount necessary if the termination quantity
were not delivered). The cost is discounted to the qtr when these costs will be
incurred and is based on the projected delivery schedule of the termination quantity.
The repair cost is inflated according to the inflation indices.
4.5.7.3.9. Total Cost to Terminate. Total is the sum of the contract costs, termination
settlement costs, increased AF unit price costs, AF administrative termination costs,
AF administrative PR costs, reprocurement costs, reprocurement transportation costs,
and repair costs.
4.5.7.4. Final Recommendation.
4.5.7.4.1. Total Cost to Continue. This is the sum of the contract payment costs,
storage costs, and transportation costs.
4.5.7.4.2. Total Cost to Terminate. This is the negative value of the total cost to
terminate (paragraph 4.5.7.3.9).
4.5.7.4.3. Cost/Benefit. Cost/Benefit is the total cost to continue plus the cost to
terminate.
4.5.7.4.4. Termination Model Recommendation. The recommendation is based on
the information input and formulas within the model, see Table 4.3
AFMCMAN23-101V1 17 NOVEMBER 2016 117
Table 4.3. Termination Model Results – Recommendations.
Definition
1 Do not take termination or cancellation action.
2 Cancel all PRs up to termination quantity. Do not terminate items on contract.
3 Cancel PR. Do not terminate items on contract.
4 Check local guidance.
5 Cancel all PRs up to termination quantity.
6 Cancel PRs, then check local guidance.
7 Take termination action on contract items.
8
Cancel PRs, then fill out a termination request. Send this form to procurement,
requesting the total value of the termination actions not exceed the maximum
economical termination cost of the item.
9 Cancel PRs, then terminate items until termination quantity is satisfied.
10 Cancel unfunded PRs up to termination quantity.
11 Cancel funded PRs up to termination quantity.
12 Cancel all PRs up to termination quantity.
13 Undelivered balance less than $5K - Do not terminate contract items (reference FAR
Subpart 49.101, para C).
4.5.7.5. Print or save the results. Open or save the PDF icon to the user’s PC and select
print from the menu in the PDF document.
4.5.8. The “Rates/Storage” tab. This tab displays the storage costs, transportation costs, and
discount rates used in the termination model. It also provides guidance on the INS/NSO
delivery schedule entries.
4.5.8.1. Discount Rates. Discount rates reflect the degree to which both costs and
benefits in the future are less valuable than costs or benefits today. Discount rates are
measured in terms of the value in currency today of a good versus the delivery of that
good at some time in the future. The discount rate measures the relative value of a good
over time measured in current year dollars. The termination model applies the discount
rate to compute the present value of a future reprocurement.
DONALD E. KIRKLAND
Brigadier General, USAF
Director, Logistics, Civil Engineering, and Force
Protection
118 AFMCMAN23-101V1 17 NOVEMBER 2016
Attachment 1
GLOSSARY OF REFERENCES AND SUPPORTING INFORMATION
References
AFFARS 5349.102, Air Force Federal Acquisition Regulation Supplement, 6 April 2015
AFH 23-123, Volume 1, Materiel Management Reference Information, 8 August 2013
AFH 23-123, Volume 2, Part 1, Integrated Logistics System-Supply (ILS-S), Materiel
Management Operations, 8 August 2013
AFH 23-123, Volume 2, Part Two, Integrated Logistics System-Supply (ILS-S), Standard Base
Supply System Operations, 8 August 2013
AFI 20-115, Propulsion Management For Aerial Vehicles, 12 February 2014
AFI 23-101, Air Force Materiel Management, 29 January 2016
AFMAN 21-106, Joint Regulation Governing the Use and Application of Uniform Source
Maintenance, and Recoverability Codes, 29 August 2014
AFMAN 33-363, Management of Records, 1 March 2008
AFMC MP Part 5349, Contracting Mandatory Procedure – Termination of Contracts, January
2014
AFMCI 20-102, Requirements Definition and Purchase Instrument Development, 11 July 2013
AFMCI 23-103, Diminishing Manufacturing Sources and Materiel Shortages (DMSMS)
Program, 13 October 2000
AFMCI 23-106, Initial Requirements Determination, 3 February 1997
AFMCI 23-112, Management of Items Subject to Repair (MISTR), 7 March 2006
AFMCMAN 20-2, Security Assistance Program (SAP) Logistics Procedures, 16 January 2014
AFMCMAN 23-101, Volume 2, System Level Data and OPR Reports (D200A, D200N), TBD
AFMCMAN 23-101, Volume 3, Computational Results (D200A, D200N), TBD
AFMCMAN 23-101, Volume 4, IMS/PMS/MM Data and Reports (D200A, D200N), TBD
AFMCMAN 23-101, Volume 5, Equipment Specialist Data and Reports (D200A, D200N), TBD
AFMCMAN 23-101, Volume 6, Central Secondary Item Stratification (D200A, D200N), TBD
AFMCMAN 23-3, Cataloging and Standardization, 14 September 2010
DoD 4100.39-M, Federal Logistics Information System (FLIS) Procedures Manual, varies by
volume.
DoD 4140.01, Volume 3, DoD Supply Chain Materiel Management Procedures: Materiel
Sourcing, 23 May 2003
DoDM 4140.01, Volume 10, DoD Supply Chain Materiel Management Procedures: Metrics
and Inventory Stratification Reporting, 10 February 2014
AFMCMAN23-101V1 17 NOVEMBER 2016 119
DoD 5200.2-R, Personnel Security Program, 1 January 1987
Federal Acquisition Regulation (FAR) Part 49, current edition
Public Law 111-84, National Defense Authorization Act for Fiscal Year 2010, Division A, Title
III, Section 328, 28 October 2009
Title 10 United States Code Section 2210
Title 10 United States Code Section 2213
Title 10 United States Code Section 2306b
Title 10 United States Code Section 2458
T.O. 00-20-3, Maintenance Processing of Reparable Property and The Repair Cycle Asset
Control System, 15 August 2015
T.O. 00-20-9-WA-1, Forecasting Repl Requirements For Selected Calendar And Hourly Time
Change Items, 15 January 2014
T.O. 00-25-195-WA-1, AF Technical Order System Source, Maintenance, and Recoverability
Coding of Air Force Weapons, Systems, and Equipments, 1 October 2012
Prescribed Forms
AFMC Form 318, Item Contracting History Record
Forms Adopted
AF Form 1996, Adjusted Stock Level
AFLC Form 47, Asset Reconciliation - Investment Items, (Historical Form)
AFMC Form 206, Temporary Work Request
AFMC Form 247, Asset Reconciliation - Investment Items, (Historical Form)
AFMC Form 326, Provisioned Item Order
AFMC Form 339, Due-In Assets Status Record, (Historical Form)
AFMC Form 614, Recoverable Item Initial Requirements Computation Worksheet
AFMC Form 804, Renegotiation And Drive Adjustment Record
AFTO Form 223, Time Change Requirements Forecast
DD Form 2875, System Authorization Access Request (SAAR)Termination Authority Template
Abbreviations and Acronyms
A&AS— Advisory & Assistance Service
A-R—Asset Reconciliation
AAC—Acquisition Advice Code
AAM—Aircraft Availability Model
AAMD—Aircraft Availability Model Data
120 AFMCMAN23-101V1 17 NOVEMBER 2016
AAO—Approved Acquisition Objective
ABCS—Automated Budget Compilation System
ADRQ—Display Additive Requirements
AF—Air Force
AFAA—Air Force Audit Agency
AFAO—Approved Force Acquisition Objective
AFB—Air Force Base
AFFARS—Air Force Federal Acquisition Regulation Supplement
AFMC—Air Force Materiel Command
AFSC—Air Force Sustainment Center
AI—Application/Indenture
ALC—Air Logistics Complex
ALT—Administrative Lead Time
ALVW—Adjusted level Verification Worksheet
AMC—Acquisition Method Code
API—Applications, Programs, Indentures
ARCR—Asset Reconciliation Computational Results
ARD—Asset Reconciliation Data
ARLG—Asset Reconciliation Losses and Gains
AROO—Asset Reconciliation On Order
AVG—Average
AY—Apportionment Year
BLSS—Base Level Self-sufficiency Spares
BMD—Basic Management Data
BP—Budget Program
BSO—Budget Support Objective
BY—Budget Year
