CBUG-AU_05_2013

CodeBook at the Conferences

27/08/2013

We are users!!!

CBUG.AU is a multi-disciplinary volunteer group of “Codebookers”.

Advocating and working towards identifying best practice workflows for Codebook.

Early Days

Professional Community

Collective Technical Resource

Knowledge Base - Support Resource

User / Developer Liaison

We would love your feedback on what you think the group can offer the codebook

professional!!!

_Committee Members

LinkedIn Group : “Codebook User Group”

Some recent updates:

Latest Build: 30th July 2013 – Final Build compatible with AutoCAD2012

Some upcoming release information:_This build implements Revit 2014. (Revit 2012 and 2013 can continue to be used)_When using new project wizard, if the library folder exists and contains a library mdb, the original file will be renamed with a version suffix rather than replaced_Equipment legends will now output 3d thumbnails when they exist_Delete Homeless rooms, will now remove all floors and departments that contain no rooms_Have added an option to the Load ribbon bar to organise rooms and floors according to the Revit levels_The Revit elements that bound a room are now collected during a sync and displayed in the Room Editor_When updating designed equip list, the current Revit design option will be displayed in dialog for information_The C Sheet equipment schedule now writes entire schedule to a single shared param, that can be included as a label of the view sheet title family_File paths of pictures in flex reports were not being defined correctly with \\, broken a few builds back when changing how network paths were manipulated_Equipment usage reports now include alternative cad names._This will be the final build that provides Acad 2012 support

Where do you find this information?In the CIS-Note-003 on BOX

(Along with all the other Codebook Information Sheets)

Other Interesting information:

CBUG committee to test CodeBook on STRATUS!_Revit + CodeBook in the cloud

_Access from any PC, any where at any time!

http://stratus.net.nz/

_Codebook News

2 x Presentations (approx. 30mins each)

Revit C-sheets – a BIM Unicorn

The A, B, C & D of Space Planning Technologies

Questions (approx. 10mins)

Things to note:

- Limited time.

- We ask that questions are ideally relevant to the topic and content of the presentation.

We ask that broader scope questions or specific technical issues are addressed to your local host, who will ensure they reach the rest of the group

and can be appropriately actioned.

Alternatively questions that arise out meeting maybe submitted to: cbug.au@gmail.com

_Tonight’s Format

CodeBook CSheets with RevitNo Longer a BIM Unicorn

Danielle Currie and Andrew HarpSilver Thomas Hanley, Perth

CSHEETS

COORDINATED

VALIDATED

Launched - 1993

v8.2 CAD

v9 and

v10 CAD

Sept 2012

CSheets

Implemented

v9 RVT

Revit - 2009 (?)

2011 (?)

Jan 2013

CSheets to create views

v10 RVT

Feb – Jun 2013

CSheets

v10 RVT

Mar 2013

EQ List as parameters

GO LIVE . . .

CSheets

v11 RVT

GONE LIVE . . .

Questions?

CodeBook CSheets with RevitNo Longer a BIM Unicorn

Danielle Currie and Andrew HarpSilver Thomas Hanley, Perth

Quick live demo!

CodeBook C-sheets with Revit, no longer a BIM Unicorn

That BIM definition… again…

Building information modelling (BIM) is the process of generating and managing building data during the life cycle of the built structure.

It uses three-dimensional, real-time, dynamic building modelling software to increase productivity in building design, construction and occupation.

The process produces the building information model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, quantitiesand properties of building components and spaces.

Many forms of analysis can then be performed on this digital prototype before it is actually physically built in its environment at great cost.

Alternative BIM definition• Building Information Management is an

alternative description of BIM, focussed on the management of information and process.

• Once the design principles and project aspirations are identified, they should drive how the BIM is developed, it’s content and final use - the project team need to be aware of this!

• Information should develop integrally within the design and the whole team understand the needs and deliverables at each project milestone.

• What information do our clients require and when?• Generic arrangements

• Specialist areas

• Schedules for Tender / BofQ

• Internal QA checks

• Brief vs. Design

• Client management

• Identification

• Design criteria

• Fabric & finishes

• Schedule of Areas• Functional brief• Equipment schedule

Briefing Rooms

FF&EValidation

Space Planning Technology

...is a general term used to describe software packages that:

o enable the briefing of facilitieso integrate briefing data with BIM’so generate reportso analysis of brief vs. designo some functionality beyond designo or the ability to export data downstream

Typical inputs + outputs

SPT in BIM

Revit does many things...Modelling...Documentation...Basis for visualisation...

