Chapter # : 01 CARRIAGE
01-01-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter
EQUIPMENT
Carriage Charges #1 59.00 1.000 59.00 Rs/50mRs/50m 1
Total Equipment % 76.00 59.00
Cost Per 50 m: 71.39
12.39
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 71.39
50 Meter Rs. 0.00
01-01-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter
EQUIPMENT
Carriage Charges #2 9.22 1.000 9.22 Rs/50mRs/50m 1
Total Equipment % 76.00 9.22
Cost Per 50 m: 11.15
1.94
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 11.15
50 Meter Rs. 0.00
01-01-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50
meter
EQUIPMENT
Carriage Charges #3 6.41 1.000 6.41 Rs/50mRs/50m 1
Total Equipment % 76.00 6.41
Cost Per 50 m: 7.76
1.35
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 7.76
50 Meter Rs. 0.00
01-01-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 250 MeterSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000
meter
EQUIPMENT
Carriage Charges #4 28.56 1.000 28.56 Rs/250mRs/250m 1
Total Equipment % 76.00 28.56
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 1 of 969
-
Chapter # : 01 CARRIAGE
Cost Per 250 m: 34.56
6.00
Composite Rates Per :
Labour Rates Per : Cost Per 250 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
250 Meter Rs. 34.56
250 Meter Rs. 0.00
01-01-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st kilometer
EQUIPMENT
Carriage Charges #5 102.38 1.000 102.38 Rs/KmRs/Km 1
Total Equipment % 76.00 102.38
Cost Per km: 123.88
21.50
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 123.88
km Rs. 0.00
01-01-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd - 5th
kilometer
EQUIPMENT
Carriage Charges #6 23.40 1.000 23.40 Rs/KmRs/Km 1
Total Equipment % 76.00 23.40
Cost Per km: 28.31
4.91
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 28.31
km Rs. 0.00
01-01-gItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 6th to 10th
kilometer
EQUIPMENT
Carriage Charges #7 20.00 1.000 20.00 Rs/KmRs/Km 1
Total Equipment % 76.00 20.00
Cost Per km: 24.20
4.20
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 24.20
km Rs. 0.00
01-01-hItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 11th &
subsequent kilometer
EQUIPMENT
Carriage Charges #8 16.50 1.000 16.50 Rs/KmRs/Km 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 2 of 969
-
Chapter # : 01 CARRIAGE
Total Equipment % 76.00 16.50
Cost Per km: 19.97
3.47
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 19.97
km Rs. 0.00
01-02-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st 50 meter
EQUIPMENT
Carriage Charges #1 37.17 0.630 59.00 Rs/50mRs/50m 1
Total Equipment % 76.00 37.17
Cost Per 50 m: 44.98
7.81
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 44.98
50 Meter Rs. 0.00
01-02-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd 50 meter
EQUIPMENT
Carriage Charges #2 5.81 0.630 9.22 Rs/50mRs/50m 1
Total Equipment % 76.00 5.81
Cost Per 50 m: 7.03
1.22
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 7.03
50 Meter Rs. 0.00
01-02-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 3rd to 5th 50 meter
EQUIPMENT
Carriage Charges #3 4.04 0.630 6.41 Rs/50mRs/50m 1
Total Equipment % 76.00 4.04
Cost Per 50 m: 4.89
0.85
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 4.89
50 Meter Rs. 0.00
01-02-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 250 - 1000 meter
EQUIPMENT
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 3 of 969
-
Chapter # : 01 CARRIAGE
Carriage Charges #4 17.99 0.630 28.56 Rs/250mRs/250m 1
Total Equipment % 76.00 17.99
Cost Per 250 m: 21.77
3.78
Composite Rates Per :
Labour Rates Per : Cost Per 250 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 21.77
50 Meter Rs. 0.00
01-02-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st kilometer
EQUIPMENT
Carriage Charges #5 64.50 0.630 102.38 Rs/KmRs/Km 1
Total Equipment % 76.00 64.50
Cost Per km: 78.04
13.54
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 78.04
km Rs. 0.00
01-02-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd - 5th kilometer
EQUIPMENT
Carriage Charges #6 14.74 0.630 23.40 Rs/KmRs/Km 1
Total Equipment % 76.00 14.74
Cost Per km: 17.84
3.10
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 17.84
km Rs. 0.00
01-02-gItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 6th - 10th kilometer
EQUIPMENT
Carriage Charges #7 12.60 0.630 20.00 Rs/KmRs/Km 1
Total Equipment % 76.00 12.60
Cost Per km: 15.25
2.65
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 15.25
km Rs. 0.00
01-02-hItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 11th & subsequent
kilometer
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 4 of 969
-
Chapter # : 01 CARRIAGE
EQUIPMENT
Carriage Charges #8 10.39 0.630 16.50 Rs/KmRs/Km 1
Total Equipment % 76.00 10.39
Cost Per km: 12.58
2.18
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 12.58
km Rs. 0.00
01-03-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/50 MetSpec. No :
Carriage of cement(bag), bitumen/lubricants (drum) by truck or other means : 1st 50
meter
EQUIPMENT
Carriage Charges #1 11.80 0.200 59.00 Rs/50mRs/50m 1
Total Equipment % 76.00 11.80
Cost Per tonne/50m: 14.28
2.48
Composite Rates Per :
Labour Rates Per : Cost Per tonne/50m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/50 Meter Rs. 14.28
Tonne/50 Meter Rs. 0.00
01-03-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/50 MetSpec. No :
Carriage of cement (bag) bitumen/lubricant (drum) by truck or other means : 2nd 50
meter
EQUIPMENT
Carriage Charges #2 1.84 0.200 9.22 Rs/50mRs/50m 1
Total Equipment % 76.00 1.84
Cost Per tonne/50m: 2.23
0.39
Composite Rates Per :
Labour Rates Per : Cost Per tonne/50m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/50 Meter Rs. 2.23
Tonne/50 Meter Rs. 0.00
01-03-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/50 MetSpec. No :
Carriage of cement (bag), bitumen/lubricant (drum) by truck or other means : 3rd to
5th 50 meter
EQUIPMENT
Carriage Charges #3 1.28 0.200 6.41 Rs/50mRs/50m 1
Total Equipment % 76.00 1.28
Cost Per tonne/50m: 1.55
0.27
Composite Rates Per :
Labour Rates Per : Cost Per tonne/50m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/50 Meter Rs. 1.55
Tonne/50 Meter Rs. 0.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 5 of 969
-
Chapter # : 01 CARRIAGE
01-03-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/250 MeSpec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 250 to
1000 meter
EQUIPMENT
Carriage Charges #4 5.71 0.200 28.56 Rs/250mRs/250m 1
Total Equipment % 76.00 5.71
Cost Per t/250m: 6.91
1.20
Composite Rates Per :
Labour Rates Per : Cost Per t/250m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/250 Meter Rs. 6.91
Tonne/250 Meter Rs. 0.00
01-03-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/1 KmSpec. No :
Carriage of cement(bags), bitumen/lubricant (drum) by truck or other means : 1st
kilometer
EQUIPMENT
Carriage Charges #5 20.48 0.200 102.38 Rs/KmRs/Km 1
Total Equipment % 76.00 20.48