CAC—Common Access Card
CAD/PAD—Cartridge Actuated Devices/Propellant Activated Devices
CAGE—Contractor and Government Entity
CARD—Consolidated Assets and Requirement
CAV AF—Commercial Asset Visibility-Air Force
AFMCMAN23-101V1 17 NOVEMBER 2016 121
CBA—Cost Benefit Analysis
CLIN—Contract Line Item Number
CLSSA—Cooperative Logistics Supply Support Arrangement
CMD—Command
CNDM—Condemnation
COPA—Center OF Parts Activity
CREP—Contract Repair Enhancement Program
CRF—Centralized Repair Facility
CSAG-M—Consolidated Sustainment Activity Group-Maintenance
CSAG-S—Consolidated Sustainment Activity Group-Supply
CSIS—Central Secondary Item Stratification
CSN—Current Stock Number
CW—Computation Worksheet
CY—Current Year
DDC—Deferred Disposal Code
DIC—Document Identifier Code
DIOH—Due In From Overhaul
DIS—Display
DISA—Defense Information Systems Agency
DLA—Defense Logistics Agency
DLM—Defense Logistics Manual or Depot Level Maintenance
DMBA—Depot Maintenance Budget Authority
DMISA—Depot Maintenance Inter-Service Support Agreement
DoD—Department of Defense
DOLP—Date of Last Procurement
DOTM—Due-Out To Maintenance
DQ—Data Query
DRC—Depot Repair Cycle
DSD—Data System Designator
DSS—Distribution Standard System
DTI—Data Type Interrogation
E-mail—electronic mail
122 AFMCMAN23-101V1 17 NOVEMBER 2016
EAIM—End Article Item Manager
ENTNAC—Entrance National Agency Check
EOH—Engine Overhaul
EPSS—Equipment Specialist (ES) Report (Output Products)
EQP—Equipment
ERRC—Expendability, Recoverability, Reparability Category
ES—Equipment Specialist
EXPRESS—EXecution and Prioritization of REpair Support System
EY—Extended Year
FAD—Factors Application Data
FBD—Factors Basic Data
FIC—Factor Indicator Code
FM or F/M—File Maintenance
FMS—Foreign Military Sales
FOB—Free-On-Board
FOE—Final Operating Environment
FRAP—Forecast Rates And Percents
FRIR—For Real Item Record
FSC—Federal Supply Classification
FUD—Factor/Usage Data
FUP—Forecast Unit Price
FY—Fiscal Year
GFE—Government-Furnished Equipment
GFM—Government-Furnished Material
GSD—General Support Division
GUI—Graphic User Interface
I&S—Interchangeability and Substitutability
I&SG—Interchangeable and Substitutable Group
IAC—Item Activity Code
IAO—Information Assurance Officer
ICC—Item Category Code
ICP—Inventory Control Point
AFMCMAN23-101V1 17 NOVEMBER 2016 123
ICS—Interim Contractor Support
ID/IQ—Indefinite Delivery/Indefinite Quantity
IIRP—Improved Item Replacement Program
IM—Item Manager
IMCS—Item Management Control System (D043)
IMS—Inventory Management Specialist
INDX—Index
INI—Inflation Index
INIS—Insurance/Numeric Stockage Objective Item Status
INS—Insurance
IOA—Index of Actions
IOE—Initial Operating Environment
IPD—Item Program Data
IRD—Initial Requirements Determination
IRIS—Interactive Requirements Information Services
IRL—Item Review Listing
ISA—In Service Asset
ISD—Input System Data
ISID—Interface System Input Dates
JEIM—Jet Engine Intermediate Maintenance
JR—Job Routed
LG—Logistics Directorate
LOR—Letter of Responsibility
LOT—Life-of-Type
LRC—Latest Repair Cost
MAH—Moving Average History
MAJCOM—Major Command
MCR—Materiel Cost Recovery
MD—Mission Design
MDC—Manager Designator Code
MDS—Mission Design Series
MGFT—Mission Design Goal/Floor Factor Table
124 AFMCMAN23-101V1 17 NOVEMBER 2016
MIAP—Multi-Host Internet Access Portal
MIEC—Mission Item Essentiality Code
MIPR—Military Interdepartmental Purchase Request
MISC—Miscellaneous
MISTR—Management of Items Subject to Repair
MM—Materiel Manager
MMAC—Materiel Management Aggregation Code
MP—Mandatory Procedures
MRRD—MISTR Repair and Repair Data
MRRL—Materiel Repair Requirements List
MRPR—MISTR Repair and Repair Data
MTBD—Mean Time Between Demands
MYC—Multiple Year Contract
MYP—Multiple Year Procurement
NAC—National Agency Check
NC—Non-Catalog
NHA—Next Higher Assembly
NIIN—National Item Identification Number
NIMSC—Nonconsumable Item Materiel Support Code
NJR—Non–Job-Routed
NRTS—Not Reparable This Station
NSN—National Stock Number
NSO—Numeric Stockage Objective
NTPD—Non-Time Phased Asset Data
O&ST—Order and Shipping Time
OIM—Organizational and Intermediate Maintenance
OP—Output Products
OPR—Office of Primary Responsibility
OPSS—Office of Primary Responsibility (OPR) Reports
OSTD—Other Service Total Demands and Requirements
OWO—On Work Order
OWRM—Other War Reserve Materiel
AFMCMAN23-101V1 17 NOVEMBER 2016 125
OWRM EXCL—Other War Reserve Materiel Exclusion
PBL—Performance-Based Logistics
PC—Personal Computer
PCLT—Procurement Lead Time
PCN—Product Control Number
PCO—Procurement Contracting Officer
PDM—Programmed Depot Maintenance
PEC—Program Element Code
PEL—PRELOG Error List
PES—PRELOG Error Summary
PF—Past Factors
PFI—Product Format Information
PGRM—Program
PICA—Primary Inventory Control Activity
PIN—Personal Identification Number
PIO—Provisioned Item Order
PL—Public Law
PLD—Pipeline Data
PLT—Production Lead Time
PMO—Production Management Officer
PMS—Production Management Specialist
POC—Point of Contact
POS—Peacetime Operating Stock
PP—PRELOG Plots
PPCO—Provisioning Procurement Contracting Officer
PPH—PRELOG Plot Headers
PR—Purchase Request
PRELOG—Predictive Logistics
PRGM—Program
PSC—Program Select Code
PSI—PRELOG Selected Information
QEC—Quick Engine Change
126 AFMCMAN23-101V1 17 NOVEMBER 2016
QPAPPL—Quantity Per Application
QPA—Quantity Per Assembly
qtr—Quarter
QTY—Quantity
QUP—Quantity Unit Pack
RAMP—Reportable Asset Management Process
RAP—Rates And Percents
RCO—Requirements Control Officer
RDE—Requirements Data Exchange
RDEO—Requirements Data Exchange Output
RDS—Reutilization and Disposition System
REALM—Requirements/Execution Availability Logistics Module (D087H)
RIID—Requirements Item Identification Data
RIR—Reduction in Requirement
RIW—Reliability Improvement Warranty
RMS—Requirements Management System
RPR—Repair Products
RSP—Readiness Spares Package
RTS—Reparable This Station
S/A—Service/Agency
SAAR—System Authorization Access Request
SAMIS—Security Assistance Management Information System
SCC—Supply Condition Code or System Compute Code
SCMG—Supply Chain Management Group
SCMW—Supply Chain Management Wing
SCOW—Supply Chain Operations Wing
SFTY LVL EXCL IND—Safety Level Exclusion Indicator
SGM—Subgroup Master
SICA—Secondary Inventory Control Activity
SIRS—Secondary Item Requirements System
SL—Safety Level
SMBA—Supply Maintenance Budget Authority
AFMCMAN23-101V1 17 NOVEMBER 2016 127
SMC—System Management Code
SMCW—Subgroup Master Computation Worksheet
SND—Stock Number Data
SNIC—Stock Number Identity Cross Reference
SOCW—Subgroup Master Other War Reserve Materiel Computation Worksheet
SOR—Source of Repair
SRAN—Stock Record Account Number
SRC—Source Reference Code
SRRB—Spares Requirements Review Board
SSIR—Supply System Inventory Report
SUD—Stock Record Account Number Usage Data
SVC—Service
SVC T-I—Service Turn-In
T.O— Technical Order
TBLD—Table Data
Term—Termination
TOC—Technical Order Compliance
TOIMDR—Total Organizational and Intermediate Maintenance Demand Rate
TPAD—Time-Phased Asset Data
TRND—Trend Analysis
TSUH—Total Subgroup Master Usage History
UH—Usage History
URC—Unit Repair Cost
USC—United States Code
USERID—User Identification
WARD—War Data
WRM—War Reserve Materiel
WTIR—What If Item Recomputation
Terms
Acquisition— Obtaining logistics support, supplies, or services under an acquisition agreement
or under a cross-servicing agreement. This includes purchasing (whether for payment in
currency, replacement-in-kind, or by exchange for equal value), renting, leasing, or any method
128 AFMCMAN23-101V1 17 NOVEMBER 2016
of temporarily obtaining logistics support, supplies, or services. Reference DoDM 4140.01,
Volume 1, DoD Supply Chain Materiel Management Procedures: Operational Requirements.
