cLEY GUILD nARDY ARC HIT E C T SPRINCIPALS
James H. Eley, FAIA
W. Taylor Guild, III, AlA, ccsDavid J. Hardy, AlA
Stephen A. Stojcich, AlA
Joseph B. Crain, AlA
Mark E. Lishen, AlA, LEED AP
July 19, 2010
Dr. Barry AmackerJackson County School District12210 Colonel Vickrey Rd.Vancleave, MS 39565
Re: New St. Martin High School, Jackson County Mississippi
Dear Dr. Amacker:
ASSOCIATES
Joseph R. Stevens, Jr., AlA, LEED AP
Eric J. Commarato, AlA
Douglas M. Roberts, AlA, LEED AP
Michael W. SChwirian, AlA
Enclosed please find Three (3) copies of, Construction Change Directive (AlADocument G714) No. Five (5) in the amount of ($24,739.23) decreasing the SiteAIJowance from $80,429.21 to $55,689.98 for the above referenced project.
Please execute all three (3) copies and return all Three (3) copies to our office. Uponexecution One (1) copy will be forwarded to you for your records.
As always, if you have any questions regarding these documents, please do nothesitate to call.
Je-nnifer L. Seym~r, AlAEley Guild Hardy Architects PA
JLSj dab
Enclosures
07-012jG-4
BILOXI OFFICE
1091 Tommy Munro DriveBiloxi, MS 39532228.5942323 P
228.5942223 F
JACKSON OFFICE
418 East Capitol StreetJackson, MS 39201
601354.2572 p
601.355.2006 F
www.eleyguildhardy.com
:=,AlA Document G714'" - 2007
Construction Change Directive
PROJECT: (Name and address)07-0] 2 New St Martin High School Jackson County School DistrictJackson County, Mississippi
TO CONTRACTOR: (Name and address)W. G. Yates & Sons Construction Co.] ]5 Main StreetBiloxi, MS 39530
DIRECTIVE NUMBER: 005
DATE: July ]9,20]0
CONTRACT FOR: General Construction
CONTRACT DATED: Ju]y 08,2008ARCHITECT'S PROJECT NUMBER: 07-0]2
OWNER: ~
ARCHITECT: ~
CONSULTANT: 0CONTRACTOR: ~
FIELD: 0OTHER: 0
You are hereby directed to make the following change(s) in this Contract:(Describe brie;fl)'an)'proposed changes or list an)' attached information in the alternative)
]. Add for labor and materials for seat Modules.
2. Add for labor and materials for wheel chair install.
3. Add for labor and materials for an additional portion for band hall sidewalk.
4. Add for labor and materials for light fixtures.
5. Add for labor and materials for gym stair tread nosing.
$3,624.00, AC#02
$]4,861.68, AD#6]
$598.55, AD#58r
$1,080.00, AD#64
$4,575.00, AD#66
Total for Construction Change Directive No. Five
Beginning Site AllowanceLess Constructive Change Directive No. One (])Less Constructive Change Directive No. Two (2)Less Constructive Change Directive No. Three (3)Less Constructive Change Directive No. Four (4)Less Constructive Change Directive No. Four (5)Remaining Site Allowance
$480,975.00$255,445.00$]30,805.50$5,4] 8.00$8,877.29$24,739.23$55,689.98
$24,739.23
PROPOSED ADJUSTMENTS
1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is:D .Lump Sum decrease of$O.OO
D .Unit Price of$ per
D ·As provided in Section 7.3.3 of AlA Document A201-2007
I:8J • As follows: UNCHANGED
AlA Document G714 ™ - 2007. Copyright © 2001 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AlA"' Document is
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA" Document, or any portion of it, may 1result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlAsoftware at 15:50:40 on 07/19/2010 under Order No.9955542448_1 which expires on 06/11/2011, and is not for resale.User Notes: (2053456707)
2. The Contract Time is proposed to (remain unchanged). The proposed adjustment, ifany, is 0 days.
When signed by the Owner and Architect and received by the Contractor, this documentbecomes effective IMMEDIATELY as a Construction Change ~irective (CCO), and theContractor shall proceed with the change(s) described above.
Contractor signature indicates agreementwith the proposed adjustments in ContractSum and Contract Time set forth in thisCCO.
Eley Guild Hardy Architects PAARCHITECT (Firm name)
1091 Tommy Munro Drive, Biloxi,MississiDDi 3
Jackson County School DistrictOWNER (Firm name)
PO Box 5069, Vancleave, MS 39565
Dr. Barry Amacker, Superintendent(Typed name)
DATE
W. G. Yates & Sons Construction Co.
CONTRACTOR (Firm name)
115 Main Street, Biloxi, MS 39530
ADDRESS
BY (Signature)
Chet Nadolski
(Typed /lame)
DATE
AlA Document G714 ™ _ 2007. Copyright © 2001 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AlA"' Document isprotected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA"' Document, or any portion of it, may 2result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlAsoftware at 15:09:57 on 07/19/2010 under Order No.9955542448_1 which expires on 06/11/2011, and is not for resale.User Notes: (1180135753)
~~~~
~.Jj~.l~ -..,.. ,'.~-< ."
