SYSTEMS TESTING LIFE CYCLE – Test Execution
MANUAL
TEST EXECUTIONTest Planning
Test Preparation
Unit Testing
Integration Testing
System Testing
Acceptance Testing
Start
Test Closure
Test Execution
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
Test Execution Test execution procedures should be well
documented and clearly covered to each member of the test team prior to any scheduled test run.
TEST DESIGN PHASE (already discussed)
TEST EXECUTION PHASE
BUILD VERIFICATION PHASE
TEST CASE/SCRIPT EXECUTION –Log results, and log defects
DEFECT REPORTING
Re-TESTING ,REGRESSION TESTING
TEST EXECUTION STATUS REPORT
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
Build Verification Process
Build Manager adds the release notes
Developers build the complied code into Software
Testers perform BVT using Smoke/Sanity Test Testing team will accept the
build and proceed with Test Execution
Fails with critical defects , test team will not proceed with testing and build is rejected
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
TEST EXECUTION ACTIVITIES Prepare Test Infrastructure
Approving and signing-off of the test cases identified for the specific level by stakeholders
Setup test environment or test lab Test Data , Test Management Tool setup(optional) and
deploying the Build Task allocation Prepare the execution run plan based on priority,
functionality dependency and complexity. Availability of mitigation plan for the revalidated risks need
to be ensured.
TEST BED
TEST EXECUTION ACTIVITIES Actual Execution Process: Execute test cases using test data identified for the
specific test cases Analyze test results (check if ER==AR) Establish the course of action i.e if test pass then log
results with proof of execution and Update Traceability Matrix. If test fails then log defect and update status of defect.
Issue problem report and update test case log Planning the reruns Update the test execution log Update the test planning/execution status form Update the testing status reports
Testing
Static Dynamic
Functional Structural(Functionality of the program)
(Logic of the Program)
Black Box Testing
White Box Testing
Execute Tests step by step
Test step PassedRe-Test
Implement Resolution
Record Results
Record Defect
Resolve Defect
Record Results
Update End User Documentation
(as needed)
Test Execution Process
Change Control Board (as needed)
Test step Failed
Execute the next step of same test case
Can we execute the next step of the testcase?
YES
Execute the next TEST CASE
NOTE: Resolving defect and Implementing the Resolution will be one by the development team
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
Execute Test Cases i.e. Run Tests
TEST LOGS
(Pass/Fail)
VERIFY AND ANALYZE RESULT
TEST PROBLEM REPORT
BUG TRACKING
FOR EACH TEST RUN
Verify the existence of defect Verify that the element under test, the execution
environment and the test case implementation are consistent with the test case design.
Verify and confirm the discrepancy between the ER and AR
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
Analyze the Defect The purpose of the task is to analyze and resolve
variances encountered during test execution.
Each variance is analyzed to determine the cause.
Analysis may indicate the cause of variance is a defect, or that a change request is required.
Analyze the Defect Investigate further and gather as much
information as possible about the symptoms.
Analyze failures by varying conditions , options and settings to gauge the severity of the defect.
Analyze failures by varying conditions, options and settings
Change the conditions under which an error occurred by changing what you do. As an example, if the problem seems related to entering data very quickly, try slowing your rate of input.
Change the options and settings of the program under test. As an example, if the problem seems related to desktop screen-resolution settings, try varying the settings.
Change the software and hardware environment. For example, if the defect seems related to a low-end hardware configuration, try using the lowest configuration specified in the requirements.
Change the data used by the program. As an example, if the defect seems related to strings exceeding a certain number of characters in length, create a second set of test data to check the hypothesis.
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
Incident Summary• Incident Summary Report Summarize the incident. Identify the test items
involved, indicating their version and revision level. Supply references to the appropriate test-procedure specification, test-case specification and test log.
SAMPLE TEST PROBLEM DOCUMENTATION OR INCIDENT REPORT
Reporting Defect For each project , the defect methodology
defined would be different. Testers need to follow that methodology defined
in the Test Plan for that project Defect can be reported either in excel sheet or in
any other defect management tool if incorporated in the project
IEEE Standard for Test Defect Report Defect ID
Defect Description Build Version ID Feature/Module Test Case ID Reproducible Severity Priority Test Environment Status
Tester Name Detected On Reported To Reviewed By Suggested Fix(Optional)
Defect Severity Impact of defect in the software Defined in the Test Plan
SEVERITY TYPESEVERITY TYPE EXPLANATIONEXPLANATION EXAMPLEEXAMPLEBlocker Blocks development and/or testing work On clicking on “submit”
button system gets hangedCritical/Major Crashes, loss of data ,severe memory
leak, major loss of function1. The program runs for an extended time and consumes additional memory over time2. In HMS, Reports function missing
Minor Minor loss of function, or other problem where easy workaround is present
Hot keys not working
Trivial Cosmetic problem like misplelled words or misaligned text
“Enter your Nme”
Enhancement Request for enhancement
BUGS???
Test ExecutionContents
Build Verification Process Test Execution
Verify Analyze
Report Defect Bug Life Cycle
BUG LIFE CYCLESTATUS
UNCONFIRMED NEW ASSIGNED RESOLVED REOPENED VERIFIED CLOSED DEFERED REJECTED
BUG LIFE CYCLEUNCONFIRMED
NEW
ASSIGNED
RESOLVED
REOPEN VERIFIED
CLOSED
Bug confirmed or receives enough votes
Rectified
QA verifies that solution works
Bug is closed
Fixed, Duplicate, Wont Fix, Invalid…
Bug recently been added to database. Not yet Validated
Bug not yet resolved, but assigned to a person
Resolution was deemed incorrect. REJECTED AND DEFERRED
SAMPLE LOG SHEET
Test Types• Smoke• Sanity• Unit• Integration• Usability• System (Functionality)• Performance
Test Types• Adhoc Testing• Negative Testing• Monkey Testing• Regression Testing• Recovery Testing• Alpha Testing• Beta Testing• User Acceptance Test
Test Types• Installation Testing• Configuration Testing• Compatibility Testing• Benefits Realization Testing• Vendor Validation Testing
top related