Data Center
OPTIMIZATION
Services
Vincent Bevan
Services Business Group
Fujitsu Technology Solutions
1
Agenda
Current Data Center Facility Issues
Fujitsu Facility Risk Assessment
Fujitsu Facility Readiness Assessment
Fujitsu Facility Energy Certification
Fujitsu Facility Implementation Services
References
2
Current Data Center Facility Issues
Many enterprises rely on data centers to provide the housing and operations of IT in driving and supporting the business
Data center operators are faced with many challenges moving forwards in considering how to support the dramatic growth in IT requirements:
Age of the facility
Cost of the facility
Available space
Power and cooling
IT Consolidation
Legislation & Sustainability
2
3
Data Center OPTIMIZATION Services
Fujitsu„s comprehensive services for your Data Center
3
• Facility Risk Assessment
• Facility Readiness
Assessment
• Design & planning
• New builds
• Modular solutions
• Modernization
• Facility Energy
Certification
Data Center
OPTIMIZATION
Inspection
Simulation
and Modeling
Certification
Planning &
Implementation
4
Data Center OPTIMIZATION Services
Fujitsu„s comprehensive services for your Data Center
4
• Facility Risk Assessment
• Facility Readiness
Assessment
• Design & planning
• New builds
• Modular solutions
• Modernization
• Facility Energy
Certification
Data Center
OPTIMIZATION
Inspection
Simulation
and Modeling
Planning &
Implementation
Certification
5
Typical Requirements for Secure IT Operations
Uncover and eliminate any unknown dangers in your data center infrastructure and operations (security gaps, safety hazards)
Identify compliance issues with relevant corporate and legal requirements
Understand how your IT infrastructure reacts to changes caused by external events and how your personnel and processes are equipped to deal with specific situations
Requirement to develop a Secure IT Operations Strategy
Requirement to optimize security, quality and energy efficiency to meet current and future company needs
5
6
Facility Risk Assessment
Energy usage information of the Data Center
Power Usage effectiveness (PUE)
Data Center Infrastructure Efficiency (DCiE)
Mechanical & Electrical redundancy
Current risks and areas of low efficiency
Downtime risks and recommended measures to reduce them
Recommendations for coordinating and optimizing your investments using state-of-the-art security standards
7
Comprehensive Measurement & Recommendations
1 • Identify and analyze possible weak points in the individual
assessment areas of your Data Center
2 • Further to the on-site inspection the risk status of your IT operations
are determined and assessed
3 • Based on your specifications and our assessment results we develop
a catalog of actions specially designed to meet your requirements
4 • This is all detailed in a detailed explanatory report and presented to
you at your premises by our consultants
5
• Additional optional service modules can be combined : • Hardware Inventory, Facility Readiness Assessment - CFD heat distribution and airflow
analysis
8
Data Center OPTIMIZATION Services
Fujitsu„s comprehensive services for your Data Center
8
• Facility Risk Assessment
• Facility Readiness
Assessment
• Design & planning
• New builds
• Modular solutions
• Modernization
• Facility Energy
Certification
Inspection
Simulation
and Modeling
Certification
Planning &
Implementation
Data Center
OPTIMIZATION
9
Understanding the Challenge
Traditionally designed facilities are unable to cope with power density growth
Owner/Operators forced to upgrade infrastructure but still experience localized hotspots
Risk of thermally-induced equipment downtime is becoming greater
10
What is the Impact?
Increasing power densities affect the entire supply chain!
Equipment Manufacturer No Man’s Land Facilities Manager
!
A lack of effective communication between the IT
equipment supplier and the building services !
11
The Variables: Equipment Architecture
Continuously changing thermal/cooling specifications of IT equipment are a challenge!
Cold air intake and hot air exhaust directional differences
Storage Server Network
12
Two identical cabinets are shown each containing different generations of Blade Server:
Blade Centre 2
Different Generations, different Thermal Behavior
Blade Centre 1
The air exhausted differs considerably in temperature
between the two pieces of equipment !
13
Adjusting the configuration of a cabinet affects the equipment‟s inlet temperatures
Maximum inlet temperatures / oC
Blade 27.1
Server1 19.6
Server2 19.7
Server3 18.9
Equipment Layout, different Thermal Behavior
Improvement is obtained by redistributing the equipment.
Initial Configuration New Configuration
Maximum inlet temperatures / oC
Blade 18.1
Server1 19.1
Server2 20.9
Server3 21.8
14
The Variables: Load Capacity Planning
Movement of IT equipment necessitates constant adjustment for optimal management of the Data Center
Present Day Placement 1 Placement 2 Inventory movement is the cause of this problem. !
15
How do we approach the Problem?
