cv discariche inglese - eracles › wp-content › uploads › 2016 › 04 › eracles... ·...
Post on 27-Jun-2020
0 Views
Preview:
TRANSCRIPT
COMPANYPROFILE
ERACLES S.r.l. is a technical office that deals with Environmental and Sanitary
Engineering since 1997.
1 COMPANY NAME AND CONTACT INFORMATION
ERACLES S.r.l.
Via G. Paglia 7, 24065 LOVERE (BG)
tel. 035 983738 - fax 035 4345102
e-mail: info@eracles.it
2 MANAGER
Name: Dott. Ing. Remo Bordini
Place of birth: Lovere (Bg)
Date of birth: 05/10/1964
Residence: Italy, Lovere (Bg), Via Tadini n°22
VAT number: 02672140163
Professional register: Engineers of Bergamo
n° 2470
first inscription: 1994
Professional condition: freelancer
3 PROFESSIONAL SERVICES
Main sector: Environmental and sanitary engineering
Services:
• conception, environmental impact assessment, economical
assessment and works direction for the construction of landfill and
waste treatment plant;
• projects of environmental remediation;
• research activities in the environmental sector with technical and
scientific partners.
4 MAIN WORKS
4.1.1 Landfills
Conception, environmental impact assessment and works direction of the
landfills listed in the table below.
Place Type of waste Activities Volume (mc)
Year
Cologno Monzese (MI) - Italy
Hazardous special waste
Conception and works direction
210'000 1995-1998
Calcinato (BS) - Italy
Hazardous and non-hazardous special waste
Conception and works direction
500'000 1999-2008
Cazzago S.M. (BS) - Italy
Special waste Conception Environmental impact assessment
1’420’000 2000
Kosovo Polje (Kosovo)
Municipal waste
Conception and works direction
100'000 2000
Calcinato (BS) - Italy
Non-hazardous special waste
Conception Environmental impact assessment
2.000'000 2002 2009-2010 2015-2016
Montichiari (BS) - Italy
Non-hazardous special waste
Conception Environmental impact assessment and works direction
985’000 2003-2011
Montichiari (BS) - Italy
Special waste containing asbestos
Conception Environmental impact assessment and works direction
875’000 2005-2016
Paderno Franciacorta (BS) - Italy
Inert waste Conception Environmental impact assessment
50'000 2006
Bedizzole (BS) – Italy
Hazardous and non-hazardous
Conception and works direction
800.000 2007-2008 2015-2016
special waste
Crotta d’Adda (CR) - Italy
Inert waste Conception Environmental impact assessment and works direction
2.900.000 2007-2012 2015-2016
Rezzato (BS) - Italy
Inert waste Conception and works direction
450.000 2008-2010
Ghedi (BS) - Italy
Inert waste Conception 1.500.000 2015-2016
Valona (Albania)
Municipal solid waste
Conception 2.000.000 2008
Rezzato (BS) - Italy
Non-hazardous special waste
Conception Environmental impact assessment
1’890’000 2011-2016
Landfill in C
alcinato (BS
)
Landfill in Calcinato (B
S)
Landfill in B
edizzole (BS
)
Landfill in M
ontichiari (BS
)
D
rilling for piezometer installation
P
lant of energy recover from biogas
Landfill in C
rotta d’Adda (C
R)
4.1.2 Waste treatment plants
Conception, environmental impact assessment and works direction of the waste
treatment plants listed in the table below.
Place Type of treatment
Activity Potentiality (ton/y)
Year
Calcinato (BS) - Italy
Waste inerting Conception Environmental impact assessment
120'000 1999-2001
Leffe (BG) - Italy
recover of non-hazardous special waste
Conception 30'000 2002
Bussolengo (VR) - Italy
Waste inerting Conception 30'000 2002
Cologno Monzese (MI) - Italy
Composting Works direction
2002
Brescia (BS) - Italy
recover of non-hazardous special waste
Conception Works direction
150.000 2003
Adro (BS) - Italy
recover of non-hazardous special waste
Conception Environmental impact assessment
14'500 2003
Adro (BS) - Italy
recover of non-hazardous special waste
Conception Environmental impact assessment
14'500 2004
Carbonara Po (MN) - Italy
recover of non-hazardous special waste
Environmental impact assessment
100.000 2004
Annone Brianza (LC) - Italy
Composting Conception 30.000 2004-2010
Vobarno (BS) - - Italy
recover of non-hazardous special waste
Conception 65’000 2014-2015
Sarezzo (BS) - - Italy
recover of non-hazardous special waste
Conception 65’700 2015-2016
Chivasso (TO) - Italy
recover of non-hazardous special waste
Conception 400’000 2015-2016
Vobarno (BS) - - Italy
recover of non-hazardous special waste
Conception 75’000 2015-2016
W
aste treatment plant in A
dro (BS
)
Waste treatm
ent plant in Carbonara P
o (Mn)
W
aste treatment plant in B
rescia
W
aste treatment plant in B
rescia
C
omposting plant in C
ologno Monzese (M
I)
Com
posting plant in Cologno M
onzese (MI)
4.1.3 Environmental impact assessments
• Landfill and waste inerting plant in Cazzago S.M. (BS)
year 2000
• Mine of inert materials in Foresto Sparso (BG)
year 2001
• Landfill for non-hazardous special waste in Calcinato (BS)
year 2002
• Landfill for non-hazardous special waste in Montichiari (BS)
year 2003
• Treatment plants for non-hazardous special waste in Adro (BS)
year 2004
• Landfill for non-hazardous special waste in Rovato (BS)
year 2004
• Landfill and waste treatment plant in Carbonara di Po. (MN)
year 2004
• Landfill for special waste containing asbestos in Montichiari (BS)
year 2005
• Treatment plants for hazardous and non-hazardous special waste in
Gavardo (BS)
year 2005
• Landfill for non-hazardous special waste in Calcinato (BS)
year 2006
• Landfill for inert waste in Paderno Franciacorta (BS)
year 2006
• Landfill for inert waste in Crotta d’Adda (CR)
year 2007
• Landfill for non-hazardous special waste in Rezzato (BS)
year 2011
• Landfill for inert waste in Ghedi (BS)
year 2015
Lovere 15/04/2016
Dott. Ing. Remo Bordini
top related