Contracting Co. Ltd.

Electro-Mechanical & Solar PV Services

Company Profile

We have started our business in 2007 as establishment in Jeddah then we became a

company, Protech Co. is now considered as one of the leading electromechanical

contractors in the field of mechanical, electrical, air Conditioning, and firefighting.

Can start from the idea! , to provide a turnkey jobs including all type of supply, installation,

replacement, startup, testing and commissioning and we offer the correct engineering

study to guarantee the optimum performance that meet the requirements of our clients

and we had done many of successful projects in different kingdom cities for local and

international customers.

Vehicles Qty.

12

Item Qty.

Portable Office ( 5 × 3 ) & ( 4 × 3 )

2

Material Container 20 " 2

Portable Toilet 3 × 2 1

Vehicles & Tools

Item Qty.

Tools box

10

Welding Machine

200A & 400A

2

CO2 Welding Machine

4

Argon Welding Machine

AC 230V – 6.6KVA

1

Air Compressor 8 Bar 1

Coring tool DD200

HILTI up to 10’’

2

H.D.P.E Welding

Machine up to 10’’

1

Item Qty.

Air Flow Meter -

Fluke 922

2

P.P.R. Heater up to

50mm

2

Manual Cladding

Machine

1

Pipe Grooving

Machine up to 12

’’

3

Electrical

Generator Supply

7.5 K.W

8

Copper Welding

Machine

3

Pipe Cutting +

threading Machine

RIDGIT up to 6’’

2

List of tools

Item Qty.

Air Blower 500W 2

Water Pressure Pump

Manual 10 Bar

2

Electrical water

pressure pump

1

Digital Water

Balancing Device 1

Hydraulic and manual

Jack Lift 2.5 TON

6

Electrical Winch 1

Hydraulic cable lugs

Punch up to 630mm

1

Item Qty.

Infrared Thermometer

1

Digital Vernier

Caliper Starrett

model

1

Digital Tachometers

DT-6233C

2

Digital Insulation

Tester - Megger

1

Wire tagging

Machine up to

6mm

1

Micro Meter

(Starret model no.

436.1XRL-1)

1

Earth Tester

1

List of tools

Item Qty.

Digital Laser Meter 50m

3

EMT Conduit bender (1/2’’ –1’’)

1

PV200 Solar test kit

1

Survey Machine 1

Drills/Hilti up to 12mm & 400 to 16mm

32

Charging Drill 21

TSI HM685

Hydronic

Manometer

Water Air Flow

Meter

2

Item Qty.

Grinders 4’’ to 14’’

10

Cable Drum 50 Meter

20

Aluminum Scaffolding

2

Light Meter

40,000Fc –

400,000Lux)

1

Digital Clamp

Meter

(2000A/1000V)

2

Hydraulic

Cable Cutter

up to 630mm

4

Safety Socket

panel

(220V/380 -

100Amp)

2

List of tools

Item Qty.

Aluminum & Steel Ladder

5

Safety belt 35

Steel Scaffolding

(vertical + horizontal

pipes Stands,

Flooring jacks)

800

Fire extinguisher

liquid & Powder

(3.50 KG)

15

Flood light (AC 220V/1000W)

3

Item Qty.

Super speed

Ventilator 16"

1500W speed

2900r/min

3

Pedestal Fan 2

Copper Pipe vacum Pump (V220)

2

Chain Block 8

List of tools

▪ Assembling of production lines.

▪ Assembling of machinery.

▪ Process cooling.

▪ Ventilation systems.

▪ Dust collection & fume extraction.

▪ Compressed air systems.

▪ Steam generators systems.

▪ Gas & fuel pipe lines.

▪ Air washers and humidifiers.

▪ All types of piping networks.

▪ Steel structures works.

Industrial Services

▪ Air Conditioning Systems [ Chillers, Package units, Split units]

▪ Direct / In direct evaporative cooling.

▪ Cooling towers.

▪ Firefighting systems.

▪ Cold stores.

▪ Water treatment.

▪ Air & Water balancing.

▪ Plumbing systems.

Mechanical Services

▪ Medium voltage / Low voltage.

▪ Cables laying and termination.

▪ Solar PV system.

▪ Solar water heater.

▪ Lighting systems.

▪ Fire alarm system.

▪ BMS (Building management systems).

▪ CCTV systems.

▪ IP data & telephone systems.

Electrical Services

Al Hamra Hotel – Jeddah ( 2019-2020 )

Main contractor : Dallah Trading

Project amount : SAR. 3,000,000

Status : Under construction

Scope of work :

Replacement of old HVAC system including Electrical works.

Medina Courts – Medina ( 2019 )

Main contractor : Dallah Trading

Project amount : SAR. 2,485,000

Status : Handed over

Scope of work : MEP works

Replacement of old HVAC system including Electrical works.