Cost Per tonne/km: 24.78
4.30
Composite Rates Per :
Labour Rates Per : Cost Per tonne/km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/1 Km Rs. 24.78
Tonne/1 Km Rs. 0.00
01-03-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/1 KmSpec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 2nd -
5th kilometer
EQUIPMENT
Carriage Charges #6 4.68 0.200 23.40 Rs/KmRs/Km 1
Total Equipment % 76.00 4.68
Cost Per tonne/km: 5.66
0.98
Composite Rates Per :
Labour Rates Per : Cost Per tonne/km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/1 Km Rs. 5.66
Tonne/1 Km Rs. 0.00
01-03-gItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/1 KmSpec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 6th -
10th kilometer
EQUIPMENT
Carriage Charges #7 4.00 0.200 20.00 Rs/KmRs/Km 1
Total Equipment % 76.00 4.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 6 of 969
-
Chapter # : 01 CARRIAGE
Cost Per tonne/km: 4.84
0.84
Composite Rates Per :
Labour Rates Per : Cost Per tonne/km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/1 Km Rs. 4.84
Tonne/1 Km Rs. 0.00
01-03-hItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit Tonne/1 KmSpec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 11th &
subsequent km
EQUIPMENT
Carriage Charges #8 3.30 0.200 16.50 Rs/KmRs/Km 1
Total Equipment % 76.00 3.30
Cost Per tonne/km: 3.99
0.69
Composite Rates Per :
Labour Rates Per : Cost Per tonne/km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Tonne/1 Km Rs. 3.99
Tonne/1 Km Rs. 0.00
01-04-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 1st 50 meter
EQUIPMENT
Carriage Charges #1 35.40 0.600 59.00 Rs/50mRs/50m 1
Total Equipment % 76.00 35.40
Cost Per 50 m: 42.83
7.43
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 42.83
50 Meter Rs. 0.00
01-04-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd 50 meter
EQUIPMENT
Carriage Charges #2 5.53 0.600 9.22 Rs/50mRs/50m 1
Total Equipment % 76.00 5.53
Cost Per 50 m: 6.69
1.16
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 6.69
50 Meter Rs. 0.00
01-04-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 3rd to 5th kilometer
EQUIPMENT
Carriage Charges #3 3.85 0.600 6.41 Rs/50mRs/50m 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 7 of 969
-
Chapter # : 01 CARRIAGE
Total Equipment % 76.00 3.85
Cost Per 50 m: 4.65
0.81
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 4.65
50 Meter Rs. 0.00
01-04-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 250 MeterSpec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 250 to 1000 meter
EQUIPMENT
Carriage Charges #4 17.14 0.600 28.56 Rs/250mRs/250m 1
Total Equipment % 76.00 17.14
Cost Per 250 m: 20.73
3.60
Composite Rates Per :
Labour Rates Per : Cost Per 250 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
250 Meter Rs. 20.73
250 Meter Rs. 0.00
01-04-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 1st kilometer
EQUIPMENT
Carriage Charges #5 61.43 0.600 102.38 Rs/KmRs/Km 1
Total Equipment % 76.00 61.43
Cost Per km: 74.33
12.90
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 74.33
km Rs. 0.00
01-04-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd - 5th kilometer
EQUIPMENT
Carriage Charges #6 14.04 0.600 23.40 Rs/KmRs/Km 1
Total Equipment % 76.00 14.04
Cost Per km: 16.99
2.95
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 16.99
km Rs. 0.00
01-04-gItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 6th - 10th kilometer
EQUIPMENT
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 8 of 969
-
Chapter # : 01 CARRIAGE
Carriage Charges #7 12.00 0.600 20.00 Rs/KmRs/Km 1
Total Equipment % 76.00 12.00
Cost Per km: 14.52
2.52
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 14.52
km Rs. 0.00
01-04-hItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 11th & subsequent
kilometer
EQUIPMENT
Carriage Charges #8 9.90 0.600 16.50 Rs/KmRs/Km 1
Total Equipment % 76.00 9.90
Cost Per km: 11.98
2.08
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 11.98
km Rs. 0.00
01-05-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of small consignments upto 250kg 1st 50 meter
EQUIPMENT
Carriage Charges #1 2.95 0.050 59.00 Rs/50mRs/50m 1
Total Equipment % 76.00 2.95
Cost Per 50 m: 3.57
0.62
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 3.57
50 Meter Rs. 0.00
01-05-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of small consigmnments upto 250 kg 2nd 50 meter
EQUIPMENT
Carriage Charges #2 0.46 0.050 9.22 Rs/50mRs/50m 1
Total Equipment % 76.00 0.46
Cost Per 50 m: 0.56
0.10
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 0.56
50 Meter Rs. 0.00
01-05-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 50 MeterSpec. No :
Carriage of small consignments upto 250 kg 3rd to 5th 50 meters
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 9 of 969
-
Chapter # : 01 CARRIAGE
EQUIPMENT
Carriage Charges #3 0.32 0.050 6.41 Rs/50mRs/50m 1
Total Equipment % 76.00 0.32
Cost Per 50 m: 0.39
0.07
Composite Rates Per :
Labour Rates Per : Cost Per 50 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
50 Meter Rs. 0.39
50 Meter Rs. 0.00
01-05-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 250 MeterSpec. No :
Carriage of small consignments upto 250 kg 250 - 1000 meter
EQUIPMENT
Carriage Charges #4 1.43 0.050 28.56 Rs/250mRs/250m 1
Total Equipment % 76.00 1.43
Cost Per 250 m: 1.73
0.30
Composite Rates Per :
Labour Rates Per : Cost Per 250 m: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
250 Meter Rs. 1.73
250 Meter Rs. 0.00
01-05-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of small consignments upto 250 kg 1st kilometer
EQUIPMENT
Carriage Charges #5 5.12 0.050 102.38 Rs/KmRs/Km 1
Total Equipment % 76.00 5.12
Cost Per km: 6.19
1.07
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 6.19
km Rs. 0.00
01-05-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of small consignments upto 250 kg 2nd to 5th kilometer
EQUIPMENT
Carriage Charges #6 1.17 0.050 23.40 Rs/KmRs/Km 1
Total Equipment % 76.00 1.17
Cost Per km: 1.42
0.25
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 1.42
km Rs. 0.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 10 of 969
-
Chapter # : 01 CARRIAGE
01-05-gItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of small consignments upto 250 kg 6th to 10th kilometer
EQUIPMENT
Carriage Charges #7 1.00 0.050 20.00 Rs/KmRs/Km 1
Total Equipment % 76.00 1.00
Cost Per km: 1.21
0.21
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 1.21
km Rs. 0.00
01-05-hItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of small consignments upto 250 kg 11th & subsequent kilometer
EQUIPMENT
Carriage Charges #8 0.82 0.050 16.50 Rs/KmRs/Km 1
Total Equipment % 76.00 0.82
Cost Per km: 1.00
0.17
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 1.00
km Rs. 0.00
01-06-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of consignments (odd job) Coolie load
LABOUR
Coolie 30.00 0.100 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 30.90
0.90
Cost Per km: 37.20
