Join us as Finegold Alexander presents the study for the Lowell Trial Court, a 250,000 SF state courthouse designated by Gov. Patrick’s Zero Net Energy Building Task Force as one of three public demonstration projects addressing the challenge of designing public buildings to high sustainability standards. The engineering components of the study involved proposals for energy reduction and on-site production, investigated through a multitude of computer models and cost-to-benefits charts and analysis. Architecture and architects must change. Architectural form is a critical element in achieving any sustainable goals, including zero net energy. This session will look at the Lowell Trial Court design process and the iterative schemes the team produced. We will discuss building massing, orientation, urban context and all the elements we always address in every project. Now we find our attitudes toward these traditional design criteria are influenced by the integration of sustainable design. Design for zero net energy caused this team to think and collaborate differently with consultants, client and user groups.

TRANSCRIPT

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Case Study: Trial Court, Lowell, Massachusetts

Governor’s ZNEB Task Force

Demonstration Project

Zero Net Energy and the Changing Shape of

Architecture

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

“A Zero Net Energy building is one

that is optimally efficient and,

over the course of a year,

generates energy onsite,

using clean renewable resources,

in a quantity equal to or greater than

the total amount of energy consumed onsite.”

• Governor’s ZNEB Energy Task Force Report 3/11/09

ZNE Definition

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Minimize Energy Use

ZNE Design Challenges

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Minimize Energy Use

• Apply Renewables

ZNE Design Challenges

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Minimize Energy Use

• Apply Renewables

• Integrate Architectural and Systems Designs

at Concept Phase

ZNE Design Challenges

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Minimize Energy Use

• Apply Renewables

• Integrate Architectural and Systems Designs

at Concept Phase

• Life Cycle Cost Analysis – First Cost vs

Operating Cost

ZNE Design Challenges

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?• How to express program and energy on the

exterior?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?• How to express program and energy on the

exterior?• Is ZNE a moral imperative regardless of cost?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?• How to express program and energy on the

exterior?• Is ZNE a moral imperative regardless of cost?• Can energy strategies have psychological

impact?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?• How to express program and energy on the

exterior?• Is ZNE a moral imperative regardless of cost?• Can energy strategies have psychological

impact?• What is a “Demonstration Project” ?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?• How to express program and energy on the

exterior?• Is ZNE a moral imperative regardless of cost?• Can energy strategies have psychological

impact?• What is a “Demonstration Project” ?• Is the owner committed?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Philosophical Challenges

• Should building advertise it is ZNE?• How to express program and energy on the

exterior?• Is ZNE a moral imperative regardless of cost?• Can energy strategies have psychological

impact?• What is a “Demonstration Project” ?• Is the owner committed?• Will the users be educated?

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

ZNE Buildings USA

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Hawaii Gateway Energy Center, USA

20053,600 SF

Ferraro Choi And Associates, Ltd.

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Hawaii Gateway Energy Center, USAFerraro Choi And Associates,

Ltd.

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Aldo Leopold Legacy Center, WI

200711,900 SF

The Kubala Washatko Architects, Inc.

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

A J Lewis Center for Environmental Studies, OH

200013,600 SF

William McDonough + Partners

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

National Renewable Energy Laboratory Research Support Facility, CO

2010/2011222,000 SF

RNL Design with Stantec

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

SUPERGREEN OUTSIDE USA

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

BREEAM, UKEnvironmental Assessment

Method for Buildings Around The

World

110,000 buildings certified

over 500, 000 registered for certification

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Salisbury Law Courts, UK

200940,700 SF

Stride Treglown/ Fielden and Mawson

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Salisbury Law Courts, UKStride Treglown/ Fielden and

Mawson

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Salisbury Law Courts, UKStride Treglown/ Fielden and

Mawson

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Leeds Metropolitan University, UK

2007110,600 SF

GWP Architecture Ltd

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

G park Blue Planet, UK

2008382,000 SF

Chetwoods Architects

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Zero Net Emissions Development, Wallington, UK

200282 units + 27,000 SF of offices

The ZED Factory Ltd

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Passivhaus Institut Darmstadt (PHI)

quality criteria for Passive Building:

Annual heating requirement ≤

15kWh/(m²a)

Primary energy consumption ≤

120kWh/(m²a)

Air tightness for building envelope n50 ≤ 0.6/h

PASSIVHAUS, Germany

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

PASSIVHAUS, Germany

Existing Buildings New Buildings Passive Building

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

20092010 Pasivhaus Award – 1st prize

Multi family house, SwitzerlandHalle 58 Architekten

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

20032,750 SF

Office Building, Boladen, Germanyoehler + faigle archkom

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

200280,000 SF

Energon Passive Office, Germanyoehler + faigle archkom

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Energon Passive Office, Germanyoehler + faigle archkom

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

200486,111 SF

Primary SchoolFrankfurt, Germany

Architekten 4a

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

MINERGIE-P – Standard defines buildings with a very low energy consumption, (especially heating energy demand)

Corresponds to the international passive –house standard.

Some requirements:

10”-14” insulation,

R=min 25 for walls, roof , floors.

