Comprehensive Commissioning Process for India

By Maija Virta Santrupti engineers

maija@santrupti.com

1

C O M M I S S I O N I N G

Commissioning Process to assist

Main Processes

Design Owners

Project

Requirements

Const-

ruction Start-up

RESULT:

Well-

performing,

sustainable,

high value

building

Operation &

Maintenance

Key Performance Indicators (KPIs)

“Coaching” – best practices, templates

“Checking & Testing”: check lists, measurement procedures

2

Why Commissioning in India?

3

Enegy for All Save People

LEED Commissioning Requirements 1/2

4

LEED Commissioning Requirements 2/2

5

Comprehensive Commissioning Process

beyond LEED Requirements

6

Initial

Commissioning

1 Target setting

2 Commissioning planning

3 Review or designs and installation

4 Start-up of components / systems

5 Performance testing

6 Systems O & M manual

7 O & M Personnel Training

8 Operation review after 10 months

Seasonal

Commissioning

1 Walk-through in building

2 Follow-up of KPIs

3 Follow-up of maintenance procedures

4 Performance tests

5 Update of systems operation manual

6 O & M Personnel Training

Continuous

Commissioning

1 Assessment of Building & Systems

2 Follow-up of KPIs

3 Repair / Retrofit Planning

4 Execution of Plans

5 Annual Reporting

6 O & M Personnel Training

7 Continuous Monitoring

Commissioning Process

• Starts in the pre-design phase, latest in the design

phase of project

• More focus on planning: coaching!

• Meetings are important: coaching!

• Documentation

• Becomes continuos commissining practice after 1 year

of operation.

7

2nd Cx

meeting:

Design review

• CxA REVIEWS CONTRACTOR SUBMITTALS;

• CONTRACTOR INSPECTS ALL

INSTALLATIONS ;

• CxA REVIEWS INSPECTION.

• CONTRACTORS START UP SYSTEMS ;

• CxA WITNESS THE BEGINNING OF EACH

START-UP;

• CxA REVIEW ALL START-UP DOCUMENTS;

• CxA, DESIGNER AND CONTRACTORS

TOGETHER CARRY OUT FUNCTIONAL

PERFORMANCE TESTS.

Design

Installation

Start-up Operation

Pre-design Air conditioning

Ventilation

DHW (+ heating)

BMS

On-site energy production

Water and plumbing

Lighting

• OWNER NOMINATES THE COMMISSIONING

AUTHORITY (CxA);

• OWNER PREPARES OWNER’S PROJECT

REQUIREMENTS (OPR);

• DESIGNERS (MEP & LIGHTING) PREPARE

BASIS OF DESIGN (BOD);

• CxA REVIEWS OPR AND BOD;

• CxA REVIEWS PRE-DESIGN DOCUMENTS.

• CxA PREPARES A COMMISSIONING PLAN;

• CONTRACTORS (MEP & ELECTRICAL) PREPARE

INSTALLATION, PRE-COMMISSIONING, START-UP

AND OPERATION CHECK-LISTS AND PROCEDURES;

• CxA REVIEWS CHECK-LISTS AND PROCEDURES;

• CxA REVIEWS DESIGN DOCUMENTS;

• CxA PREPARES PERFORMANCE TESTING PLAN;

• IAQ MANAGEMENT PLANS AND MEASUREMENT &

VERIFICATION PLAN ARE DEVELOPED.

• O&M PERSONNEL TOGETHER WITH CONTRACTOR CARRIES

OUT SEASONAL COMMISSIONING;

• CxA REVIEWS THE KPIS AND SYSTEM OPERATION

TOGETHER WITH CLIENT, DESIGNERS AND CONTRACTORS;

• SYSTEM O&M MANUAL IS UPDATED;

• O&M SYSTEM TRAINING AND TROUBLESHOOTING SESSION.

• CONTRACTORS PREPARES THE O&M-MANUAL;

• SYSTEM O&M MANUAL IS PREPARED;

• DESIGNERS AND CONTRACTORS ORGANIZES THE

TRAINING FOR O&M PERSONNEL;

• CxA REVIEWS THE O&M MANUALS AND TRAINING.

8

3rd Cx

meeting:

Installation

review

4th Cx

meeting:

Performance

review

Final Cx

meeting:

Operation

review

1st Cx

meeting:

Start-up

Commissioning Plan 1/4

1. Project Definition

a. Background

b. Functional Description of the Building

2. Project Site Location & Team Members

a. Project Site Address

b. Project Team Member Directory

3. Project Schedule

4. Objective and Goals of Commissioning

9

Commissioning Plan 2/4

5. Systems to be Commissioned

6. Commissioning Authority

7. Commissioning Process, Milestones and Meetings

a. Start-up meeting

b. Design review meeting

c. Installation review meeting

d. Performance review meeting

e. Final operation review meeting

10

Commissioning Plan 3/4

8. Commissioning Process Activities

a. Review of Owners Project Requirements and KPIs

b. Review of Basis of Design

c. Review of Pre-Design Documents (HVAC&R, Plumbing, Lighting)

d. Review of Design Documents (HVAC&R, Plumbing, Lighting)

e. Review of Contractor’s Start-Up Procedures and Check Lists

f. Review of Contractor Submittals

g. Installation Inspection

h. Review of Start-up Procedures

i. System Functional Performance Tests

11

Commissioning Plan 4/4

9. Creation of O&M Manual and System O&M Manual

10.Training of O&M Personnel

11.Commissioning Final Report

12.Seasonal Commissioning

13.Operation Review after 10 Months of Use

14.Expected work products / deliverables by each party

12

Contractor to Prepare Start-up Procedures and Checklists 1/4

• Ventilation system: 1. TFA and AHU installation; 2. TFA and AHU pre-commissioning; 3. TFA and AHU panel wiring; 4. TFA and AHU start-up; 5. TFA and AHU operation; 6. VFD - Pre-commissioning, Commissioning & Operation; 7. VAV-damper pre-commissioning, commissioning and operation; 8. Ductwork air leakage test method; 9. Exhaust fan installation, commissioning and operation; 10. Fire damper installation and operation; 11. Ductwork balancing method;

