Company profile
&
References
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 1
DESCRIPTION
MONTMONTAZA PLC is a worldwide contracting organization for buildings, infrastructures and industrial plants
providing design, construction and maintenance services for all categories of works.
COMPANY STRUCTURE
MONTMONTAZA PLC is a Parent Company with major equity ownership in all subsidiary companies. List of
Subsidiary Companies in Croatia and abroad is shown in MONTMONTAZA GROUP STRUCTURE.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 2
Table of Contents
CORPORATION PROFILE ............................................................................................................................................ 3
INTRODUCTION ...................................................................................................................................................... 3
C O M P A N Y I N F O R M A T I O N ..................................................................................................................... 4
MONTMONTAZA GROUP STRUCTURE .................................................................................................................. 5
CORPORATION ACTIVITIES .................................................................................................................................... 6
COMPANY QUALITY SYSTEM ................................................................................................................................. 7
HEALTH, SAFETY AND ENVIRONMENT PROTECTION .......................................................................................... 10
R E F E R E N C E S ..................................................................................................................................................... 11
OIL AND GAS TERMINALS .................................................................................................................................... 11
GAS FACILITIES ..................................................................................................................................................... 17
OIL REFINERIES ..................................................................................................................................................... 19
OIL, GAS AND OTHER STORAGES ........................................................................................................................ 20
INSTRUMENTATION ‐ POWER ROOMS ‐ VENTILATION – CONDITIONING ...................................................... 22
ELECTROFILTERS AND GAS COOLERS ............................................................................................................ 23
RECYCLING PLANTS .............................................................................................................................................. 24
THERMAL POWER PLANTS ................................................................................................................................... 25
PETROCHEMICAL PLANTS .................................................................................................................................... 26
FOOD PROCESSING PLANTS AND PHARMACY PLANTS ...................................................................................... 27
HYDROENGINEERING ........................................................................................................................................... 28
WIND PLANTS ...................................................................................................................................................... 29
MAINTENANCE ..................................................................................................................................................... 30
S U M M A R Y ...................................................................................................................................................... 31
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 3
CORPORATION PROFILE INTRODUCTION
MONTMONTAZA Group, led by Montmontaza PLC as the Parent Company, covers a group of companies with
1,000 employees working mainly as a world‐wide capital investment contractor for construction of industrial
plants, building and infrastructures.
The strength of MONTMONTAZA Group lies in:
its operating as the leader in the above mentioned three distinct, promising markets, both international
and domestic, reducing thereby the overall business risk;
its capabilities to introduce solutions to meet its customers present and future needs;
its organization, where a significant part of construction is subcontracted between group members;
its policy to ensure and implement strict adherence to the wide range of internal procedures and control
systems in execution of the projects;
its world‐wide reputation and
its financial strength and considerable resources.
MONTMONTAZA’s strategy is to be the leader in its chosen fields of business, and thereby to realise on a long‐
term basis a return on its invested capital substantially higher than its cost of capital. In this way it aims to create
value and provide the shareholders with a return on their investment commensurate with the risk involved, and
so also to secure the continuity and independence of the corporation.
In selecting the business activities through which the above objective is to be achieved, the focus is almost
entirely on those markets and projects on which the Group’s existing core competencies, i.e. its commercial and
technical expertise, and track records, can be brought to bear. However, in general, the Group companies position
themselves in accordance with the prevailing market conditions and focus on the top end of the markets where
new technology and innovation are required, in order to limit competition.
Almost all projects pursued by the Group companies are of a nature that requires specific performance criteria
with respect to quality, performance, timely execution, etc. established by its customers, including adherence to
international standards. Only technical experience and expertise together with strict adherence to internal
procedures, such as those required to obtain ISO 9000 accreditation can limit these risks.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 4
MONTMONTAZA’s corporate structural and organisational concept is based on project principle orientation of
business activities.
Essential activities linked to the realization of the projects are organized primarily and particularly with the
purpose to fulfill the specific requirements of the projects. As result, a comprehensive range of procedures and
control systems to enable the Project Managers to effectively execute, monitor and control the Project have been
developed. Control Systems appropriate to each project are used to plan the tasks to be performed, allocate
resources, monitor the work undertaken and the costs incurred, provide the necessary information to assist
decision making and enable timely corrective action to be taken. The Quality Assurance, Health Safety and
Environment Project Management Systems are implemented on each project.