Acquisition Advice Code (AAC)—Codes indicating how (as distinguished from where) and
under what restrictions an item will be acquired. Reference DoD 4100.39-M, Volume 10, Table
58.
Activity— A unit, organization, or installation performing a function or mission, (e.g., reception
center, redistribution center, naval station, naval shipyard). Reference Joint Publication 1-02,
DoD Dictionary of Military Terms.
Additive Requirement—Requirements that are supported by projected requirements
(e.g.,modifications) rather than past demand experience. Requirements computed outside
therecoverable computation. Reference AFI 23-101.
Adjustments (Physical Inventory)— The accounting transaction that corrects a book balance to
agree with the quantity of the item in storage. Such adjustments may result from (1) physical
inventory, (2) a potential discrepancy revealed by a materiel release denial or location
survey/reconciliation, (3) capitalization/decapitalization actions, (4) reidentification of stock, (5)
type of pack changes, (6) catalog data changes, (7) supply condition and purpose code changes,
etc. Reference DLM 4000.25, Defense Logistics Management Standards.
Administrative Lead Time (ALT)— The time interval between initiation of a purchase request
and the date of signature of a contract. Reference DoDM 4140.01, Volume 2, DoD Supply
Chain Materiel Management Procedures: Demand and Supply Planning.
Apportionment Year (AY)— The second Fiscal Year (31 March and 30 June cycle) or first
Fiscal Year (30 September and 31 December). It is also known as the operating year.
Approved Acquisition Objective (AAO)— The quantity of an item authorized for peace time
and war time requirements to equip and sustain U.S. and allied forces, according to current DoD
policies and plans. That quantity shall be sufficient to support other U.S. Government agencies,
as applicable. Reference DoDM 4140.01, Volume 6, DoD Supply Chain Materiel Management
Procedures: Materiel Returns, Retention, and Disposition.
Assembly— In logistics, an item forming a portion of equipment that can be provisioned and
replaced as an entity and which normally incorporates replaceable parts or groups of parts.
Reference DoDM 4140.01, Volume 2.
Automated Budget Compilation System (ABCS)—An online, real-time mainframe system that
resides on the Logistics and Sustainment Management Data Bank (LMDB)(D075). It is used to
prepare budget submissions for both buy and repair of AFMC- managed reparables and
consumables. Reference AFMCI 23-112, Management of Items Subject to Repair (MISTR).
Base Condemnation Rate—The number of base condemnations divided by the sum base RTS
and base condemnations. Reference AFI 23-101.
Budget— A planned program for a fiscal period in terms of estimated costs, obligations, and
expenditures. Reference AFMAN 65-604, Appropriation Symbols and Budget Codes.
Budget Code— A one-position alphanumeric code employed by the Air Force to identify
investment items to budget programs from which procurement of the particular items is funded,
AFMCMAN23-101V1 17 NOVEMBER 2016 129
or to identify expense items to the various divisions of the Air Force Stock Fund. Reference
DoD 4100.39-M, Volume 10, Table 67.
Budget Cycle— That time necessary to formulate, review, present, and secure approval of the
fiscal program for a specified ensuing period. Reference AFMAN 65-604.
Budget Year (BY)— The fiscal year covered by the budget estimate. A budget year begins 1
October and ends 30 September of the following calendar year. It is used by the federal
government for accounting purposes, and is frequently referred to as "BY." Reference AFMAN
65-604.
Cancellation Request— A transaction that allows a requisitioner or other authorized activity to
request cancellation of all or a portion of the quantity of materiel ordered in a previously
submitted requisition. Reference DoDM 4140.01, Volume 5, DoD Supply Chain Materiel
Management Procedures: Delivery of Materiel.
Cataloging— The process of uniformly identifying, describing, classifying, numbering, and
publishing in the Federal Catalog System all items of personal property (items of supply)
repetitively procured, stored, issued, or used by federal agencies. Reference DoDM 4140.01,
Volume 8, DoD Supply Chain Materiel Management Procedures: Materiel Data Management
and Exchange.
Center Of Parts Activity (COPA)—An AF information technology system that requires human
intervention in the supply chain to assure materiel is made available to the mechanics/technicians
when required to produce aircraft and repair commodities needed by the warfighter.
Central Secondary Item Stratification (CSIS)— An automated capability that applies to
wholesale and retail asset and requirements data. The CSIS shall uniformly display the materiel
requirements and associated asset status of individual secondary items and generate summaries
of essential information. If a methodology other than stratification is used as a foundation, an
audit trail to the applicable stratification table shall be submitted to the USD(L&MR). Secondary
item assets shall be stratified at least semiannually. One stratification shall be as of September 30
(for inventory reporting and funding reviews), and the other shall be as of March 31 (for budget
preparation). Reference AFI 23-101.
Commercial and Government Entity (CAGE) Code— A five character data element assigned
to establishments which are manufacturers or have design control of items of supply procured by
the Federal Government. Reference DoD 4100.39-M, Glossary.
Component— In logistics, a part or combination of parts having a specific function, which can
be installed or replaced only as an entity. Reference DoDM 4140.01, Volume 6.
Computation Asset Cutoff Date—The last calendar day of each calendar quarter (31
December, 31 March, 30 June, and 30 September). The Secondary Item Requirements System
(SIRS)(D200A) computes items using data that are current on these dates.
Compute Code—One-digit alpha code assigned to all subgroup master items in SIRS that tells
D200A to perform or not perform a computation. SIRS generates the compute code; it cannot be
file maintained.
Consolidated Sustainment Activity Group–Supply Division (CSAG-Supply)— The CSAG-
Supply provides policy, guidance, and resources to meet the needs of the Air Force for spare
parts, in war and peace. The CSAG-Supply manages weapons system spare parts, fuels,
130 AFMCMAN23-101V1 17 NOVEMBER 2016
equipment, and items used for non-weapon system applications. Reference AFI 65-601, Volume
1, Budget Guidance and Procedures.
Consumable Item— An item of supply or an individual item (except explosive ordnance and
major end items of equipment) that is normally expended or used up beyond recovery in the use
for which it is designed or intended. Reference DoDM 4140.01, Volume 2.
Contract— A mutually binding legal relationship obligating the seller to furnish the supplies or
services (including construction) and the buyer to pay for them. It includes all types of
commitments that obligate the Government to an expenditure of appropriated funds and that,
except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts
include (but are not limited to) awards and notices of awards; job orders or task letters issued
under basic ordering agreements; letter contracts; orders, such as purchase orders, under which
the contract becomes effective by written acceptance or performance; and bilateral contract
modifications. Contracts do not include grants and cooperative agreements covered by 31
U.S.C. 6301, et seq. Reference FAR, Subpart 2.1.
Contract Line Item— An item of supply or service on a contractual document usually identified
by a contract line item number (CLIN). Reference DFARS 204.7103.
Contract Termination—- The cessation or cancellation, in whole or in part, of work under a
prime contractor a subcontract for the convenience of, or at the option of, the government, or due
to failure of the contractor to perform in accordance with the terms of the contract. Reference
AFI 23-101.
Contracting— Purchasing, renting, leasing, or otherwise obtaining supplies or services from
nonfederal sources. Contracting includes description (but not determination) of supplies and
services required, selection and solicitation of sources, preparation and award of contracts, and
all phases of contract administration. It does not include making grants or cooperative
agreements. Reference FAR, Subpart 2.1.
Contracting Activity— An element of an agency designated by the agency head and delegated
broad authority regarding acquisition functions. Reference FAR, Subpart 2.1.
Contracting Office— An office that awards or executes a contract for supplies or services and
performs post-award functions not assigned to a contract administration office (except for use in
Part 48, see also 48.001). Reference FAR, Subpart 2.1.
Contracting Officer— A person with the authority to enter into, administer, and/or terminate
contracts and make related determinations and findings. The term includes certain authorized
representatives of the contracting officer acting within the limits of their authority as delegated
by the contracting officer. Reference FAR, Subpart 2.1.
Contractor—An authorized Air Force contractor that occupies the facilities of, or receives
support from, another Air Force, Air Force Reserve, or Air National Guard unit. Reference AFI
65-601, Volume 1.
