Ponente. Ignacio López Cabido Subdirector Técnico del CESGA DATA CENTERS 2012 Madrid, 21 de noviembre 2012

TRANSCRIPT

DATA CENTERS 2012

Eficiencia, Disponibilidad y Seguridad

Javier García Tobío

Managing Director

Centro de Supercomputación de Galicia

21 de noviembre 2012, Madrid

CESGA MISSION STATEMENT

To provide high performance computing and advanced

communications resources and services to the

scientific community of Galicia and to the Spanish

National Research Council (CSIC), as well as, to

institutions and enterprises with RTD activity.

To promote high quality research in Computational

Science in close collaboration with the research

community from Galicia as well as from other

regions or countries all over the world; contributing in

this way to the advancement of science, to transfer

technology to industry and administrations, and

as consequence, to the wellbeing of society as a

whole.

CESGA BOARD OF TRUSTEES

• Non Profit Foundation

• Regional Government of Galicia

• National Reseach Council of Spain

PARTNERS

CESGA USER COMMUNITY

Universities of Galicia

Regional Research Centres

Spanish National Research Council Centres

Other National and Foreign Institutions:

Hospitals: RTD Departments

Private Companies

Technological Centres

Other Non Profit RTD Centres

Excellence in Management

ISO

9001:2008 Quality Management

UNE166002

R&D Management

CESGA IS:

• Service Provider

Computing e-Learning &

Collaboration tools

Data Storage Technology Transfer to

Industry

Communications GIS

Training Courses

Project Management

PR & Communication

CESGA IS:

Research Centre:

Joint RTD&i Project Promoter

Projects (2001-2011)

-UE 30

-National 19

-Regional 70

-With Industry & Others 31

Total 150

CESGA IS:

Outstanding e-Infrastructures for RTDi

– Computing platforms

– Data storage servers

– Communications network

Evolution of CPU usage

Computing users

RECETGA exchanged traffic

CESGA’S STAFF

CESGA: A selection of significant Projects

Galician Regional Weather Forecasting Service

Galician Regional Weather Ocean Service

More detailed Climate simulations to better inform the Intergovernmental Panel on Climate change (IPCC)

UVIGO

Juan Antonio Añel Cabanelas

Puertos del Estado

Spanish Port Authority

Enrique Álvarez Fanjul

European IBI Area: Ocean Forecasting Service

Oceanographic simulation to better understand fisheries population dynamics

Instituto Español de Oceanografía

Manuel Ruiz Villarreal

Galician Public Health Administration

ULTRASEQUENCING SERVICE: complete genomes sequencing

FGMX – USC – CHUS - CESGA

Ángel Carracedo

Fundación Galega de Medicina Xenómica

Molecular Docking to Design of malaria drugs on the fast track

Scientists Against Malaria

Hugo Gutierrez de Terán

Fundación Galega de

Medicina Xenómica

Molecular Docking techniques aimed at design of Alzheimer drugs

UAB – USC - FGMX

Xavier Daura

Hugo Gutierrez de Terán

Simulation aimed at the optimization of radiotherapy treatment dosage

CHUVI-CHUS-USC-CESGA

Proxecto e-IMRT

New material Design for nuclear plant safety

Instituto de Fusión Nuclear UPM

Sergio Eduardo Courtin Vega

Computational fluid dynamics for new turbine design

CENER

Sugoi Gómez

CTAG : Galician Automotive Technology Centre

Numerical Simulation

for Engineering

Large scale electromagnetism simulation for improved radar systems

UVIGO – UNEX – CESGA

Fernando Obelleiro Basteiro

Exploring complexity to better describe Ecological networks

Estación Biológica de Doñana

CSIC

Jordi Bascompte

European Grid Initiative (EGI): Monitoring & Accounting Service

CESGA DATA CENTRE

FINIS TERRAE SUPERCOMPUTER

CESGA DATA CENTRE: FinisTerrae

PLAN DE EFICENCIA ENERGÉTICA DEL CESGA

33

Análisis de la situación de partida (2008)

34

Puntos existentes que favorecen el ahorro energético • Free Cooling- Enfriadoras

• Recuperación Calor-Enfriadora

• Bomba de calor

Sistema de Climatización

1 2 3 4 5 6 7 8

EQUIPOS L-15

ENFRIADORAS

RECUPERACIÓN

CALOR ENFRIADORA

SALA CPD

GF1

GF2

FAN-COILS

OFICINAS

SIST. PASILLOS

B.C

DEMANDA FRÍO SALA CPD

35

• Detectores de presencia sala CPD

• Lámparas fluorescentes con balasto electrónico zona centra planta primera

Sistema de Iluminación

36

Toma de datos

Esquemas unifilares

Planos del edificio

Datos técnicos y manuales de equipos

Datos de consumos energéticos

Registros de consumos y facturación

37

Medidas eléctricas

1. Interruptor General

2. PP SAI 1

3. PP SAI 2

4. UPS 60

5. UPS 120

6. Climatización CPD

7. Climatización Centro

8. Enfriadora 2

9. SAI Climatizadora 2

10. Interruptor General de

Iluminación

11. Interruptor General

Alumbrado Sótano (IGALS)

12. Iluminación. Exterior

13. Iluminación CPD

14. Iluminación Pasillo

15. Iluminación Planta Baja

16. Iluminación Planta Primera

38

Medidas de iluminación, temperatura y humedad (1/3)

39

Medidas de iluminación, temperatura y humedad (2/3)

40

Medidas de iluminación, temperatura y humedad (3/3)

41

Medidas termográficas

42

Distribución de consumos en el edificio

43

Distribución de consumos de fuerza

44

Distribución de consumos de climatización

45

Distribución de consumos de iluminación

46

Recomendaciones de mejora

Mejoras en el control

Mejoras en la iluminación

Mejoras en la climatización

Mejoras en servidores de computación

Mejoras en el agua

Sustitución de fuentes energéticas

CLIMATIZACIÓN

Enfriadoras: 2 x 580 KW8

Climatizadoras: 8 x 150 Kw

GRUPO y UPS

CIERRE DE PASILLOS FRIOS

CIERRE DE PASILLOS FRIOS

CIERRE DE PASILLOS FRIOS

CIERRE DE PASILLOS FRIOS

CONCLUSIONES: ahorros obtenidos

-Mecanismos de ahorro energético de los

servidores:

33.900 €/año

- Consolidación de nodos SVG:

6.300 €/año

- Consumo discos vs Cintas:

575 €/año

- Free-AIR Cooling:

260.000 €/año

CONCLUSIONES: ahorros obtenidos

- Cierre de pasillos: 6 ºC descenso temperatura y

aumento de temperatura pasillos fríos a 27ºC

105.000 €/año

- Climatizadoras: ventiladores de velocidad variable

30.000 €/año

- Suspensión/apagado automático de nodos inactivos:

22.000 €/año

- Renovación parcial de nodos Finis Terrae

70.000 €/año

TRABAJO ACTUAL Y FUTURO

- Optimización del uso de jerarquías

internas de memoria.

- Planificador de trabajos considerando el

coste del KWh según hora y día.

- Aprovisionamiento de energías

renovables.

CESGA: a way to make EUROPE