C O M P A N Y I N F O R M A T I O N General Information
Full Name: MONTMONTAZA PLCIncorporated in: Zagreb, Croatia Date of Foundation / Incorporation: 12.12.1950 / 23.03.1992 Registration No.: Fi‐11706/2/23.07.1992Registered by: ECONOMIC COURT, Zagreb Type of Company: Public Limited Company (PLC) Legal Form: Joint Stock Company Name changes that have occurred up to date:
1950 JUGOMONTAZA, State owned Company1974 JUVENT, Parastaral Company 1977 MONTING‐MONTMONTAZA, Parastaral Company1992 MONTMONTAZA, Public Limited Company Corporate Head Office:
Office Address: Montmontaza PLCRakitnica 2 10040 Zagreb, Croatia
Postal Address P. O. Box 260, 10040 Zagreb, Croatia Telephone +385‐1‐6168‐709 / 6168‐710 Facsimile +385‐1‐6168‐713E‐mail info@montmontaza.hrWeb www.montmontaza.hr
Supervisory Board
DARIJO LISICAR Chairman MIRELA LISICAR Deputy Chairman JOHN ANTHONY ROHAN Board Member Director
ANDRIJA LISICAR
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 5
MONTMONTAZA GROUP STRUCTURE
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 6
CORPORATION ACTIVITIES
Industrial Plants and Facilities Construction
Petrochemical and Chemical Plants
Oil and Gas Processing Plants
Oil and Gas Transportation and Storage Facilities
Power Generating Plants
Desalinization Plants
Ecological Plants and Facilities
Iron and Steel, Non‐ferrous and Mining Plants
Food Processing Plants
Cold Storages, Mills and Silos
Infrastructure and Public Utilities
Civil Engineering
Ferry Quays
Marinas
Ports
Sewer Systems and Facilities
Under Water Pipelines
Water Supply Facilities
Roads and Roads Infrastructure
Shipbuilding
Shipbuilding and ship alterations
Building Construction
Apartment Buildings
High Rise Buildings
Hotel Building and Facilities
Industrial Buildings
Residential Buildings
Energy Distribution
BOT Concessions for Gas System Construction and Gas Distribution
Trading in Electric Energy
Scope of Montmontaza Group Services:
Feasibility Studies
Design and Engineering
Tender Document Preparation
Procurement, Expediting and Testing Services
Construction, Erection and Installation
Commissioning and Start‐Up Activities
Management and Operating Services
Maintenance and Reconstruction
Contracting Modalities:
EPC (Engineering, Procurement, Construction)
EPCM (Engineering, Procurement, Construction Management)
Turnkey
Negotiated Contracts, etc.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 7
COMPANY QUALITY SYSTEM
Quality Policy
Our Quality Policy emphasizes the significance of our customer’s choice and expresses our commitment to
continuously improve the quality and performance of our products and services.
Quality Organization
The organization and scope of responsibility are firmly established.
Quality Department is an independent unit on the highest level of
organization. Quality Manager reports directly to the Management
and has necessary authority and responsibility to implement, control
and improve quality system.
Quality Planning
Quality Plans are prepared and maintained for every project or
contract in order to ensure that specified quality practices,
resources and sequence of activities are met. Quality Plans are
consistent with all other parts of MONTMONTAZA Quality System.
Quality Assurance System
MONTMONTAZA maintains the documented quality assurance system according to the International Standard ISO
9001:2000. It covers all activities during manufacturing, installation and servicing. The three tiers of the
documented quality system are:
1. Quality Management Manual ‐ describes the quality policy, which in the practice of our Company
complies with all requirements of ISO 9001:2008 and allocates responsibilities and authorization within
the Company.
2. Operating Procedures ‐ the procedures which are implemented to fulfill requirements of the Quality
Management Manual.
3. Work Instructions and Quality Plans ‐ are issued only in cases where lack of clear instructions would
adversely affect the quality of product / services. Quality Plans are prepared when required and provide
details of the controls, methods, responsibilities and interfaces for specific contracts. All Quality Plans
must be approved by Quality Assurance Manager.
Certification of Quality System
MONTMONTAZA Quality System has been certified by TÜV CERT, Certification Body of TÜV Management Services
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 8
GmbH since 1996 (Certificate Registration No. 12 100 6718).