STC Warehouses – Jeddah & Madinah ( 2019 )

Main contractor : Suliman Swayeh Group

Project amount : SAR. 2,000,000

Status : Handed over

Consultant : Zuhair Fayez

Scope of work : Fire fighting, Fire alarm and FM200

SAR Stations – Al Mashaer ( 2019 )

Main contractor : Dallah Trading

Project amount : SAR. 500,000

Status : Under construction

Scope of work : HVAC

HVAC works for elevator rooms .

Projects List

Saudi Can Co. Ltd. Factory, Jeddah ( 2018 )

Project amount : SAR. 8,000,000

Status : Handed over

Consultant : Abdulaziz A. Bakri Architects

Scope of work : MEP Works

Supply and installation of HVAC system for Saudi Can factory with electrical works .

Ravago Middle East Company – Jubail ( 2017 )

Project amount : SAR. 17,000,000

Status : Handed over

Consultant : Radicon

Scope of work : Civil and MEP works

Civil Construction works, Chilled Water, Compressed Air, Dust and Fume, Water & Air Treatment works.

Fine Tool Factory – Jeddah ( 2016 )

Project amount : SAR. 7,600,000

Status : Handed over

Consultant : Dr. Khaled Sherbini – Engineering Consultants

Scope of work : Civil and MEP works

Civil Construction works, Chilled Water, Compressed Air, Dust and Fume, Water & Air Treatment works.

Emirate of Madinah Province – Madinah ( 2016 )

Main contractor : Dallah Trading

Project amount : SAR. 2,000,000

Status : Handed over

Scope of work : Replacement Chilled Water HVAC

Replacement Chilled Water HVAC Sys. (Electromechanical Works).

Projects List

Al-Hanaa Sweet Factory – Jeddah ( 2016 )

Project amount : SAR. 13,000,000

Status : Under construction

Consultant: Dr. Khaled Sherbini – Engineering Consultants

Scope of work : MEP works

HVAC, Ventilation, BMS, Fire Fighting & Plumbing Works.

PETROMIN Gasoline Stations – Jeddah ( 2016 )

Year : 2016

Project amount : SAR. 6,600,000

Status : Handed over

Scope of work : Civil & MEP works

New Construction of Gasoline Civil + MEP Works.

Makarem Ajyad Makkah Hotel – Makkah ( 2015 )

Main contractor : Dallah Trading

Project amount : SAR. 2,900,000

Status : Handed over

Consultant : Engineering & Research International (ERI)

Scope of work : Replacement

Replacement Chilled Water HVAC Sys. (Civil & Electromechanical) Works.

Arabian Chemical Co. Factory – Jeddah ( 2015 )

Project amount : SAR. 3,350,000

Status : Handed over

Consultant : Enoia consultants Scope of work : Civil and MEP works

Assembling, installation of production lines & Utilities.

Projects List

Tabuk Pharmaceuticals - Tabuk ( 2015 )

Main contractor : Al Salem Johnson Controls (York)

Project amount : SR.1,400,000

Status : Handed over

Scope of work : MEP works

HVAC system, Electrical & Control works.

SCECO - Tabuk-Rabigh - Medina-Jeddah ( 2014 )

Main contractor : Al Salem Johnson Controls (York)

Project amount : SAR. 3,800,000

Status : Handed over

Type o Work : Replacement

Replacement of HVAC System.

Mataf Extension for Haram – Makkah ( 2014 )

Main contractor : Al Salem Johnson Controls (York)

Project amount : SAR. 3,300,000

Status : Handed over

Type o Work : MEP

HVAC & Electrical Works.

Aramco Warehouse – Rabigh ( 2013 )

Main contractor : Al Salem Johnson Controls (York)

Project amount : SAR. 1,000,000

Status : Handed over

Type o Work : MEP

HVAC, Electrical Works and control.

Projects List

Juffali PolyOne Master Batches Factory – Jeddah (2013)

Project amount : SAR. 2,600,000

Status : Handed over

Scope of work : MEP works

HVAC , Compress Air , fumes & dust collection , Fire Fighting sprinkler , Fire Alarm system Electrical & Control works.

Tahweel Integrated Factory – Rabigh ( 2013 )

Project amount : SAR. 1,300,000

Status : Handed over

Scope of work : MEP works

Ventilation, Fire Fighting, Fire Alarm, Electrical & Control works.

Modern Food Industries- Jeddah ( 2012 )

Project amount : SAR. 7,130,000

Status : Handed over

Scope of work : MEP & BMS

Chilled water HVAC works, Electrical & BMS works.

Modern Food Industries- Jeddah ( 2010-201)

Project amount : SAR. 12,200,000

Status : Handed over

Scope of work : MEP & BMS

Chilled water HVAC works, Electrical & BMS works

Projects List

Completion Certificates

Completion Certificates

Government Certificates

top related