CFD usage in Alstom ECS

Ali Tabikh

05 200605 2006

Date of last change Reference/Name of Presentation/SN 2

SIAMUF

Alstom History Alstom Business areas…….. About Environmental Control Systems (ECS) , Växjö

– Electrostatic Precipitators (ESP)– Wet Flue Gas Desulphurisation (WFGD)– Dry Flue Gas Desulphurisation (DFGD)– Selective Catalytic Reduction (SCR)– Dioxines… and CO2 reduction

Modelling in Alstom– Physical Modelling– CFD Modelling

• CFD as a design tool

Discussions

Summary

Date of last change Reference/Name of Presentation/SN 3

Alstom History

GEC-ALSTHOM

3

ALSTHOMALSTHOM

Date of last change Reference/Name of Presentation/SN 4

ALSTOM

Global specialist in Global specialist in infrastructureinfrastructure for for energyenergy and transport and transport4

Transport Marine

T & D

Date of last change Reference/Name of Presentation/SN 5

ALSTOM today

Sales €13.7 bn*

Orders €15.8 bn*

Employees 64 000

Present in 70 countries

Power

* FY 2004/05 figures

Date of last change Reference/Name of Presentation/SN 6

ALSTOMPower

ALSTOMT&D

ALSTOMTransport

ALSTOMSverige

6

Astom Sverige

Date of last change Reference/Name of Presentation/SN 7

Anställda i Sverige 3 000varav:

• Industriturbiner 2 100

• Customer Service 450

• Hydro Systems 180

• Boiler & Environment 140

• T&D 130

Anställda i Sverige 3 000varav:

• Industriturbiner 2 100

• Customer Service 450

• Hydro Systems 180

• Boiler & Environment 140

• T&D 130

Orter med mer omfattandeverksamhet

Övriga orter

Alstom Sweden

7

Orderingång €725 M. 01/02Orderingång €725 M. 01/02

VVääxjxjöö

Stockholm

Luleå

Skellefteå

Sundsvall

Gävle

VästeråsStorforsStorfors

Ludvika Enköping

ÖÖrebrorebro

GGööteborgteborg

MalmMalmöö

FinspFinspåångng

KarlstadKarlstadVäxjö

FinspFinspåångng

VVäästersterååss

Date of last change Reference/Name of Presentation/SN 8

VVääxjxjöö8

Products and Services

Environmental ControlSystems

– Particulate cleaning systems

– Flue gas cleaning systems

– "Waste-to-Energy"

– Service & maintenance

Date of last change Reference/Name of Presentation/SN 9

Electrostatic Precipitator (ESP)

Particulate cleaning systems

Date of last change Reference/Name of Presentation/SN 10

ESP Principle

Discharge electrodes Discharge electrodes

Dust-laden gas

Dust particles

Collected dust

Clean gas

Collecting electrodes

Corona

90B03CSP/06-97

Date of last change Reference/Name of Presentation/SN 11

Fabric Filter

Particulate cleaning systems

Date of last change Reference/Name of Presentation/SN 12

WFGD

Air

LimestoneForced Oxidation

Mill

ME Wash

Water

Cake Wash(Optional)

PrimaryDewatering

SecondaryDewatering

Fabric FilterOr ESP

Absorber

ReclaimWaterTank

Make-UpWaterTank

GYPSUM

Date of last change Reference/Name of Presentation/SN 13

WFGD

ReagentPreparationSystem

AbsorberVessel

Dewatering Area

Date of last change Reference/Name of Presentation/SN 14

DFGD

NID system

Date of last change Reference/Name of Presentation/SN 15

DFGD (SDA)

Date of last change Reference/Name of Presentation/SN 16

Date of last change Reference/Name of Presentation/SN 17

Modelling and Pilot Testing

Physical Modelling

CFD Modelling

Pilot Testing

Date of last change Reference/Name of Presentation/SN 18

Physical Modelling

Date of last change Reference/Name of Presentation/SN 19

CFD Modelling

Single phase – ESP ( flow distribution prediction)

– Fabric Filter ( Flow distribution and pressure drop)

– SCR ( Flow, NH3, NOX, and Temperature distribution)

– Gas mixing

Multiphase – SCR ( Ash Capture, NH3 direct injection)

– DFGD ( SDA )

– SWFGD (Flue gas conditioning)

Date of last change Reference/Name of Presentation/SN 20

CFD Modelling

Single phase

Date of last change Reference/Name of Presentation/SN 21

CFD Modelling

Multiphase

Date of last change Reference/Name of Presentation/SN 22

Pilot Testing

Multiphase Validation

Level z = -100 mm

-25

-20

-15

-10

-5

0

5

10

15

20

-0.65 -0.45 -0.25 -0.05 0.15 0.35 0.55

Distance from centerline [m]

[m/s

]

Velocity u, CFD Velocity u, meas

Level z= -100 mm

-35

-30

-25

-20

-15

-10

-5

0

5

10

-0.65 -0.45 -0.25 -0.05 0.15 0.35 0.55

Distance from centerline [m]

[m/s

]

Velocity w, CFD Velocity w, meas

Date of last change Reference/Name of Presentation/SN 23

Pilot Testing

Multiphase Validation

Date of last change Reference/Name of Presentation/SN 24

Conclusions

More validation is needed