6.30
Composite Rates Per :
Labour Rates Per : Cost Per km: 37.20
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 37.20
km Rs. 37.20
01-06-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of consignments (odd job) Donkey load
EQUIPMENT
Donkey 30.00 0.075 400.00 DayDay 1
Total Equipment % 76.00 30.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 11 of 969
-
Chapter # : 01 CARRIAGE
Cost Per km: 36.30
6.30
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 36.30
km Rs. 0.00
01-06-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of consignments (odd job) Cart Load
EQUIPMENT
Bullock Cart 26.25 0.038 700.00 DayDay 1
Total Equipment % 76.00 26.25
Cost Per km: 31.76
5.51
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 31.76
km Rs. 0.00
01-06-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit kmSpec. No :
Carriage of consignments (odd job) Camel load
EQUIPMENT
Camel 45.00 0.075 600.00 DayDay 1
Total Equipment % 76.00 45.00
Cost Per km: 54.45
9.45
Composite Rates Per :
Labour Rates Per : Cost Per km: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
km Rs. 54.45
km Rs. 0.00
01-07-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit DaySpec. No :
Hire Charges of Truck
EQUIPMENT
Truck (10ton) 6,956.52 7.729 900.00 HourHour 1
Total Equipment % 76.00 6,956.52
Cost Per Day: 8,417.39
1,460.87
Composite Rates Per :
Labour Rates Per : Cost Per Day: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Day Rs. 8,417.39
Day Rs. 0.00
01-07-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit DaySpec. No :
Hire charges of Tractor with trolley
EQUIPMENT
Tractor With Trolly 5,797.50 7.730 750.00 HourHour 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 12 of 969
-
Chapter # : 01 CARRIAGE
Total Equipment % 76.00 5,797.50
Cost Per Day: 7,014.98
1,217.48
Composite Rates Per :
Labour Rates Per : Cost Per Day: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Day Rs. 7,014.98
Day Rs. 0.00
01-07-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit DaySpec. No :
Hire charges of Tractor without trolley
EQUIPMENT
Tractor Without Trolly 80 HP 4,347.60 7.246 600.00 DayDay 1
Total Equipment % 76.00 4,347.60
Cost Per Day: 5,260.60
913.00
Composite Rates Per :
Labour Rates Per : Cost Per Day: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Day Rs. 5,260.60
Day Rs. 0.00
01-08-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting loaded railway wagons Upto 500 meter
LABOUR
Coolie 450.00 1.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 463.50
13.50
Cost Per Each: 558.00
94.50
Composite Rates Per :
Labour Rates Per : Cost Per Each: 558.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 558.00
Each Rs. 558.00
01-08-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting loaded railway wagons Upto 1 kilometer
LABOUR
Coolie 675.00 2.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 695.25
20.25
Cost Per Each: 837.00
141.75
Composite Rates Per :
Labour Rates Per : Cost Per Each: 837.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 837.00
Each Rs. 837.00
01-08-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting loaded railway wagons Upto 2 kilometer
LABOUR
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 13 of 969
-
Chapter # : 01 CARRIAGE
Coolie 825.00 2.750 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 849.75
24.75
Cost Per Each: 1,023.00
173.25
Composite Rates Per :
Labour Rates Per : Cost Per Each: 1,023.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 1,023.00
Each Rs. 1,023.00
01-08-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting loaded railway wagons 3rd & subsequent kilometer
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 386.25
11.25
Cost Per Each: 465.00
78.75
Composite Rates Per :
Labour Rates Per : Cost Per Each: 465.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 465.00
Each Rs. 465.00
01-09-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting empty railway wagons Upto 500 meter
LABOUR
Coolie 225.00 0.750 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 231.75
6.75
Cost Per Each: 279.00
47.25
Composite Rates Per :
Labour Rates Per : Cost Per Each: 279.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 279.00
Each Rs. 279.00
01-09-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting empty railway wagons Upto 1 kilometer
LABOUR
Coolie 337.50 1.125 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 347.63
10.13
Cost Per Each: 418.50
70.88
Composite Rates Per :
Labour Rates Per : Cost Per Each: 418.50
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 418.50
Each Rs. 418.50
01-09-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting empty railway wagons Upto 2 kilometer
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 14 of 969
-
Chapter # : 01 CARRIAGE
LABOUR
Coolie 412.50 1.375 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 424.88
12.38
Cost Per Each: 511.50
86.63
Composite Rates Per :
Labour Rates Per : Cost Per Each: 511.50
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 511.50
Each Rs. 511.50
01-09-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Hand shunting empty railway wagons 3rd & subsequent kilometer
LABOUR
Coolie 187.50 0.625 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 193.13
5.63
Cost Per Each: 232.50
39.38
Composite Rates Per :
Labour Rates Per : Cost Per Each: 232.50
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 232.50
Each Rs. 232.50
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 15 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
02-01Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 cftSpec. No :
Load into or unload from railway wagons within 50m shingle, sand, ballast, tiles, etc,
laid & stacked
(British)
LABOUR
Coolie 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 309.00
9.00
Per CUM : Rs 131.37
63.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 131.37
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 cft Rs. 372.00
100 cft Rs. 372.00
02-02-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 No.Spec. No :
Load into or unload from railway wagons within 50m laid & stacked : Bricks 10" size
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 386.25
11.25
Cost Per 1000 No.: 465.00
78.75
Composite Rates Per :
Labour Rates Per : Cost Per 1000 No.: 465.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 No. Rs. 465.00
1000 No. Rs. 465.00
02-02-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 No.Spec. No :
Load into or unload from railway wagons within 50m laid & stacked : Bricks 9" or
smaller size
(British)
LABOUR
Coolie 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 309.00
9.00
Cost Per 1000 No.: 372.00
63.00
Composite Rates Per :
Labour Rates Per : Cost Per 1000 No.: 372.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 No. Rs. 372.00
1000 No. Rs. 372.00
02-03Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Load into or unload from railway wagons, cement in bags and stacking within 50m.