GUILD HARDYARCHITECTS 1''\
ARCHITECTURAL CLARIFICATION
Date: November 7, 2008
1041 Tarmy Munro I)ive
Biloxi, MS 39532
Tel: 228.594.2323
Fax: 228.594.2223
www.gharchilects.net
W. Taylor Guild, III, AlA, CCS
David J. Hardy, AlA
Stephen A. Slojcich. AlA
Joseph B. Crain. AlA
Mark E. lishen, AlA
To:
From:
Project:
~
Todd Bradford, Sr. Project ManagerW.G.Yates & Sons Construction115 Main StreetBiloxi, MS 39530
Jennifer Seymour, Sr. Project ManagerGuild Hardy Architects
07-012 NEW ST. MARTIN HIGH SCHOOLJACKSON COUNTY SCHOOL DISTRICT
Douglas M. Roberts, AlA
Michael W. SChwirian, AlA
CLARIFICATION #02:
Please incorporate the following information to the work:
1. Adjust structural drawings to provide handicap accessible area to the bleachers in thegymnasium as shown on sheet A 1.11 in Bid Alternate 21. See Attached sheet SK-03, SK-05,SK-07, SK-09 SK-010 for information, and see additional dimensions on drawings 1 and 4 onattachment A 1.11 R1.
2. Provide two additional handicap accessible areas to the bleachers in the gymnasium as shownon drawings 2 and 3 on attachment A 1.11 R 1 and on attachments SK-02, SK-04, SK-06,SK-08, and SK-010.
If you have any questions or comments, please do not hesitate to contact me.
07 -012/ Architectural Clarifications
, I
i
HANDICAPSPACE TYP 30'CLR
F~LDING ;EAT T~MATCH BLEACHERCONSTRUCTION
CMU BELOW
FOLDING SEAT TO IIMATCH BLEACHERCONSTRUCTION "
I
III:
I
HANDICAPSPACE TYP 30'CLR
/ PREFIN ALUM GUARD RAIL
t-- '-':, ,,/ '~, '-ft~2"6'CLR IIff=---~;..;.....~ ----1---- : '
,~--C-~:ri::' ,~ I
--- ",--- !' ' I" • ISTE~Sb'i' "1" 1~i; CL~ "1'- FOLDING SEATTO I, -,i(--- -~--' -," , MATCH BLEACHER,
CoL,A CCESSIBLE ~A \, CONSTRUCTION I, ~ HANDICAP I
=..",;=c_"~.;:-~, - ":" ~-_~' " ',~, ~" _ SPACETYP I-ONI~i II'-==- -~~-,- ~~~~~ j I
1 - -- ~ ,r--- FOLDING SEAT TO '
• ACCESSIBLE AREA ;' MATCH BLEACHER~ 11',11 112" CLR CONSTRUCTION;.. 'J.<---- ". - -----I '-Y-
STEPS ~ [I I ;' "I r -- HANDICAP~ - -, -I - I -l{ -,(SPACE TVP
:--=-'~ 1. ' I ' '#-.*---, I,' ,I • ~-- - LL,;~~_''j..---i-7~ -,-r--_-~ I '//'-.:::t.j'-;"
, ,', - ,- ,~2', 6' CLR~ ! / '--CMU WALL BELOW, _J /SEE STRUCT /
PREFIN ALUM ,---./GAURDRAIL
6',0" 6'- '-~
('1'\ HANDICAP A<:,gES§!B..!:.E_ARE.6.:GYMAU' R,.I 1/8" = 1'-0"'.- ../
FOLD DOWN SEAT TOMATCH BLEACHERCONSTRUCTION,
I
eo.!
~~=== -~'-~ ~-~, { ~
CMU BELOW, SEE STRUCTPREFIN ALUM -- -7GUARDRAIL
,- HANDICAP.-' SPACE TYP!
--7 Ii /I.: ,:";' ;I I !I
,I , :::~-~
rr ~j c'"I-, ' ,~ I"" --- .- -
I' L..J '_ I ,-=: -' -::..--~
*-" '-:6~' 9_314"C:R __ ..•. -~-?!'1, STEPS
, ACCESSIBLE AREA : r~~ :-"-=-- -=---=:-- -~ -~ -~-~;.
,e';9'3WCLR ,ro, 3."23/1'-" "~-'-X---0'
)' c. " ACCESSIBLEAREA: '1 ! STEPS'
J---r- --'--j, .,-- -'-]. ,,-r.1 .I',~-~=~,""
'J' h~ ~'¥C]:~:-:~~:-~~:-~l'~,1'.-~~~=-~~~-~HANDICAP -_/ ! I, PRE FIN ALUMSPACE TYP I GUARD RAILFOLD DOWN SEAT TO ,_.JMATCH BLEACHERCONSTRUCTION
(2 ~:~ HAN'pIC~~ACCE??.!.~.h.~ARE~- GY~A1,11 ~1 1/8" = 1',0"'---.-'
6' , 0" 6' , 0' 6' , 0' 5' , G'
~'--j~,,,,,,,~'-t-' '-•- -- ~-~ FOLD OOWN SEAT TO.~-~~~::I!!~'~-IT~~ BELOW~~I +-1 k-J I 1~l \,-L ,l,.. ', .. , '
.}~ '~': 4~ ~~U T~CM'::: _ j ,- , \. HANDICAP SPACE TYP ,Ix>
ACCESSIBLE AREA
b k ACCESSIBLE AREA
" , 1T·4',CMUTOCMU 3',0', - ",-, Co.: .------ . .,-- 'n~_'_ ",--,--).L-'7iL
I' " I - j STEPS
! I ~~~.~~~~,I ' ~ ~1~~G',O' i, 5',6'! / - ~,.(--- -\(---"TJ.' -- ;of
, \ \
I HANDICAP SPACE TYP -- \ ~-, - FOLD DOWN SEAT TOMATCH BLEACHERCONSTRUCTION
I
! I
I '
II,,I
I I
I I
I i
III
!
