covington & burling interior... · 2019. 12. 18. · building lobby and covington reception...

Post on 28-Sep-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

COVINGTON & BURLINGC I T Y C E N T E R , W A S H I N G T O N , D C

One CityCenter entry—front door for Covington .

Building lobby and Covington reception area.

Semi-public ground level gallery space with Carlos Cruz Diez art installation

Carlos Cruz Diez’s kinetic art installations Transchromie and Physichromie create an

ever-changing condition of light.

View from Level 01 multipurpose room. Transparency and layering of glass create a strong visual connection to the retail arcade and beyond.

Level 10 Auditorium. The Casey Reas art installation provides a dynamic

backdrop when the screens are not in use.

Five adjacent conference spaces can be opened or closed as needed to provide flexibility, seating

anwhere from 20 to 250 people.

Level 10 cafe. The dynamic lighting design relates to the city grid of Washington and park below.

The atria and bridges engage the new development of CityCenter and provides daylight, energy, and collaboration for the entire project.

ONE CITYCENTERTWO CITYCENTER

N

1

6

2

3

4

4

5

3

1

2

3

4

5

6

DEDICATED COVINGTON ENTRY

LOBBY / RECEPTION

ART INSTALLATION / “PHYSI-CHROMIE,” WALL PAINTING

ART INSTALLATION / “TRANSCRHOMIE,” COLORED PLEXIGLASS FINS

RECEPTION GALLERY

AUDITORIUM4

LEVEL 1

88

11

11

11

7 7

10

11

11

11

10

HUB

OFFICE AREA

7

8

9

10

11

12

RECEPTION

KITCHEN

SERVING

DINING

STAIR TOWER

ATRIUM

13

MULTI-PURPOSE ROOM

14

PREFUNCTION

15

16

N

ONE CITYCENTERTWO CITYCENTER

LEVEL 9

ONE CITYCENTERTWO CITYCENTER

HUB

OFFICE AREA

7

8

9

10

11

12

RECEPTION

KITCHEN

SERVING

DINING

STAIR TOWER

ATRIUM

13

MULTI-PURPOSE ROOM

14

PREFUNCTION

15

16

N

13

14 15

16

7 7

8

13

11

11

11

12

13

9

8

10

9

9LEVEL 10

top related