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 386.25
11.25
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 16 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
Cost Per 100 No.: 465.00
78.75
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 465.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 465.00
100 No. Rs. 465.00
02-04Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 No.Spec. No :
Load into or unload from railway wagons, empty cement bags and stacking
(British)
LABOUR
Coolie 336.00 1.120 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 346.08
10.08
Cost Per 1000 No.: 416.64
70.56
Composite Rates Per :
Labour Rates Per : Cost Per 1000 No.: 416.64
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 No. Rs. 416.64
1000 No. Rs. 416.64
02-05Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Load into or unload from railway wagons and stacking white lime in bags
(British)
LABOUR
Coolie 75.00 0.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 77.25
2.25
Per Tonne : Rs 93.00
15.75
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 93.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 93.00
tonne Rs. 93.00
02-06Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Load into or unload from railway wagons structural steel, RS joists, rails, rail
fastenings etc
(British)
LABOUR
Coolie 180.00 0.600 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 185.40
5.40
Per Tonne : Rs 223.20
37.80
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 223.20
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 223.20
tonne Rs. 223.20
02-07Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Load into or unload from 45 gallon drums full, into or from railway wagons,lead upto
50m
(British)
LABOUR
Coolie 24.00 0.080 300.00 DayDay 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 17 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
Total Labour
Sundries (Labour Only): %3
% 79.00 24.72
0.72
Cost Per Each: 29.76
5.04
Composite Rates Per :
Labour Rates Per : Cost Per Each: 29.76
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 29.76
Each Rs. 29.76
02-08Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit EachSpec. No :
Loading or unloading packages of all sorts upto 50 kg.
(British)
LABOUR
Coolie 21.00 0.070 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 21.63
0.63
Cost Per Each: 26.04
4.41
Composite Rates Per :
Labour Rates Per : Cost Per Each: 26.04
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Each Rs. 26.04
Each Rs. 26.04
02-09-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Load or unload sleepers other than wooden, incl stacking, lead upto 50 m : Broad
gauge
(British)
LABOUR
Coolie 750.00 2.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 772.50
22.50
Cost Per 100 No.: 930.00
157.50
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 930.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 930.00
100 No. Rs. 930.00
02-09-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Load or unload sleepers other than wooden, including stacking, lead upto 50 m :
Metre gauge &
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 386.25
11.25
Cost Per 100 No.: 465.00
78.75
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 465.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 465.00
100 No. Rs. 465.00
02-10Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Load or unload timber logs or shuttering into or from railway wagons, including
stacking within 50m
(British)
LABOUR
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 18 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
Coolie 99.00 0.330 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 101.97
2.97
Per Tonne : Rs 122.76
20.79
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 122.76
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 122.76
tonne Rs. 122.76
02-11Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Loading or unloading bhoosa in railway wagons lead upto 50 m.
(British)
LABOUR
Coolie 225.00 0.750 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 231.75
6.75
Per Tonne : Rs 279.00
47.25
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 279.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 279.00
tonne Rs. 279.00
02-12Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Load or unload timber scrap or wooden plugs into or from railway wagons &
stacking within 50m
(British)
LABOUR
Coolie 150.00 0.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 154.50
4.50
Per Tonne : Rs 186.00
31.50
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 186.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 186.00
tonne Rs. 186.00
02-13Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 cftSpec. No :
Load or unload pitching stone/spawl from railway wagons of any guage including
clearing 1.5m away
(British)
LABOUR
Coolie 111.00 0.370 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 114.33
3.33
Per CUM : Rs 48.61
23.31
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 48.61
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 cft Rs. 137.64
100 cft Rs. 137.64
02-14Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 cftSpec. No :
Loading or unloading building stone including clearing away 1.5m from rails
(British)
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 19 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
LABOUR
Coolie 144.00 0.480 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 148.32
4.32
Per CUM : Rs 63.06
30.24
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 63.06
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 cft Rs. 178.56
100 cft Rs. 178.56
02-15-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 ltrSpec. No :
Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from tank wagon into
tank)
(British)
LABOUR
Coolie 90.00 0.300 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 92.70
2.70
Cost Per 1000 ltr: 111.60
18.90
Composite Rates Per :
Labour Rates Per : Cost Per 1000 ltr: 111.60
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 ltr Rs. 111.60
1000 ltr Rs. 111.60
02-15-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 ltrSpec. No :
Unloading oil,bitumen or tar etc Crude oil (drained by gravity)
(British)
LABOUR
Coolie 90.00 0.300 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 92.70
2.70
Cost Per 1000 ltr: 111.60
18.90
Composite Rates Per :
Labour Rates Per : Cost Per 1000 ltr: 111.60
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 ltr Rs. 111.60
1000 ltr Rs. 111.60
02-15-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit TonSpec. No :
Unloading oil,bitumen or tar etc Crude oil materials from railway wagons
(British)
LABOUR
Coolie 17.10 0.057 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 17.61
0.51
Cost Per Ton: 21.20
3.59
Composite Rates Per :
Labour Rates Per : Cost Per Ton: 21.20
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
Ton Rs. 21.20
Ton Rs. 21.20
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 20 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
02-15-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty drums including
stacking within 50 m
(British)
LABOUR
Coolie 150.00 0.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 154.50
4.50
Per Tonne : Rs 186.00
31.50
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 186.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 186.00
tonne Rs. 186.00
02-15-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Unloading oil,bitumen or tar etc Petrol (2 gallon tin)
(British)
LABOUR
Coolie 189.00 0.630 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 194.67
5.67
Cost Per 100 No.: 234.36
39.69
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 234.36
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 234.36
100 No. Rs. 234.36
02-15-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 386.25
11.25
Cost Per 100 No.: 465.00
78.75
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 465.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 465.00
100 No. Rs. 465.00