i '
, I
I :
T/F=-1 ' -4"
~+4' -0"T/F=-1 '-4"
~...
- - ~-+~=;~~~E~ ~f~I I I D H
E}RACE FFAME i ~. (SEE 2 4· 3/S~05 ~ 8! I I •
TIF= ~ 1 I -4" . ~ 1"/,-+----+----+---t-
.•.•• D----===---_::..._~ - ~ - ' .
~ Structural Design Group220 Gmol Orcle Rood. Svao 106
Noshvmo, Tennessee 37228
p. 615.255.5537f. 615.255.1486
SDG Prnjed No. 2007·241.01
PROJECT TTTl.E:
NEW ST. MARTIN HIGHSCHOOL-BID AlT 21
BLEACHER FOUNDATION PLAN
PROJECT NO: IDRA'NN BY:07-012 C.F..C><£D BV:
C.H.
DA~v 6, 2008 ISCAi.,J' NOTED
~E NUIoIBER:
SK-02
1041 TOMMY MUNRO DR
BILOXI. MS 39532
TEL: 2 2 8.594.2323
FAX: 2 2 8.594.2223
www.gbarcbitects.net
)
'-"A~
(//I'!/ /
/ /
/ /1/./1I / ~II~I I~11m I .
I~15:1
I~I ~IS1010...I
I"-I.... I 1m
:LO1«-11 IN1~\f)1 IlL
5:1= I ,''.,= I,0 I f _~" I__L I ,I- I ',. II ~ L _ ~J. Y'__ ...J
11\ HF2.5
1~~+I' -0"II-V
L I~"_~M~ Y'l1**5@4_~iJ
I HF3. 5 .--L.. PCW1aI =
I()I1 -
I~1 1\
I~II-I1m
ITIIII-I'
! 1./'-<II "
." LL _
IIII1
() I~ I() I
I1
I I1__ ..J
r;~1 -J I ~I~I
: _+_+ : 1\f) 1=- - - I 1
I - - - 1I mr--'"'f"1
~I
-$+41 -0" =
TIF= - 1 I -4" "'f" -
____________ 1__ ~
'II ,J I
T/F=-I'-4"
_.:...- I •
I ------------.:.- I ~- ; - -q- ~ A6ES-J-6 L-().!! J _ --: r---'-! ! i HSS4x14x-!4' ,
F~ME I lL. ± (TYP.' 44.3/SQ05 m. II I ~ 8 II GMU'
== ~ 1 ' -4" . ! Y'l1#5@4.o"-+-----!----t-----!--, , .
PRa.Ecnm.e:
SK-03
1041 TOMMY MUNRO DRey-
e.H. B I LOX I , M S 3 9 5 3 2E;
ASNOTEO TEL:228.594.2323
FAX:228.594.2223
www.gharehiteets.net
DRAWN BY.
e.F.
D.\TE;
NOV 6, 2008
MGE NtN8ER;
PROJECT NO:
07-012~REVISION=~-NO:~.
BLEACHER FOUNDATION PLANSHEET TITl.E:
NEW ST. MARTIN HIGHSCHOOL-BID AlT 21
~ Structural Design Group220 G<eo.O«:1a Rood. Sua.. '06
Noshvin•• T.~e 37228p. 615.255.5537,. 615.255.1486
SDG Project No. 2007.241.01
~.Y'-.//\1/
/\-
,/OT__
~ ~Ic.e--6· SLA8~ 1112
$+'" -0·Q: V---~
,r---;'I' '~o ' j
- !-----1--. __.1.
-----4- - ,.--=-- -
1><1" ~12XL"_-A1t112><1"1112><1'"•1112x1"~ SF'I .!!:.04~J2xI-1•••=-t.n¥ I~1"12><~"_
1112><'"1112><141112><14II.'
'. -.•. - --- - - -- -- or-_"l2)<I" C(,.~ -t--r 1112t1"-
-') - -,- - -f-TBF--- -
__.I'tI2>it .•-f------1~r'--- 't:.,112x I"
•••..1112><1.• ~ .~-•--- ,
.---
1112kl"I
--- -It..-I"1112><1-4',' "".••...••..1_1't!.~_14__~-LLIJ---+ I;-=;;--_.I'I-'2><.L"- .-- --- ._-~I-I-'4-:- CD:~
..•..~.~~1·--4· ..,~.~-- GONT.
