crossrail moving london forwardcic.org.uk/admin/resources/martin-buck-crossrail.pdf ·...
Post on 28-Jun-2020
0 Views
Preview:
TRANSCRIPT
CROSSRAIL MOVING LONDON FORWARD
Martin Buck
Commercial Director
Header here max 30 characters What is Crossrail?
A new railway for London and the south east
Over 100 km from east to west
24 trains per hour in each direction
More than 200 million passenger journey per annum
Spacious and bright stations
And much more…
Header here max 30 characters Crossrail route
Header here max 30 characters Crossrail benefits
£42bn+
24
14,000 people
24 trains per hour
200 million journeys per year
Header here max 30 characters Project progress
0.00
20.00
40.00
60.00
80.00
100.00
120.00
% C
om
ple
te
Design
Procurement
Construction
Testing & Comm.
Header here max 30 characters Crossrail: delivering a railway
13 14 15 16 17 18
Railway Systems
Stations
Rolling Stock & Depot
NR Surface Works
Test and
Co
mm
ission
Trial Op
eration
Crossrail TOC
2012
Civils and Tunnelling
Header here max 30 characters Tunnelling
Header here max 30 characters Tunnelling progress: 29km
Header here max 30 characters Spray concrete lined tunnels
Header here max 30 characters Excavated material
On a tonne/km basis 85% of excavated
material is transported by rail or
water
Header here max 30 characters Wallasea Island 2016
Header here max 30 characters Central stations
8 new underground stations
Majority of main works contracts awarded
Major construction underway at all central London stations
Header here max 30 characters Tottenham Court Road
Header here max 30 characters Platform mock-up
Header here max 30 characters
London’s greatest commercial art galleries create a line-wide exhibition
7 galleries for 7 stations
One artist per station
Spencer Finch selected for Paddington for his proposal “A Cloud Index”
Funding secured from the City of London and Canary Wharf Group
The Culture Line
Header here max 30 characters Over site developments
Header here max 30 characters Archaeology
Header here max 30 characters Property impacts
c.£5.5bn additional residential and commercial property value
Support 57,000 new homes
3.25 million square metres of commercial office floor space
“Crossrail is more than a new rail link, it will be the catalyst for regeneration in key locations and a driver of London’s economic growth; in particular from a property perspective.”
Header here max 30 characters Equipping a workforce
Header here max 30 characters Opportunities on Crossrail
Header here max 30 characters The new rolling stock
16
200m long trains
1,500 seated & standing passengers per train at peak times
Regenerates energy during braking (major savings in energy and CO2 emissions)
Header here max 30 characters Railway integration timeline
2018 2017 2016 2012
1
2013
2
2014
3
2015
4 5 6
Q1
Stage 5
2019
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Stage 4 Stage 3 Stage 2 Stage 1
7 8 9 10
Stage 1: Liverpool St (mainline) to Shenfield (May 2017)
Stage 3: Paddington (Crossrail platforms) to Abbey Wood (Dec 2018)
Stage 2: Heathrow to Paddington (mainline platforms) (May 2018)
Stage 4: Paddington (Crossrail platforms) to Shenfield (May 2019)
Stage 5: Full through service (Dec 2019)