Presently the company has been certified according to the following norms too: ISO 14001:2004, OHSAS
18001:2007, ISO/TS 29001 and ISO 3834‐2.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 9
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 10
HEALTH, SAFETY AND ENVIRONMENT PROTECTION
Health and safety of MONTMONTAZA’s personnel, health and safety of client’s employees and their property as
well as environment protection are a matter of corporate utmost care. The company safety procedures define
safety system, which ensures and implements the above‐mentioned premises.
The premise that all accidents are preventable is realistic. Every work that may lead to injury or disease, can and
will be controlled. We are committed to sending all our employees’ home at the end of their shift as physically
sound as when they arrived.
Safety and security of the property is prerequisite of proper and smooth execution of the works.
Senior line management shall exert sustained leadership in establishing goals and demanding accountability for
safety and health performance. All line supervisors must be fully committed to and constantly involved in the
injury and illness prevention programs.
Each employee is expected to arrive at work in a proper mental and physical condition to perform the assigned
tasks and comply with the established safety programs and procedures. Proper worker attitude, knowledge,
attention and action are very essential to the prevention of injury and disease. Carelessness or disregard of the
established safety and health standards and practices will not be tolerated.
MONTMONTAZA has established its own safety assurance standards in order to eliminate or minimize risks during
the contract execution.
For each particular contract separate Safety Plan will be prepared containing:
Croatian pertinent safety law and regulations
Client’s safety regulations
Contract execution in accordance with the law including provincial, territorial and/or municipal
legislation, laws, by‐laws and/or regulations
MONTMONTAZA’s Safety Assurance System
People are our most important asset. The pain and suffering felt by the affected employees, due to illness or
injury sustained on or off the job, is also felt by the family and company in terms of decreased quality of life or lost
productivity and profits. It therefore becomes paramount for us to prevent, to the best of our collective abilities,
all injures and illnesses at work and at home.
The protection of the environment and the efficient use of its resources have become a key consideration in
project design, planning and execution. Environment is legacy of former generation and environment protection is
pledge to the next generation, to which MONTMONTAZA is fully committed.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 11
R E F E R E N C E S
OIL AND GAS TERMINALS
LNP Terminal, Sv.Kriz Zacretje, 2009 Railway Wagon Unloading Plant, Novorosijssk, Grushovaja,
Russia, 1995
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 12
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
Crodux – Plin
d.o.o.,
Zagreb,
Croatia
Sv. Križ
Začretje,
Croatia
LNP Terminal
Storage Tanks,
loading/unloading
arms, fire fighting
system with water
tank, auxiliary
buildings
EPC – Turnkey Contract
3 contracts
2010
Crodux – Plin
d.o.o.,
Zagreb,
Croatia
Sv. Križ
Začretje,
Croatia
LNP Terminal
Storage Tanks 11 x
500 m3, 2 x 100
m3,
loading/unloading
arms, fire fighting
system with water
tank 1.000 m3,
auxiliary buildings
EPC – Turnkey Contract
4 contracts
2009
JANAF,
Zagreb,
Croatia
Omišalj,
Croatia
Crude Oil Terminal Storage Tanks:
Crude Oil 680.000
m3 Oil products
60.000 m3 Two
Tanker Jetties each
equipped with 4 x
16" Marine load. /
unloading arms for
crude oil and prods
and 2 x 12" Marine
(cont.) loading/unloading arm
serving for ballast water and
service water. Total capacity
2.000.000 t/year of oil and
products. ‐ Complete
construction including painting
and insulation
1997
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 13
PIPELINES
Main gas pipeline Benkovac – Dugopolje 20 ˝ , 75 bar; 2011. – 2012.
Main gas pipeline Podrebar – Josipdol, 20 ˝ , 75 bar; 2008. – 2009.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 14
Main gas pipeline Sv. Ivan Žabno – Bjelovar, 12˝, 50 bar
Bay Krka, Main gas pipeline Benkovac – Dugopolje 20 ˝ , 75 bar;
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 15
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
Douglas Terminal Ghent,
Belgium
building of
pipelines
ND300x1.500,00m
for charging and
discharging
5x50.000m3 oil
tanks
2017
Sea Tank Terminal Ghent,
Belgium
building of the
stainless steel
pipelines ND200
from the tanks to
the unloading
arms
2017
Plinacro, Zagreb,
Croatia
Benkovac‐
Dugopolje
High pressure gas
pipeline
20"/75 bar
96 km
Procurement/Construction –
Turnkey Contract, 2013
EVN‐Croatia
plin d.o.o.