02-15-gItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Unloading oil,bitumen or tar etc Tar & Bitumen in drums with carriage upto 1 km
(British)
EQUIPMENT
Bullock Cart 175.00 0.250 700.00 DayDay 1
Total Equipment % 76.00 175.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 21 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
Cost Per 100 No.: 211.75
36.75
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 0.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 211.75
100 No. Rs. 0.00
02-16-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 cftSpec. No :
Removing and stacking within 50m. lead Stone, spawl, brick bats, shingle, sand,
lime etc
(British)
LABOUR
Coolie 150.00 0.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 154.50
4.50
Per CUM : Rs 65.69
31.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 65.69
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 cft Rs. 186.00
100 cft Rs. 186.00
02-16-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 No.Spec. No :
Removing and stacking within 50m. lead Bricks
(British)
LABOUR
Coolie 435.00 1.450 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 448.05
13.05
Cost Per 1000 No.: 539.40
91.35
Composite Rates Per :
Labour Rates Per : Cost Per 1000 No.: 539.40
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 No. Rs. 539.40
1000 No. Rs. 539.40
02-16-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Removing and stacking within 50m. lead Broad gauge wooden sleepers
(British)
LABOUR
Coolie 240.00 0.800 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 247.20
7.20
Cost Per 100 No.: 297.60
50.40
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 297.60
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 297.60
100 No. Rs. 297.60
02-16-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Removing and stacking within 50m. lead Metre gauge or narrow guage wooden
sleepers
(British)
LABOUR
Coolie 137.10 0.457 300.00 DayDay 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 22 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
Total Labour
Sundries (Labour Only): %3
% 79.00 141.21
4.11
Cost Per 100 No.: 170.00
28.79
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 170.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 170.00
100 No. Rs. 170.00
02-16-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Removing and stacking within 50m. lead Rails, girders, pipes, cement etc.
(British)
LABOUR
Coolie 69.00 0.230 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 71.07
2.07
Per Tonne : Rs 85.56
14.49
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 85.56
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 85.56
tonne Rs. 85.56
02-16-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Removing and stacking within 50m. lead Bridge and crossing timbers, etc.
(British)
LABOUR
Coolie 801.00 2.670 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 825.03
24.03
Cost Per 100 No.: 993.24
168.21
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 993.24
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 993.24
100 No. Rs. 993.24
02-17Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Load into wagons girders, rails, MS bars, pipes etc. including 50m lead & stacking
inside wagons
(British)
LABOUR
Coolie 192.00 0.640 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 197.76
5.76
Per Tonne : Rs 238.08
40.32
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 238.08
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 238.08
tonne Rs. 238.08
02-18Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Unload from wagons girders, rails, MS bars, girder etc. including 50m lead but
excluding stacking
(British)
LABOUR
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 23 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
Coolie 75.00 0.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 77.25
2.25
Per Tonne : Rs 93.00
15.75
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 93.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 93.00
tonne Rs. 93.00
02-19Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Load into wagons wooden baord guage sleepers including 50m lead & stacking
(British)
LABOUR
Coolie 600.00 2.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 618.00
18.00
Cost Per 100 No.: 744.00
126.00
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 744.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 744.00
100 No. Rs. 744.00
02-20Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Unload wooden broad gauge sleepers from wagons including 50m lead and
stacking
(British)
LABOUR
Coolie 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 309.00
9.00
Cost Per 100 No.: 372.00
63.00
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 372.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 372.00
100 No. Rs. 372.00
02-21Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Loading metre gauge or narrow guage wooden sleepers including 50m lead & stack
inside wagons
(British)
LABOUR
Coolie 330.00 1.100 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 339.90
9.90
Cost Per 100 No.: 409.20
69.30
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 409.20
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 409.20
100 No. Rs. 409.20
02-22Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Unloading metre gauge or narrow guage wooden sleepers including 50m lead but
excluding stacking
(British)
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 24 of 969
-
Chapter # : 02 LOADING, UNLOADING AND STACKING
LABOUR
Coolie 159.00 0.530 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 163.77
4.77
Cost Per 100 No.: 197.16
33.39
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 197.16
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 197.16
100 No. Rs. 197.16
02-23Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Loading bridge and crossing timber including 50m lead & stacking
(British)
LABOUR
Coolie 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 309.00
9.00
Cost Per 100 No.: 372.00
63.00
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 372.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 372.00
100 No. Rs. 372.00
02-24Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 100 No.Spec. No :
Unloading bridge and crossing timbers including 50m lead but excluding stacking
(British)
LABOUR
Coolie 150.00 0.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 154.50
4.50
Cost Per 100 No.: 186.00
31.50
Composite Rates Per :
Labour Rates Per : Cost Per 100 No.: 186.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
100 No. Rs. 186.00
100 No. Rs. 186.00
02-25Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit tonneSpec. No :
Load or unload bitumen, asphalt, tar in drums, into or from railway wagons, lead
upto 50m
(British)
LABOUR
Coolie 150.00 0.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 154.50
4.50
Per Tonne : Rs 186.00
31.50
Composite Rates Per :
Labour Rates Per : Per Tonne : Rs 186.00
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
tonne Rs. 186.00
tonne Rs. 186.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 25 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
03-01-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation undressed upto single throw of kassi phaorah or shovel etc : in
ashes, sand, soft soil or silt clearance
(British)
LABOUR
Coolie 1,125.00 3.750 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 1,158.75
33.75
Per CUM : Rs 49.26
236.25
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 49.26
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 1,395.00
1000 Cft Rs. 1,395.00
03-01-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation undressed upto single throw of kassi phaorah or shove etc : in
ordinary soil,
(British)
LABOUR
Coolie 1,350.00 4.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 1,390.50
40.50
Per CUM : Rs 59.12
283.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 59.12
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 1,674.00
1000 Cft Rs. 1,674.00
03-02Item Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in ashes, sand & soft soil or silt clearance, undressed lead upto
25m.
