canopy by hilton chicago version renovation …...symmons industries 31 brooks drive braintree, ma...

Post on 09-Mar-2020

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SYMMONS INDUSTRIES31 BROOKS DRIVE BRAINTREE, MA 021841-800-SYMMONS www.symmons.com

“THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF SYMMONS INDUSTRIES, INC. AND NEITHER THIS DOCUMENT OR ANY OF SAID PROPRIETARY INFORMATION SHALL BE PUBLISHED, REPRODUCED, COPIED, DISCLOSED OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF A DULY AUTHORIZED REPRESENTATIVE OF SYMMONS INDUSTRIES, INC.”

VERSION

A

REQUIRES:Design & Dimensions subject to change•Consult your Symmons Sales Representative for Timeline•

Canopy by Hilton Chicago Renovation 2021Widespread Lav

---

ADDITIONAL NOTE:

Approval Signature:

Widespread LavPRODUCT NAME:

Approved by:

CDSLW154610159/9/2019DATE SYMMONS MODEL#

1.5 GPM

Approval Date:

Polished ChromeVERSION:FLOW RATE:A

FINISH:TOOLING:Yes

---

Location:

34"

278"

4" 4"

2" 2"

212"

358"

6"

878"

SYMMONS INDUSTRIES31 BROOKS DRIVE BRAINTREE, MA 021841-800-SYMMONS www.symmons.com

“THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF SYMMONS INDUSTRIES, INC. AND NEITHER THIS DOCUMENT OR ANY OF SAID PROPRIETARY INFORMATION SHALL BE PUBLISHED, REPRODUCED, COPIED, DISCLOSED OR USED FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF A DULY AUTHORIZED REPRESENTATIVE OF SYMMONS INDUSTRIES, INC.”

VERSION

A

REQUIRES:Design & Dimensions subject to change•Consult your Symmons Sales Representative for Timeline•

Canopy by Hilton Chicago Renovation 2021Widespread Lav

---

ADDITIONAL NOTE:

Approval Signature:

Widespread LavPRODUCT NAME:

Approved by:

CDSLW154610159/9/2019DATE SYMMONS MODEL#

1.5 GPM

Approval Date:

Polished ChromeVERSION:FLOW RATE:A

FINISH:TOOLING:Yes

---

Location:

top related