Who are we?
Capitol Complex Architects
Supports our building’s tenants spatial needs as well as requesting and implementing controlled maintenance and capital construction projects.
Division of Capital Assets
• State Capitol Building
• Governor’s/Executive Residence
• 14 Office Buildings
• 1 Multi level parking garage
• Camp George West grounds
• Lincoln Park - 14th & Lincoln St.
& multiple parking lots
DPA State Buildings
Capitol Complex – Denver Campus• Power Plant
• HSB
• Capitol Building
• LSB
• Capitol Annex
• Centennial
• Parking Garage
• SOB
• SSB
• 1570 Grant
Outside Downtown Denver Locations• 1881 Pierce, Lakewood• 690 & 700 Kipling, Lakewood• Governor Residence• Carriage House• Camp George West, Golden• North Campus, N. Denver• State Services, Grand Junction
DPA – EPC 2002 - 2013
Phase I• Investment grade audit reviewed all DPA
assets and delivered a shopping list/aka Energy Conservation Measures.
• HVAC upgrades
• Interior lighting
• Energy management systems –EMS/BAS
• New boiler plant – Xcel
• Chilled water loop upgrades
DPA – EPC 2002Phase I
ENERGY COSTS /YR. PRIOR TO EPC
• ELECTRICITY $2M
• NATURAL GAS $51K
• STEAM $368K
• WATER/SEWER $96K
– TOTAL $2.6M
Phase IEnergy Conservation Measures
28 ECM’s Identified$9.3M
• 28 ECM’s Identified during IGA
• Replace T12 fluorescent w/T8 fluorescent & electronic ballast
• Replace incandescent with Compact Fluorescent
• Water
• VFD’s
• Building Envelops
• CHW Optimization
• DDC Controls
• ERCM
• Power Plant Boiler
Phase II$4.5M
• Lighting Controls
• DDC Controls
• CDLE
• Power Plant Chiller
• 690 Kipling Mechanical
Phase III$9.2M
• Geothermal & GSHP – Governor’s Residence
• Boilers – GJ State Services Building
• CRAC Units – 690 OIT & CBI Data Centers
• Photo Voltaic – 1881
• Photo Voltaic – State Capitol Building
• Condensing Boilers – HSB, LSB, SSB & 1570 Grant
Phase IV$4.6M DOE ARRA Grant
$1.4M EPC
• Geothermal State Capitol BuildingOpen Loop System
• 1 – 2 supply wells• 1 – 2 recharging wells• 800 + feet to Arapahoe Aquifer• Provide infrastructure for future
expansion of the system• Reduce Capitol’s operating costs by
more than $100,000 per year.
New EPC 2019
• Governor’s 2040 Goal
• DPA’s 2020 Goal 100% LED’s all Capitol Complex Buildings
• IGA Phase I Complete
• Replace all fluorescent bulbs with LED
• Retrofit LED kits - Centennial Building & NC
• IGA Phase II Centennial Building HVAC distribution
• Window & Exterior Insulation Commissioning – Centennial Building
• Chiller Plant & Chilled Water Loop Commissioning – Power Plant
• Other ECM Phase II Opportunities
EPC Benefits
• Replaces old equipment with modern state of the art energy efficient technology
• Replaces old pneumatic technology with DDC control systems
• Systems integration through energy management technology
• Provides funding steam for larger capital projects
EPC Contributions
• 30% reduction in projected energy costs
• More than $8M in utility cost savings to date
• 41,368 metric tons of carbon emissions offset, the equivalent to removing 8,858 cars from the road for a year
• LEED-EB of five buildings
• 1st State Capitol Building in the nation to be LEED certified
Larger Capital Projects
• DPA Funding Request demonstrates combination of EPC, CM, CC and COP’s for building renovation
What Motivated DPA to pursue multi-phase EPC’s
• seeing the performance of the project with guarantees.
• EPC provides less risk as contract costs are locked in and performance of the system backed by the guarantee so savings persist.
• ‘low-hanging’ fruit in phase I LIGHTING produced quick energy savings during guarantee 3 year period.
• Excess savings from Phase I and Phase II helped fund phase III.
• PV Xcel had good incentives that were leveraged and rebates of course in each phase.