Coordination—- The necessary action to ensure adequate exchange of information to integrate,
synchronize, and deconflict operations between separate organizations. Coordination is not
necessarily a process of gaining approval but is most often used for mutual exchange of
information. Reference AFI 23-101.
AFMCMAN23-101V1 17 NOVEMBER 2016 131
Current Year (CY)— The first Fiscal Year covering the time period from the computation asset
cutoff date to the first calendar day of the next FY (1 October).
Customer— The individual or activity requesting or ordering a material asset at any
organizational level. Reference DoDM 4140.01, Volume 5.
Data Element— A basic unit of information in a business transaction. Reference DLM
4000.25.
Demand— An indication of a requirement, a requisition, or similar request for an item of supply
or individual item. Demands are categorized as either recurring or non-recurring. Reference
DoDM 4140.01, Volume 1.
Depot Maintenance Inter-Service Support Agreement (DMISA)— A formalized agreement
similar to a contract whereby one Service (the Agent) obligates itself to provide depot
maintenance support for another Service (the Principal). (Source: OPNAVINST 4790.14A, et.al)
For the purpose of this manual, DMISA also covers depot maintenance provided for under inter-
Service support agreements not covered by the referenced joint regulation. Reference DLM
4000.25.
Depot Repair Cycle (DRC)—Begins when a maintenance activity determines that an
unserviceable item can be repaired and end when the unserviceable item is restored to
serviceable condition and is recorded as such on supply records. Include all time between the
beginning and end of the repair cycle in computing repair-cycle requirements, except avoidable
time, such as time expended due to the lack of a repair requirement or inefficiency. Beginning
and ending points of each segment of the total repair cycle are described in Appendix 4 of this
enclosure. Do not include increases to the repair cycle time due to awaiting parts in computing
repair cycle. Reference DoDM 4140.01, Volume 2.
Depot Stock Levels—Depot stock levels represent those levels that are required in support of
depot overhaul requirements. These are subdivided into two categories, job-routed (JR) and non
job-routed (NJR) stock levels. JR items are those items that are repaired as part of a higher
assembly repair. The stock level in support of JR overhaul requirements represents the amount
of stock required to prevent delay of programmed overhauls during the subassembly O&ST. NJR
items are those items that are removed during an overhaul and turned into supply. The NJR
stock level requirement represents the quantity of stock required to support the overhaul line
during subassembly O&ST. Reference AFI 23-101.
Distribution Standard System—A DLA information technology system that creates a paperless
environment for the distribution business area and provides automated support tools needed to
implement process control and uniformity. It is the means for DLA to provide tailored logistics
support.
Document Number— A unique reference number assigned to a requisition or a release/receipt
document in order to identify the transaction throughout the logistics system and for the life of
the transaction unto; its retirement is authorized in official audit reports. The first six positions
are the DoDAAC of the reporting activity; the next four positions are the year and three position
numerical day of the year; the next position is the utilization code; and the last three positions are
the activity serial number. Reference DLM 4000.25-1.
132 AFMCMAN23-101V1 17 NOVEMBER 2016
Effective Date (ED)— The year and Julian day denoting the date that a predetermined condition
or action becomes effective in the defense logistics system. (e.g., 04122 is 1 May 2004).
Reference DoD 4100.39-M, Glossary.
End Item— A final combination of end products, component parts, or materials that is ready for
its intended use, e.g., ship, tank, mobile machine shop, or aircraft. Reference DoDM 4140.01,
Volume 2.
Equipment— In logistics, all nonexpendable items needed to outfit or equip an individual or
organization. Reference DoDM 4140.01, Volume 5.
Equipment Specialist (ES)—- Individual who collects, analyzes, interprets and develops
specialized data about specific pieces of equipment and/or systems. Provides information and
advisory service to other functions involved in the design, test, production, procurement, supply,
operation, repair, or disposal of equipment. This advice includes, but is not limited to, issues
concerning interchangeability and substitutability of NSNs, repair concepts, ERRC coding and
reliability. Assists an acquisition team during the development/production phase of a
system/equipment. Responsible for the technical management of a system, subsystem or
commodity during the sustainment phase of a program. Maintains documentation supporting
factors, including those based on initial provisioning data, applications and any other file
maintained data. Makes decisions for technical orders and AFTO Forms 22, Technical Manual
(TM) Change Recommendation and Reply.
Essential Item— A support item or a repair part whose absence renders the supported system or
end item inoperable. Reference DoDM 4140.01, Volume 2.
Essentiality Code— Weapon system or end item designation used to indicate the measure of an
item’s military worth in terms of how its failure (if a replacement is not immediately available)
would affect the ability of a weapon system, end item, or organization to perform its intended
functions. In stockage models, it is the number by which the shortage cost parameter is
multiplied to reflect the differences in military worth among items. Reference DoDM 4140.01,
Volume 2.
Estimated Termination Costs—- An informal estimate of costs to terminate all or part of a
contract. The contracting activity provides this estimate to the IMS/MM who submits the
request for termination to contracting, usually without contacting the contractor, as an initial
assessment of the benefits of terminating a contract.
Excess— Materiel at a retail supply activity that is excess to that activity’s requirements and is
subject to return to the wholesale materiel manager, redistribution within the DoD supply chain,
or to disposal by Defense Logistics Agency Disposition Services. Reference DoDM 4140.01,
Volume 1.
Expendability, Recoverability, Reparability, Category (ERRC) Code— A code employed by
the Air Force to categorize AF inventory into various management groupings. The three position
ERRC Designator and the one-position ERRC Code are completely interchangeable. Generally,
the three position is used in correspondence and publications and the one position in automatic
data processing programs (space premium). Reference DoD 4100.39-M, Volume 10, Table 69.
Extended Year (EY)— The Fiscal Year that follows the Budget Year.
AFMCMAN23-101V1 17 NOVEMBER 2016 133
Failure— The event, or inoperable state, in which any item or part of an item does not, or would
not, perform as previously specified. AFI 20-106 (IP), Management of Aviation Critical Safety
Items.
Federal Supply Classification (FSC)— A series of four numbers at the beginning of the
national stock number (NSN) that designates the general commodity grouping of the item of
supply (e.g., Class 5130 designates hand tools, power driven). Reference DoDM 4140.01,
Volume 3.
File Maintenance—The act or method of making changes, deletions, or additions to elements of
data on an established computer file.
Fiscal Year (FY)— The 12 month period which begins 1 October of one year and ends 30
September of the next. Reference AFMAN 65-604.
Forecast Unit Price (FUP)—A nine-position numeric element that is determined by multiplying
the unit price by the appropriate inflation factors in D200A. Valid entries are in dollar and cents
format with two decimal places.
Foreign Military Sales (FMS)— That portion of the United States security assistance
authorized by the Foreign Assistance Act of 1961, as amended, and the Arms Export Control Act
of 1976, as amended. This assistance differs from the International Military Education and
Training Program in that the recipient provides reimbursement for defense articles and services
transferred. Also called FMS. (See Joint Publication 1-02.) Reference DLM 4000.25.
Free-On-Board— Term used in conjunction with a physical point to determine—(1) The
responsibility and basis for payment of freight charges; and (2) Unless otherwise agreed, the
point where title for goods passes to the buyer or consignee. “F.o.b. destination” means free on
board. Reference FAR, Subpart 2.1.
Free-On-Board (FOB) Destination— Product is accepted at destination by the Government.
Shipper provides transportation. Reference DLM 4000.25.
Free-On-Board (FOB) Origin— Product is accepted at origin (source) by the Government.
Government provides transportation with commercial carriers. Reference DLM 4000.25.
Future Program— The number of time changes required by quarter over the 10-year period.
Hazardous Materiel (Dangerous Goods)— A substance of materiel that has been determined
to be capable of posing an unreasonable risk to health, safety, and property when transported.
This materiel includes explosives, gasses (compressed, liquefied, or dissolved under pressure),
flammable liquids, flammable solids or substances, oxidizing substances, poisonous and
infectious substances, radioactive substances, corrosives, and miscellaneous dangerous
substances presenting real or potential hazards to life and property. Procedures for handling this
materiel are specified in applicable publications of the Department of Transportation, the
Interstate Commerce Commission, Federal Aviation Agency, U.S. Coast Guard, U.S. Agriculture
Department, U.S. Public Health Service, Intergovernmental Maritime Consultative Organization,
the International Civil Aviation Organization, and in federal or military documents. Dangerous
goods is the term applied to hazardous materiel in international movement. Reference DLM
4000.25.
Individual Item— A single instance of a stock-numbered item, a single assembly, or a single
subassembly. Reference DoDM 4140.01, Volume 2.