CD:,- I1..I.:J •
--"'J 2><I"
Ir 1112x)_"__I2!!.~~ __ 1--.-:1:____ ._"I!2>< 14 ,--- --'-- ----- -- - -- ~---- .
caIr. 0 IGONT'RF"0GONT.-I--j'RF"GONT. I,
II -
--1112kl"
'111~1112x~~_~~.~~-_tl~'.:4 __
;-.- -;;.-l14 •I~I~~r~ _ti.!2><I.:4 ___. ----.-----II .-.14
- GONT .1'112><1-4
•1'112><1-4.-GONT •
1"1 1"_~. •111 14 GONT.1112><1-41112x1.•-I-!
_11121<1" Lrl;2).+4 1112><1-4_~
,
-2li2><1" .6-11~1" I-_HJ2><I.L~1,'--- -fl-;/)(I-4- -,-' ---_. "1;2,,1'" --..lCiMr. GONT.~.
~f-. -jGONT.
---~~ .. If--------.---- ---_ -!':I!~I~_--1---_':!.!2xJ~ ___..- L __
-f·--_."12><1"..
- ._--" -- I'-GONT.
~. GONT.0-
.--.-"'M' i~.
~~-~~ .•t ~ ill!~~
-nJHI2><I"~ IIT
r-'i~~.Ll~---~~ ~~--:---i'~-~~~~.~----.-i~--i~
.~~- GONT~ C) ~, ,
TT~T;rI
:r,:roC 7';I!--;;-21-!:p :III >,;rI :r;rl>,;rI ,--11121<1.•
0,'---- 1112><.L"__.1112x 1_"__-1I- -
---- ---_ J"!!2xI."_--
.-.-- - ----~. -----J-
GONT.I~.I
GONT.I-1,
- ..- I -'"....----.- ~~ . --.--- --..- ._,.0-J---. ~~~ ..
I_.1112><1'"
IJ:ll~_I"__-_.----I--.,
_1112><_1.•__--.- - -- ---.---. ,GONT.
GONT. GONT.I,- C-._... , ,..j
_ 1'I1:2kI4 "'2xI~111~L4 __---! I1:!!.2x14_
" •..-- ----=-coNT.BF
--.-:BF
-_.----- - --I
4" 0,~.
11-:J-4GONT.!><I"
1112x 1-4!'--- HI 2><I"II.
tI
I "'-II
,I,,I'-LOAn, •• n",..,.., I I, II,I
~ Structural Design Group220 Grear Grela Rood, Su~. 106
Nashville. Tennesseo 37228
p. 615.255.5537f. 615.255.1486
SDG p",~ No. 2007·241.01
PROJECT TTT1..E:
NEW ST. MARTIN HIGHSCHOOL-BID AlT 21SHEET Tin.£:
BLEACHER FRAMING PLAN
PROJECTNO: DRAWNBY:07-012 C.F.
REV1SK)NNO: CHECKEDBY;C.H.
DATE: ;
NOV 6, 2008 AS NOTEDP.AGE N\JUBER:
SK-04
104 1 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 228.594.2323
FAX: 228.594.2223
www .gh arch ileets. Del
---
/f\~= """""m~ ~n"
~ ~/ge01 -~-I \ -
~6" !!UB
~"~-"'"~ ...,...,.
rf""..•.
6"f, -"'-+- - -- -_I_____-"-~~ •...~ .•.....l--+- -f-~-4
/'41:2><1-4/'41:2)(1-4II/'41:2><1-4/'41:2><1-4, __
_~I:2><I~~" I;-
.....::....:...- .. - .-= .-•--L- -,
_.---.- f-.--t. T i' -••.--ti~l~-
--~~- ---IGOHT. ~ - /'41:2><1-41't1:2><1-4oJ- ,
__ 0 __ ,
. -.-
- .~.1
/'41.:2><1-4..J 0-0
0- -
CD:GOHT.
__ oj-- - - -- ~--- _11!:2><J~ __ - -I ; GOHT. L1'11;l>C1-4 I/'41:2><1-4/'41:2><1-4
- - !
/'41~-'--4_j
- --- - •· 1---- - -.--- .-.-/'412)(1-4
1't1:2><1-4I 1't1:2><1-4GOHT.~-r-. - .----
-t:~"',;j)(1--4 I
111;l>C1-4 ILf- /'41:2><1-4 ~------,--.GOHT. ~ __
----I-1
1'11~!£j
--i---- L---- - --- ._-.
,GOHT.--Ir-
f!~.-
____ ~.l11
IIIIIJ/'41:2><1-4 JiI~----ji.,--f.1- ----~ ,~~GOHT. -t-;:~
;:~I
:;:-:;---~ ;:;:--- - ----------·_ /'4.l:2><J±.., L _-------------
I GOHT. f-----I..- ---..-- - --- ---
t"l:2>cl-4 I r--_.- .__ ._-------GOHT. t-- - -
--I I'tl :2>cJ£t
- -- -.- --------
,'----------
·GOHT •
I •••1't1:2>c1-4
~
I- - l-I I ,
~ Structural Design Group
220 G<eat Grd. Rood. Sua. 106Nashville. Tennessee 37228
p. 615.255.5537f. 615.255.1486
SDG Projoct No. 2007.241.01
PROJECT nT1..£:
NEW ST. MARTIN HIGHSCHOOL-BID ALT 21SHEET TTT1.£:
BLEACHER FRAMING PLAN
PROJECT NO: DRA'NNBY;07~12 C.F.
