c:\documents and settings\michael fisher\my documents\kollel

Post on 13-Jul-2015

232 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Ground Breaking: December 7, 2008

Ground Breaking:December 7, 2008

Ground Breaking:December 7, 2008

Ground Breaking:December 7, 2008

Ground Breaking:December 7, 2008

Construction: Demolition and site work

Construction: Setting concrete forms

Construction: Pouring concrete foundations

Construction: Pouring concrete foundations

Construction: Steel framing

Construction: Metal stud framing for attaching insulation and brick

Construction: Metal stud framing

Construction: Brick mock-up

Construction: Setting brick

Construction: Setting brick

Construction: Brick at corners of building

Construction: Setting brick

Exterior Brick Detail

Construction: Installing glass curtain wall

Construction: Installing glass curtain wall

Construction: Planting landscape

New Kollel of Greater Boston: Cummings Road Entrance

New Kollel of Greater Boston:Rear Yard Elevation

Lobby: stairs down to Function Room stairs up to Women’s section and offices

Lower Level: Function Room

Lower Level: Function Room

Second floor: Administrative office

Second FloorStudy area at Outlook

Second FloorView from balcony

Second floor: Women’s Section

Second floor: Women’s Section

Second floor: Women’s Section

Lobby: Washing station and doors to Beit Midrash

Beit Midrash

Beit Midrash: design forart installation at windows

Beit Midrash

top related