construction projects - ellis countyftp.dot.state.tx.us/.../construction/ellis-cst.pdf · ellis...

Post on 04-Apr-2020

18 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

1107

_121

919

Connecting You With TexasELLIS COUNTY CONSTRUCTION PROJECTS2019 HIGHWAY PROJECTS:

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONDanielle Boyd – Information SpecialistOffice: (214) 320 - 4480Email: danielle.boyd@txdot.gov TxDOT graphic* Not mapped. SOURCE: Texas Department of Transportation.

ELLIS COUNTY PROJECTS UNDER CONSTRUCTION (WINTER Q4 2019)# CSJ Hwy Project Limits Description Letting Start/End Contractor Est. Cost % Complete

1 1159-01-022 FM 875 At Waxahachie Creek Replace bridge and approaches Jun-2015May-2017/Feb-2020

Massana Construction, Inc.

$3.7 M 99%

2 0048-04-079 IH 35EUS 77 N of Waxahachie to US 77 S of Waxahachie

Reconstruct/widen from 4 lanes to 6 lanes

Aug-2015Mar-2016/ Mar-2021

OHL USA, Inc. $126.4 M 65%

3 1451-01-025 FM 55 At Big Onion Creek Replace bridge and approaches Aug-2015Nov-2016/Feb-2020

Surety company $1.5 M 99%

4 0172-08-053 US 287 South of SH 34 to IH 45 S in EnnisWiden 2-ln to 4-ln divided hwy. w/grade separation.

Jan-2017May-2017/Feb-2020

Fluor Heavy Civil, LLC

$61.7 M 99%

5 1051-01-037 FM 664Westmoreland Rd. to IH 35E in City of Red Oak

Widen from 2 lanes to 6 lanes urban divided, including intersec. improv.

May-2018Oct-2018/Sep-2020

Sterling Delaware Holding Co., Inc.

$32 M 50%

6 1317-01-015 FM 1183 SH 34 to IH 45Reconstruct Existing Pavement and Add Shoulders

Jun-2018Nov-2018/Jul-2020

Knife River Corp. - South

$8.1M 63%

7 1211-02-019 FM 984 From FM 877 to SH 34Reconstruct Existing Pavement and Add Shoulders

Dec-2018Mar-2019/ Apr-2020

A.K. Gillis and Sons, Inc.

$7.1 M 53%

8 0918-22-157* VA At various Locations Replace Turn Downs and Guardrail Jun-2018Jan-2019/Feb-2020

DBI Service, LLC $4.5M 92%

9 0048-08-051 IH 35E Hill County Line to US 77 South Full depth concrete repair Jan-2019May-2019/Mar-2020

O. Trevino Construction LLC

$1.5 M 67%

10 0092-05-051 IH 45 At FM 1181Construct intersection improvements

Feb-2019Jun-2019/Mar-2020

Accelerated Critical Path, Inc.

$1.4 M 37%

11 0172-05-122 US 287 Park School House Road Pavement repair and overlay Mar-2019Jun-2019/ Mar-2020

Austin Bridge & Road Services L.P.

$8 M 47%

12 0048-03-050 US 77 At UPRR and Waxahachie Creek Replace bridge and approaches Jun-2019Dec-2019/Feb-2022

Fluor Heavy Civil, LLC

$21.6 M 0%

13 0172-05-115 US 287 At Walnut Grove Road Construct interchange Apr-2019Jul-2019/ Jan-2022

OHL USA, Inc. $37 M 7%

ESTIMATED TOTAL $314.5 M

WINTER • Q4 2019

1

3

5

4

12

13

2

6

79

10

11

CORSICANA

MIDLOTHIAN

ENNIS

CORSICANA

ENNIS

45

45

77

77

77

77

67

67

287

67

45

45

45

35E

35E

35E

FerrisOvilla

Pecan Hill

Red Oak

Trumbull

Milford

Palmer

Maypearl

Garrett

Rosser

Rice

Emhouse

BarryFrost

BloomingGrove

AlmaBardwell

Italy

Forreston

JOHN

SON

CO.

ELLIS CO.

NAVARRO CO.

ELLIS CO.

NAVARRO CO.

HILL CO.ELLIS CO.

ELLIS

CO.

JOHN

SON

CO.

ELLIS

CO.

KAUFMAN CO.

ELLIS CO.

DALLAS CO.

ELLIS CO.

DALLAS CO.TARRANT CO.

ELLIS CO.

Mid-WayRegionalAirport

660

983

813

878879

876

308

934

308

667

877

984

984 985

744

660

1390

1182

1603

1126

1722

916

157

875875

663

34

34

34

34

22

22

31

287

287

287

287

66

66

66

55

55

55

Combine

LancasterAirport

Cedar Hill

LancasterDeSoto Wilmer1382

35

N

2 miles

664

664

1446879

85

MIDLOTHIANW

estm

orel

and

Rd.

BardwellLake

Joe PoolLake

LakeWaxahachie

Rockett

WAXAHACHIE

City of Waxahachie

Projects Under Construction

TxDOT graphicSOURCE: Texas Department of Transportation.

NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of WINTER Q4 2019.

top related