REVIS10NNO; CHECKEDBY:C.H.
DATE: SCAlE;NOV 6, 2008 AS NOTED
PAGE NUIoI8ER:
SK-05
1041 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 228.594.2323
FAX: 2 2 8.594.2223
www.gharehileels.net
HF4.0roINIlL .,5: _. _'-- _1_
I ~~~Jt~~-~-~=~IJr_JJ~~--
~~~ET Dook . I II "POW8~ -t&CJ:j~i- - - ~ il _L_~ -t J.~-=..::;:-_ -,,~. __ (;_)I. __ ~ 11 __ 1_1- fr r' : I I"' i I
I ' \,." .1-;--;----1,( I! ! "1-" ~ 1-/ I II ! I I
I I I I ; 1i II ''I ~ I . I
! I ! I I /-1- --I
F,~,..L -...;-- - -40- ~ -T/F=i 1'-=~I-i-- - ,--
- -0I I •--;-----;----V'"Ii', ~ ..
B ACE FR MES~E 2 4 /SCf05! L
I I I(PACE;;
•
(-'is' .. f.. ;+ '- ',.., 7>i<> s.;, 2' -2k" -......-... - I 4.- I - - - '-- •IQ ''<' ",,,_' . --- . - .l.L•..o- . -. ~ - - - .IN ., A"'-f TIF _I ;-:'4"- - - JjF __ BF - - _.,f.IlL '-C --,5: S.) -$+41 -0"~ 1________ I__________ 1
~ Structural DesIgn Group220 Great C;",le Rood, Su;Ie 106
Noshv;lIe. Tennessee 37228
p. 615.255.5537f. 615.255.1486
SOO P'PjoC No. 2007-241.01
PROJECT Tn1..e:
NEW ST. MARTIN HIGHSCHOOL-BID ALT 21SHEETTm.E;
BLEACHER FOUNDATION PLAN
PROJECTHe> DRAWNBY:07-012 C.F.
REVtSK>NNO: CHECKEDBY;C.H.
DATE: SCAlE:NOV 6, 2008 AS NOTED
PAGE NUMBER:
SK-06
1041 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 228.594.2323
FAX: 2 2 8.594.2223
www.gharehiteels.net
,Ilor,or-,S,U10....
,I,IiI),cO,~,II,,
y-{F3.5
,,I
0"__ y-{F2.~.J
www.gbarehiteels.nel
1041 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 2 2 8.594.2323
FAX: 228.594.2223
--.-.-.-.-.--- ..--- ,8 II c.MLT ~/#5@40" r__ ,
I,II,,,II
,--.----
If =
,()I -'INI, \I
IlL"-..II-,I,L __
SK-07
PROJECT NO: ORAVM~07.{J12 C.F.
R CHECKED BY;
C.H."" SCAlE:
NOV 6. 2008 AS NOTED
PROJECT TTTlE:
BLEACHER FOUNDATION PLANSHEET TTTlE:
NEW ST. MARTIN HIGHSCHOOL-BID AlT 21
y-{F4.0
210 G...m Ord. Rood, Su~. 106No.IMII., Tenn• .,ee 37228
p. 615.255.5537f. 615.255.1486
SDG Project No. 2007·241.01
~ Structural Design Group
I , I \ 1
t1::tH-f+n:~"i+l-/-.L ~ ~~-r- ...L~~~
,
, III- - ->< ><->< ~
-J,L- c.<1N I •
BF
"-c;GINT •
I.-
I'BFc;.G>NT •
1'112><14
1'112><1"" 1'112><14
-.1-. =±=- 77'J/iJT'----. -1 f-I --..- -"- . -
rIi.-
f-
-I- ..J _____1--- --.. -i
1'112><14HI2><I""_1______1'112><1"" I--- ---j -----_.--l71FlT---_._. --- -77RT .. --I---~- ."~ -~--....• ------..- ..-..
!, ,...
-r----t I--------!
I I1112><14
1'112><14 1112><1""- ,-- _.----:'::- .. 7.r'RT-.----+.. -lZNT~
. ----
_ .. •...
L_.__. ..L_ I
__ !-n _~,_._-I- I I
--I,1 '-4' H12><14 l 1'-4'HI2><14· I 1 '_.04-1'112><14 ~-- I 1
I~'-----:Of! .. ___
--"I'~--,!"_: . -
··-r.rl/J"f---·--- -•___ • _"u' ••__,____ . "._n_
1•.••.-- }~.-~-- ~-.--;'-- ..i -
-....
~i-1-~,L- __,
1'112><14 --j .1'112><14
-- ~ j1"41::2><14
,'...----
III-~ -~--;;;.--_._--.. --- -~
no
~~-1t~-1~t_J§.~~
1'112><14 t~ ~I~~1'112><14 ~_~
I~-~---~~I~-~
1'112><14~J ~_...t~I1--- -~;
~ 11:-:c7~- );- .--):.- r7'1>rT - - it-. -"
,,' •...
=L-1-W12>< 14
-
.~~4 -J-
-
-1'I12?<l4 '"-'2><t",,HI2)(1""_1 _
;cT4-,-.-~~~: 1"412><141 n~
.rx~HI2><14 I HI
~12><1~1'112><141'112><14
....---!1. ---,"", ..-
\......
