CEGH Info Workshop I Vienna, 04th June 2013

Welcome!

Agenda

04.06.2013

Who is “the” Market Area Manager

What does the Market Area Manager do?

Experiences with the New Market Model

2

Who is “the” Market Area Manager

04.06.2013 3

Who is “the” Market Area Manager?

04.06.2013 4

Who is “the” Market Area Manager?

Market Area East Market Area

Tirol

Market Area

Vorarlberg

MAM DAM

BGC

DAM

BGC BGC

DAM

VTP

NO (1-n) BGR (1-n)

Storage Production

NO (1-n) NO (1-n)

BGR (1-n) BGR (1-n)

BGC: Balance Group Coordinator

DAM: Distribution Area Manager

NO: Network Operator

BGR: Balance Group Representative

VTP: Virtual Trading Point

MAM: Market Area Manager

Distribution System

operators

appoint the DAM

Transmission System

Operators appoint the

MAM

Concession of the

BMWJF

MAM appoints the

VTP

04.06.2013 5

What does the Market Area Manager do?

04.06.2013 6

Capacity Calculation Model

Capacity Allocation (Online platform)

Nomination Management

Balancing

Balance Group Management

Market Area Control

Coordinated Network Development Plan

Maintenance

An organization for the

coordination of the

Market Area

04.06.2013 7

Balance Group Management

• One-Stop-Shop / Online-platform as Point of Contact and registration

• EIC assignment

• Central data collection and provision to relevant market participants without any

additional administration for BGR

Coordinated Network Development Plan

CNDP 2013-2022

Approved on 11/01/2013

CNDP 2014-2023

Currently: Data analysis & establishment of the NDPs by TSOs

30/06/2013: submission of the 1st CNDP version by TSOs

July 2013: consultation of the market participants

30/09/2013: submission of the final version of CNDP by TSOs

Further information: www.gasconnect.at / Market Area Manager / Coordinated Network

Development Plan

04.06.2013 8

Capacity Calculation Model

Capacity Allocation (Online platform)

Nomination Management

Balancing

Balance Group Management

Market Area Control

Coordinated Network Development Plan

Maintenance

An organization for the

coordination of the

Market Area

04.06.2013 9

No oversupply possible

Standardised calculation

method

Maximization of firm

capacity on offer

Implementation by TSOs

Capacity Calculation Model

Baum garten

... MG E/E

... NKP TT

... vNKP

BOP 12 Entry/Exit

Zone TAG AZ

Entry/ExitBOP 11 Exit

BOP 13 Exit

Mosonmagyaróvár

Exit

Petrzalka

Exit

Murfeld

Exit

Arnoldstein

Entry/ExitWeitendorf

Exit

Sudal

Entry/Exit

ABG

Entry/Exit

BOP 14

Entry/ExitOberkappel

Entry/Exit

MAB Entry/Exit

WAG

PW

... GCA

... BOG

... TAG

vNKP PVS1

Entry/Exit

vNKP WAG Exit

7Fields

Entry/Exit

Überackern:

vNKP TAG Exit

TAG

PVS1PVS1

SOL

KIP

Baumgarten: TAG

Entry

GCA

Entry

BOG

Entry/Exit

Nicht separat dargestellt sind:

NKP TD je System (zusammengefasst über den jeweiligen vNKP)

Phys. Verbindungen zwischen WAG, PVS1 und TAG vor den Messstellen in Baumgarten („Kollektor“) für Pre-Border-Shifts

HAG

Development by MAM (in coordination with TSOs)

Update with effectiveness in 2014

04.06.2013 10

Capacity Allocation

• European initiative

• 23 TSOs (19 shareholders and

4 customers)

• Start of the first auctioning was

1st April 2013 (day-ahead

products)

• Further information: websites

of the respective TSOs

04.06.2013 11

Capacity Calculation Model

Capacity Allocation (Online platform)

Nomination Management

Balancing

Balance Group Management

Market Area Control

Coordinated Network Development Plan

Maintenance

An organization for the

coordination of the

Market Area

04.06.2013 12

Balancing

04.06.2013

+/- balanced hourly transaction quantities on VTP

+/- allocated nominations for Entry/Exits within the Market Area in the transmission system

network

+/- Distribution Area input/output incl. “kleiner Grenzverkehr”, Storage, Production

- Registered end-customer schedule

+/- Carry forward

Balance Area with

virtual trading point

Export „kleiner

Grenzverkehr“

Sell virtual

trading point

Export transmission

system

End-customer

Storage

Import „kleiner

Grenzverkehr“

Buy virtual

trading point

Import transmission

system

Storage

Production/

Biogas

13

Experiences with the new Market Model

04.06.2013 14

Balance Group Administration

04.06.2013

Current number of BGRs: 74*

Contract type

FL 36

FL+VG 9

FL+VG+EKV 29

Balance Groups

Balance Groups: 93

Sub-Balance Accounts: 30

* Status quo: 03.06.2013

15

19

10

21

9

2

5

1 2

1 2

1 1

0

5

10

15

20

25

Balance Group Administration

04.06.2013

Many “last-minute”-BGRs in December “iBGRs” (until 28/02/2013)

Support for special requests

Assignment of capacity contracts to

BGs/SBAs

Contracts from contractual partners directly

from the MAM online platform

Structure of BG/SBA incl. all capacity assignments

Agreement with BG-members

(Allocation authorization for network users)

“One-Stop-Shop” for BGRs

BGRs can make changes centrally and all the market operators

get the date from the MAM (changes of the company name, BG

structure, cessation of activity … )

© macgyverhh - Fotolia.com

16

Balancing

04.06.2013

January:

10 BGs Structuring fees 6,473,552 kWh

February:

7 BGs Structuring fees 6,774,638 kWh

March:

21 BGs Structuring fees 26,461,506 kWh

April

17 BGs Structuring fees 9,460,910 kWh

17

Changes of MAM‘s General Terms and Conditions (GTC) and Platform usage

Changes of the structuring fee

Old: 0.4 Cent/kWh

New: 0 – 400,000 kWh 0.1 Cent/kWh

400,001 – 700,000 kWh 0.2 Cent/kWh

700,001 - ∞ kWh 0.4 Cent/kWh

04.06.2013

Changes of the Carry Forward Account The separate IMBNOT_CF file is no longer required Now shown RFF

CF_ACCOUNT_EOD

D-1

Extension Renomination Reaction Time for MAM Balancing From 75 to 135 minutes

this extension of reaction time is only possible as long as the Market

Area East is in a technical manageable situation

18

Thank you for your attention!

Gas Connect Austria GmbH

Floridotower

Floridsdorfer Hauptstraße 1

1210 Wien

Phone: +43 (1) 27500-0

Fax: +43 (1) 27500-88490

Market Area Manager-Hotline: +43 664 88644319

http://www.gasconnect.at/en/Market-Area-Manager

19 04.06.2013

© 2012

GAS CONNECT AUSTRIA GmbH

floridotower

Floridsdorfer Hauptstraße 1

1210 Wien, Vienna, Austria

T +43 1 27500-88000

www.gasconnect.at

Goodbye!

04.06.2013 20