134 AFMCMAN23-101V1 17 NOVEMBER 2016
Initial Requirements Determination (IRD)(D200H)—Information Technology system that
computes recoverable and consumable item requirements. It is the preferred method for initial
spares computation, accumulating multiple weapons and includes a simulation capability.
Reference AFMCI 23-106, Initial Requirements Determination.
Initial Spares— Spares stocked to support a newly fielded weapon system or a modification of a
weapon system. Reference DoDM 4140.01, Volume 2.
Insurance Item— A non-demand-based, stocked, essential item for which no failure is predicted
through normal usage. However, if a failure were to be experienced or a loss should occur
through accident, abnormal equipment or system failure, or other unexpected occurrence, lack of
replacement item will seriously hamper the operational capability of a weapon system.
Reference DoDM 4140.01, Volume 2.
Interchangeability and Substitutability (I&S)— Conditions which permit the exchange of one
item for another without affecting design or performance beyond acceptable limits. Reference
DoD 4100.39-M, Glossary.
Interchangeable Item— An item which possesses such functional and physical characteristics
as to be equivalent in performance, reliability, and maintainability, to another item of similar or
identical purposes, and is capable of being exchanged for the other item without selection for fit
or performance and without alteration of the items themselves or adjoining items, except for
adjustment. Reference DoD 4100.39-M, Glossary.
Interchangeable and Substitution Group (I&SG)— Set of items that have similar physical
and functional characteristics to the extent that the items can provide comparable functional
performance against a given requirement. Reference AFI 23-101.
Inventory— Materiel, titled to the U.S. Government, held for sale or issue, held for repair, or
held pending transfer to disposal. This definition covers the same population of items as the
definition for inventory in Chapter 4 of Volume 4 of DoD 7000.14-R (Reference (f)). Inventory
does not include tangible personal property to be consumed in normal operations, operating
materials, and supplies as defined in DoD 7000.14-R. Reference DoDM 4140.01, Volume 1.
Inventory Control Point (ICP)— An organizational unit or activity within the DoD supply
system assigned the primary responsibility for the materiel management of a group of items
either for a particular Military Department or for the DoD as a whole. In addition to materiel
management functions, an ICP may perform other logistics functions in support of a particular
Military Department or for a particular end item (e.g., centralized computation of retail
requirements levels and engineering tasks associated with weapon system components).
Reference DoDM 4140.01, Volume 2.
Inventory Management Specialist—Individual who performs analytical work in managing,
regulating, coordinating, or otherwise exercising control over supplies, equipment, or other
materiel. The work includes one or more phases of materiel management including initial
planning, provisioning and requirements determination, acquisition and distribution,
accountability, and ultimate issue for consumption, retention, or disposal. The work requires
knowledge of acquisition processes, automated records and control systems, materiel substitution
criteria, and storage, issue, and disposal processes.
AFMCMAN23-101V1 17 NOVEMBER 2016 135
Item— An item is a single hardware article or a unit formed by a grouping of subassemblies,
components or constituent parts. In the DoD, an item is any article produced, stocked, stored,
issued, or used; or any product, including systems, materiel, parts, subassemblies, sets and
accessories. Reference DLM 4000.25.
Item Activity Code (IAC)—One-position code used in SIRS to identify the cycle or cycles that
an item must be reviewed.
Item Identification— A collection and compilation of data to establish the essential
characteristics of an item that give the item its unique character and differentiate it from other
supply items. Reference DoDM 4140.01, Volume 3.
Item Management Control System (IMCS)(D043)—Information technology system that
provides for AF participation in the Federal Cataloging Program, as set forth by DoD 4100.39M.
D043 interfaces with FLIS and numerous other databases, and is the central repository of Federal
and AF logistics data for over two million AF-used items of supply. Reference AFMCMAN 23-
3.
Item Management Team—Functional group consisting of IMS/MM, ES, PMS, Logistics
Management Specialist, and Engineer.
Item Manager Wholesale Requisition Process (IMWRP)(D035A)—An information
technology system that provides worldwide property accounting, inventory control, and
distribution/redistribution of materiel at the wholesale level (reference AFMCMAN 23-5,
Volume 1, D035A, D035B, RAMP and WHSL Module Data Subsystems).
Item Review Listing (IRL)— Web-based tool designed for the IMS/MM and PMS to use
during file maintenance. It presents the list of NSNs for the IMS/MM/PMS and ES in the order
of most important to review, down to least important to review. It also provides the capability to
document which items they have reviewed/worked. The IRL in IRIS also provides the ability for
IMS/MM, PMS, and ES supervisors to monitor the progress of their personnel during the
review/file maintenance window(s).
Job Routed Repair—When a recoverable component is found to be unserviceable during the
overhaul, the item is removed, repaired/reconditioned, and reinstalled on the same end item.
Reference AFI 21-101, Aircraft and Equipment Maintenance Management, AFMC Supplement
Kits— Assembled repair parts and components required for maintenance support of an end item.
Reference DoDM 4140.01, Volume 4, DoD Supply Chain Materiel Management Procedures:
Make and Maintain Materiel.
Life-of-Type (LOT) Buy— A one-time procurement, when all cost effective and prudent
alternatives have been exhausted, for the total future requirement of an item that is no longer
expected to be produced. The procurement quantity is based upon demand or engineering
estimates of wear out rates or item malfunction or failure sufficient to support the applicable
equipment until phased out. Reference DoDM 4140.01, Volume 2.
Maintenance (Materiel)— All action taken to retain materiel in a serviceable condition or to
restore it to serviceability. It includes inspection, testing, servicing, classification as to
serviceability, repair, rebuilding, and reclamation. (Source: Joint Publication 1-02).
Maintenance, used generically in this manual, also includes evaluation, assembly, disassembly,
conversion, and modification. Reference DLM 4000.25.
136 AFMCMAN23-101V1 17 NOVEMBER 2016
Master Item— The item/NSN in an I&S Family which is commonly regarded by the managing
and using Services/Agencies as a suitable substitute for all other items in the family as the
preferred item for procurement purposes. Reference DoD 4100.39-M, Glossary.
Materiel— All items necessary to equip, operate, maintain, and support military activities
without distinction as to its application for administrative or combat purposes, excluding real
property, installations, and utilities. Materiel is either serviceable (i.e., in an issuable condition)
or unserviceable (i.e., in need of repair to make it serviceable). Reference DoDM 4140.01,
Volume 1.
Materiel Condition— A classification of materiel that reflects its readiness for issue and use or
to identify the action underway to change the status of materiel. Reference DLM 4000.25.
Materiel Management— That phase of military logistics that includes managing, cataloging,
demand and supply planning, requirements determinations, procurement, distribution, overhaul,
and disposal of materiel. Reference DoDM 4140.01, Volume 1.
Materiel Management Aggregation Code (MMAC)— A two-position alphabetic code (AA
thru ZZ) authorized to identify specific items (National Stock Numbers) to be managed by a
specific manager at one of the Air Logistics Centers (ALCs), Contractor Inventory Control
Points (**) or Special Cataloging Activities. The ** identifies a MMAC designated for use by a
Contractor ICP. Reference DoD 4100.39-M, Volume 10, Table 66.
Materiel Manager— Any DoD activity or Defense Agency that has been assigned materiel
management responsibilities for the DoD and participating federal agencies. The term includes
responsibilities performed by either wholesale materiel managers or retail materiel managers:
managing, cataloging, demand and supply planning, requirements determination and definition,
procurement, distribution, overhaul and repair of reparable materiel, and disposal of materiel.
Reference DoDM 4140.01, Volume 1.
Military Interdepartmental Purchase Request (MIPR)— The primary document used by the
Department of Defense to order goods or services from other DoD Services or Components, as
well as other Government activities outside the DoD. The goods or services may be provided
from in-house resources or may be procured from commercial sources. The Air Force uses the
AF Form 616 for orders between Air Force units. Reference AFI 65-116, Air Force Purchases
Using Military Interdepartmental Purchase Requests (MIPRS).
Mission Item Essentiality Code (MIEC)—Three-position alpha/numeric code that designates
the level of criticality of an asset to the mission. This code is broken down into: position 1 =
System Essentiality, position 2 = Item Essentiality, and position 3 = Organization Essentiality.
This code is provided to the bases by the major commands. Reference AFH 23-123, Volume 1.
Modification— A U.S. Government-approved change in the configuration of a part or item that
offers a benefit to the U.S. Government by correcting deficiencies, satisfying a change in
operational or logistic support requirements, or effecting a life-cycle cost savings. Reference
DoDM 4140.01, Volume 2.