1'I1:2>h"'--.~ I 1'112><14\......
1'I'2><14BF'--
f-111:zx',••-I--I-,SF \......f--1'I12><14
BI,
1'112><14 H12><14
I
--~~ I--. -+7rN'r"• • - •__ n __-.
'1=u....
1112><14.rr
...,,";;",~ib--~-,u....~ ,I.~
II'V'\ • _OJ. m:I1112><14
CD-;I
--- -. ---- -.'
1-----f~_
.11J.'4_ '~2><I<4;~111:.bc~41112><14l ~_.----
I~.
I-
- - -r - - ---- .---
- --I-=. '"==r:= - - - ..__~4 __"'"--- - --= -.... ~..-=I
_ ... r .. :-, --- '--- -- -'- -----b..• W-pj 1112><14 •l HI2><14~'
!-~-&\'1H :Z;CT~
- '-~n~>d ~
I .~ •I
~2><1"" ~
--!-"-"-
__ HI~I""H12><14HI2><141"412><14
-
-p-
o-- -~ .•...- -,1.-u •• _ • ___ 0 __
I_____J~
L- ~TANDAAD -.J5I£AR SPL.I GC
1'0><10----~
~6' 5l.AB
-A.. "~$+""'-0'~ /
~
\
~-~ \ /
SN1 GUT GON"I"Ro'GTI c;t.I JOr N"
5fE 9/5901
~ Structural Design Group
220 Groot O,d. Rood, Sua. 106Nashville. Tennessee 37228
p. 615.255.5537I. 615.255.1486
SDG P",,"ct No. 2007.241.01
PROJECT TTTlE:
NEW ST. MARTIN HIGHSCHOOL-BID Al T 21SHEET TIT\.E:
BLEACHER FRAMING PLAN
PROJECTNO: DRAWNBY:07-012 C.F.
REVISIONNO; CHECKEDBY;C.H.
DATE: SCAlE;
NOV 6. 2008 AS NOTEDPAGE NUMBER:
SK-08
1041 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 2 2 8.594.2323
FAX: 228.594.2223
www.gharehiteels.net
1 1I1
111111111,
5'1 ,,,•••
I,
IIIII
::t:~ -L tti+f+.i:tttt+-J.-f:t:ttHw:r:tt+ ...L ~
-T -,I
I- 1"112><14 -><
~- - -l-
I.-
I,SF <-<JI'< . vvn •. I~
,1"11:2><14 1'11.:2><14 I-- ---j t---1----~.-_._-------t;-----!'"non' , ---.- -- -------I-
1__
--_.J --.
-- --~ ~~-1"11.:2><14 _J ________1"11.:2><14- --l7Jf:I.------------- C'ZJFlT'- !- -- --- ---- -
--
I-1_- _ --- I
Il._-1"11:2><14 -=~)- -- ...
--;,..-;- ._--- -cmT":-' ------- --,--'. r-------- -.._- --'f--
- ...- - -L__
- --j1 1.- - G-
----j f..-
1'- .••.•.1"11:2><14 ,1'-4' 1'11:2><14 -
~-rrNr-- --.. - -- --_._-f -1Z1NT. ,-
- -._. -------- -- --- .----
j
--- - -. I _'_ -_ .. -- I 1"11:2><14 -
- --1"11:2><14 L-- t--------: .-~ -.-;;-- ~I;·
-- ;..-~~~ --
-", ~81II>
-~
'---H---~,~
I~~1'11:2><14 !~~1-t~IJ~
1"11:2)(14 ~.~ - t~~.~-~1I- 1---j
~.,1:-
.1;- ,,;--l2JNT. I: ----I -_ -1 _I- - ----
~'4-'-.-
'~14 &-~I.:2><I~' 1"I1:2><1~1
1"11:2><14"1:2><141_."1:2><14
~I +--:iF- --- --- r..•.-~:- - 1"I1:2><1~HI:2><14'H~><14-----
1'C12it+-1 --- ,SF1"11.:2><14 "-
"1:2><14I, 1'11:2><14 f>-
1'112><14 -i :..I ~-- - ,. --1~----i -- }~
--1LLI
1'11:2><14 r---- --j-
,.. k- --I1'11:2><14
-m; r- CD-;l- i
1-------!BF-:
-I ' .-~~-
h.- - 1-1- -, "1:2><14I"12><14 L "1.:2><14"1:2><14
-1-:-=---- - -------"- -- =--,~-- -ffilT-'- f - f- -
-~ ---~= I-
'"
I'I~~.-. I .- •I
"1:2><1~--IWI:t,cdw :--r-4 .".."1~14 _
"1:2><14"12><14"12><14 "1:2><14~ __ J ____ ...,-
-- -- - - - J--
r- T": ~, L____
----,--
--q ......A<10
-A~~
A~
$+04' -0'
j~ 6' SI..A5-
$+4' -0'~'" \
-
~ •...= "•.•,..,,,,"".",,..-~I--.
