converge factories an introduction for print
Post on 17-Jul-2015
167 Views
Preview:
TRANSCRIPT
CAU T IONEle c tric a l Eq uip m e nt
Switc h O ff Be fo re O p e ning
CAU T ION
CAU T ION
CAU T ION
Posi
tion
gua
rds
Befo
re S
tart
ing
Switc
h O
ffBe
fore
Op
eni
ngW
ea
r Ea
rmuf
fsBe
fore
Sta
rtin
g
Furnace Oil
Storage Tanks
No Sm okingNo Light
HighlyInflam m able
RestrictedEntry
Don’t m onkeywith e lec tric a l fittings...
...C a ll a n e le c tric ia n
Why Safety Signs ?
To prevent accidents
Our Aim : A Visual Factory
To move safely within the premises To move safely within the premises
Our Aim : A Visual Factory
To take correct action and be able to reach the Assembly point or the safe zones in the shortest possible time
To take correct action and be able to reach the Assembly point or the safe zones in the shortest possible time
Our Aim : A Visual Factory
To ensure compliance with statutory regulations To ensure compliance with statutory regulations
Our Aim : A Visual Factory
To make visually pleasing and well integrated signs and markings
To make visually pleasing and well integrated signs and markings
Signages and Markings
Traffic and road signs and markings.
Corporate branding and office labeling.
Vehicle conspicuity markings - tankers,cranes, trucks etc.
Floor marking for safe passage, hazardous areas, storage and machine spaces.Machine and assembly line marking.
Environmental signage.
Safety signs
Our Products & Services
Traffic and road signs and markings.
Corporate branding and office labeling.
Vehicle conspicuity markings - tankers,cranes, trucks etc.
Floor marking for safe passage, hazardous areas, storage and machine spaces.Machine and assembly line marking.
Environmental signage.
Safety signs
Our Products & ServicesEscape route plans and safety plan lay-out maps for one look information on location of :
Fire fighting equipmentEmergency exits.
Colour coding of chemical and other storage tanks.
Any other detail which you may require e.g.Capacity of DG sets etc.
Hazardous Area
Fire fighting equipmentEmergency exits.
Colour coding of chemical and other storage tanks.
Any other detail which you may require e.g.Capacity of DG sets etc.
Hazardous Area
Our Products & Services
Turn-key projects for industrial & commercial sites
Designing safety signs & markings
Site safety & fire layout map.
Database development for continuous improvement of safety signs and markings
Turn-key projects for industrial & commercial sites
Designing safety signs & markings
Site safety & fire layout map.
Database development for continuous improvement of safety signs and markings30
GIVEW AY
ONE WAY
HH OS PITA L
QUIETPLEASE
Other Products
PPE material
Inventory , material hazard, material handling, PPEs & information posters.
Specialized boards for- TPM, TQM, SOP and process flowcharts.
PPE material
Inventory , material hazard, material handling, PPEs & information posters.
Specialized boards for- TPM, TQM, SOP and process flowcharts.
Activity Three
Installation
Action Plan
Activity one
Survey the plant keeping in mind the project objectives and requirements.Activity Two
Manufacture the required material.
Activity one
Survey the plant keeping in mind the project objectives and requirements.Activity Two
Manufacture the required material.
Activity Three
Installation
Deliverables
Exit
1. A visual factory
2. Standardisation of safety signs, in accordance with BSI standards and a database for future reference and requirements.
1. A visual factory
2. Standardisation of safety signs, in accordance with BSI standards and a database for future reference and requirements.
top related