Multi—Year Contract – A contracting method that procures items or services over more than
one year, but not more than five years, without establishing options. Reference AFMCI 20-102,
Requirements Definition and Purchase Instrument Development.
AFMCMAN23-101V1 17 NOVEMBER 2016 137
Multiple Year Contract (MYC)—A one-year contract with option years spanning up to a total
of five years for an item that can be reasonably forecasted over several years. Reference AFMCI
20-102, Requirements Definition and Purchase Instrument Development.
Multiple Year Procurement (MYP)—Contracts used primarily for large weapon system
acquisitions. These contracts must specify quantities, prices, and delivery schedules, and usually
a substantial cancellation penalty applies if the government wants to cancel the buy. MYPs are
generally appropriate only for major system buys managed by AFMC Product Centers.
Reference AFMCI 20-102, Requirements Definition and Purchase Instrument Development.
National Item Identification Number (NIIN)— The last 9 digits of the NSN that differentiates
each individual supply item from all other supply items. The first 2 digits signify the National
Codification Bureau that assigned the NIIN, while the last 7 digits are not significant and are
sequentially assigned by the FLIS. All U.S. manufactured items have a National Codification
Bureau Code of “00” (cataloged before 1975) or “01” (cataloged in 1975 or later). Reference
DoDM 4140.01, Volume 9, DoD Supply Chain Materiel Management Procedures: Materiel
Programs.
National Stock Number (NSN)— The 13-digit stock number replacing the 11-digit federal
stock number. It consists of the 4-digit federal supply classification code and the 9-digit national
item identification number. The national item identification number consists of a 2-digit National
Codification Bureau number designating the central cataloging office (whether North Atlantic
Treaty Organization or other friendly country) that assigned the number and a 7-digit (xxx-xxxx)
nonsignificant number. Arrange the number as follows: 9999-00-999-9999. Reference DoDM
4140.01, Volume 2.
Next Higher Assembly (NHA)— The next higher assembly on or with which the item is used as
a subassembly, part, attachment, or accessory. Also, the classification of the higher assembly is
indicated specifically in Groups and Classes of the Federal Supply Classification (Cataloging
Handbook H2). May actually include components, subassemblies, assemblies and end items or
systems. Reference DoD 4100.39-M.
Non-Consumable Item Materiel Support Code (NIMSC)— Alphanumeric codes assigned to
non-consumable items, which indicates the degree of materiel support (numeric) or repair
responsibility (alpha). Reference DoDM 4140.01, Volume 2.
Non Job Routed Repair—When an unserviceable item is removed and replaced with a
serviceable item from supply. This process is strictly a remove and replace operation. Reference
AFI 21-101, Aircraft and Equipment Maintenance Management, AFMC Supplement.
Not Reparable This Station (NRTS)— Term used to characterize the process of returning
items that cannot be successfully repaired by a base maintenance repair shop to a repair activity
designated by the wholesale item manager. Reference AFI 23-101.
Numeric Stockage Objective (NSO)—Essential items with low or sporadic demands or
forecasts of failure. These items are stocked in minimum quantities. Reference AFI 23-101.
On-Order Excess— Assets on an unfunded PR that exceed the SIRS worldwide buy operating
level, or assets on contract or funded PR that exceed the SIRS worldwide termination level.
138 AFMCMAN23-101V1 17 NOVEMBER 2016
Operating Level (OL)— The quantities of materiel or operating stocks required to sustain
operations in the interval between replenishment shipments. Reference DoDM 4140.01, Volume
2.
Operating Requirement— Ensures that all assets removed due to failure will be replaced at the
time of removal. It is computed by multiplying the organizational/intermediate demand rate by
the operating program. Reference AFI 23-101.
Optimum Position— Indicated by items not computing in a buy, repair, termination or excess
position.
Order and Shipping Time (O&ST)— Average number of days between the initiation and
receipt of stock replenishment requisitions assuming sufficient stock is available on the depot
shelf to satisfy the requisition at the time the requisition is received. Reference AFI 23-101.
Organic— The capability of a Military Service or a Defense Agency to sustain logistics
operations through U.S. Government organizational structures. Reference DoDM 4140.01,
Volume 1.
Organizational Intermediate Maintenance (OIM)—That maintenance which is the
responsibility of and performed by a using organization on its assigned equipment. These
responsibilities normally include the inspection, service, lubrication, adjustment and replacement
of parts, minor assemblies, and subassemblies. Reference AFI 23-101.
Other War Reserve Materiel (OWRM)— Consumable and reparable items required to sustain
forces after the RSP support period. Reference AFI 25-101, War Reserve Materiel (WRM)
Program Guidance and Procedures.
Overhaul— The process of disassembly sufficient to inspect all the operating components and
the basic end article. It includes the repair, replacement, or servicing as necessary, followed by
the reassembly and bench check or flight test. Upon completion of the overhaul process, the
component or end article will be capable of performing its intended service life or service tour.
Reference AFI 20-106 (IP).
Performance-Based Logistics (PBL)— Logistics that delineate outcome performance goals of
weapon systems, ensure that responsibilities are assigned, provide incentives for attaining these
goals, and facilitate the overall life-cycle management of system reliability, supportability, and
total ownership costs. Reference DoDM 4140.01, Volume 2.
Preferred Item— An item of supply which has functional or physical characteristics which
render it a higher order of preference for use than that accorded to another similar item of supply.
Reference DoD 4100.39-M.
Primary Inventory Control Activity (PICA)— The service or agency ICP designated as the
single activity within the DoD responsible for providing materiel support. Reference DoDM
4140.01, Volume 2.
Procurement Lead Time (PCLT)— The sum of the ALT and PLT. Procurement lead time is
the lead time for acquisition of secondary items. Reference DoDM 4140.01, Volume 2.
Production Lead Time (PLT)— The interval between the date of signature of a contract and
the receipt of the first significant delivery of the purchased materiel into the supply system.
Reference DoDM 4140.01, Volume 2.
AFMCMAN23-101V1 17 NOVEMBER 2016 139
Production Management Officer (PMO)— Individual within an SCM group that provides staff
surveillance, procedural guidance and management controls for file maintenance of recoverable
items by the PMSs in D200A to apply production management experience in analyzing and
evaluating issues, directing, coordinating and implementing improvements/enhancements that
will improve the accuracy and quality of computed repair requirements.
Production Management Specialist (PMS)— An individual assigned by the contracting
activity to act as liaison for production, supply and transportation issues.
Program Element Code (PEC)—A description of a mission by the identification of the
organizational entities and resources needed to perform the assigned mission. Resources consist
of forces, manpower, materiel quantities, and costs, as applicable. The program element is the
basic building block of the Future Years Defense Program. Reference AFMAN 65-604.
Program Office—An office created by the Component Acquisition Executive to complete the
necessary actions associated with planning of an acquisition program. Reference DoDI 5000.02,
Operation of the Defense Acquisition System.
Program Select Code (PSC)—A four-position code that determines the type(s) of item
program(s) to be developed. It is assigned to each component that is expected to be removed
from a higher assembly and replaced. The four-position PSC in D200A translates to a two-
position PSC in D200F. Reference AFMCI 23-109.
Programmed Depot Maintenance (PDM)—- Inspection and correction of defects that require
skills, equipment or facilities not normally possessed by operating locations. Reference T.O. 00-
25-4, Depot Maintenance of Aerospace Vehicles and Training Equipment.
Property Loss— Unintended, unforeseen, or accidental loss, damage or destruction to
Government property that reduces the Government’s expected economic benefits of the property.
Loss does not include purposeful destructive testing, obsolescence, normal wear and tear, or
manufacturing defects. Loss includes, but is not limited to: items that cannot be found after a
reasonable search; theft; damage resulting in unexpected harm to property requiring repair to
restore the item to usable condition; or destruction resulting from incidents that render the item
useless for its intended purpose or beyond economical repair. Reference DoDI 5000.64.
Provisioning— The management process of determining and acquiring the range and quantity of
support items necessary to operate and maintain an end item of materiel for an initial period of
service. Reference DoDM 4140.01, Volume 2.
Purchase Request (PR)—The initial request prepared for future procurement action used for the
central procurement of AF requirements.
Quantity—- Shows the number of units applicable to a particular transaction (rp 25-29).
Reference DLM 4000.25-1, Appendix 2.6.
Quantity Per Application (QPAPPL)—The number of components that are installed in a
higher assembly that is also the component’s application. The application and the next higher
assembly may or may not be the same assembly. Reference AFMCI 23-109, Applications,
Programs, and Indentures.
Quantity Per Assembly (QPA)— The number of components that are installed in that
component’s Next Higher Assembly (NHA). Reference AFMCI 23-109.