- 1-
~ ~/!5e01
l
SK-09
AIIIIII Structural Design Group
220 G'OOIC;m. Rood, Suit. 106Nashville, Tennessee 37228
p. 615.255.5537
f. 615.255.1~86SDG Project No. 2007-2~1.01
PROJECT TTIU;
NEW ST. MARTIN HIGHSCHOOL-BID AlT 21SHEETTTIU;
BLEACHER FRAMING PLAN
PROJECT N(>
07-012REVt$1OH NO:
DATE:
NOV 6, 2008
_E NUUSER:
DRAWN B'I';
C.F.CHECKED BY,
C.H.SCAlE:
AS NOTED
1041 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 2 2 8.594.2323
FAX: 2 2 8.594.2223
www.gharchileels.ne I
10'-~'
10'-11'
+6'-011'
~."I
+-4'-0·
+2'-e'~T/GHJ
0.00' ~
j ----~J~---1 ~I
EG. I e' I EG.
SEGTION AT SL..EAc.HERS-BID ALT 21AT HANDICAP SEATIN6
~ Structural Design Group
220 Grca1 Orclo Rood, Suile 106Noshvillc. Tennes.seo 37228
p. 615.255.5537
f. 615.255.1486SDG Project No. 2007·241.01
PROJECT TITLE;
NEW ST. MARTIN HIGHSCHOOL-BID ALT 21SHEET Tm.E:
SECTIONS AND DETAILS SHEET S905
PROJECTNO: DRAWNBY:07-012 e.F.
REVISION NO: CHECKED BY.
e.H.DAre: :
NOY 8, 2008 AS NOTEDPAGE NUt.4BER:
SK-010
1041 TOMMY MUNRO DR
BILOXI, MS 39532
TEL: 2 2 8.594.2323
FAX: 2 2 8.594.2223
www.gharehileels.net
•.. ",
, I l 'j.
~ ?~;.~ ,t I.' P
r ,,,\! t, •.,\(i/ F
f <. 'I ~, ",~:f D~Vt
8110;- 'v::. '·'9S3./.(1... ;,1.;•• /.373t'.?E :,"-'4 /2L'')
JACKSON OffiCE
~.dS: C 'C)'tVI Sllb?').'\d-: ~'( -I, r\"~c '~<,.;(1
! I( J1. lfit
DIRECTIVE #61:
April 21, 2010
Quint Moran
Eley Guild Hardy Architects
07-012
NEW ST. MARTIN HIGH SCHOOL
JACKSON COUNTY SCHOOL DISTRICT
W,G.Yates & Sons Construction
115 Main Street - Biloxi, MS 39530
( d( j'l .••r I:! rlar'·',)
If you have any questions or comments, please do not hesitate to contact me.
07-012/ Architectural Directives
1- Provide 12" high cast aluminum numbers, as shown on the attached sketch AD 61.1,
which is a revision to REV 68 of Addendum #10. Numbers to match signage letters shown.
Verify exact location of numbers with Architect and mount to pre cast concrete permanufacturers' standards.
2- Provide GENESIS OPAL VERTICAL WHEELCHAIR PLATFORM LIFT by Garaventa
Wheelchair Lifts, in Gym, at location shown on attached AD 61.2. Type to be Standard
Size, Straight-Through Configuration, Floor Mount, Model GVL-OP-60 with folding ramp.
Use clear safety glass for gate and sidewall panels. Provide 120VAC on a dedicated 20
Amp circuit for a Leadscrew Drive System.
',,<.\.- ;)!. f: \" r,,'~ .
From:
Quint MoranConstruction Administrator
Eley Guild Hardy Architects
Proj ect:
Date:
ARCHITECTURAL DIRECTIVE
Please provide an additive or deductive cost estimate withill seven (7) days for review to
incorporate the following changes and or additions to the work:
To:
Sincerely,
(J~Af{-~
RFVISI()N~ co "'001 !
('II In\l\t\'.\~~R()'"
BllO'1 \1:> '"t,l:
PRECASTCONC PANEL.
SEE STRUCT I
12" HIGH CASTALUM LETTERS:MOUNT TO CONCPER MFGRSTANDARDS
PRECAST CONCPANEL - WHITESMOOTH FINISHON ALLEXPOSEDFACES.CONCEAL ALLCONNECTIONSAS POSSIBLE
CONCFOOTING SEE STRUCT
CAST STONECAP #1SEE 11/A002FOR DETAILS
112"
COMPRESSIBLEFILLER
CONCRETESIDEWALKSEE CIVIL
ALUM LETTERS BEYOND
- PRECAST CONC PANEL
f
4"8"-/,/ /~-!,//>--l
12' HIGH CAS IALUM LETTERS:~,:OUNT TO CONCPER IAFGR5T ANDARDS:VERIFY EXACTLOCAT!O~ WITHARCHITECT
/3' , BUILDING SIGNAGE ELEVATION'REV 68"174;' = 1'-0" --' .•.. ./
PRECASTCONC PANELSEE STRUCT
12" HIGH CAS ALUMLETTERS: MOUNTTO CONC PERMFGR STANDARDS
N{_~ ~_
~2"', BUILDING SIGNAGE ELEVATION ..TO REPLACE 3 A002\' ---~ --- ~-~ --- ----- - -'R....E_V_~ 1/4" = 1'-0"
.--
/
\\.