(British)
LABOUR
Coolie 1,650.00 5.500 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 1,699.50
49.50
Per CUM : Rs 72.25
346.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 72.25
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 2,046.00
1000 Cft Rs. 2,046.00
03-03-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Bed clearance and dressing slopes of drains including removing of weeds and roots
etc. Excavated material undressed within 25m
(British)
LABOUR
Coolie 2,100.00 7.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,163.00
63.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 26 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Per CUM : Rs 91.96
441.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 91.96
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 2,604.00
1000 Cft Rs. 2,604.00
03-03-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Bed clearance and dressing slopes of drains including removing of weeds and roots
etc. Excavated material dressed within 25m lead
(British)
LABOUR
Coolie 2,322.00 7.740 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,391.66
69.66
Per CUM : Rs 101.68
487.62
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 101.68
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 2,879.28
1000 Cft Rs. 2,879.28
03-04-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Borrowpit excavation undressed lead upto 50m in Ordinary soil
(British)
LABOUR
Coolie 2,100.00 7.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,163.00
63.00
Per CUM : Rs 91.96
441.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 91.96
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 2,604.00
1000 Cft Rs. 2,604.00
03-04-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Borrowpit excavation undressed lead upto 50m in Hard soil
(British)
LABOUR
Coolie 2,580.00 8.600 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,657.40
77.40
Per CUM : Rs 112.98
541.80
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 112.98
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,199.20
1000 Cft Rs. 3,199.20
03-04-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Borrowpit excavation undressed lead upto 50m in shingle/gravel formation
(British)
LABOUR
Coolie 5,100.00 17.000 300.00 DayDay 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 27 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Total Labour
Sundries (Labour Only): %3
% 79.00 5,253.00
153.00
Per CUM : Rs 223.33
1,071.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 223.33
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 6,324.00
1000 Cft Rs. 6,324.00
03-05-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Embankment formation in ordinary soil & compaction by mechanical means at
optimum moistures content to 95% to 100% max. modified. AASHTO dry density
(borrow area)
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Dresser 150.00 0.500 300.00 DayDay 1
Water Sprinkler 27.00 0.090 300.00 DayDay 1
Water Carrier 24.00 0.080 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 9.97 593.28
17.28
EQUIPMENT
Tractor With Trolly 540.00 0.720 750.00 HourHour 1
Comp Roller 864.00 0.720 1,200.00 HourHour 1
Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1
Rammer Mech 88.00 0.320 275.00 HourHour 1
Lab Test 56.00 0.080 700.00 NoNo 1
Total Equipment % 69.03 5,708.00
Per CUM : Rs 269.13
1,319.64
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 25.22
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 7,620.92
1000 Cft Rs. 714.24
03-05-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Embankment formation in ordinary soil & compaction by mechanical means at
optimum moistures content to 90% max. modified AASHTO dry density (borrow
area)
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Dresser 150.00 0.500 300.00 DayDay 1
Water Sprinkler 24.00 0.080 300.00 DayDay 1
Water Carrier 21.00 0.070 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 10.01 587.10
17.10
EQUIPMENT
Tractor With Trolly 540.00 0.720 750.00 HourHour 1
Comp Roller 768.00 0.640 1,200.00 HourHour 1
Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1
Rammer Mech 88.00 0.320 275.00 HourHour 1
Lab Test 56.00 0.080 700.00 NoNo 1
Total Equipment % 68.99 5,612.00
Per CUM : Rs 264.77
1,298.22
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 24.96
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 7,497.32
1000 Cft Rs. 706.80
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 28 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
03-05-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Embankment formation in ordinary soil & compaction by mechanical means at
optimum moistures content to 85% max. modified AASHTO dry density (borrow
area)
(British)
LABOUR
Coolie 375.00 1.250 300.00 DayDay 1
Dresser 150.00 0.500 300.00 DayDay 1
Water Sprinkler 21.00 0.070 300.00 DayDay 1
Water Carrier 18.00 0.060 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 10.05 580.92
16.92
EQUIPMENT
Tractor With Trolly 540.00 0.720 750.00 HourHour 1
Comp Roller 672.00 0.560 1,200.00 HourHour 1
Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1
Rammer Mech 88.00 0.320 275.00 HourHour 1
Lab Test 56.00 0.080 700.00 NoNo 1
Total Equipment % 68.95 5,516.00
Per CUM : Rs 260.40
1,276.80
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 24.70
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 7,373.72
1000 Cft Rs. 699.36
03-06-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth fill in lawns including dressing & compaction with earth available from
cutting/excavation
(British)
LABOUR
Coolie 450.00 1.500 300.00 DayDay 1
Bhishti 150.00 0.500 300.00 DayDay 1
Dresser 300.00 1.000 300.00 DayDay 1
Carrier 600.00 2.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 1,545.00
45.00
Per CUM : Rs 65.69
315.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 65.69
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 1,860.00
1000 Cft Rs. 1,860.00
03-06-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth fill in lawns including dressing & compaction with suitable earth borrowed.
