HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Delivering Major Minnesota Bridges
Hastings Bridge Design Build ProjectRedundancyand Service Life
March 5, 2013 Vincent Gastoni, PE
MnDOT – ACEC/MN Annual Conference
Leading Together-Innovative Solutions for an Evolving Industry
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Location Map
2
Base Map Source: Google Maps
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Overview - Existing Bridge
3
• Project replaces 1950 steel arch truss
• Lowest 1% in the state for overall sufficiency
• Highway 61 over Mississippi River
• Highest daily two-lane highway traffic volume in the state
• MnDOT Chapter 152 Bridge
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Overview - Aerial Plan
4
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Overview - Design-Build Process
• Design-Build SOQ Issued: October 2009
• Design Build Selection: June 2010
• MnDOT identified two acceptable alternatives
• RFP allowed Alternative Technical Concepts (ATC’s)
• Design Build Team:
5
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Overview - Design-Build Process
INNOVATIVE RFP FEATURES
• Alternative Technical Concepts (ATC’s)– Allow innovation and flexibility
• Pre Approved Elements (PAE)– Reduce risk and provide best value opportunities
o Redundancy Concepts for the Main Structure Segmento Scour Analysis Methodo Bridge Fixity and Thermal Expansion of Bridge No. 19004o Refined Analysis Method
6
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Overview - Design-Build Process
TECHNICAL PROPOSAL SCORING
• Bridge 34 Points
• Environmental Management 6 Points
• Maintenance of Traffic 5 Points
• Public Communications 2 Points
• Schedule 3 Points
7
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Project Overview - Design-Build Process
TECHNICAL PROPOSAL SCORING
• Bridge 34 Points
– Durability/Quality of Bridge No. 19004 13 Points
– Inspection/Maintenance 9 Points
– Geotechnical 5 Points
– Erection of Bridge No. 19004 4 Points
– Demolition of Bridge No. 5895 3 Points
8
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
SCORING DRIVES INNOVATION
• Selection =
Bid Price Technical Score
Project Overview - Design-Build Process
9
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
SCORING DRIVES INNOVATION
• Selection =
• Win Strategy=
Bid Price Technical Score
Minimize Bid PriceMaximize Technical Score
Project Overview - Design-Build Process
10
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
SCORING DRIVES INNOVATION
• Selection =
• Win Strategy=
• Use innovative ATC’s & PAE’s to:– Minimize Risks– Optimize Design Solution
Bid Price Technical Score
Minimize Bid PriceMaximize Technical Score
Project Overview - Design-Build Process
11
Need A Better Mouse Trap
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Design-Build Process – Base Concepts
MnDOT RFP Baseline Options
12
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Design-Build Process – Base Concepts
MnDOT Cable Stayed Option
13
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Design-Build Process – Base Concepts
MnDOT Arch Option
14
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Base Concept Evaluation
• Evaluate Base Designs
– Preliminary engineering analysis
– Cost estimating exercises
• Produce Comprehensive Evaluation Matrix Tool
– Material costs & risks
• Develop Alternative Designs
15
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovation – Develop Alternatives
• Evaluate Alternative Designs
– Prescriptive design/performance criteria
– Aesthetic requirements
– Technical scoring criteria
– Cost & schedule impacts
• Add to Comprehensive Evaluation Matrix Tool
• Develop Overall Best Value Technical Approach
16
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovation – Develop Alternatives
Lunda/Ames-Parsons Alternatives
17
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovation – Develop Alternatives
•
18
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovation – Develop Alternatives
•
19
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Winning Alternative
20
Project Architect: Bradley Touchstone, Touchstone Architecture
• Successful Proposal-Free Standing Tied Arch $120M
• 545 ft. Main Span
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Winning Alternative
21
Project Architect: Bradley Touchstone, Touchstone Architecture
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Visual Quality Process & Color Selection
22
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Aesthetic Lighting
23
Lighting Design: Illumination Arts
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Concrete Tie
• Best value solution
• Higher level of redundancy
• Ease of inspection/maintenance
24
• More durable than steel box
• No shop assembly and fit-up issues
• Active tension control
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Concrete Knuckle
• Framed into pier and rib
• Improved durability/fit-up
25
• Post-tensioned anchorage
• Highly redundant
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features – Steel Box Arch Rib
• Aesthetically pleasing
• Improved maintenance
26
• Simplified fabrication
• Best Value solution
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Floor System Redundancy
27
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
28
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
29
• Build low
TEMP TIE & FORMS
TEMP BRACING
FLOOR SYSTEM
ARCH RIB
TEMP LIFTING CONNECTION
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
30
• Build Low On Land
TEMP TIE & FORMS
TEMP BRACING
FLOOR SYSTEM
ARCH RIB
TEMP LIFTING CONNECTION
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
31
• Build Low On Land
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Erection
32
• Move onto Barges Using SPMT’s
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
33
• Move onto Barges Using SPMT’s
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
34
• Float
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
35
• Float
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
36
• Skid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
37
• Skid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
38
• Skid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
39
• Lift
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
40
• Lift
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
41
• Lockoff
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Innovative Features - Erection
42
• Get Some Sleep
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Other Innovative Features
43
• Column Supported Embankment
• Long Span Precast Concrete Beams
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Other Innovative Features
44
COLUMN SUPPORTED EMBANKMENT• 4” over 25 years• CSE -10’x10’ Pile Grid• Conc. Caps• Sand/Geogrid
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Other Innovative Features
45
LONG SPAN PRECAST BEAMS
• Precast Pretensioned Concrete Beams
• 5 Spans of 9-Girder Lines
• 173’-7” Long Span
• Longest Beam Overall length = 174’-3”
• Innovative beam design became the basis of MnDOT’s new MW Long Span Precast Concrete Beam Standards
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Other Innovative Features
Photos: Joel Mich, Cretex
46
LONG SPAN PRECAST BEAMS
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Other Innovative Features
Photos: Joel Mich, Cretex
47
LONG SPAN PRECAST BEAMS
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Other Innovative Features
48
LONG SPAN PRECAST BEAMS
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Summary
49
• Innovative RFP Process
• Best Value Approach Drives Innovation
• MnDOT Partnering in Innovation
• Continued Commitment to Innovation
HASTINGS TIED ARCH BRIDGE | REDUNDANCY AND SERVICE LIFE
Thank You
50