12- HIGH CAST ALU:,: LETTERS:MOUNT TO CO~C PER :"iFGRSTANDARDS: VERIFY EXACTLOCATION WITH ARCH'TECT
...f..
CONC FOOTING-SEE STRUCT
112" COMPRESSIBLEFILLER
CONC SIDEWALKSEE CIVIL
./
i /~.-~~
- .1- >"\ \0,-~
-......., ..
CONC SIDWALK- SEE CIVIL/
~\
/' SOD - SEE CIVIL ,./
\"
-'-' -' -'-'-
! HE. 2T..(t'"
~h-- i
i
,[, 111~-----;') ~
[Provide wheelchairlif: at this location
BlEACHERS
_____ ~c •• }~
. STEPs
)8'·0·
BlEACHERS
•
·
.:..c•
t.
..•I
~:s~~-~-:;--~-'~-,~-'-~'--------:jIMPACT
RES:$T .-HTGlAZING
STEPS
2!)'·,1 H."
~ ,= I
IIII
I j ,
I~u'
~~" i
" '
,- cY"\ [ \. PREF'IN AlU'-' 1\..4f A ,I-OAA'ORAIt
~' I "...,, I
e..-~ . - . 7: II.::.J ~------ -- - .. '" ~ II
~ . ~' i,r~
~~-~-~-~-~-~-t~-~-~-~~~-~~~-~-~-~-'-~-~-~-~-~-~;'-~-1~~F--\ .a:. ~ I I
• ! I ~ II~ ~ . I'~-•.••Er,N AlUM ,•... ~.y I ., "ANOfW" \r-r'l '
. j
IN~;,<=t=FRAil -- .'.
~.-- FJ_ ......: -=-J
CJ
T_7· .•.'"0.W~'"
AD 61.2
; 1 / ("',1\" 1('
'" '\' r;1 ~I~)I() •)r I\I':i 10>',. :'v1S 39[ ';:;.it :.9A 2~..~::< ,
"2F :~~.,2?h
f ,1':.9ui1d '!\ ,con
JACI<SON OFfiCE
.j?E t- o:..IS~ Ciq. \01 <)lrt-.; !j,\cb-,q il' ',;9?(,
()o., 3t:,~1~;'l~' f;,( i )c..c,:\ .JrJr J(-, F
l ( ., ~,)~\)~.~,d\.. r\t~ ROLli ,'.
:.•~ ,h. { V/ S\ !'h','
i )'1
.J'.)5t;'-"~.!L I.... fDIf'., :•. ! I '11',.
I",
DIRECTIVE #64:
May 21, 2010
07-012
NEW ST. MARTIN HIGH SCHOOL
JACKSON COUNTY SCHOOL DISTRICT
W.G.Yates & Sons Construction
J 15 Main Street - Biloxi, MS 39530
Quint Moran
Eley Guild Hardy Architects
, •• ' ~I t
.I,. Y 0' (, I ~iIII
f Jf: ,../} , t' 'v
07-012/ Architectural Directives
1- Delete the two (2) angled INDS fixtures, in each of the four (4) feature areas, in Corridors
Al00l, Al071, A200J & A2046. Total of eight (8) fixtures. See attached 64.1. Two INDS
fixtures adjacent to the two INDS fixtures that are to be deleted should be wired to the
emergency circuit.
2- Delete the three (3) POl fixtures over the stairs at Student Lobby Al034.
Replace with DL2 fixtures at same locations. See attached 64.2
Quint MoranConstruction Administrator
Eley Guild Hardy Architects
If you have any questions or comments, please do not hesitate to contact me.
Project:
Please provide an additive or deductive cost estimate within seven (7) days for review to
incorporate the following changes and or additions to the work:
From:
Date:
ARCHITECTURAL DIRECTIVE
To:
)~/~ \
Note: A 1001 shown, but typical at A 1071, A2001 & A2046.Delete total of (8) INDS fixtures.
~iI
I
/AD 64.1
i·' hr.u',I'll ... 1:\ \' .••• 'IvMay 25, 2010
DIRECTIVE #66:
Jennifer L. SeymourEley Guild Hardy Architects
07-012
NEW ST. MARTIN HIGH SCHOOL
JACKSON COUNTY SCHOOL DISTRICT
W.G.Yates & Sons Construction
115 Main Street - Biloxi, MS 39530
Date:
JA(tC.SO';i 0'" IC£
LJ r- - 'fY~' elf'
f.'" -'n i.1' .'{ 1
"y
")\';
07-012/ Architectural Directives
Project:
\'.• guild 1', ~ (,Or
.~\' !.. r)8 'x ~, -./:91." ~
I?P c,L4L.?2 ..-
,.
ARCHITECTURAL DIRECTIVE
. ,
Please provide an additive or deductive cost estimate within seven (7) days for review toincorporate the following changes and or additions to the work:
If you have any questions or comments, please do not hesitate to contact me.
In the Gymansium area, provide a one (1) inch strip of paint at the nosing edge of each concrete
stair tread in color PT12 Brittlebrush SW6684. Create a template to provide the strip in order toachieve consistent strips in width and in length. The strip of paint shall occur across the entire
length of each concrete stair tread.
From:
Jelmifer L. Seymour
Sr. Project Manager
Eley Guild Hardy Architects
To:
top related