(British)
LABOUR
Coolie 450.00 1.500 300.00 DayDay 1
Bhishti 150.00 0.500 300.00 DayDay 1
Rammer 450.00 1.500 300.00 DayDay 1
Digger 900.00 3.000 300.00 DayDay 1
Carrier 900.00 3.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,935.50
85.50
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 29 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Per CUM : Rs 124.80
598.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 124.80
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,534.00
1000 Cft Rs. 3,534.00
03-07-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Ordinary
Soil
(British)
LABOUR
Coolie 1,500.00 5.000 300.00 DayDay 1
Dresser 300.00 1.000 300.00 DayDay 1
Skilled Coolie 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,163.00
63.00
Per CUM : Rs 91.96
441.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 91.96
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 2,604.00
1000 Cft Rs. 2,604.00
03-07-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Hard Soil
(British)
LABOUR
Coolie 1,875.00 6.250 300.00 DayDay 1
Dresser 375.00 1.250 300.00 DayDay 1
Skilled Coolie 375.00 1.250 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,703.75
78.75
Per CUM : Rs 114.95
551.25
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 114.95
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,255.00
1000 Cft Rs. 3,255.00
03-07-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Very
hard Soil
(British)
LABOUR
Coolie 1,950.00 6.500 300.00 DayDay 1
Dresser 390.00 1.300 300.00 DayDay 1
Skilled Coolie 390.00 1.300 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,811.90
81.90
Per CUM : Rs 119.55
573.30
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 119.55
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,385.20
1000 Cft Rs. 3,385.20
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 30 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
03-07-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Gravel &
shingle
(British)
LABOUR
Coolie 2,175.00 7.250 300.00 DayDay 1
Dresser 435.00 1.450 300.00 DayDay 1
Skilled Coolie 435.00 1.450 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 3,136.35
91.35
Per CUM : Rs 133.34
639.45
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 133.34
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,775.80
1000 Cft Rs. 3,775.80
03-08-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in
Ordinary Soil
(British)
LABOUR
Coolie 3,000.00 10.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 3,090.00
90.00
Per CUM : Rs 131.37
630.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 131.37
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,720.00
1000 Cft Rs. 3,720.00
03-08-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in
Hard Soil
(British)
LABOUR
Coolie 3,390.00 11.300 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 3,491.70
101.70
Per CUM : Rs 148.45
711.90
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 148.45
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 4,203.60
1000 Cft Rs. 4,203.60
03-08-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in
Very Hard Soil
(British)
LABOUR
Coolie 3,900.00 13.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 4,017.00
117.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 31 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Per CUM : Rs 170.78
819.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 170.78
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 4,836.00
1000 Cft Rs. 4,836.00
03-08-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in open cut 1.5m - 3m depth for drains etc & disposal : in Gravel &
shingle
(British)
LABOUR
Coolie 6,720.00 22.400 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 6,921.60
201.60
Per CUM : Rs 294.27
1,411.20
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 294.27
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 8,332.80
1000 Cft Rs. 8,332.80
03-09-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m
lead : Dry
(British)
LABOUR
Coolie 5,700.00 19.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 5,871.00
171.00
Per CUM : Rs 249.60
1,197.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 249.60
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 7,068.00
1000 Cft Rs. 7,068.00
03-09-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m
lead : Wet
(British)
LABOUR
Coolie 6,600.00 22.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 6,798.00
198.00
Per CUM : Rs 289.02
1,386.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 289.02
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 8,184.00
1000 Cft Rs. 8,184.00
03-09-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in shingle or gravel formation & rock not req. blast, undressed, 50m lead
: in Flowing Water
(British)
LABOUR
Coolie 8,400.00 28.000 300.00 DayDay 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 32 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Total Labour
Sundries (Labour Only): %3
% 79.00 8,652.00
252.00
Per CUM : Rs 367.84
1,764.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 367.84
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 10,416.00
1000 Cft Rs. 10,416.00
03-10-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in
Ordinary Soil
(British)
LABOUR
Coolie 2,100.00 7.000 300.00 DayDay 1
Dresser 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,472.00
72.00
Per CUM : Rs 105.10
504.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 105.10
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 2,976.00
1000 Cft Rs. 2,976.00
03-10-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in
Hard Soil
(British)
LABOUR
Coolie 2,580.00 8.600 300.00 DayDay 1
Dresser 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 2,966.40
86.40
Per CUM : Rs 126.12
604.80
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 126.12
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 3,571.20
1000 Cft Rs. 3,571.20
03-10-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in
Very Hard Soil
(British)
LABOUR
Coolie 3,090.00 10.300 300.00 DayDay 1
Dresser 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 3,491.70
101.70
Per CUM : Rs 148.45
711.90
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 148.45
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 4,203.60
1000 Cft Rs. 4,203.60
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 33 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
03-10-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in
Shingle/Gravel
(British)
LABOUR
Coolie 5,700.00 19.000 300.00 DayDay 1
Dresser 600.00 2.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 6,489.00
189.00
Per CUM : Rs 275.88
1,323.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 275.88
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 7,812.00
1000 Cft Rs. 7,812.00
03-11-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Rock Excavation, dressing & disposal up to 50m Soft Rock, slate, shale, schist or
lateriate
(British)
LABOUR
Coolie 4,200.00 14.000 300.00 DayDay 1
Bhishti 300.00 1.000 300.00 DayDay 1
Black Smith 600.00 1.000 600.00 DayDay 1
Dresser 2,700.00 9.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 8,034.00
234.00
Per CUM : Rs 341.56
1,638.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 341.56
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 9,672.00
1000 Cft Rs. 9,672.00
03-11-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Rock Excavation, dressing & disposal up to 50m Medium hard rock, requiring
occasional blasting
(British)
MATERIAL
Explosives for Blasting 450.00 3.000 150.00 NoNo 1
Total Material % 3.58 450.00
LABOUR
Coolie 7,299.00 24.330 300.00 DayDay 1
Bhishti 300.00 1.000 300.00 DayDay 1
Black Smith 600.00 1.000 600.00 DayDay 1
Dresser 600.00 2.000 300.00 DayDay 1
Hammer Man 300.00 1.000 300.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 75.42 9,371.97