Zadar,
Hrvatska
VT/ST/NT
distribution gas
pipeline
Construction
works, piping
layout, welding,
material supply
Turnkey Contract
2012
Plinacro, Zagreb,
Croatia
Zadar ‐
Biograd
High pressure gas
pipeline
12˝/75 bar –
36,6km, and 8˝/75
bar – 12,7km
Procurement/Construction –
Turnkey Contract, 2010/2011
Plinacro, Zagreb,
Croatia
Sv. Ivan
Žabno ‐
Bjelovar
High pressure gas
pipeline
12˝ / 50 bar
24,5 km
Procurement/Construction –
Turnkey Contract, 2009
Plinacro, Zagreb,
Croatia
Josipdol‐
Podrebar
High pressure gas
pipeline
20"/75 bar
30,5 km
Procurement/Construction –
Turnkey Contract, 2008
Plinacro, Zagreb,
Croatia
Bolman –
Beli Manastir
High pressure gas
pipeline
8˝/50 bar 8,8
km
Procurement/Construction –
Turnkey Contract, 2006/2007
Plinacro, Zagreb,
Croatia
Lucko‐Ivanja
Reka
High pressure gas
pipeline
28"/75 bar and
20"/50
22,3 km
Procurement/Construction ‐
Turnkey Contract
2007
Plinacro, Zagreb,
Croatia
Pula‐Karlovac High pressure gas
pipeline
20"/75
14,12 km
Procurement/Construction ‐
Turnkey Contract, 2006
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 16
Plinacro, Zagreb,
Croatia
Kutina‐ Sl.
Brod
High pressure gas
pipeline
24"/75
107,4 km
Procurement/Construction ‐
Turnkey Contract, 2005
Plinacro, Zagreb,
Croatia
Zagreb East ‐
Kutina
High pressure gas
pipeline
24"/75
67,4 km
Procurement/Construction ‐
Turnkey Contract, 2005
City of Zagreb,
Croatia
Zagreb Water supply 8" ‐ 40"
10 km
Procurement/Construction ‐
Turnkey Contract, 2004
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 17
GAS FACILITIES
Molve, 2012 & 2013
Odorisation station Zadar, 2011.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 18
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
INA d.d.,
Zagreb Molve CPS Molve III
Construction works on
CO2 compressing
dehydration facility CPS
Molve III on Molve
exploatation field
Turnkey Contract
2012
EVN‐
Croatia
plin d.o.o.
Zadar,
Hrvatska
VT/ST/NT
distribution gas
pipeline
Digging / construction
works, piping layout,
pipe welding, material
suppy for area of Zadar
city, Hrvatska
Turnkey Contract
2012
EVN‐
Croatia
plin d.o.o.
Zadar,
Hrvatska
Odorisation station
Zadar
Odorisation station for
max. gas capacity of
10.000 Nm3/h
PC contract for construction of the
station along with connecting
pipelines
2011
Plinacro
d.o.o.,
Zagreb,
Hrvatska
Nova
Gradiška,
Croatia
MRS Nova Gradiska MRS capacity 25.000
m3/h with conn.
pipeline DN 200/75 bar
MRS capacity 2 x 4.000
m3/h
EPC – Turnkey Contract
2007
INA d.d.