140 AFMCMAN23-101V1 17 NOVEMBER 2016
Readiness Spares Package (RSP)— A kit consisting of selected spares and repair parts required
sustaining operations (without resupply) at a base, a deployed location, or a dispersed location
for the first month of conventional activity as projected in USAF war plans. Reference AFH 23-
123, Volume 1.
Receipt— A transmission or other acknowledgment made by a receiving entity to indicate that a
message, good, or service has been satisfactorily received. Receipt is often denoted by signing a
situation specific form, such as DD Form 250, “Material Inspection and Receiving Report,” DD
Form 1149, “Requisition and Invoice/Shipping Document,” or DD Form 1348-1a, “Issue
Release/Receipt Document.” Reference DoDI 5000.64.
Reclamation— The process of reclaiming required serviceable and economically reparable
components and material from excess or surplus property for return to the proper supply activity,
whereas the residue is processed as disposable property. Reference DoDM 4140.01, Volume 2.
Reconciliation— The process of aligning the physical count with the quantity posted to the
accountable property records, researching discrepancies, and determining inventory accuracy,
i.e., calculation of loss or overage rates. Reference DoDI 5000.64.
Reduction—(As it refers to termination actions) An action to reduce or cancel quantities that
have been requested for purchase on a PR or MIPR, but are not yet on a firm contract or priced
exhibit. A reduction is accomplished with an amendment to the PR or MIPR.
Reduction In Requirements (RIR)— (As it refers to termination actions) An official request
from the IMS asking the contracting activity to terminate quantities that are on a firm contract.
Reliability Improvement Warranty (RIW) Item—An item that is under manufacturer
warranty. When RIW-coded items fail, the retail supply system keys on RIMCS data to initiate
shipment to a contractor using project code 390 and project name PACER WARRANT.
Repair Cycle Days—- A 3-position numeric field used to compute demand levels for repair
cycle items. The average repair cycle days are computed using data from all quarters contained
on the repair cycle record. The computed figure is the Repair Cycle Time (RCT). Reference
AFH 23-123, Volume 1.
Reparable Item— An item of supply subject to economical repair and for which the repair (at
either depot or field level) is considered in satisfying computed requirements at any inventory
level. Reference DoDM 4140.01, Volume 10.
Replenishment— Actions to resupply an inventory when it reaches the ROP. Reference DoDM
4140.01, Volume 2.
Requirements Computation— Any mathematical calculation performed to support
requirements determination functions. Reference DoDM 4140.01, Volume 2.
Requirements Control Officer (RCO)— Individuals within the IMS groups that disseminate
guidance, assist IMSs with SIRS issues and to help them understand secondary item processes
and tasks. RCOs also consolidate and submit the data inputs for reports required by the site’s
D200A OPRs.
Requirements Item Identification Data (RIID)(D200E)—An information technology system
that receives feeds from the Master Item Identification Control System (MIICS) (D043). It
AFMCMAN23-101V1 17 NOVEMBER 2016 141
provides cataloging data and stock list changes. Reference AFMCI 23-109, Applications,
Programs and Indentures.
Requisition— An order for materiel initiated by an established, authorized organization (i.e., a
DoD or non-DoD organization that has been assigned a DoD activity address code) that is
transmitted either electronically, by mail, or telephoned to a supply source within the DoD or
external to the DoD (the General Services Administration, the Federal Aviation Administration,
or other organizations assigned management responsibility for categories of materiel), according
to procedures specified in Reference (a) and DLM 4000.25-1-M (Reference (u)). Reference
DoDM 4140.01, Volume 2.
Research (Physical Inventory)— An investigation of potential or actual discrepancies between
physical count and recorded balances. The purpose of research is to determine the correct
balance and determine the cause of discrepancies. Reference DLM 4000.25.
Safety Level (SL)— The quantity of materiel required to be on-hand to permit continued
operation in the event of a minor interruption of normal replenishment or a fluctuation in
demand. Reference DoDM 4140.01, Volume 2.
Secondary Inventory Control Activity (SICA)— The service or agency inventory control
point receiving materiel support from the PICA for selected logistics functions. Reference
DoDM 4140.01, Volume 4.
Secondary Item— An item of supply that is not defined as a principal item and includes
reparable components, subsystems, and assemblies, consumable repair parts, bulk items and
material, subsistence, and expendable end items, including clothing and other personal gear.
Reference DoDM 4140.01, Volume 1.
Secondary Item Requirements System (SIRS)—- A wholesale information technology system
aligned under the Requirements Management System (RMS). It computes the Air Force’s
secondary item requirements on an aggregate basis, and applies available worldwide assets to
those requirements. It is assigned Data System Designator (DSD) D200A.
Security Assistance (SA)—- A group of programs authorized by the Foreign Assistance Act
(FAA) of 1961, as amended and the Arms Export Control Act (AECA) of 1976, as amended, or
other related statutes by which the United States provides defense articles, military training and
other defense related services, by grant, loan, cash sale, or lease, in furtherance of national
policies and objectives. Reference Joint Publication 1-02.
Service Code—One-digit alpha code that signifies the first position of the MAPAC and
identifies the customer service. Reference DLM 4000.25, Appendix 2.2 and DLM 4000.25-1,
Appendix 2.2.
Shelf-Life Item— An item of supply possessing deteriorative or unstable characteristics to the
degree that a storage time period is assigned to ensure that it performs satisfactorily in service.
Reference DoD 4140.27-M, Shelf-Life Management Manual.
Shipment— Movement of materiel from point of origin to destination by any mode. Reference
DLM 4000.25.
Shop Flow Days (SFD)—The number of calendar days required to process an end item,
measured from the time the item is placed in work to the day of serviceable turn-in. Reference
AFMCI 21-105, Depot Maintenance Work Measurement.
142 AFMCMAN23-101V1 17 NOVEMBER 2016
Source of Repair (SOR)— An industrial complex (organic, commercial contract, or inter-
service facility) with required technical capabilities to accomplish depot repair, overhaul
modification, or restoration of specific types of military hardware or software. Reference T.O.
00-25-4.
Source Of Supply— Any Federal Government organization exercising control of materiel and
to which requisitions are directed. Reference DLM 4000.25.
Source Reference Code (SRC)—A system-generated code used to indicate the origin of the unit
data.
Stock Fund— Revolving fund established to finance the costs of inventories of supplies. It is
authorized by specific provision of law to finance a continuing cycle of operations.
Reimbursements and collections derived from such operations are available for use by the fund
without further action by the Congress. Reference AFI 23-101.
Stock Level—Demand level or an adjusted level. Reference AFI 23-101.
Storage Costs— The variable costs of storing materiel. A storage cost factor is not variable (and
therefore not considered) if the factor would remain the same after eliminating 50 percent of the
stored materiel. Use one percent of the annual average value of the relevant inventory for storage
costs unless actual variable storage costs are available. Reference DoDM 4140.01, Volume 2.
Subgroup—A range of items within a family group which are interchangeable with each other.
Items which have no interchangeable relationships with any other items are the sole members of
their subgroup. Items which are not interchangeable are assigned different subgroup code values.
DoD 4100.39-M.
Substitute Item— An item which possesses such functional and physical characteristics as to be
capable of being exchanged for another only under specified conditions or for particular
applications and without alteration of the items themselves or of adjoining items. This term is
synonymous with the phrase "one way interchangeability", such as item B can be interchanged in
all applications for item A, but item A cannot be used in all applications requiring item B.
Reference DoD 4100.39-M, Glossary.
Supply—- The procurement, distribution, maintenance while in storage and salvage of supplies,
including the determination of kind and quantity of supplies. Reference Joint Publication 1-02.
Supply Condition Code (SCC)—A one-position alphabetic code used to classify materiel in
terms of readiness for issue and use or to identify action underway to change the status of
materiel. Reference DLM 4000.25-2, Military Standard Transaction Reporting and
Accountability Procedures, Appendix 2.5.
Termination— An action to reduce or cancel an undelivered quantity of assets that are on a firm
contract.
Termination Authority Template— Instrument that the IMS/MM uses to request the
contracting activity to initiate termination action. Reference AFFARS 5349.102.
Termination Code—A 2-digit code used in the Automated Budget Compilation System
(ABCS) to describe the status and cause of a termination.
Termination Model—A tool that helps determine if termination is economical. The model is
available via IRIS.
AFMCMAN23-101V1 17 NOVEMBER 2016 143
Total OIM Demand Rate— The rate at which an item has failed. It is developed by dividing the
sum of the base repaired this station (RTS), base not reparable this station (NRTS), and the base
condemnations by the item past program for the period. Reference AFI 23-101.
