ENVS 10003 CONSTRUCTION LOG BOOK
109
Week 9: Detailing Strategies 2 Construction Workshop
• Stress Testing • Box Beam construction
Full Size 1:1 Detailing Drawing Tutorial
• Construction Site Visit: 522 Collins St • Concrete pour • Tension rods • Glazed curtain window system
eLearnings • Finish Work and Composite Materials • Wall finishes • Engineered composite materials • Flooring • Ceiling
ENVS 10003 CONSTRUCTION LOG BOOK
110
Construction Workshop 5th May 2014
Design brief: -Using the materials provided, construct a structure that will span a 1m gap and be as strong and rigid as possible, enough to substantially withstand a point load from directly above. Consider:
• The material-what works best in tension and compression-why? • In what way will your structure utilise the material inherited qualities • How will your design maximise the load bearing capacity?
Materials provided:
• 3mmx100mmx1200mm brace plywood X2 • 30mmx40mmx1200mm structural pine X2
Extra materials provided: • Handsaw • Measuring tape • Various types of nails • Bench hooks • Hammer • Power drill • Timber screws • Square
ENVS 10003 CONSTRUCTION LOG BOOK
111
Design:
Note: Plasterboard nails were used as they have a wider surface area on the head, thus a greater purchase between the pine and plywood
3mmx100mmx1200mm Brace Plywood
30mmx40mmx1200mm Structural Pine
Plasterboard Nails
Timber Decking Nails
ENVS 10003 CONSTRUCTION LOG BOOK
112
Materials used in construction: • 3mmx100mmx1200mm Brace Plywood X2 • 30mmx40mmx1200mm Structural Pine X2 • Plasterboard Nails • Timber Decking Nails
Final Product:
Plasterboard nails
Cracks in timber due to nails at each end
ENVS 10003 CONSTRUCTION LOG BOOK
113
Stress Testing: The device that we used was similar to the device shown here, however it was hand driven.
http://www.frontiersin.org/files/Articles/63674/fbioe-01-00013-HTML-r1/image_.jpg Device we used for stress testing:
Digital Pressure readout
Crosshead
Supports
Specimen
Impact point
Deflection ruler
ENVS 10003 CONSTRUCTION LOG BOOK
114
Stress Testing Result: Our structure withstood 380kg of stress before failing in the centre
• Structure shattered in the centre where the mass was applied
• Shattered where a nailed had weakened the structural integrity
• Faired pretty well relative to
other designs-small fracture rather than complete collapse
Peer designs:
Point of failure
ENVS 10003 CONSTRUCTION LOG BOOK
115
Full Size 1:1 Scale Detail Drawing
ENVS 10003 CONSTRUCTION LOG BOOK
116
ENVS 10003 CONSTRUCTION LOG BOOK
117
Tutorial CBD Construction Site Visit
522 Collins St Overview: As a group we visited the Construction Site of 522 Collins St, soon to be new, Premium office space. We were given an overview of the various components and construction principled employed in the buildings construction and fabrication. The following show the construction techniques employed on site:
• Tension rods: increase the strength and rigidity of concrete once set
• Reinforcing for concrete
• Corrugated alloy sacrificial formwork for concrete
• Temporary formwork for concrete
• Onsite power
• Tension rods
1. 2.
3.
ENVS 10003 CONSTRUCTION LOG BOOK
118
• Set concrete
• Service corridor
• Formwork impression
• Temporary crane
• Concrete pump
• Mechanical system piping
5.
4.
ENVS 10003 CONSTRUCTION LOG BOOK
119
• Concrete pour process: Pumped up form cement trucks on the base level floor, pumped into the steel reinforcing’s, levelled, extruded and settled
• Concrete pump
• Bundles of steel rods for the tension casing
• Tension casing
• Arterial reinforcing
6.
7.
ENVS 10003 CONSTRUCTION LOG BOOK
120
• Safety barriers
• Concrete pump mechanism
• Column reinforcing
Figures 1-8: 10th floor external concrete construction 8.
9.
• Internal steel sacrificial concrete formwork
10.
Figures 9-10: 10th and 11th floor internal concrete formwork
ENVS 10003 CONSTRUCTION LOG BOOK
121
11.
12.
• Fire system
• 30mm polyurethane insulation board coated with sisalation paper to increase thermal insulation properties
• Temporary formwork
• Glazed curtain wall: unit system (pg. 93)
• Temporary safety barrier
ENVS 10003 CONSTRUCTION LOG BOOK
122
• Hanging support system
• Space for glazed curtain wall system installation
• Theodolite
• Glazed curtain wall units
• Installation process: units are hung from a series of cantilevered rails, which are fixed to the above concrete floor. They are then connected with a system of weather proof stripping and galvanised steel brackets. All curtail walls are non loadbearing
13.
14.
ENVS 10003 CONSTRUCTION LOG BOOK
123
• Galvanised steel bracket
• Concrete bracket
• Weatherproof stripping
• Temporary safety barrier
16.
15.
Figures 11-16: 4th and 5th floor glazed curtain wall installation process
ENVS 10003 CONSTRUCTION LOG BOOK
124
• Reinforced steel pylons are a structural as well as an aesthetic feature
• Open foyer integrates the structure with the landscape
• Mechanical systems-climate control
• Temporary cover paper-protect the surface
• Base of the temporary crane
• Exposed sacrificial formwork
19.
17.
18.
Figures 17-19: Ground floor superstructure