Zagreb,
Croatia
Gola,
Croatia
Gola Duboka Central gas station
123.500.000 m3/yr of
natural gas Condensate
42500 m3/yr
Procurement/Construction ‐ Turnkey
Contract
2000
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 19
OIL REFINERIES
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
INA d.d.,
Zagreb,
Croatia
Refinery
Sisak
FCC Naphta
Hydrodesulphurization
Unit
FCC Naphta
Hydrodesulphurization
Unit
• Equipment installation
works ‐ 350 tons (columns,
pumps, exchangers etc.) •
Furnace assembly ‐ 200
tons • Piping installation
works ‐ 300 tons •
Equipment and piping
insulation works • Painting
works
2008
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 20
OIL, GAS AND OTHER STORAGES
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
STT, Bordeaux Bordeaux,
France
Storage building storage tank,
3.000m3 using Bygging
system
2018 ‐ in progress
Vopak Eurotank Antwerpen,
Belguim
Tanks upgrade,
prefabrication
and mounting
heating coils and
mounting sprinkler system
on the two tanks,
5.000m3
2018 ‐ in progress
Port Dunkerque Dunkerque,
France
Tank Storages two tanks for the additive
powder 10.000m3 in the
port of Dunkerque
2017
Fertighent Fertighent,
Belgium
Storage Tank tank for bitumen,
10.000m3
2017
Terminal Sisak, Vertical tanks with steel tanks and floating roof, 3 x 80.000 m3 , 2012.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 21
Cemminerals Cemminerals,
Belgium
building cement
mill and cement
silos
diameter 7 and 10m,
height 25/35m, 10pcs
2017
K700 Antwerpen,
Belguim
Tanks upgrades
vacuum testing
of the tank
bottoms,
mounting and welding
vacuum rings,hydrotesting
tanks 10.000 ‐50.000 m3,
30pcs
2017
STT Ghent Piping Ghent,
Belguim
Tank upgrades,
pre‐fabrication
and mounting of
the stainless
steel heating
coils
for 10 tanks, 15.000m3
including the main
pipelines between the
tanks
2017
Jadranski naftovod
d.d., Zagreb, Hrvatska
Sisak, Croatia Terminal Sisak
3 storages for
raw oil: A‐2509,
A‐2510, A‐2511
Vertical steel storages
with floating roof
3 X 80.000 m3
Engineering/procurement of
oil storages and
interconnection piping
2012
MAN‐FIA NC‐174 Libya Lasmo Storage
Field
2x16.900 m3 2x1.270 m3
1x670 m3 1x270 m3
EPC Contract
2004
TRANSNJEFT Russia Novorossijsk
Russia
Storage No. 59 50.000 m3 Storage construction
2003
HEP, Zagreb, Croatia Zagreb,
Croatia
TE‐TO Power
station
Storage 5.000 m3 EPC ‐ Turnkey Contract,
2002
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 22
INSTRUMENTATION ‐ POWER ROOMS ‐ VENTILATION – CONDITIONING
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
HEP, Zagreb
Croatia
Zagreb TE‐TO Zagreb
Unit K
€ 6,000,000.‐
Combined
Cogeneration Cycle
Power Plant
Total: 200 MWe
Installation of generator unit,
switchgears, HV/ LV distribution
system, lightning and grounding,
lighting, instrumentation works,
testing and start‐up Extention (4
bays)and reconstruction (17 bays)
of 110 kV substation, 2000 ‐ 2003
HKZP Zagreb,
Croatia
Zagreb Airport Ventilation, air
conditioning, heating
Complete works, 2003
Busi, Italy Zagreb,
Croatia
Business center Firealarm, air
conditioning, heating
etc.
Complete installations works.
2002
INA d.d. Zagreb,
Croatia
Gola Croatia Gola Duboka Central gas station
123.500.000 m3/yr of
natural gas
Condensate 42500
m3/yr
Installation of HV/ LV distribution
system lightning and grounding,
lighting instrumentation works,
installation of control system,
testing and start‐up , 2000
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 23
ELECTROFILTERS AND GAS COOLERS
CLIENT PROJECT SCOPE OF WORKS
Location Title Technical Data Year of completion
Oswald Metzen
GmbH Bitburg
Germany
LAFARGE Zement
Wosslngen GmbH
Walzbachtai
Germany
LAFARGE
Zement
Assembly of
gas cooler
gas cooler erection
works cca. 112
tons
Mechanical erection of gas cooler
Works completed: 2008
Galler GmbH
Kulmbach,
Germany
Otto‐'Renn.Str.5
Neu‐Ulm,
Germany
Neubau
Central
storage
C.Gotz ‐ Neu‐
Ulm
Pelet racking
storage 37 x 24 x
135 m, Alfa‐heavy
steel‐construction
cca 1.200 tons
Mechanical erection of storage
construction, inch preassembling
of frames, wall and roof
supporting structure, guiding
profiles and measuring protocols.