Transportation Costs— Costs paid to common carriers or Government activities to move
materiel within the transportation system. Reference DLM 4000.25.
Unit Price—Indicates the cost or value of one unit of issue of an item. Reference AFH 23-123,
Volume 1.
User— An individual, organization, or accounting entity that receives services. A user may be
internal or external to the DoD Component. Reference DoD 7000.14-R, Glossary.
War Reserve Materiel— Consists of enterprise managed, dynamically positioned equipment
and consumables that contribute to initial operations and provide initial support cross the full
range of military operations. It enhances Agile Combat Support capability to reduce the time
required to achieve an operational capability and/or produce an operational effect. Reference
AFI 23-101.
Wholesale— The highest level of organized DoD supply that procures, repairs, and maintains
stocks to resupply the retail levels of supply. Synonymous with wholesale supply, wholesale
level of supply, wholesale echelon, and national inventory. DoDM 4140.01, Volume 1.
Worldwide Buy Operating Level— The basic operating requirement (condemnations,
replacements, and additive requirements) at the buy point in the requirements computation. For
additional information, see AFMCMAN 23-101, Volume 3.
Worldwide Termination Level— Result of a comparison of basic operating requirement at the
AY buy point and the BY termination point in the computation. For additional information, see
AFMCMAN 23-101, Volume 3.
144 AFMCMAN23-101V1 17 NOVEMBER 2016
Attachment 2
SIGNATURE REQUIREMENTS
A2.1. Table A2 1. identifies the signature levels required for items that computed in
termination on the Summary computation.
Table A2.1. Signature-Level Requirements for Terminations.
A2.1.1. The IMS/MM, ES, PMS, Leads (IMS, PMS, and ES), RCO, TCO, and Production
Management Officer (PMO) will sign all terminations. Exceptions are identified below for
organizations that do not have the level(s) designated; go to the next higher level for signature.
Exceptions:
PMS, PMS Lead and PMO Do not sign ERRC “N” or “P” or AF SICA NIMSC 5
ERRC “T” items
IMS/MM supervisor Signs all termination codes except 02, 03, & 13
IMS/MM and ES Signatures required for requirements with termination
code 13 assigned
Group $999,999.00/Center > $1 million Term code 12
Squadron Term code 14
IMS/MM supervisor Will coordinate on all computations/INS/NSO Item
Status Listings after validating that additive
requirements are accurate and adequately supported
A2.1.2. Below are the required approval levels required for terminations based upon dollar
thresholds:
Threshold Minimum Approval Level *
$1 - $999,999.99 Element/Unit
$1,000,000 - $2,000,000 Section
$2,000,000.01 - $5,000,000 Flight/Branch
$5,000,000.01 - $50,000,000 Squadron/Division
$50,000,000.01 - $150,000,000 Group/Directorate
$150,000,000.01 - $500,000,000 Wing
* Note: If the organization does not have the approval level identified, then the approval will be
elevated to the next level of approval in the chain of command (i.e., no section, then elevate to
flight/branch).
A2.2. Table A2 2. identifies the signature levels required for items that computed a POS and/or
RSP buy (CY plus AY), a POS and/or RSP repair (CY plus AY), or in excess on the Summary or
recomputation after the Summary computation.
AFMCMAN23-101V1 17 NOVEMBER 2016 145
Table A2.2. Signature-Level Requirements for Buy, Repair, and Excess.
A2.2.1. The IMS/MM, ES and PMS will sign Summary computations for items computing buy,
repair and excess. Exceptions are identified below for organizations that do not have the level(s)
designated; go to the next higher level for signature. See Notes 1 and 2.
Exceptions:
Annual signature Unless quantity breaches next level
Program Office coordinates Buy and/or repair with additives and items on which the
application program is phasing in or out to determine if the
schedule is still valid.
PMS, PMS Lead and PMO Do not sign ERRC “N” or P” or AF SICA NIMSC 5 ERRC
“T” items
Paragraph 1.11.7. POS or RSP with positive asset reconciliation variance or
when buying more than the computed POS/RSP requirement
Paragraph 1.12.1. LOT buy
Paragraph 1.11.5. Economic procurement
IMS/MM supervisor Will coordinate on all computations/INS/NSO Item Status
Listings that have file maintained additives after validating
that additive requirements are accurate and adequately
supported
Note 1: The IMS/MM, PMS and ES will sign the computation, recomputation or INS/NSO Item
Status Listing based on the IAC.
Note 2: For buy, repair or excess, higher signatures are only required once a year beginning with
the March computation cycle as long as the buy, repair, or excess quantity does not increase or
the item does not breach the next signature level. The IMS/MM will attach the signature page
from that cycle or annotate on the computation or INS/NSO Item Status Listing which cycle was
last used for higher level signatures, the quantity on that cycle, and the dollar value on that cycle.
A2.2.2. Below are the required approval levels required for buy, repair, and excess based upon
dollar thresholds (see Notes 3 - 5):
Threshold Minimum Approval Level
$1 million - $3 million RCO, TCO, PMO, leads (IMS, ES and PMS), and Element
$3,000,000.01 - $5,000,000 Section
$5,000,000.01 - $20,000,000 Flight/Branch
$20,000,000.01 - $50,000,000 Squadron/Division
$50,000,000.01 - $150,000,000 Group/Directorate
$150,000,000.01 - $500,000,000 Wing
$500,000,000.01 - up Center
Note 3: For buys, signature level will be determined by which FY has the highest total POS plus
RSP dollar value - CY plus AY. For repair, signature level will be determined by which FY has
the highest total POS plus RSP dollar value - CY plus AY.
Note 4: If the POS and/or RSP for buy and repair in the CY or AY does not breach $1,000,000,
but the POS and/or RSP for buy or repair in the BY or EY breaches $5,000,000 or above, the
RCO, TCO, PMO, Lead and the lowest level of supervision must review and sign for the item
with the remainder of the signature policy above still in force.
Note 5: If the organization does not have the approval level identified, then the approval will be
elevated to the next level of approval in the chain of command (i.e., no section, then elevate to
146 AFMCMAN23-101V1 17 NOVEMBER 2016
flight/branch).
A2.3. Table A2 3. provides a ready reference on timeframe requirements for obtaining the
required signatures. All timeframes are based upon printout date of the products and are
calculated in calendar days.
Table A2.3. Signature Timeframes.
Responsibility Requirement Timeframe
IM / ES Termination computations 10 calendar days
IM Buy or repair requirements or 1st occurrence of excess or if
excess quantity is greater than previous cycle
35 calendar days
IM /ES Excess is equal to or less than previous cycle’s excess or if
in an optimum position
60 calendar days
ES Summary Factors/Usage 35 calendar days
ES Products for buys, repair, and excess 35 calendar days
PMS Summary MRRD reports 35 calendar days
PMS Computations, recomputations and INS/NSO Item Status
Listings with repair requirements
35 calendar days
A2.4. Title 10 United States Code (USC) Title 2458 and Public Law 111-84, National Defense
Authorization Act for Fiscal Year 2010, Division A, Title III, Section 328 requires: “a plan for a
comprehensive assessment of inventory items on-hand that have no recurring demands, including
the development of metrics to track years of no demand for items in stock; and procedures for
ensuring the systemic review of such items for potential reutilization or disposal.” Therefore,
NSNs having assets with no recurring demands in over 5 years will be reviewed annually to
determine whether the assets/quantity of assets still need to be retained. The review will be
conducted based on the IAC of the NSN. The IMS/MM, with the assistance of the PMS, ES and
the Program Office, will determine if the system(s) on which the item is a component is still
being used by the AF, another Service/Agency (S/A), or FMS customer(s). A statement will be
placed on the computation or INS/NSO Item stating that this review was completed as well as
the determination of the review—how many assets will be disposed or retained and why. The
IMS/MM, their supervisor, and ES will sign and date the documents with this review statement
and the squadron commander must approve.
A2.5. Each site may establish signature level requirements for the entire site for computations,
INS/NSO Item Status Listings and Factors/Usage Printouts. These signature levels must ensure
that high dollar actions (i.e., buy, repair, excess, and termination) receive review by other
person(s) in addition to the IMS/MM, PMS, and ES. Signature of the computation products
indicates that management has reviewed and concurred with the indicated actions. In cases
where HQ AFMC has established a minimum signature level in this manual, the site may require
higher signature level requirements. Title or function will be included with signatures (i.e., IMS
or flight chief). Site unique signature level requirements will be codified in an official
supplement to this manual IAW AFI 33-360.