13

Contractor to Prepare Start-up Procedures and Checklists 2/4

• High side cooling:

1. Chiller installation

2. Chiller pre-commissioning;

3. Chiller start-up;

4. Cooling tower installation and pre-commissioning;

5. Cooling tower start-up;

6. Pump installation and pre-commissioning;

7. Pump start-up;

8. Pipe work flushing and chilled water quality test;

9. Chiller, cooling tower and pumps operation;

14

Contractor to Prepare Start-up Procedures and Checklists 3/4

• Low side cooling and air conditioning: 1. Chilled ceiling / beam installation and pre-commissioning,

commissioning and operation; 2. Pipe work pressure testing; 3. Pipe work balancing method; 4. Room air conditioning unit (split, multi-split, etc.) installation,

pre-commissioning, commissioning and operation; 5. Precision air conditioning unit installation, pre-commissioning,

commissioning and operation;

• Building management system: 1. Installation of BMS; 2. Installation and operation of measurement sensors; 3. Installation and operation of weather station.

15

Contractor to Prepare Start-up Procedures and Checklists 4/4

• Lighting: 1. Installation and pre-commissioning of lights and emergency lights

(indoors, external); 2. Operation of lighting controls and emergency lights; 3. Measurement of lighting levels in working and other area;

• Water and sewer systems: 1. Installation and pre-commissioning of water supply shut-off valves

and water meters; 2. Water quality testing; 3. Operation of water consumption measurement.

Contractor shall also provide the list of measurement equipment used during the commissioning and valid calibration certificates.

16

Commissioning Team

Commissioning organization which is adapted in term of cost and benefit to the complexity and quality expectations of a given project.

Leader: CxA Commissioning

Authority

Client Architect

Contractor HVAC&R

Designer

17

Team work

Interaction

Cooperation

Product

Suppliers

Commissioning Authority CxA

• Is leader of the commissioning team

• Works directly for the owner and is independent of

designers, contractors, vendors and suppliers on the

project

• Is totally objective in leading the commissioning

process

• Maintains an unbiased approach to problem solving

and conflict resolution

18

Skills of CxA

• Have knowledge of HVAC systems, covering design, common

control strategies, installation, operations and maintenance

• Experienced in controls for HVAC systems, including familiarity

with current technology

• With practical background in field construction

• Demonstrated ability to organize many specific activities into a

coherent commissioning plan

• Have good communications skills, both written and verbal

• Proficient in documentation

• Experienced in working with multi-disciplinary teams

• Familiarity with testing and balancing

19

Role of Component Suppliers

• To deliver desired performance and benefits sold to customer

• Especilly with new products / solutions in Indian market

• To provide all necessary documents and information

– Commissioning checklists;

– Functional performance testing;

– O&M manual: Just a product leaflet or something more?

– Training material:

• O&M personnel

• Users

20

Commissioning Areas

• Commissioning needs may differ from project to project.

• To meet the LEED EA prerequisite 1 or the LEED-NC credit

3, commissioning must be completed, at a minimum, for:

1. HVAC&R systems;

2. Lighting and day-lighting controls;

3. Domestic hot water systems;

4. Renewable energy systems.

• What about:

1. Plumbing;

2. Water;

3. ?

21

Functional Performance Testing 1/4

• Evaluation of results is the final step.

• System functional performance testing occurs once all

system components are installed, energized,

programmed, balanced and otherwise ready for

operation under part - and full-load conditions.

• Systems performance testing is performed by the CxA,

the installing contractor, and designer.

• It may reveal problems with the performance of the

commissioned systems and may require significant

follow-up and co-ordination among members of the

project team.

22

Functional Performance Testing 2/4

• Each component has a well-defined function inside the whole HVAC system. Any malfunction can compromise the correct behaviour of the entire system. The malfunction may be due to:

– Design faults

– Selection or sizing mistake

– Manufacturing fault or initial deterioration

– Installation fault

– Wrong tuning

– Control failure

– Abnormal conditions of use.

• The functional performance testing (FPT) is devoted to the detection of such possible malfunction and to its diagnosis.

23

Functional Performance Testing 3/4

• The test can be "active" or "passive", according to the way

of analyzing the component behaviour.

– Active test to assess performance by analyzing data obtained from

systems that are subjected to artificial changes in operational

conditions.

– Passive test to assess performance by analyzing data obtained

from systems operating under normal conditions

• Active tests are mostly applied in initial commissioning,

i.e. at the end of the building construction phase.

• Later in the Building Life Cycle a passive approach is

usually preferred in order to preserve health and comfort

conditions inside all the building occupancy zones.

24

Functional Performance Testing 4/4

• CxA provides a plan of functional performance test of key equipment and systems during design phase and carries on the performance testing together with contractor and designers.

• Two key areas:

– Ventilation and Cooling System Operation (operation of TFAs, AHUs, exhaust fans, chiller, cooling tower and pumps as system with different weather and occupancy conditions)

– Overall Performance of Room Systems in different occupancy conditions:

• Monitoring of Room Conditions: temperature, CO2, relative humidity

• Monitoring of Operation of Critical Components like VAV-dampers.

• Operation of Lighting System in case of power failure, different occupancy and outdoor lighting conditions.

25

LEED Buildings => Buildings?

• ISHRAE Good Practise of Commissioning?

• Awareness building?

• Training?

• Accreditation of professionals?

• Part of ECBC?

26