©2017 Ulteig

Challenging Transmission Structure Designs: Case

StudiesMinnesota Power

Systems Conference

November 8, 2017

Marlon W. Vogt, PE, M. ASCE. F.SEIJosh E. Potts, PE

©2017 Ulteig 2

MIPSYCON 2017

Your assignment, should you decide to accept…..

©2017 Ulteig 3

Purpose

“Flying is hours and hours of boredomsprinkled with a few seconds of sheer terror.”

Gregory “Pappy” Boyington

©2017 Ulteig 4

Why Challenging?

LandownersROW

Design ConstraintsConflicting Facilities

Regulators

Why they pay us the ‘big bucks’

©2017 Ulteig 5

Impacts

Cost Schedule

Headaches (literally)Constructability

Aesthetics

Decisions have consequences

©2017 Ulteig 6

Case #1 - Scenario

• Politically-charged project• 115 kV wood H-frame• Franchised for 161 kV• Upgrade to double circuit 161 kV

©2017 Ulteig 7

Case #1 - Challenges

Same pole locationsSame pole spacing

Phase-to-Phase > 15.5 ft.

©2017 Ulteig 8

Case #1 - Challenges

Pole bearing(OMG moments!)

Flange joints

©2017 Ulteig 9

Case #1 - Challenges

Initial or later?

Insulator constraint

Fatigue?

Coating bleed?Vendor Involvement!

©2017 Ulteig 10

Case #2 - Scenario

• 345kV Dead End Crossing Structure• Highly Congested Area• Single Circuit Structure, from Triple Circuit• Significant Sideslope• Grading Required

©2017 Ulteig 11

Case #2

©2017 Ulteig 12

Case #2

345kV Circuit

69kV Circuits

Future 345kV Line

Existing 345kV Line

©2017 Ulteig 13

Case #3 - Scenario

• Mix of existing and new circuits• 69 kV• Public ROW• Minimum guying

©2017 Ulteig 14

Case #3Existing Circuit #1

Underbuild(of course)

New Circuit

Existing Circuit #2

©2017 Ulteig 15

Case #3

Loading Tree

GeometryClearances

Guying

©2017 Ulteig 16

Case #4 - Scenario

• 138kV DC T-line• 2nd Circuit for future Wind Farm• Narrow ROW• Distribution• Landowner Requests• Circuit-Circuit clearances

©2017 Ulteig 17

Case #4

©2017 Ulteig 18

Case #4

©2017 Ulteig 19

Case #5 - Scenario

• Politically-charged project

• Greenfield route

• Minimal footprint

BANANAS to NIMBY

©2017 Ulteig 20

Case #5

Quad bundle T2

Narrow profile

LandownerAccommodations

©2017 Ulteig 21

Case #5

Hardware

Deadends

Constructability

©2017 Ulteig 22

Conclusion

• Challenging Designs• Creativity• Collaboration• Flexibility• Maximize what you can cram into your ROW

Many Ways to Skin a Cat

©2017 Ulteig 23

Questions

©2017 Ulteig 24

Thank You!