case study - tideland signal library/documents/case studies/stand... · case study benefits •...

Post on 26-Mar-2018

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

USA • UNITED KINGDOM • UAE • SINGAPORE • CHINA • CANADA

www.tidelandsignal.com

CASE STUDY

BENEFITS• Fast response technical support

• Compliant with IALA Recommendations

• UL listed for Class1, Division 2 Group D Hazardous Locations

• Full monitor and control access

• Galvanised steel base

• Fiber-glass water tight battery box

• Energy system is sized for stand-alone service for continuous year-round operation

• Patented fresnal lens incorporating 38 optical elements

Stand-Alone Solar PoweredSystem - Zone 1 & 2

Tideland Signal Corporation (Tideland) provided stand-alone solar powered systems for Premier Oil, Petronas, and L&T India well head platforms. We have supplied 22 solar powered light systems for un-manned platforms in a span of three years which have no AC to DC input supply. Tideland’s low maintenance stand-alone solar powered systems provide reliable solar energy with minimal maintenance.

Tideland systems are configured to clients’ specification to meet the site requirements. All our products are factory assembled and pre-wired to withstand the harsh marine environments. Tideland‘s top-rated field service providers work with project personnel to customise equipment to exact specification for the project need. Site acceptance, testing, and configuration are conducted with client on-hand to ensure seamless operation and quality assurance standards are met. Many systems have been equipped with 10NM lights using solar power without AC to DC input.

Tideland’s commitment to high quality, innovative engineering design keeps us the number one choice for reliable aids to navigation solutions.

Clients/Region:Premier Oil Well Head Platform - SingaporePetronas - IndonesiaL&T India - India

Project Name:Zawtika - Bukit Tua - Myanmar

Product/Service Delivery:Stand Alone Solar Powered System(Zone 1 & 2)Tideland Signal Manufacturing Facility

L&T India - India

us-sales@tidelandsignal.com • emea-sales@tidelandsignal.com • asia-sales@tidelandsignal.com • canada-sales@tidelandsignal.com

CHINAP: + 86 (0) 158 0223 7983 (primary)P: + 86 (0) 138 0101 4639E: asia-sales@tidelandsignal.com

UAE - DUBAIP: + 971 (0) 4 885 5842F: + 971 (0) 4 885 7352E: emea-sales@tidelandsignal.com

SINGAPOREP: + 65 6333 0078F: + 65 6333 0079E: asia-sales@tidelandsignal.com

UK - BURGESS HILLP: + 44 (0) 1444 872240F: + 44 (0) 1444 872241E: emea-sales@tidelandsignal.com

UK - GT YARMOUTHP: + 44 (0) 1493 441711F: + 44 (0) 1493 440322E: emea-sales@tidelandsignal.com

USA - HOUSTONP: + 1 713 681 6101F: + 1 713 681 6233E: us-sales@tidelandsignal.com

CANADA - DSS MARINEP: + 844 843 3526F: + 613 680 7418E: canada-sales@tidelandsignal.com

The stand-alone solar powered systems (Zone 1 & 2) supplied in the asia/pacific region includes:

Premier Oil

• 8 sets of Zone 1 Solar Powered Lights

Premier Oil & Petronas Indonesia

• 8 sets of Zone 1 Solar Powered Lights• 4 sets of Zone 1 Solar Powered Lights

L&T India

• 2 sets of Zone 2 Solar Powered Lights

Tideland’s reputation to deliver high quality products and service ensures a positive impact to our clients success rate. Our aids to navigation solutions promote low maintenance, reduced man-power resources and sustainability. Tideland commits to each and every project marine solutions in which will exceed client expectations and improve success rates that promote longivity.

Naga Pelikan Project - Installed

Naga Pelikan Project - Testing

Naga Pelikan Project - Testing Onsite

Bukit Tua Project - TestingYatagun Myanmar Project - Testing

Manufacturing Facility

Project At A Glance

top related