Object oriented

No object = no information

Alan Johnston Drawing a Shadow

Alan Johnston used white walls as a blank sheet of paper on which to base his drawing. He divided Galleries 1, 2 and 3 up into unequal frames, drawing directly with a pencil onto the walls in strips covering an area of about 2 square cm. Navigating the corners, recesses and architraves; the space which is left is equally as important as the space that he fills in; constantly measuring the shape in space, he makes sculpture out of architecture.

Brief development

Brief

Design

ReviewClient input

Design

Review

Areas of Focus

DATA CAPTURE_Spaces_Location_Functional_Finishes_Furniture_Equipment_Services_Door

Object oriented

DATA CAPTURE_Economy strength_BIM Capability_BIM Management Plans_Standards (BIM)_SPT Capability

Revit + BIM Link + RDB Link …

Revit + BIM Link + RDB Link …

Both are great tools, but have limitations

o enable the briefing of facilitieso integrate briefing data with BIM’so generate reportso analysis of brief vs. designo some functionality beyond designo or the ability to export data downstream

SPT main players

A – Affinity (Trelligence)B – BuildingOneC – CodeBookD – dRofus

Noteworthy…

_Project Size_International Use_Years of Operation_BIM Interoperability_Organizational Size

Common ground

_Each do many similar things_Approx 75% overlap_Each has a unique point of difference_Each has a bi-directional link to BIM_Focus on rooms and their content_Drive brief information into BIM_Analyse the design against the brief

Overview Process (dRofus)

Programming Design and

construction

- Check differences between

program and BIM (IFC)

- Cost control different

solutions

- Design step 2

As-built Program As-built model / building

”Best practice”

Evaluation

Continous

update of

requirements

and BIM.

- Function programming

Step 3

- Equipment programming

Step 2

- Function programming

Step 2

- Equipment programming

Step 1

- Function programming

Step 1

- Construction

- FM

- Design step 3

- Design step 1

© Nosyko AS

Process with owner

stakeholders and

consultants

Org.developement

- Additional programming

- Equipment purchase

The iterative process of client requirement management

Standardized Requirements model Exchange and present requirements in design toolExchange and compare design to requirementsDeviations trigger one of the following actions:> Update design> Update requirements> Present delta

At handover Requirement=Design=As Built

All data exchange using open buildingSMART standards

Detailed Workflow - SD

Detailed Workflow - DD

Detailed Workflow - CD

Typical / traditional deliverables

buildingSMART

Standard Pack of Deliverables

> 1:200 Generic Room Keyplan

> 1:50 Generic Room Layout Sheets (relevant to dept)

> Generic Room Data Sheets (relevant to dept)

> 1:100 GA setout plans

> 1:50 FF&E plans (key rooms for user review)

> 1:50 RLS drawings (key room for user review)

> Schedule of Accommodation (department)

> Room Data Sheets (key rooms for review in meeting)

> RDS excel extract (update in meeting, rather than markup)

> FF&E Schedule

Revit considerations

Data Author –

BIM or SPT?

Map it out and

make sure the

team know

Shared or System

System parameters – built in, for specific uses

Shared parameters – user defined, do anything!

Categories

You may also choose

to use categories such

as Communication

Devices, Data Devices,

Fire Alarm... available

within the Building

Design Suite

Unique selling point

Affinity – planning module

BuildingOne – FM solution

CodeBook – works with multiple

design tools

dRofus – accessibility

Roles

Deliverables & Programme

Issuing Process

INTEGRAL PART OF DESIGN PROCESS

_UPDATING / SYNCHRONISATION

_QA CHECKING

_PRODUCTION OF INFORMATION

_PDF’ing

_UPLOADING

Implementation challenges

_BRIEF CAPTURE

_CONCEPTUAL PLANNING

_EASE OF USE

_AREA ANALYSIS

_BIM INTEGRATION

_INFORMATION MANAGEMENT

_EQUIPMENT VALIDATION

_ADDITIONAL SERVICES / FEES

_EXPORT TO COBie / FM

_ACCESS FROM MOBILE DEVICES

Advice?

_Get training, or embed a specialist in your team

_Shoot the content re-designers, re-namer, that over model, over

complicate....

_Know your project delivery requirements, define the deliverables, their

format etc...

_define roles and define the Data Author

_Design what is important

_Technology doesn’t stop bad work

Questions?