Works completed in 2003.
Olajterv
contract. &
Engineering Co.
Ltd., Hungary
Sisak Refinery,
Croatia
FCC Gasoline
Desulphurizat
ion Unit Sisak
Refinery
piping and piping
supports, cca. 250
tons
Equipment erection incl. Pumps,
compressors and heater erection,
cca 550 t.
Works completed 2008.
Oswald Metzen
GmbH Bitburg
Germany
LAFARGE Zement
Wfissinoen GmbH
Welzbachtal
Germany
LAFARGE
Zement
elektrio filter
erection works cca.
293 tons
Mechanical erection works of
electric filter. Worke completed;
03/2000.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 24
RECYCLING PLANTS
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
City of Zadar Zadar, Croatia MBT ‐ Mechanical
Biological Treatment
60.000 t/year of
comunal waste
EPC ‐ Turnkey Contract acquired
and soon under construction,
2000.
MBT Recyclying Plant to
be built in Zadar,
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 25
THERMAL POWER PLANTS
CLIENT PROJECT SCOPE OF WORK
Main Contractor Location Title Technical Data Year of completion
Hrvatska elektroprivreda (HEP)
Zagreb, Croatia
Joint venture Parsons Power
Group, U.S.A. and Montmontaza
PLC, Zagreb
Zagreb, Croatia TE‐TO Zagreb Combined Cogeneration
Cycle Power Plant,
200 MWe / 150 MWt
42% of total EPC
contract
Work completed:
2003
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 26
PETROCHEMICAL PLANTS
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
PARACHEM CHEMICALS L.P., Montreal, Quebec
Montreal, Quebec, Canada
Refinery
Evaluation of expenses for
relocation and reassembly of
refinery facility, including:
equipment, piping,
construction works and
instrumentation works.
2012
DINA‐Petrokemija Omišalj, Croatia
Omišalj, Croatia
VCM plant Rehabilitation of VCM plant Mechanical erection works;underway since , 2007
BASIC Engineering Inc., Houston, Texas, USA
Santa Fe Springs, California, USA
CENCO REFINERY Relocation of Existing Plant
Plant Configuration Comprising: • Vacuum Unit • Platformer NO3 Unit an Stabilizer Units • Gasoline, LSR, JET Merox Units • Naphta Hydrotreater Un • Middle Distillate Hydrotreater Unit • Amine Treater Unit • Sulphur Plant/ Tailgas Unit • FCC Hydrotreater Unit • FCC/FCC Gas Concentr.Unit
Preliminary work for dismantling nd relocation of the facility, i.e.: Engineering services to produce "As ‐ Is" documentation for the existing CENCO Refinery, including: • laser scan services • 3D modeling of plant and checking through available As‐Built Documentation • drafting and issue complete "As‐Is" Documentation, 2008
CRNL, Canada Fort
McMurray,
Alberta,
Canada
Oil Sands
Project, CAD
Heating and Cooling Plant,
Plant 64
Erection of Pipelines,
Piperacks, Cooling Tower,
Electrical, Instrumentation,
2008
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 27
FOOD PROCESSING PLANTS AND PHARMACY PLANTS
Teva group Pliva Croatia, Zagreb,
Savski Marof, Croatia
Pharmacy plant unit – VNS
Plant Configuration Fabrication and installation
of a wide variety of process
piping systems (made of
carbon steel, stainless
steel, brass, Polypropylene
and
Polytetrafluoroethylene);
with the use of fittings and
valves; welding, connecting
and assembling to the
specified equipment in
accordance with technical
documentation.
˝Turnkey˝
2014.
Teva group Pliva Croatia, Zagreb
Savski Marof, Croatia
Pharmacy plant unit – SM 2
Plant Configuration
˝Turnkey˝
2014.
Teva group Pliva Croatia, Zagreb
Savski Marof, Croatia
Pharmacy plant unit – SM 1
Plant Configuration
˝Turnkey˝
2012. ‐2014.
Teva group Pliva Croatia, Zagreb
Savski
Marof,
Hrvatska
Pharmacy plant unit
– ˝Mini plant˝
Plant Configuration
˝Turnkey˝
2012. – 2013.
Zagrebačka pivovara, Zagreb, Croatia
Zagreb,
Croatia
Brewery Cooling Unit
Reconstruction;
Maintenance in
Brewery
Procurement/Construction
‐ Turnkey Contract
2004.