272.97
Per CUM : Rs 417.68
2,005.29
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 398.45
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 11,827.26
1000 Cft Rs. 11,282.76
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 34 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
03-12-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting and disposal upto 25m & dressing :
Grade I
(British)
MATERIAL
Explosives for Blasting 450.00 3.000 150.00 NoNo 1
Total Material % 5.68 450.00
LABOUR
Coolie 1,800.00 6.000 300.00 DayDay 1
Bhishti 150.00 0.500 300.00 DayDay 1
Black Smith 150.00 0.250 600.00 DayDay 1
Quarry Man 3,000.00 10.000 300.00 DayDay 1
Smithy Coolie 75.00 0.250 300.00 DayDay 1
Chiseller 400.00 1.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 73.32 5,742.25
167.25
Per CUM : Rs 263.36
1,265.25
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 244.13
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 7,457.50
1000 Cft Rs. 6,913.00
03-12-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting and disposal upto 25m & dressing :
Grade II
(British)
MATERIAL
Explosives for Blasting 750.00 5.000 150.00 NoNo 1
Total Material % 8.32 750.00
LABOUR
Coolie 1,800.00 6.000 300.00 DayDay 1
Bhishti 150.00 0.500 300.00 DayDay 1
Black Smith 300.00 0.500 600.00 DayDay 1
Quarry Man 3,300.00 11.000 300.00 DayDay 1
Smithy Coolie 150.00 0.500 300.00 DayDay 1
Chiseller 400.00 1.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 70.68 6,283.00
183.00
Per CUM : Rs 299.17
1,438.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 267.12
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 8,471.50
1000 Cft Rs. 7,564.00
03-12-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting and disposal upto 25m & dressing :
Grade III
(British)
MATERIAL
Explosives for Blasting 900.00 6.000 150.00 NoNo 1
Total Material % 8.29 900.00
LABOUR
Coolie 1,800.00 6.000 300.00 DayDay 1
Bhishti 225.00 0.750 300.00 DayDay 1
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 35 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Black Smith 450.00 0.750 600.00 DayDay 1
Quarry Man 4,050.00 13.500 300.00 DayDay 1
Smithy Coolie 225.00 0.750 300.00 DayDay 1
Chiseller 600.00 1.500 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 70.71 7,570.50
220.50
Per CUM : Rs 360.32
1,732.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 321.86
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 10,203.00
1000 Cft Rs. 9,114.00
03-12-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting and disposal upto 25m & dressing :
Grade IV
(British)
MATERIAL
Explosives for Blasting 1,050.00 7.000 150.00 NoNo 1
Total Material % 8.60 1,050.00
LABOUR
Coolie 1,800.00 6.000 300.00 DayDay 1
Bhishti 225.00 0.750 300.00 DayDay 1
Black Smith 600.00 1.000 600.00 DayDay 1
Quarry Man 4,500.00 15.000 300.00 DayDay 1
Smithy Coolie 300.00 1.000 300.00 DayDay 1
Chiseller 800.00 2.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 70.40 8,471.75
246.75
Per CUM : Rs 405.04
1,947.75
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 360.17
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 11,469.50
1000 Cft Rs. 10,199.00
03-12-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting and disposal upto 25m & dressing :
Grade V
(British)
MATERIAL
Explosives for Blasting 1,200.00 8.000 150.00 NoNo 1
Total Material % 8.85 1,200.00
LABOUR
Coolie 1,800.00 6.000 300.00 DayDay 1
Bhishti 300.00 1.000 300.00 DayDay 1
Black Smith 600.00 1.000 600.00 DayDay 1
Quarry Man 5,100.00 17.000 300.00 DayDay 1
Smithy Coolie 300.00 1.000 300.00 DayDay 1
Chiseller 1,000.00 2.500 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 70.15 9,373.00
273.00
Per CUM : Rs 449.77
2,163.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 398.49
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 12,736.00
1000 Cft Rs. 11,284.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 36 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
03-12-fItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting and disposal upto 25m & dressing :
Grade VI
(British)
MATERIAL
Explosives for Blasting 1,350.00 9.000 150.00 NoNo 1
Total Material % 9.18 1,350.00
LABOUR
Coolie 1,800.00 6.000 300.00 DayDay 1
Bhishti 300.00 1.000 300.00 DayDay 1
Black Smith 750.00 1.250 600.00 DayDay 1
Quarry Man 5,400.00 18.000 300.00 DayDay 1
Smithy Coolie 375.00 1.250 300.00 DayDay 1
Chiseller 1,200.00 3.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 69.82 10,119.75
294.75
Per CUM : Rs 487.93
2,346.75
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 430.24
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 13,816.50
1000 Cft Rs. 12,183.00
03-13-aItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting but blasting prohibited, dispose & dress
within 25 m : Grade I
(British)
LABOUR
Coolie 3,600.00 12.000 300.00 DayDay 1
Bhishti 300.00 1.000 300.00 DayDay 1
Black Smith 300.00 0.500 600.00 DayDay 1
Quarry Man 6,000.00 20.000 300.00 DayDay 1
Smithy Coolie 150.00 0.500 300.00 DayDay 1
Chiseller 800.00 2.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 11,484.50
334.50
Per CUM : Rs 488.26
2,341.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 488.26
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 13,826.00
1000 Cft Rs. 13,826.00
03-13-bItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting where blasting prohibited, dispose &
dress within 25 m : Grade II
(British)
LABOUR
Coolie 3,600.00 12.000 300.00 DayDay 1
Bhishti 300.00 1.000 300.00 DayDay 1
Black Smith 600.00 1.000 600.00 DayDay 1
Quarry Man 6,600.00 22.000 300.00 DayDay 1
Smithy Coolie 300.00 1.000 300.00 DayDay 1
Chiseller 800.00 2.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 12,566.00
366.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 37 of 969
-
Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)
Per CUM : Rs 534.24
2,562.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 534.24
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 15,128.00
1000 Cft Rs. 15,128.00
03-13-cItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting where blasting prohibited, dispose &
dress within 25 m: Grade III
(British)
LABOUR
Coolie 3,600.00 12.000 300.00 DayDay 1
Bhishti 450.00 1.500 300.00 DayDay 1
Black Smith 900.00 1.500 600.00 DayDay 1
Quarry Man 8,100.00 27.000 300.00 DayDay 1
Smithy Coolie 450.00 1.500 300.00 DayDay 1
Chiseller 1,200.00 3.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 15,141.00
441.00
Per CUM : Rs 643.72
3,087.00
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 643.72
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 18,228.00
1000 Cft Rs. 18,228.00
03-13-dItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting where blasting prohibited, dispose &
dress within 25 m: Grade IV
(British)
LABOUR
Coolie 3,600.00 12.000 300.00 DayDay 1
Bhishti 450.00 1.500 300.00 DayDay 1
Black Smith 1,200.00 2.000 600.00 DayDay 1
Quarry Man 9,000.00 30.000 300.00 DayDay 1
Smithy Coolie 600.00 2.000 300.00 DayDay 1
Chiseller 1,600.00 4.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 16,943.50
493.50
Per CUM : Rs 720.35
3,454.50
Composite Rates Per :
Labour Rates Per : Per CUM : Rs 720.35
%21Contractors Profit + Over Heads (Material+Labour+Equipment) :
1000 Cft Rs. 20,398.00
1000 Cft Rs. 20,398.00
03-13-eItem Code :
Item Name :
Detail Qty Amount Rate (Rs.)Unit
Unit 1000 CftSpec. No :
Excavation in hard rock requiring blasting where blasting prohibited, dispose &
dress within 25 m: Grade V
(British)
LABOUR
Coolie 3,600.00 12.000 300.00 DayDay 1
Bhishti 600.00 2.000 300.00 DayDay 1
Black Smith 1,200.00 2.000 600.00 DayDay 1
Quarry Man 10,200.00 34.000 300.00 DayDay 1
Smithy Coolie 600.00 2.000 300.00 DayDay 1
Chiseller 2,000.00 5.000 400.00 DayDay 1
Total Labour
Sundries (Labour Only): %3
% 79.00 18,746.00
546.00
NWFP CSR 2008 - Approved 25-August-2008
As on Jul-Sep (Qtr-3) 2012Page 38 of 969
-