comparing two bills of material_spd
Post on 30-May-2018
218 Views
Preview:
TRANSCRIPT
-
8/14/2019 Comparing Two Bills of Material_SPD
1/15
System Process DocumentComparing Two Bills of Material
Department
Responsibility/Role
File Name 27760324.docRevision
Document Generation Date 18/01/2010 09:37:00
Date Modified 1/18/2010 09:37:00 AM
Last Changed by
Status
Comparing Two Bills of Material
Trigger:
Concept
You can compare any two bills by entering the bills in the Find Bills to Compare page. The Bill
Components Comparison page displays both the bills. For example, you can compare the
primary to an alternate bill, the same bill across organizations, or the current revision of an item
to a future revision.
The two assemblies and their attributes are referred to as Bill 1 and Bill 2, or simply as 1 and 2.
In this topic, you will compare two bills of material of the same organization.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:37:00 AM Page 1
-
8/14/2019 Comparing Two Bills of Material_SPD
2/15
System Process DocumentComparing Two Bills of Material
Procedure
Step Action
1. Begin by navigating to the Comparison page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Comparing Two Bills of Material_SPD
3/15
System Process DocumentComparing Two Bills of Material
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:37:00 AM Page 3
-
8/14/2019 Comparing Two Bills of Material_SPD
4/15
System Process DocumentComparing Two Bills of Material
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Comparison link.
Page 4 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Comparing Two Bills of Material_SPD
5/15
System Process DocumentComparing Two Bills of Material
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:37:00 AM Page 5
-
8/14/2019 Comparing Two Bills of Material_SPD
6/15
System Process DocumentComparing Two Bills of Material
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Comparing Two Bills of Material_SPD
7/15
System Process DocumentComparing Two Bills of Material
Step Action
8. Use the Find Bills to Compare page to enter selection criteria for Bill 1 and Bill 2.
Last changed on: 1/18/2010 09:37:00 AM Page 7
-
8/14/2019 Comparing Two Bills of Material_SPD
8/15
System Process DocumentComparing Two Bills of Material
Step Action
9. Click in the Item field.
Step Action
10. Enter the desired information into the Item field. Enter "RT1000".
Page 8 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Comparing Two Bills of Material_SPD
9/15
System Process DocumentComparing Two Bills of Material
Step Action
11. Click in the Item field.
Last changed on: 1/18/2010 09:37:00 AM Page 9
-
8/14/2019 Comparing Two Bills of Material_SPD
10/15
System Process DocumentComparing Two Bills of Material
Step Action
12. Enter the desired information into the Item field. Enter "RT_MODEL".
Step Action
13. Click the Item Seq, Operation Seq option.
Page 10 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Comparing Two Bills of Material_SPD
11/15
System Process DocumentComparing Two Bills of Material
Step Action
14. To view only the differences between bills, check the Differences Only check box.
Click the Differences Only option.
Last changed on: 1/18/2010 09:37:00 AM Page 11
-
8/14/2019 Comparing Two Bills of Material_SPD
12/15
System Process DocumentComparing Two Bills of Material
Step Action
15. Click the Compare button.
Step Action
16. Use the Bill Components Comparison page to view both the bills. You can see
the two columns of check boxes, one for assembly #1 and one for assembly #2,
which indicate if the component appears in the assembly.
The Main tab region displays the item and operation sequences, the planning
percent, the quantity, and whether the item is optional.
Page 12 Last changed on: 1/18/2010 09:37:00 AM
-
8/14/2019 Comparing Two Bills of Material_SPD
13/15
System Process DocumentComparing Two Bills of Material
Step Action
17. The Effectivity tab region displays the effective date range and whether the item is
implemented.
Click the Effectivity tab.
Last changed on: 1/18/2010 09:37:00 AM Page 13
-
8/14/2019 Comparing Two Bills of Material_SPD
14/15
-
8/14/2019 Comparing Two Bills of Material_SPD
15/15
System Process DocumentComparing Two Bills of Material
Step Action
19. You have completed the Comparing Two Bills of Material procedure.
End of Procedure.
Last changed on: 1/18/2010 09:37:00 AM Page 15
top related