Pliva, VNS upgrade, Savski Marof, 2012 – 2013.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 28
HYDROENGINEERING
CLIENT PROJECT SCOPE OF THE WORK
Location Title Technical Data Year of completion
Benghazi
Municipality,
Lybia
Benghazi,
Libya
Benghazi North
Lakes Project
Excavation of two artificial lakes
linked to the sea by two canals,
revetments with pedestrian
walkways
Dredging and excavation, placing of
rocks, concrete work, paving, lighting
columns, substations, landscaping and
planting, car parks, jetty pontoons.
Works underway; completion
scheduled for mid 2013
Split Port
Authority,
Croatia
Split,
Croatia
Reconstruction
and extension
of Split city port
Reconstruction of main
breakwater, 250 m, with new
berths (9 m depth), extension of
St. Peter’s gate for ferries
Complete construction and piling work
2003
Vodovod i
odvodnja
d.o.o.
Šibenik,
Croatia
Šibenik,
Croatia
Šibenik
submarine
outfall
Submarine outfall pipeline 5 km
(PEHD pipes 1200 mm), max.
diffuser depth 60 m; on shore
works ‐ pumping stations,
manholes, culverts, sewage
pipe work
Complete construction, electrical and
mechanical installations and
equipment
2003
ECO‐
KAŠTELA
BAY, Split,
Croatia
Split
region
Stobreč
submarine
outfall
Submerged pipeline 5 km
(PEHD pipes 1000 mm, AC pipes
900 mm), max. depth 37 m,
onshore installations – pumping
stations, shore pipe works,
manholes, control equipment
Complete supply, construction and
installation works
2003
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 29
WIND PLANTS
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
Koncar
Elektrotehnik i
Transport
(KET), Zagreb,
Croatia
Konjsko,
Croatia
Wind Plant on
location Pometeno
Brdo
15 turbines
KO‐VA57/1 (1,5 MW)
2012.
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 30
MAINTENANCE
CLIENT PROJECT SCOPE OF WORK
Location Title Technical Data Year of completion
HEP, Zagreb,
Croatia
Zagreb,
Croatia
TE‐TO Zagreb
All 3 units
Unit K: CCC Plant 200 MWe/150
MWt
Unit L: CCC Plant 110 MWe/80
MWt
Unit C: Oil Plant 250 MW
Mechanical maintenance and
outage, spare parts delivery
Continuous work in 2010, 2011
and 2012
HEP, Zagreb,
Croatia
Zagreb,
Croatia
TE‐TO Zagreb
Unit K
Combined Cogeneration Plant
200 MWe/150 MWt
Maintenance
2003 ‐ 2009
HEP, Zagreb,
Croatia
Rijeka,
Croatia
Thermal Power
Plant Rijeka
Turbine set Mechanical maintenance and
outage
2003 – 2006, 2008 – 2011, new
contract for 2012 ‐ 2014
MONTMONTAZA GROUP
CORPORATION PROFILE AND REFERENCES
Page 31
S U M M A R Y Sixty years of experience in domestic and international market and deals with leading companies and state agencies and authorities.
LOCAL CLIENTS:
HEP City authorities – Zagreb, Rijeka, Zadar HEP Proizvodnja Ministry of Internal Affairs
INA Zagrebačka pivovara INA – Petrokemija EVN Croatia Plin INA – Naftaplin Zagrebački holding PLIVA Gradska plinara Zagreb DINA – Petrokemija Zvijezda JANAF etc. Plinacro Crodux
FOREIGN CLIENTS:
RWI, Siemens, Sulzer, MAN Germany
ThyssenKrupp Germany, Russia
Basic Engineering United States of America
Codest International Italy
CRNL Canada
Galitchina Refinery Ukraine
Slovnaft Slovakia
Oil and gas companies Russia, Libya, Algeria, Cuba
State industrial companies Iran, Iraq, Cuba
Ministry of Health, Ministry of Economy Kazakhstan
Ministry of Tourism Czech Republic
Ministry of Work Malawi, Tanzania
National Development Corporation Tanzania
Slovin, Petrol Slovenia
Energoinvest Bosnia & Herzegovina
Stell Mill Nikšić Montenegro