Switzerland

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

HOLINGER SOLAR OFFICES, BUBENDORF, CH

20046,700 SF50% Thermal solar energy50% Electrical water heater

Solar OfficesBubendorf, CH

F. Fregnan, FHBB, Muttenz

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

200772,473 SF 80% Gas20% Solar Thermal

SporthalleRuti, CH

Architekturbüro Beat Ernst

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

2007153,000 SF 100% GSHP

Lager Umnutzung StoreAlbis, CH

Stücheli Architekten AG

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

ZNE FUTURE BUILDINGS

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Energy Tower by SOM, China

20112.3 million SF Wind turbines in mechanical floors

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Burj Al- Taqa, UAEEckhard + Gerber Architekten

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Vision

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Case Study of Courthouse

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Supreme Court

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Fall River Justice Center

LEED Gold Pending

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

100%

ASHRAE Building

73%

Fall River Justice Center

• Daylight in Courtrooms

• Natural Ventilation

• Total Energy Wheels

• CO2 Control of Fresh Air

• Variable Speed Drives

• Premium Efficiency Motors

• Systems Commissioning

Fall River Justice CenterEnergy Reduction Strategies

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Lowell Trial Court

Zero Net Energy Building

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Dignity

Community

Security

Universal Access

Sustainability

Lowell Trial CourtGuiding Principles of Design

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Lowell Trial Court250 000 SF Program

• 5 Court Divisions

• 16 Jury Courtrooms

- Judicial & Jury Deliberation Suites

- Jury Assembly

• Clerk & Probation Transaction Offices

• Detainee Holding

• Library, Grand Jury, District Attorney

• Building and Court Support

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Benchmark Research

• Alternative Energy Solutions

• Preferred Energy Solution

– Energy Reduction Strategies

– Renewable Energy Strategies

Zero Net Energy Project Approach

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Organizing PrinciplesCourtrooms Set

100’

60’

Circulation Zones

Public

Private

Secure

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Various Courtrooms Configurations

2 courtrooms per floor

4 courtrooms per floor

6 courtrooms per floor

6 courtrooms per floor

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Proposed Configuration

4 courtrooms per floor

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Respond to urban context & site

• Civic presence

• Maximize Natural Daylight

• Fulfill Program

Design Objectives

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Energy Cycle

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Lowell Trial CourtEnergy Reduction

• Natural Ventilation

• Enhanced Façade Performance

• Chilled Beams

• Displacement Ventilation

• Natural and Artificial Lighting

• Ground Source Heat Pumps

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Energy Consumption with Proposed Systems Compared to Base100%

100% 52%

0%

73%

ASHRAE Based Building Fall River Trial Court

Lowell Trial Court

Energy Reduction

11,057 x10^6

BTU/Year

7,980 x10^6 BTU/Year

5,720 x10^6 BTU/Year

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Renewable Options Considered

• Solar Wall

• Photovoltaics

• Solar Thermal

• Wind Power

• Biofuel Boiler

• Biofuel CHP

• Hydropower

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• Solar Wall 4 % $208,000

• Photovoltaics 6-17 % $2-

$3.6m

• Solar Thermal 6 % $1.3 m

• Biofuel CHP 52-64 %

$500,000

• Biofuel Boilers 34-39 % $120,000

• Hydropower * 100 % no data

Potential Savings Cost

Renewable Options Considered

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Options Considered

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Lifecycle Costs

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Lifecycle Costs

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Renewable Energy

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Preferred Options

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Proposed Option 2E

36 % Renewables Zero Net Energy

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Lowell Trial Court Case Study

Original Goal : LEED Silver

Revised Goal : LEED Platinum

Toward: Zero Net Energy

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Basic Building Configurations & Siting

Less efficient 10% More efficient

No impact

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

30º Rotation

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• 12 of 16 courtrooms with direct natural light

Energy Reduction

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• 12 of 16 courtrooms with direct natural light

• 2 of 3 double height public spaces -

community gardens

Energy Reduction

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• 12 of 16 courtrooms with direct natural light

• 2 of 3 double height public spaces -

community gardens

• Lightwell in collegial suite - more integral

Energy Reduction

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• 12 of 16 courtrooms with direct natural light

• 2 of 3 double height public spaces -

community gardens

• Lightwell in collegial suite - more integral

• Enhanced Façade Performance

Energy Reduction

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

• 12 of 16 courtrooms with direct natural light

• 2 of 3 double height public spaces -

community gardens

• Lightwell in collegial suite - more integral

• Enhanced Façade Performance

• Chilled Beams

• Displacement Ventilation

• Ground Source Heat Pumps

Energy Reduction

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Massing

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Program

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Program

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Program

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Program

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Daylight

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Air Circulation

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Air Circulation

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Energy Strategies

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Community Court

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

The Learning Curve

ZNE

PLATINUM

GOLD

LEED SILVER

MASS LEED+

CODE MIN. ‘98 2000 ‘02 ‘04 ‘06 ‘08 ‘10 ‘12 ’1

4‘16

Today

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

“You build with stone, wood, cement;

You make houses, places:

That’s construction.(..)

Then suddenly you catch my heart,

I’m happy and I say: that’s beautiful.

That’s architecture.”

Le Corbusier

Le Poeme de l’angle droit, 1955

Finegold Alexander + Associates Inc.Nexus Green Roundtable February 16, 2011

Sherman “Pat” Morss, Jr., AIA, LEED APAssociate Principal

smjr@faainc.com

Tony Hsiao, AIA, LEED APPrincipal, Director of Design

th@faainc.com

Asia Dubiel, LEED APProject Designer

jdubiel@faainc.com

Finegold Alexander + Associates77 N Washington Street

Boston MA 02114

(617) 227-9272

www.faainc.com

Presenters

top related