A New Approach is necessary, assessing the Physics of the Data Center Facility
The facility is now a box housing high-powered electronic components
It is no longer a BUILDING SERVICES problem
It is an ELECTRONICS COOLING problem and therefore an IT issue
It needs to be divided into two complementary parts:
The Room The Cabinet/Rack Level
16
Facility Readiness Assessment
Uses advanced 3D Computational Fluid Dynamics (CFD) simulation software to deliver valuable qualitative insight, into the efficiency of data center power and cooling:
Cooling dynamics baseline, with operational load based on infrastructure population of the site
Analysis of the current cooling methods used (floor cooling, raised floor cooling, ducting, in-row, in-cabinet)
Assess the impact of factors which affect the efficiency of power and cooling
Enable what-if scenario analysis for future planning based on your real situation from room, to rack, to individual equipment
Not easily achieved in production data center!
Identify quick win measures to increase the effectiveness of air flow and power
Realize cost savings quicker!
17
Data Center OPTIMIZATION Services
Fujitsu„s comprehensive services for your Data Center
• Facility Risk Assessment
• Facility Readiness
Assessment
• Design & planning
• New builds
• Modular solutions
• Modernization
• Facility Energy
Certification
Inspection
Simulation
and Modeling
Certification
Planning &
Implementation
Data Center
OPTIMIZATION
18
Facility Energy Certification
Delivers valuable insight into the efficiency of Data Center energy usage and enables you to plan continuous improvement:
From fast “Efficiency Check” inspection to full formal certification “Energy-Efficient Data Center”, you choose how far you want to go
Understand how efficient your data center currently is
Enable improvement planning from valuable reporting of optimization potentials and weak points
Implement a continuous improvement process
Demonstrate commitment to Green IT goals
19
Data Center OPTIMIZATION Services
Fujitsu„s comprehensive services for your Data Center
• Facility Risk Assessment
• Facility Readiness
Assessment
• Design & planning
• New builds
• Modular solutions
• Modernization
• Facility Energy
Certification
Data Center
OPTIMIZATION
Inspection
Simulation
and Modeling
Certification
Planning &
Implementation
20
Our holistic design & project approach contains all steps to reach a reliable,
energy efficient and secure data center for your business requirements:
Implementing Sustainable Data Centers
Usage goals current & future
Site location
IT technologies & availability
Facility availability levels (Tier)
Sustainability goals
Communications
Security
Consulting on your
Requirements
Design & Planning
Implementation & Project
Management
Assurance Testing and Hand-over
Detailed Planning & Costing
Architecture
Civil Works
Electrical Engineering
Air Conditioning/ Ventilation
Safety and Security Systems
Energy Efficiency Consultancy
Complete Project Management
Subcontractor and supplier management
Quantity Survey
Quality Control
Checking of Documentation
Management of Certification processes
Training of staff
Process documentation
IT relocation
In-place testing
Maintenance schedules and agreements
Hand-over
21
Fire detection systems
Fire extinguishing automatic and manual
Intrusion detection systems
Access control systems
Building management systems
Video Surveillance systems
Water detection systems
Building Layout and concept (container, modular…)
Workflow optimization
Fire compartments
Room in room systems according to EN 1047
Security zones
Burglary protection
Planning and optimization of raised floor systems
Data Center Implementation Services Focus
Architecture / Civil Works Security
22
Power supply concepts
Emergency generators
Uninterruptable Power Supply (UPS)
Electrical bus bar systems
Lighting / Emergency lighting
Overvoltage protection
Equipotential bonding (earthing)
EMC compatible installation
Consultancy for energy efficient components and systems
Redundancies
Data Center Implementation Services Focus
AC & ventilation concepts
Fresh air supply
Smoke protection
Fire dampers
Sanitary installations
Consultancy for energy efficient components and systems
Redundancies
Electrical Engineering Air Conditioning/Ventilation
23
Selected Data Center References
24
GDV (German Insurance Association)
New primary data center for the company
Construction of DC in new building
Project duration 9 months
Completion 2011
2 Computer rooms, total 150 m2
Tier III
Room-in-room systems S³R
according to EN 1047
25
New primary Data Center for the company
Reconstruction of existing building
Project duration 9 months
Completion 2011
1 Computer room, total 75 m2
Tier III
Room-in-room systems S³R according to
EN 1047
EOS DID, Germany
26
Summary
Fujitsu‟s Data Center OPTIMIZATION Assessment services take the guesswork out of understanding the opportunity for increasing and assuring efficiencies in your data centers
Complementary Data Center OPTIMIZATION Implementation services assist you in establishing change, both in modernizing and building efficient data center facilities
Our services are based on many years of data center expertise, and are continually enhanced based on the experiences obtained during various consulting projects
27